Method Statement for Formwork Reinforcement Bars and


Ready Mix Concrete Work
DOWNLOAD

This method statement covers the scope of work including the placement of formwork, reinforcement bars
and ready mixed concrete.

Arrange following equipment before start of the work:

• Batching Plants 1-2


Mobile Concrete Pumps 1-
4 Truck-mixers 1-8
Air Compressor 1-3

.
Latest Method Statements Mobile Water Tank
1 Diesel Generator

rl
1

Risk Assessments

Risk: Falling from height


Action: Personnel to be 100% tied-off when working outside of
Fire Temporary handrails or on incomplete scaffolding or walkways while
Sprinkler Traffic Drainage participating in their erection. Handrails to be fitted to
System Management Piping and stairways walkways
Installation Plan& Underground
Installatio
n
Method Method Method Risk: Vehicles and mobile plant and equipment driving or working too close to work area or
Statement Statement Statemen
for t Striking of equipments
Constructio
n Project Action: Banksman to be employed for equipment traff c.
Sites
Risk: Working with Concrete; and Contact with concrete, burns to the skin

i
r;,Rsafeil Action: Necessary PPE must be worn and provided at all times when working with additive (gloves,

i'.1
[i;
· safety glasses, face mask etc.)

Proiect HSE Mechanical Soecific


https://www.googleadservices.com/pagead/aclk?sa = L&ai=C56LURiPpYvXSCljaowPq1bj4DPOM_9Rmxvm8m80Ps7zdy7oYEAEgzKGfeGOly4GFtBegAZ2w 7qEDyAECqQKV 1x2gjS6xPqgDAcgDyQSqBKoCT9BOVWTOpm6WXGWVD EEJTeXsk 1D2hn3aife1XumQPESJG3sv·wYsXP7pq 1hkrBhnPVkAZOQ70CCJ9pt
6EJoAyh8G17n8nYmU8tyy9plzi:xUM5q2tEOtFAhAXsFs •.

-
• Firefox lnstaller.exe El El msjkr.20800.200S.pdf pdfcoffee.com_wo....pdf Show all X
msjkr.20800.2005....pdf
•••• " ENG

0 UK
' --
--
LJ, x

· ----
7 C ii
iprojectmanagement123.com
Action: Necessary PPE must be worn and provided at all times when working with additive (gloves,safety
/method-statement-for-formwork-reinforcement-bars-and-ready-mix-concrete-work/
; glasses,face mask etc.)
Project HSE Mechanical Spec ific
Training, Equipment Gravity Risk: Access between areas can be poor
and Awareness Inspection Water
Action: Access equipment and structures should be assembled,which makes access easier.
and Checklists Absorption
Competence During Aggregate
Procedure Construction Testing Formwork Procedure
Project Method
Lifecycle
Formwork system which gives an advantage of combining speed and qual ty of construction willbe used.

The vertical load carrying members will be made of steel whereas the horizontal members will be of plywood
inserted two wooden beams thereby forming a web flange.
Document Categories
111 CivilMethod Statements (65) Allthe formwork and support systems will be designed for the loads coming during the actual execution
stage.
111 Construction Definitions (3)

111 Electrical Engineering (2) Allthe members in the formwork and the support system will be designed as per the relevant codes
111 Electrical Method Statements (3) and standards.
111 HSE Procedures (4)
In case of a wall formwork system the H-Beams along with steel components are assembled to form a very
111 Job Description (4)
convenient and safe formwork system up to the sub structure levels.
111 Job Safety Analysis (6)

111 MechanicalMethod Statement (13) The wall formwor k facilitates fixing of working platforms for access,checking of reinforcement, concreting
etc.
111 Project Management (48)

111 Project Management Procedures (17) The formwork panel along with the work ing platform and alignment systems can be lifted as a single
111 Project Specifications (9) unit using a crane thus the labor involved in each operat on of erection and de-shuttering is reduced
111 Project Templates (18) to a

111 Risk Assessment (7) minimum.

111 Road Work (6)


Formworks shall have adequate bracing and support to carry the concrete load and other loads
foreseen prior to and during concreting.

Proper access (scaffolding,ladders,etc.) and working platforms will be provided for elevated formwor ks.
Editable Documents
r.!ltPanriP
The wall formwor k system can handle very large pressures generated due to pumping of concrete. The
https://www.googleadservices.com/pagead/aclk?sa =L&ai=C56LURiPpYvXSC ljaowPq1bj4DPOM_9Rmxvm8m80Ps7zdy7oYEAEgzKGfeGOly4GFtBegAZ2w 7qEDyAECqQKV 1x2gjS6xPqgDAcgDyQSqBKoCT9BOVWTOpm6WXGWVD
1hkrBhnPVkAZOQ70CCJ9ptl6EJoAyh8G17n8nYmU8tyy9plzi:xUM5q2tEOtFAhAXsFs...
EEJTeX sk1D2hn3aife1XumQPESJG3sv·wYsXP7pq UK
II
x
• 7 C lnstaller.exe
Firefox El msjkr.20800.2005....pdf El msjkr.20800.2005.pdf
iprojectmanagement123.com/method-statement-for-formwork-reinforcem ent-bars-and-ready-mix-concrete-
pdfcoffee.com_wo....pdf Show all X
work/

•••• 0
- " ENG
x

CivilMethod Statements
Electrical Method Statements All embedded items shall be supported against displacement; reinforcement shall be secured with adequate
Mechanical Method Statements number and type of spacing.
Discounted Method Statement Packages
Columns, Beams, Concrete Walls,Footings and Foundations
Plumbing Method Statements
HVAC Method Statements Scaffolding system (including wooden shuttering beam s, shuttering boards -plywood- and supporting
Project Plans systems) wh ich shall be erected for foundations, columns, beams and concrete wa lls.For footings and grade
Testing and Commissioning Method beams a simpler system sha I I be used which consist of shuttering board s and supporting systems.

Statements Project Management Foundations shall be placed on lean concrete and sub-grade compaction and strength resu lts shall be
Commercial & Finance Management obtained prior to lean concrete. Concrete shall be placed in formwork;casting against soil is not permitted .
Procedures Corporate Management Procedures
Concrete shall not be placed directly in standing water.
HSE Procedures
Construction Risk Assessment Following the concreting of footings/found ations, place formwork and reinforcing bars for the column
Quality Management and finish concreting for the columns. Waterproofing will be done as per the specification.
Procedures Fire Fighting After the columns are cast. formwork will be placed for the suspended slabs and the beams, reinforcement
Method Statements will be tied and the concreting will be done.

Slabs
Meta
Log in H-Type scaffold ing system shall be used in slabs. It shall be erected near one of the walls as a single row. The
Entries feed forkheads shall be placed on the top of H-Type System.
Comments
Then the shuttering beams into the forkheads and, the shuttering boards by plywood shall be erected above
feed
them.
WordPress.org
Erection of Formwork and Support System

The Table formwork shall be erected using the Crane. Al l alignments & levels shall be checked & The
Visitor Stats


formwork shall be erected using the mobile crane.
299,961 Visitors
All alignments & levels shall be checked & verified from established datum on the project site. Concrete
edges shall be chamfered.

hic-m-'!llntlina nf r:nrmwnrl, '!Intl C::unnnrt C::uC'tDm

• Firefox El msjkr.20800.2005....pdf El msjkr.20800.200S.pdf pdfcoffee.com_wo....pdf Show all X


lnstaller.exe

•••• 0 :..
UK
" ENG
U
x
7 C iprojectmanagement123.com/method-statement-for-formwork-reinforcem ent-bars-and-ready-mix-concrete-
work/

Allalignments & levels shall be checked & verified from established datum on the project site. Concrete
edges shall be chamfered.

Dismantling of Formwork and Support System

Once the concrete achieves the required strength, the formwork shall be dismantled. The minimum
duration for dismantling of formwork shallbe in accordance with the standards and civilworks spec
ification.

The Dismantling shall be done in a pre planned manner leaving the required number of props in position till
the concrete attains its required strength.

Formwork material shall be handled by mobile crane,where access is avai able.

Concrete repairs shall be done immediately after the removal of formwork. For underground bituminous
coating shall be carried out prior to commencement of backfilling and after minor repairs are done.
Concrete repair method shall be submitted with separate work method statement.

Reinforcing Rebar Works


The reinforcing bars in conformity with the valid drawings shall be used in the construction. Steel
workers shall bend all rebar under supervision of the foremen.

These foremen have to organize bending works according to the valid revision of related project. After that
steel fixers shall install all reinforcing steel.

Erection of rebar shalltake place in layers from bottom to top,and the embedded items (if exist) shall be
installed at the required level.

Installation of Embedded Items


Allbox-outs shall be wooden elements, and shall be fixed to the rebar temporarily. The installation of


bowouts shall be done in accordance with the drawings during the rebar production by the supervision
of site manager.

supervision of survey group.


Allplates and other embedded items shall be installed and f ixed on the surface of the reinforcement under

• Firefox lnstaller.exe El msjkr.20800.2005....pd f El msjkr.20800.2005.pdf pdfcoffee.com_wo....pdf Show all X


x
7 C iprojectmanagement123.com/method-statement-for-formwork-reinforcement-bars-and-ready-mix-concrete-
work/

•••• 0
- " ENG

U
x
7 C iprojectmanagement123.com/method-statement-for-formwork-reinforcem ent-bars-and-ready-mix-concrete-
work/

Concrete Production/Transportation / Placing


Ready mix concrete supplied by the ready mix concrete supplier willbe used for concreting. The design mix
and materials for the grade of concrete specified willbe prepared by the ready-mix concrete supplier's
laboratory and will be approved by clients.

Admixtures as specified in accordance with the Technical specifications will be added to the concrete
during mixing. The concrete will be transported by transit mixer and pumped to the locations.

Maximum allowable transport duration for ready mix concrete shall be in accordance with related standards
and technical specifications.

The operation of placing and vibrating are interdependent and will be carried out almost
simultaneously. They are most important for the purpose of ensuring the requirements of strength,
impermeab ility,and durability of the hardened concrete in the structure.
111'11'"1'!'11•

Care will be taken to place the concrete as close as possible to its final position (max free fall 1.5 m)


so that segregation is avoided and the concrete can be fully compacted.

in the specific work method statements,so that the concrete can be placed without segregati on.
Wherever required for foundation or deep concreting, necessary precautions will be taken as will be defined

-
• Firefox lnstaller.exe El msjkr.20800.2005....pd f El msjkr.20800.2005.pdf pdfcoffee.com_wo....pdf Show all X

" ENG

•••• 0 UK
x
7 C iprojectmanagement123.com/method-statement-for-formwork-reinforcem ent-bars-and-ready-mix-concrete-
work/
For concrete to be placed above ground, concrete pump with pipe line of required capacity & height will
be used.

Concrete will be discharged in pour point in uniform layers and vibrated by adequate type of vibrators as
will be defined in the specific work method statements.

The process of compacting concrete by vibration consists essentially of the elimination of entrapped air and
forcing the particles into a closer conf guration.

Concrete finish shall be done in accordance with approved IFC drawings submitted by contractor.

Method of "Concrete works in cold weather" shall be submitted with a separate work method

statement.

Concrete Curing Plan

In order to obtain good quality concrete,the placing of an appropriate mix willbe followed by curing in
a suitable environment.

Curing shall be done using potable water complying with applicable standards.

Allfreshly placed concrete surfaces will be protected from damages and from harmful effects of weather

including rain,sun & Wind. Concrete surfaces will be covered or protected for curing using hessian or
PE sheet.

Horizontal surfaces shallbe covered with PE sheeting or hessian,which shall be in contact with concrete
surface,with the edges lapped or tied down to exclude air circulation.

Generally curing willbe done up to period as per the relevant code to achieve the required strength. Curing
shall commence immediately after finishing and shall be done as per standards.

Construction Joint

Constructionjoint will be provided as required during construction in accordance with standards and •••
technical specifications shown as per the RFC drawings.

Constructionjoint will be prepared to achieve good bonding between old and new concrete by removing
laitance and to expose top surface or aggregate without damaging I dis lodgi ng of aggregate .

• Firefox
El msjkr.20800.2005.pdf

lnstaller.exe
U " ENG
x
7 C iprojectmanagement123.com/method-statement-for-formwork-reinforcem ent-bars-and-ready-mix-concrete-


work/

Show all

X
x
7 C iprojectmanagement123.com/method-statement-for-formwork-reinforcem ent-bars-and-ready-mix-concrete-
work/

Control Measures
For all works, excavation (for ground works),lean concrete (if needed),earthing (if needed), embedded
parts (anchors and plinths) and shutter checks shall be done before concreting by Survey team.
Embedded parts (anchors and plinths) check shall be done after concreting by Survey Team. (survey
check)

Abrams cone test and temperature monitoring shall be done to fresh concrete by concrete producers
technicians under controlof QC Team on the site.

Enough concrete samples shall be taken by concrete producer's laboratory under control of QC
Team according to TS 206-1.Concrete pouring records including information about fresh
concrete shall be prepared by QC team.(QC check)

Concrete Strength Test for 7 days and 28 days shallbe done by concrete producers' officially accredited
laboratory for compressive strength. (QC check)

Concrete strength test for 24 hr or 3 days shall be done for the planning of formwork stripping.

If required, QC team shall control the temperature of the hardened concrete for required period.(QC check)

• Firefox lnstaller.exe El msjkr.20800.2005....pd f El msjkr.20800.2005.pdf


Sharing is Cari ng:

if iiMfii
pdfcoffee.com_wo....pdf
J9..'!'.lhalsApp


Show all X

-
U

•••• 0 U
" ENG

You might also like