Scope of Works:

BOM:
1.
2.
3.
FOC Installation (24F Core)
Fiber Distribution Box
ODF Splicing and Termination
PROPOSED FTTX PLAN OF
4.
5.
FOC End to End Testing
Acceptance DILIMAN COMMERCIAL CENTER

Pullback Cable Installation Guidelines:


PCN: EPNQCBB201000576G-2010
Cable Laying Procedure:
DISTRICT:
1. Unroll the cable by the pay-off stand
release cable in figure 8 shape on the floor. PROVINCE: METRO MANILA
2.
3.
Cut the cable to the required total length.
Relieve the twist and set the cable as
MUNICIPALITY: QUEZON CITY
straight as possible. If the space is limited, BARANGAY:
settling the cable in U-Track is
recommended.
4. Fix the fiber cores on the cable sheeth with
adhesive tape at the top end of the cable.
5. Lay the cable from the top floor to the
basement through the bus duct without any
twist.
6. Identify the maintenance loop for proper
placement.
7. Fix the cable in bus duct with tie rope.
8. Fix the top end. Create loops and remove
the adhesive tape to free the cable core.

Midspan Access
1. Create an extraction window where fiber
core will be routed to the NAP.
2. Create a pick window in a higher level.
Make sure the distance between the
window will cover the length between
extraction window and the user or core in
the NAP.
3. Select the required fiber cores in the pick
window and cut off. LINK LOSS BUDGET
4. Pull the selective fiber core back from the LINK BUDGET LOSS @ 1550nm 0.25db/km
extraction window and lay them to the ONU ODF ODF TO Splice in Splice in LCP-NAP Splice in NAP Active joint
LCP(1:8) NAP(1:8)
or NAP. Connector
0.3db/Each
LCP
0.25db/Km
LCP
0.05db/Each
10db/Each
LCP
0.05db/Each
Fiber loss
0.25db/Km
0.05db/Each
10db/Each
in NAP TOTAL(db)
0.5db/Each
5. For complex scenario, special protection
are required on the set up to prevent fiber N/A
Dome-Type Closure N 8 Single NAP
Equipment Rack Cable Ladder
break, no trace and high loss. LOOP N 16 Double NAP
LINK BUDGET LOSS @ 1490nm 0.30db/km
Pipe (PVC)
N 32 Four NAP Wall-mounted ODF
Point to remember during installation ODF ODF TO Splice in
LCP(1:8)
Splice in LCP-NAP Splice in NAP
NAP(1:8)
Active joint
Grounding System L 8 LCP Hanger Lop
Connector LCP LCP LCP Fiber loss 0.05db/Each in NAP TOTAL(db) Rack-mounted ODF
10db/Each 10db/Each Flexible Metal
1. This cable should not be twisted during the 0.3db/Each 0.3db/Km 0.05db/Each 0.05db/Each 0.3db/Km 0.5db/Each 24F/48F Pull Back Cable
Metal Enclosure Fiber Distribution Box (FDB) Conduit (FMC)

whole installation. N/A


2. For cable laying in vertical tube, pulling rope
is recommended and tension should be LINK BUDGET LOSS @ 1310nm 0.36db/km Dome-Type Closure DIGITEL/SMART Pole W Electric Pole (Wooden)
observed not to exceed as what the specs ODF ODF TO Splice in Splice in LCP-NAP Splice in Active joint LOOP PLDT Pole (Cirular Conc.)
Steel Electric Pole (Steel)
LCP(1:8) NAP(1:8)
prescribed.
CC
Connector LCP LCP LCP Fiber loss NAP in NAP TOTAL(db) Manhole
10db/Each 10db/Each Grounding System
0.3db/Each 0.36db/Km 0.05db/Each 0.05db/Each 0.36db/Km 0.05db/Each 0.5db/Each PLDT Pole (Wooden)
3. Proper bending must be observe (10D Extended messenger wire
W

Central Office
Electric Pole (Conc. Square)
Aerial FOC CS

during installation and 20D under N/A ODF


Underground FOC Electric Pole (Conc. Circular) Proposed Pole
operation.) CC
LCP/NAP TABLE
LCP/NAP ID LATITUDE LONGITUDE REMARKS
LP1 ACTIVE

LP1NP1 14.682074153372897 121.0855028955438 ACTIVE

LP1NP2 ACTIVE

DILIMAN COMMERCIAL CENTER


A LCP/NAP TABLE
NTS
2/6
Scope of Works:
Site Location:
● FOC Installation (24F Pullback Cable)
● ODF Installation
● LCP/NAP Installation
● FOC End to End Testing
● Acceptance

DILIMAN COMMERCIAL
CENTER

Single Line Diagram / Inter Office Trunk:

Dome-Type Closure DIGITEL/SMART Pole W Electric Pole (Wooden)


Steel Electric Pole (Steel)
LOOP PLDT Pole (Cirular Conc.)
CC

Grounding System Manhole


PLDT Pole (Wooden)
W
Extended messenger wire Central Office
Electric Pole (Conc. Square)
Aerial FOC CS

ODF
Underground FOC CC
Electric Pole (Conc. Circular) Proposed Pole
L8 N 16

Dome-Type Closure N 8 Single NAP DILIMAN COMMERCIAL CENTER


Equipment Rack Cable Ladder
LOOP N 16 Double NAP

N 32 Four NAP Wall-mounted ODF


Pipe (PVC)
B RISER DIAGRAM
Hanger Lop NTS
Grounding System

24F/48F Pull Back Cable


L 8 LCP Rack-mounted ODF
Flexible Metal
4/6
Metal Enclosure Fiber Distribution Box (FDB) Conduit (FMC)
PROVISION 2"Ø FMC W/ C-CLAMP
(C/O TAILING OF DILIMAN)

PROPOSED FDB (400X310X105mm)


W/ LCP (1*1:8) & NAP (2*1:8)

PROPOSED 24F PULLBACK CABLE


PROPOSED 2"Ø FMC W/ C-CLAMP
PROPOSED 24F WALL-MOUNTED ODF

AUXILLIARY ROOM | LG
M
O
O
R

LG
Y
R
A
LI
IL
X
U
A

DILIMAN COMMERCIAL CENTER Dome-Type Closure N 8 Single NAP


Equipment Rack Cable Ladder

C ODF & LCP/NAP DETAILS LOOP N 16 Double NAP

N 32 Four NAP Wall-mounted ODF


Pipe (PVC)

NTS Hanger Lop


5/6 Grounding System

24F/48F Pull Back Cable


L 8 LCP Rack-mounted ODF
Flexible Metal
Metal Enclosure Fiber Distribution Box (FDB) Conduit (FMC)
Expansion Sleeves

Expansion Bolt

CONCRETE
ODFLCP/NAP

Expansion Bolt

Drilling

DILIMAN COMMERCIAL CENTER


D ODF & LCP/NAP INSTALLATION
NTS
6/6