You are on page 1of 31

Dates : Name : Reference :

Approval Return Status

Comments

SigN Date

SigN.

SigN.

SigN.

SigN.

SigN.

SigN.

A SigN. 2016/12/30 First Issue GFE.


DXW HXN LPH

REV ESTABLISHED CHECKED APPROVED DATE MODIFICATIONS STAT.

VIETNAM ELECTRICITY
TRI AN HYDROPOWER COMPANY
LOT NO.5:“DESIGN,MATERIAL,EQUIPMENT SUPPLY AND
TECHNICAL SERVICES”
CONTRANT NO:99/HD-TDTA/ALSTOM

PURCHASER: SUPPLIER:

ALSTOM-HYDRO

CSCS
CONTROLOG FUNCTION TEST PROCEDURE

SCALE SIZE
SUBSUPPLIER:
A4

REV. SH/SH END N of S

H-10207 99 CKA 00-102F DC 1/31 31


A
MODIFICATIONS TABLE

REV ESTABLISHED CHECKED APPROVED DATE MODIFICATIONS Status.

A DXW HX LPH 2016/12/30 FIRST ISSUE GFE

CSCS CONTROLOG FUNCTION TEST PROCEDULE 2/A


Table of Contents

1. ORGANIZATION OF THE ACCEPTANCE TEST SESSION ........................................... 4 

1.1  AIMS .......................................................................................................................... 4 

1.2  PROCEDURE ............................................................................................................ 5 

1.3  PROJECT VALIDATION ENVIRONMENT ............................................................... 6 

1.3.1 Project characteristics................................................................................................... 6 

1.3.2 Configuration.................................................................................................................. 6 

2. ACCEPTANCE TEST FORMS ........................................................................................ 7 

2.1  STEP: FUNCTIONAL TESTS ................................................................................... 7 

2.1 .1 Sub-Step: Supervision functions ................................................................................. 7 

2.1 .2 Sub-Step: Data management ....................................................................................... 11 

2.1 .3 Sub-Step: Alarms .......................................................................................................... 13 

2.1 .4 Sub-Step: Control functions ........................................................................................ 16 

2.1 .5 Sub-Step : Printer outputs ........................................................................................... 18 

2.1 .6 Sub-Step : HISTORIAN Function ................................................................................. 20 

2.1 .7 Sub-Step : Gateway IEC101/104 function ................................................................... 22 

2.2  STEP: SYSTEM TESTS .......................................................................................... 24 

2.2 .1 Sub-Step: Administration Center ................................................................................ 24 

2.2 .2 Sub-Step: System .......................................................................................................... 27 

2.2 .3 Sub-Step: Controcad Engineering Tool ....................................................................... 28 

CSCS CONTROLOG FUNCTION TEST PROCEDULE 3/A


1. ORGANIZATION OF THE ACCEPTANCE TEST SESSION

1.1 AIMS

The document to be validated is the system considered from the functional point of
view in conformance with the Standard General Technical Specifications.
The aim of the session is to verify:
- The functional aspects
- The system management aspects
• System start-up/shutdown,
• Maintenance tools
• Redundancy management,
• Gateway functions (IEC60870.5-101/104)

CSCS CONTROLOG FUNCTION TEST PROCEDULE 4/A


1.2 PROCEDURE

At the start of the session, AHC hands over the pre-acceptance document to the
customer. This document is identical to the Acceptance Test Book and demonstrates
that AHC has already run all the tests. The customer then indicates which of the tests
in the book he wishes to verify.
The different Acceptance Forms are passed in the order defined in the Acceptance
Test Book.
As the tests proceed the forms are completed with the following information:

• initial conditions,
• results observed,
• result of the step: accepted, refused, accepted with reservation,
• any remarks.
For each step or sub-step, the full series of results is entered on an Acceptance Test
Report Form. Any anomalies are entered on an Anomaly Report (RA) and indexed on
the Acceptance Test Report Form.

Completing an Anomaly Report (RA)


When an error is observed, it is necessary first to check whether the anomaly is due to
an incorrect action or to the test procedure itself. In which case, the procedure is re-
executed after rectification.
If the anomaly is clearly identified as such, the possible solutions to the problem must
first be envisaged before the authorized representatives appraise the level of seriousness
of the error:
- Reservations associated to application data may be corrected during the session,
- Reservations associated to the ALSPA HMI software version (Kernel and
CIS functions) must be corrected in the next version. These
reservations must be verified at provisional acceptance at the latest.
In this Anomaly Report document (see remark page) the serious level shall
be precise according to the following criteria:
- blocking problem which blocking exploitation of control system (example: system shutdown),
- major error on not critical function (example: unsatisfactory operation),
-minor anomaly not prevent a function of ALSPA CONTROPLANT DCS (example: documentation)
Closing the session
The Acceptance Test Session is completed by a report written by the session manager.
The report is written up from the Report Forms.

CSCS CONTROLOG FUNCTION TEST PROCEDULE 5/A


1.3 PROJECT VALIDATION ENVIRONMENT

1.3.1 Project characteristics

PROJECT TRI AN

Project type Hydro

ALSPA CONTROPLANT Serial 6.3


RELEASE LX 6.3
MFC3000 MFC3000_2.3.
11186

CE1500

CP1485-1 - CPU NA
ALSPA HMI - VERSION 6.3.17

CONTROCAD VERSION 5.3.5 sp1

1.3.2 Configuration

The test platform will be composed of the ALSPA CONTROPLANT Serial 6 system of this project.
Please refer the doc:
H-10207 00 0EA00-001F FA-CSCS SYSTEM CONFIGURATION DIAGRAM

CSCS CONTROLOG FUNCTION TEST PROCEDULE 6/A


2. ACCEPTANCE TEST FORMS

2.1 STEP: FUNCTIONAL TESTS

The aim of this step is to review the supervision functions described in the documents
below:
- PTP 20A48014
ALSPA Series 6 CONTROPLANT Hydro DCS LX Architecture

2.1 .1 Sub-Step: Supervision functions

Supervision functions are presented in detail in the following documents:


- GFR-020C04020-EDC-200073-en-B
ALSPA HMI - V6 - Workspace - Reference Manual

- GFR-020C04020-EDC-200092-en-A
ALSPA HMI - V6 - Bargraphs & Trends Viewers - Reference Manual

- GFR-020C04020-EDC-200082-en-A
ALSPA HMI - V6 - Y=f(x) Curve Viewer - Reference Manual

- GFR-020C04020-EDC-200080-en-B
ALSPA HMI - V6 - Y=f(t) Curve Viewer - Reference Manual

CSCS CONTROLOG FUNCTION TEST PROCEDULE 7/A


ACCEPTANCE FORM

Step: FUNCTIONAL TESTS

Sub-step: Supervision functions

ACTION List of Action Result Observation

1. Check of System functions

Start / Stop ALSPA HMI

Check of System workspace

Enable/Disable station sound

NTP Time synchronize check

2. Access to Mimics

3. Check of system mimics and variables

4. Show y=f(t) curves

Assign/Disassign a variable

Change sampling rate

Customer Visa Supplier Visa : Date:

CSCS CONTROLOG FUNCTION TEST PROCEDULE 8/A


ACCEPTANCE FORM

Step: FUNCTIONAL TESTS

Sub-step: Supervision functions

ACTION List of Action Result Observation

5. Show y=f(x) curves

Change scale

Clear all points

6. Show Bar graphs Veritcal View

Assign/Disassign a variable

Change scale

7. Show Bar graphs Horizontal View

Assign/Disassign a variable

Change scale

8. Show Trends Views

Assign/Disassign a variable

Change sampling rate

Customer Visa Supplier Visa : Date:

CSCS CONTROLOG FUNCTION TEST PROCEDULE 9/A


ACCEPTANCE FORM

Step: FUNCTIONAL TESTS

Sub-step: Supervision functions

ACTION List of Action Result Observation

9. Presentation of Operative Units

Show All

Show Boolean

Show Analog

Show Command

Show Set-point

Show Control Block

10. Presentation of Variable Query

Check each predefined filter

Enter a specific filter

Customer Visa Supplier Visa : Date:

CSCS CONTROLOG FUNCTION TEST PROCEDULE 10/A


2.1 .2 Sub-Step: Data management

Data management functions are presented in detail in the following documents:


- GFR-020C04020-EDC-200085-en-B
ALSPA HMI - V6- Variable Properties Viewer - Reference Manual

CSCS CONTROLOG FUNCTION TEST PROCEDULE 11/A


ACCEPTANCE FORM

Step: FUNCTIONAL TESTS

Sub-step: Data Management

ACTION List of Action Result Observation

1. Check of Bsig Property View

Modify status and value

2. Check of Asig Property View

Modify status and value

3. Check of Muti State Signal Property View

Check status and value

Customer Visa Supplier Visa : Date:

CSCS CONTROLOG FUNCTION TEST PROCEDULE 12/A


2.1 .3 Sub-Step: Alarms

The alarm functions are presented in detail in the following documents:


- GFR-020C04020-EDC-200076-en-G
ALSPA HMI - V6 - Alarms and Events Viewer - Reference Manual
- GFR-020C04020-EDC-200106-en-F
ALSPA HMI - V6 - Advanced Alarms Management - Reference Manual

CSCS CONTROLOG FUNCTION TEST PROCEDULE 13/A


ACCEPTANCE FORM

Step: FUNCTIONAL TESTS

Sub-step: Alarms functions

ACTION List of Action Result Observation

1. Check of Access

Show alarm list

Show the different short alarm


windows

2. Check of Bsig Alarm Point

Set a Bsig on alarm

Change Bsig status

Acknowledge alarm

3. Check of Asig Alarm Point

Set Asig on overpassed of


threshold

Change Asig status

Acknowledge alarm

Customer Visa Supplier Visa : Date:

CSCS CONTROLOG FUNCTION TEST PROCEDULE 14/A


ACCEPTANCE FORM

Step: FUNCTIONAL TESTS

Sub-step: Alarms functions

ACTION List of Action Result Observation

4. Check of Alarm filters

Enter different criteria

5. Check of Chronology

6. Check of Acknowledgement by page

Customer Visa Supplier Visa : Date:

CSCS CONTROLOG FUNCTION TEST PROCEDULE 15/A


2.1 .4 Sub-Step: Control functions

Control functions are presented in detail in the following documents


- GFR-020C04020-EDC-200085-en-B
ALSPA HMI - V6- Variable Properties Viewer - Reference Manual
- GFR-020C04020-EDC-200094-en-A
ALSPA HMI - V6 - Data Description & Management - Reference Manual

Initial conditions

The control blocks utilised in this section are those used to test the Command
and Set point transmission control functions.

A Command or Set point can only be transmitted by a control block if

- the control block authorisation variables are in the (authorized) state,

- the Command or Set point which is to be modified is authorized. This


presumes two conditions

- The verification cBSig or cASig (controller check) is acquired valid or is replaced.


- The authorisation cBSig of the command is valid or replaced and
authorized

Important : Proceed by replacement to ensure that the authorisation


conditions are met in order to transmit commands.

CSCS CONTROLOG FUNCTION TEST PROCEDULE 16/A


ACCEPTANCE FORM

Step: FUNCTIONAL TESTS

Sub-step: Control functions

ACTION List of Action Result Observation

1. Check of Property view

Setpoint

Command

Control block (modify its status)

2. Check of Control block

Transmit a setpoint

Transmit a command

Customer Visa Supplier Visa : Date:

CSCS CONTROLOG FUNCTION TEST PROCEDULE 17/A


2.1 .5 Sub-Step : Printer outputs

The printer output functions are presented in detail in the following documents:
- GFR-020C04020-EDC-200073-en-B
ALSPA HMI - V6 - Workspace - Reference Manual

CSCS CONTROLOG FUNCTION TEST PROCEDULE 18/A


ACCEPTANCE FORM

Step: FUNCTIONAL TESTS

Sub-step: Printer Outputs

ACTION List of Action Result Observation

1. Consultation and Printing of Alarm log

Customer Visa Supplier Visa : Date:

CSCS CONTROLOG FUNCTION TEST PROCEDULE 19/A


2.1 .6 Sub-Step : HISTORIAN Function

This function is available for Control room station and simulator station.
HISTORIAN functions are presented in detail in the following documents:
- GFR-020C04020-EDC-200091-en-C
ALSPA HMI - V6 - Historian Function - Reference Manual

CSCS CONTROLOG FUNCTION TEST PROCEDULE 20/A


ACCEPTANCE FORM

Step: FUNCTIONAL TESTS

Sub-step: HISTORIAN function

ACTION List of Action Result Observation

1. Access a base to consult

2. Consultation of samples

Select variable to display

Change zoom

3. Consultation of events

4. Storage and retrieval function

Store a base

Retrieve the base, and consult it

5. Check of Remote Access from a PC

Consult samples

Consult events

6. Test of Historian Switch-over

Customer Visa Supplier Visa : Date:

CSCS CONTROLOG FUNCTION TEST PROCEDULE 21/A


2.1 .7 Sub-Step : Gateway IEC101/104 function

This function is available for Control room 2 Gateway station.


Gateway IEC101/104 function are presented in detail in the following documents:
- GFR-020C04050-EDC-200460-en-A
Gateway CSS-G - IEC 870.5-101 Server Protocol - User Manual

CSCS CONTROLOG FUNCTION TEST PROCEDULE 22/A


ACCEPTANCE FORM

Step: FUNCTIONAL TESTS

Sub-step: Gateway IEC101 function

ACTION List of Action Result Observation

1. Gateway IEC101/104 function

Start / Stop the IEC101/104 program

Config the Sys.do file

Config the Data.do file

2. Simulate the Master check the comm

Simulate the Master check the comm

Check the system variables

Change Bsig status

Change Asig status

Check the time tag

Customer Visa Supplier Visa : Date:

CSCS CONTROLOG FUNCTION TEST PROCEDULE 23/A


2.2 STEP: SYSTEM TESTS

2.2 .1 Sub-Step: Administration Center

Use the following documents:


- UPA100695-en-C
ALSPA HMI - CAC - Administration Center for HMI Stations - User's Manual

- ALSPA_Series6_Response_Time
ALSPA Series 6 - System Response Time - PPT

CSCS CONTROLOG FUNCTION TEST PROCEDULE 24/A


ACCEPTANCE FORM

Step: SYSTEM TESTS

Sub-step: Administration Center

ACTION List of Action Result Observation

1. HMI Administration Center

Start / Stop CIS

Update database on CIS

Update calculation library on CIS

Update database / calculation library on CIS

Update database / calculation library /


Views on CIS

Update database / Views on CIS

Update Views

Update Sheets

Customer Visa Supplier Visa : Date:

CSCS CONTROLOG FUNCTION TEST PROCEDULE 25/A


ACCEPTANCE FORM

Step: SYSTEM TESTS

Sub-step: HMI

ACTION List of Action Result Observation

2. Check the response times

When displaying a mimic on HMI


or other operator Reques

When sending a command to a


controller

When receiving an alarm or event


from a controller

Check time of updating a view on


controller change

Generation of new real-time database

Data acquiring period (see Section


05 1.1, p50)

Accuracy of synchronous clock

Time sending an order and see


result on HMI

Time of record an "event" on


Historian Database

SOE resolution in Historian

3. Check of the CPU load rate

Customer Visa Supplier Visa : Date:

CSCS CONTROLOG FUNCTION TEST PROCEDULE 26/A


2.2 .2 Sub-Step: System

ACCEPTANCE FORM

Step: SYSTEM TESTS

Sub-step: System

ACTION List of Action Result Observation

1. Check of CIS Switchover

Main CIS loss of the power Switch

Main CIS loss of S8000-1 connection No Switch

Reconnect S8000-1 No Switch


DisconnectS8000-2

Reconnect S8000-2 No Switch

On the loss of the office connection No Switch


Reconnect office

2 Check the System Structure

Status: C30/CIS/S8000/MFC3000

Status: CE1000

Status: HISTORIAN

Status: Time Synchronization

Status: CVS

Status: C10

Customer Visa Supplier Visa : Date:

CSCS CONTROLOG FUNCTION TEST PROCEDULE 27/A


2.2 .3 Sub-Step: Controcad Engineering Tool

Use the following documents:


- GFR-020C04010-EDC-202005-en-D
ALSPA Controcad - V5 - Functions & Data Configuration - Reference Manual

- GFR-020C04010-EDC-202007-en-B
ALSPA Controcad - V5 - Mimics Views Configuration - Reference Manual

CSCS CONTROLOG FUNCTION TEST PROCEDULE 28/A


ACCEPTANCE FORM

Step: SYSTEM TESTS

Sub-step: Controcad Engineering Tool

ACTION List of Action Result Observation

1. Mimics Modification

Modify a Mimic

Generate new view version

Update Views

2. Database Modification

Modify a variable

Generate Database

Select database

Update database

Customer Visa Supplier Visa : Date:

CSCS CONTROLOG FUNCTION TEST PROCEDULE 29/A


REPORT date :

ACCEPTANCE TESTING SESSION REPORT


Session from to
Location Platform in AHC

Project: TRI AN
System ALSPA CONTROPLANT Serial 6

Qualitative appraisal

List of Anomaly Reports appended □ Yes □ No

Result □ Accepted □ Accepted with reservation □ Refused

Remarks:

Customer's representative : Supplier's representative

Company : Company :

Name : Name :

Position : Position :

Signature : Signature :

CSCS CONTROLOG FUNCTION TEST PROCEDULE 30/A