Hard Land Scape Risk Assessment
Hard Land Scape Risk Assessment
P C RR P C RR
1 Shifting of Hard Land Strain/Sprain injury while 3 2 6 Manual handling procedure to be 2 1 2
scape material handling material followed and for heavy object "Buddy
system" to be followed
1 P-Probability
C-Consequences
RR-Risk Rating
PROJECT NAME: MAG-EYE MEYDAN
MAIN CONT: CNCEC JOB SAFETY ANALYSIS / RISK ASSESSMENT
SUB CONT: NEC CONTRACTING LLC
SCOPE: HARD LANDSCAPING
DATE: 10/08/2022
3 Interlock / tiles / Personal injury 3 3 9 Speed of the cutting blade will be lessr 2 1 2
Kirbstone Cutting than the grinder speed
Only trained person will use elctrical
hand tools
Electrical shock 2 3 6 All electrical Panel and switch board 1 2 2
will equiped with GFCB/ELCB
2 P-Probability
C-Consequences
RR-Risk Rating
PROJECT NAME: MAG-EYE MEYDAN
MAIN CONT: CNCEC JOB SAFETY ANALYSIS / RISK ASSESSMENT
SUB CONT: NEC CONTRACTING LLC
SCOPE: HARD LANDSCAPING
DATE: 10/08/2022
4 Formworks Hand/Foot/Eye & Back Injury, 2 3 6 All workers must wear required PPE's 1 3 3
for the job, i.e. gloves, safety glasses,
safety shoes.
3 P-Probability
C-Consequences
RR-Risk Rating
PROJECT NAME: MAG-EYE MEYDAN
MAIN CONT: CNCEC JOB SAFETY ANALYSIS / RISK ASSESSMENT
SUB CONT: NEC CONTRACTING LLC
SCOPE: HARD LANDSCAPING
DATE: 10/08/2022
1-5: Low
6-15: Medium
16-25: High
4 P-Probability
C-Consequences
RR-Risk Rating