BOM:
1.
2.
3.
FOC Installation (24F Core)
Fiber Distribution Box
ODF Splicing and Termination
PROPOSED FTTX PLAN OF
4.
5.
FOC End to End Testing
Acceptance DILIMAN COMMERCIAL CENTER
Midspan Access
1. Create an extraction window where fiber
core will be routed to the NAP.
2. Create a pick window in a higher level.
Make sure the distance between the
window will cover the length between
extraction window and the user or core in
the NAP.
3. Select the required fiber cores in the pick
window and cut off. LINK LOSS BUDGET
4. Pull the selective fiber core back from the LINK BUDGET LOSS @ 1550nm 0.25db/km
extraction window and lay them to the ONU ODF ODF TO Splice in Splice in LCP-NAP Splice in NAP Active joint
LCP(1:8) NAP(1:8)
or NAP. Connector
0.3db/Each
LCP
0.25db/Km
LCP
0.05db/Each
10db/Each
LCP
0.05db/Each
Fiber loss
0.25db/Km
0.05db/Each
10db/Each
in NAP TOTAL(db)
0.5db/Each
5. For complex scenario, special protection
are required on the set up to prevent fiber N/A
Dome-Type Closure N 8 Single NAP
Equipment Rack Cable Ladder
break, no trace and high loss. LOOP N 16 Double NAP
LINK BUDGET LOSS @ 1490nm 0.30db/km
Pipe (PVC)
N 32 Four NAP Wall-mounted ODF
Point to remember during installation ODF ODF TO Splice in
LCP(1:8)
Splice in LCP-NAP Splice in NAP
NAP(1:8)
Active joint
Grounding System L 8 LCP Hanger Lop
Connector LCP LCP LCP Fiber loss 0.05db/Each in NAP TOTAL(db) Rack-mounted ODF
10db/Each 10db/Each Flexible Metal
1. This cable should not be twisted during the 0.3db/Each 0.3db/Km 0.05db/Each 0.05db/Each 0.3db/Km 0.5db/Each 24F/48F Pull Back Cable
Metal Enclosure Fiber Distribution Box (FDB) Conduit (FMC)
Central Office
Electric Pole (Conc. Square)
Aerial FOC CS
LP1NP2 ACTIVE
DILIMAN COMMERCIAL
CENTER
ODF
Underground FOC CC
Electric Pole (Conc. Circular) Proposed Pole
L8 N 16
AUXILLIARY ROOM | LG
M
O
O
R
LG
Y
R
A
LI
IL
X
U
A
Expansion Bolt
CONCRETE
ODFLCP/NAP
Expansion Bolt
Drilling