Bim: Implementasi Pada Reker jaan (ngra steve
Narasumber: Luki Danardi (Engineering Manager)
22 BIM= Building Ingormation Modelin
D> Survey equip ment (wasters Fong)
— Terrestrial lager scanner
— Fixed wing dene
— Geora dar
— Processing Soptware
> BiMat Warktn + Survey, Modelling and Planning, Oyeranion
2 Model integration is exsential in wodelliig and planning.
D Operation:
= Common datn envirmment (AvtrDesk BIM360, Project Wise)
= Monitering heavy equipment )
—hvbwahin (rebar)
> BIM memiliki resike dalam invettasi manutia, purnlatnn, program.
2 Dynamo t+ Phyton
ponent te
Create complex geometry Chuilding prjet)
) Nodes OF logics
Ah USCA for
Avbomate wo deltivg, Cingrastnicvre pry)
) Inerastivere vse Case
Riderthip Kereta Api fergantny Fendisi pendvdvk sebitar Cabilil of
payment, uc)
2) CovApurational design
= Advantnges: speed vp mod tlling process
+ parametric
+ better model accvrrny
— Disadvantanes: Complen
Scanned with CamScannerApakal 81M360 memiliki Kebvrangan vnWk digunakan di lapangan 2
Apakah salah saty fatter Hnagginya resite Feqagalan BIM [keregian BIM
mmerpakan kvrangnyn BIM exert dan mengapa?
Apakealh ea 3D printing, Suda diqalatkan A uN, akan di aplikasikan
pada pratinkvm mahasiswa ?
Scanned with CamScanner