You are on page 1of 26

Document Risk Assessment

Abu Dhabi Future School Program - Phase 8,


Ref: No AEGC-KG-RA - 010
Package 1, Al  Falah KG Sector 1C plot P3
Rev. 00

Project Abu Dhabi Future School Program - Phase 8, Package 1, Al  Falah KG

Employer MUSANADA Contract No.

Consultant: Al Suweidi Engineering Consultant LLC Date:

Contractor Al Eslah General Contracting Est Document No.

RISKASSESSMENT TEAM SITE REPRESENTATIVES

NAME DESIGNATION SIGNATURE NAME DESIGNATION SIGNATURE

Eng. Ayham Sabouni Project Manager Ahmed Hajeer Project Engineer

Eng.Zafeer Arif OSH Coordinator

Subject RISK ASSESSMENT for Suspended & Slab on Grade Construction

NOTE:- This Risk Assessment is prepared in line with the METHOD STATEMENT for Suspended & Slab on Grade ConstructionRev. 00; and it
covers all activities described in this Method Statement.

1
RISK ASSESSMENT
Document Risk Assessment
Abu Dhabi Future School Program - Phase 8,
Ref: No AEGC-KG-RA - 010
Package 1, Al  Falah KG Sector 1C plot P3
Rev. 00

RISK LEVEL RESIDUAL RISK LEVEL


S.No Activity HAZARD & RISK Groups Exposed Control Measures Action By Legal Reference
P S R RL P S R RL

 Site OSH induction course for every


Parking at live road worker working in this project.
to drop or carry  Bus should be park at safe area with
workers. double indicators and gate should not OSHAD-SF– Cod
open until bust fully stop. Construction of Practice CoP
Unfamiliar with the
local situation and  Worker should not cross the road manager, 44.0 Traffic
the Safety rules until bus is move from road to clear Management and
OSH In Logistics – Versio
1 sight for upcoming traffic.
Unfamiliar to the charge, 3.0
Mobilization of  Proper training and guidance for all
nature of work and Employees 3 2 6 M 1 1 1 L
Employees new workers HR staff,
weather condition OSHAD-SF –
 Minimum PPE must be worn at all Supervisor Codes of Practice
Lack of training times CoP 08.0 – Gene
&
 Follow site safety rules Workplace
Younger workers  Follow the traffic safety regulations Individuals Amenities – Versi
Medically not fit  Medical Check up to be done 3.0
 Special care for young people and
should not be involved in high risky
work

Falling of materials  Ensure that all the pickup driver OSHAD-SF–COP


company/supplier are informed about 1.0 – Hazardous
Collision of Workers, the project safety requirements prior Materials - V 3.0
delivery truck/pick Drivers, to the delivery of the materials. OSHAD-SF–COP
Material Delivery
2 up with men and Property 3 4 12 H  Ensure that all drivers and vehicle AEGC 1 3 3 L 2.0 – Personal
on Site
materials. damage, Protective
comply with the safety requirements.
flagman, public Equipment - V 3.0
Slips, Trips & falls,  Ensure that the delivery truck is
OSHAD-SF – CO
inspected at the project gate by the
Pickup trucks 4.0 – First Aid and
security and safety personnel to

2
RISK ASSESSMENT
Document Risk Assessment
Abu Dhabi Future School Program - Phase 8,
Ref: No AEGC-KG-RA - 010
Package 1, Al  Falah KG Sector 1C plot P3
Rev. 00

RISK LEVEL RESIDUAL RISK LEVEL


S.No Activity HAZARD & RISK Groups Exposed Control Measures Action By Legal Reference
P S R RL P S R RL

toppling over check if the load/material is secured Medical Emergen


properly, the vehicle doesn’t have any Treatment - V 3.0
Damaging exiting OSHAD-SF –COP
defects ( leaks, damages)
utilities ( Street 08.0 – General
 Ensure that the drivers have
light poles, etc ) Workplace
adequate PPE
Unsafe storage of  Ensure that the drivers are provided Amenities – V 3.0
materials. with a visitor induction at the site OSHAD-SF –COP
14.0 – Manual
entrance ( they are instructed/
Unsafe unloading Handling and
informed about the site rules, driving
of materials Ergonomics – V 3
speed limit, storage areas,
OSHAD-SF –
Delivery during emergency procedures etc) COP 17.0 – Safet
night time.  Ensure that they are guided by Signage and
trained banksman towards the safe Signals – V 3.0
storage zone. OSHAD-SF- CO
 Ensure that AEGC provides a safe 22.0 – Barricading
and clear vehicle access for the of Hazards – V 3.
delivery trucks/pick ups. OSHAD-SF –COP
 Separate pedestrian access to be 36.0 – Plant and
used by pedestrians. Equipment – V 3.
 Ensure that there is adequate lighting OSHAD-SF–COP
is provided if the delivery is done at 44.0 Traffic
night. Management and
Logistics – V 3.0
 Ensure that the access ways are
OSHAD-Sf–
demarked with cones and warning
Element 2 - Risk
tape to prevent them from going too
Management
close to the edges of the access OSHAD-SF –
ways. Element 3 –

3
RISK ASSESSMENT
Document Risk Assessment
Abu Dhabi Future School Program - Phase 8,
Ref: No AEGC-KG-RA - 010
Package 1, Al  Falah KG Sector 1C plot P3
Rev. 00

RISK LEVEL RESIDUAL RISK LEVEL


S.No Activity HAZARD & RISK Groups Exposed Control Measures Action By Legal Reference
P S R RL P S R RL

 Ensure that the pick up truck have Management of


reverse alarm and beacon light. Contractors
 Ensure that there is enough distance OSHAD SF-
maintained between the delivery Element- 5 –
access way and the pedestrian way. Training &
 No unauthorized personnel to enter awareness and
the storage area while the material is competency
OSHAD-SF–
being unloaded.
Element 6 -
 Adequate signage are displayed
Emergency
around the access ways and the
Management
storage areas. Musanada Key H
 Ensure that the public property/ Requirements
materials which are near the storage
area are protected and barricaded
with hard PVC barriers.
 Ensure that the materials is stored
safely on the project and storage is in
location as approved in the logistic
plan.
 Ensure that hazardous material if any
is stored in safe area and proper
precaution is taken as per the MSDS
or supplier’s recommendation.
 Ensure that mechanical aid is being
used for unloading materials of
heavy materials
 Ensure that workers wear adequate

4
RISK ASSESSMENT
Document Risk Assessment
Abu Dhabi Future School Program - Phase 8,
Ref: No AEGC-KG-RA - 010
Package 1, Al  Falah KG Sector 1C plot P3
Rev. 00

RISK LEVEL RESIDUAL RISK LEVEL


S.No Activity HAZARD & RISK Groups Exposed Control Measures Action By Legal Reference
P S R RL P S R RL

ppe while handling/unloading


materials.
 Ensure that there is a certified First
Aider and adequate first aid facility
available on site.

 Ensure that all workers are inducted OSHAD-SF– Co


and are taking part in daily Toolbox 2.0 – Personal
talks. Protective
 Ensure workers wear appropriate Equipment - Vers
PPE while lifting steel bars. 3.0
 Avoid lifting steel manually, use OSHAD-SF – C
mechanical Aids. 14.0 – Manual
Handling and
 If steel is to be shifted using a boom
Ergonomics –
Steel- loader or any other equipment ensure
Steel Fixers, Version 3.0
Reinforcement Falling of material ( that it is secured properly and the
personnel OSHAD-SF- Co
3 works ( Storage, Reinforced steel 4 4 16 H equipment to have a trained AEGC 1 3 3 L 22.0 – Barricading
nearby, Property
shifting , cutting, bars while shifting ) banksman during loading, moving of Hazards –
damage
bending, usage) and unloading of steel. Version 3.0
 Equipment to have a banksman at all OSHAD-SF – C
times. Equipment and operator to be 08.0 – General
3rd party certified. Workplace
 Equipment to be checked and Amenities – V 3.0
approved by the HSE Team prior to OSHAD-SF –
the start of the works. CoP 17.0 – Safet
 Ensure the area is barricaded while Signage and
shifting the load. Signals – V 3.0
OSHAD-SF – C

5
RISK ASSESSMENT
Document Risk Assessment
Abu Dhabi Future School Program - Phase 8,
Ref: No AEGC-KG-RA - 010
Package 1, Al  Falah KG Sector 1C plot P3
Rev. 00

RISK LEVEL RESIDUAL RISK LEVEL


S.No Activity HAZARD & RISK Groups Exposed Control Measures Action By Legal Reference
P S R RL P S R RL

 Prevent unauthorized access. 36.0 – Plant and


 Ensure that safe access and egress Equipment – V 3.
is provided and maintained at all OSHAD-SF– Co
times. 44.0 Traffic
Management and
Logistics – V 3.0
OSHAD-SF –
Element 2 - Risk
Management
OSHAD-SF –
Element 3 –
Management of
Contractors
OSHAD SF-
Element- 5 –
Training and
awareness and
competency
OSHAD-SF –
Element 6 -
Emergency
Management
Musanada Key H
Requirements
Sharp edges of  Ensure that rebar caps are fitted on OSHAD-SF- Co
Steel Fixers, the protruding sharp edges of the re-
protruding steel 22.0 – Barricading
Engineers, 3 4 12 H enforced steel. AEGC 1 3 3 L
bars can cause of Hazards –
Inspectors
puncture wound  Ensure that workers handling steel Version 3.0
wear PPE ( Hand Gloves, Safety

6
RISK ASSESSMENT
Document Risk Assessment
Abu Dhabi Future School Program - Phase 8,
Ref: No AEGC-KG-RA - 010
Package 1, Al  Falah KG Sector 1C plot P3
Rev. 00

RISK LEVEL RESIDUAL RISK LEVEL


S.No Activity HAZARD & RISK Groups Exposed Control Measures Action By Legal Reference
P S R RL P S R RL

OSHAD-SF– Co
Glasses etc ) 2.0 – Personal
Protective
Equipment - V 3.0

 Ensure that a safe access and egress OSHAD-SF –


Steel Fixers, is provided with secured planks on CoP 08.0 – Gene
Slips, Trips and
Engineers, 2 3 6 M AEGC 1 3 3 L Workplace
Falls the re-enforced steel bars to prevent
Inspectors Amenities – Versi
slips and trips.
3.0

 Ensure that Hot work permit is in OSHAD-SF– C


place prior to the start of Grinder use. 21.0 – Permit to
 Ensure only competent and trained Work Systems -
personnel use grinders. Version 3.0
 Ensure workers wear appropriate
OSHAD-SF– Co
Cutting Steel bars PPE while lifting steel bars ( Hand 47.0 – Machine
using grinders – Gloves, Safety shoe ), cutting steel Guarding Version
Hand Injury, ( eye glasses, ear plugs, hand gloves,
Steel Fixers, 3.0
Electrocution, Slips face shield)
Engineers, 3 4 12 H AEGC 1 3 3 L
Trips, Fire,  Ensure that the guard of the grinder is OSHAD-SF – C
Inspectors
Unauthorized 28.0 – Hot Work
secured at all times. No works to be
access, Face Operations (eg.
carried out without guards.
Injury, Noise Welding and
 Ensure that the grinder has been
Cutting) – Version
inspected, approved and tagged by
3.0
competent electrician.
 Ensure that a designated area is OSHAD-SF –
assigned for cutting steel. CoP 35.0 – Porta
 Ensure that the designated area is Power Tools –

7
RISK ASSESSMENT
Document Risk Assessment
Abu Dhabi Future School Program - Phase 8,
Ref: No AEGC-KG-RA - 010
Package 1, Al  Falah KG Sector 1C plot P3
Rev. 00

RISK LEVEL RESIDUAL RISK LEVEL


S.No Activity HAZARD & RISK Groups Exposed Control Measures Action By Legal Reference
P S R RL P S R RL

barricaded and suitable signage for Version 3.0


PPE and No unauthorized access is
OSHAD-SF –
posted.
CoP 3.0 –
 Ensure that Combustible and
Occupational Noi
Flammable material is not stored or – Version 3.0
kept near the grinder usage area.
OSHAD SF –
CoP 15.0 –
Electrical Safety –
Version 3.0

OSHAD-SF-CoP
4.0 – First Aid and
Medical Emergen
Treatment - V 3.0

OSHAD-SF–
Element 2 - Risk
Management

OSHAD SF-
Element- 5 –
Training and
awareness&
competency

OSHAD-SF –
Element 6-
Emergency

8
RISK ASSESSMENT
Document Risk Assessment
Abu Dhabi Future School Program - Phase 8,
Ref: No AEGC-KG-RA - 010
Package 1, Al  Falah KG Sector 1C plot P3
Rev. 00

RISK LEVEL RESIDUAL RISK LEVEL


S.No Activity HAZARD & RISK Groups Exposed Control Measures Action By Legal Reference
P S R RL P S R RL

Management

Musanada Key H
Requirements

OSHAD-SF– C
 Ensure that the Steel cutting machine
1.0 – Hazardous
is inspected and approved by
Materials - V 3.0
competent electrician prior to the start
of the works. OSHAD-SF –
 Ensure that only competent workers CoP 17.0 – Safet
carry out the steel cutting works on Signage and
the machine. Signals – Version
 Ensure workers wear appropriate 3.0
PPE while lifting steel bars. OSHAD SF –
Cutting Steel using  Avoid lifting steel manually, use CoP 15.0 –
Steel cutting Steel Fixers, mechanical Aids. Electrical Safety –
machine – Hand Engineers, 3 4 12 H  If steel is to be shifted using boom AEGC 1 3 3 L
Version 3.0
Injury, Back Injury, Inspectors
loader or any other equipment ensure
Oil Leakage, OSHAD-SF – C
that it is secured properly and the
equipment to have a trained 14.0 – Manual
Handling and
banksman during loading, moving
Ergonomics –
and unloading of steel.
Version 3.0
 Ensure that suitable signage is
displayed near the cutting machine. OSHAD-SF- Co
 Ensure that the guards and 22.0 – Barricading
emergency stop button is available. of Hazards –
 Ensure that there are no leaks in the Version 3.0
cutting machine. If repairs are to be OSHAD-SF– C

9
RISK ASSESSMENT
Document Risk Assessment
Abu Dhabi Future School Program - Phase 8,
Ref: No AEGC-KG-RA - 010
Package 1, Al  Falah KG Sector 1C plot P3
Rev. 00

RISK LEVEL RESIDUAL RISK LEVEL


S.No Activity HAZARD & RISK Groups Exposed Control Measures Action By Legal Reference
P S R RL P S R RL

1.0 – Hazardous
Materials - Versio
3.0

OSHAD-SF –
Element 2 - Risk
Management

OSHAD SF-
done , then drip tray must be kept Element- 5 –
beneath to prevent oil spillage on the Training and
ground. awareness and
competency

OSHAD-SF –
Element 6 -
Emergency
Management

Musanada Key H
Requirements

4 Shuttering work Plywood and wood Carpenters, 3 4 12 H  Ensure that the Table Saw machine AEGC 1 3 3 L OSHAD-SF –CoP
cutting works using Workers nearby is inspected and approved by 17.0 – Safety
Table saw – Hand competent electrician prior to the start Signage and
injury, Eye Injury, of the works. Signals – Version
Fire, Slips Trips,  Ensure that only competent workers 3.0
Noise, Back Injury operate the table saw.
while moving OSHAD SF –CoP
 Ensure workers wear appropriate 15.0 – Electrical
shutters
PPE while using table saw ( Hand

10
RISK ASSESSMENT
Document Risk Assessment
Abu Dhabi Future School Program - Phase 8,
Ref: No AEGC-KG-RA - 010
Package 1, Al  Falah KG Sector 1C plot P3
Rev. 00

RISK LEVEL RESIDUAL RISK LEVEL


S.No Activity HAZARD & RISK Groups Exposed Control Measures Action By Legal Reference
P S R RL P S R RL

gloves, Safety glasses, ear plugs, Safety – Version


masks etc )
OSHAD-SF –CoP
 Ensure that push stick is used while
14.0 – Manual
cutting plywood.
Handling and
 Ensure that guard is secured on the Ergonomics –
table saw while doing cutting works. Version 3.0
 Ensure that cut pieces, wooden slats
are accumulated in designated areas. OSHAD-SF-CoP
The area near the table saw should 22.0 – Barricading
be clear at all times. of Hazards –
 Ensure that there is a collection box Version 3.0
beneath the Table saw to collect saw OSHAD-SF –CoP
dust. After it is collected it has to be 08.0 – General
removed from the location and Workplace
disposed off safely. Amenities – V 3.0
 No smoking signage to be displayed.
OSHAD-SF–CoP
 Avoid lifting shutters manually, use
47.0 – Machine
mechanical Aids.
Guarding Version
 If Shutters are to be shifted using
3.0
boom loader or any other equipment
ensure that it is secured properly and OSHAD-SF –CoP
the equipment have a trained 36.0 – Plant and
banksman during loading, moving Equipment – V3.0
and unloading of shutters. OSHAD-SF –
 Ensure suitable PPE signage are Element 2 -Risk
displayed near the cutting machine. Management
 Ensure that the guards and
OSHAD SF-

11
RISK ASSESSMENT
Document Risk Assessment
Abu Dhabi Future School Program - Phase 8,
Ref: No AEGC-KG-RA - 010
Package 1, Al  Falah KG Sector 1C plot P3
Rev. 00

RISK LEVEL RESIDUAL RISK LEVEL


S.No Activity HAZARD & RISK Groups Exposed Control Measures Action By Legal Reference
P S R RL P S R RL

Element- 5 –
Training and
awareness and
competency
emergency stop button is available.
 All electrical connections are done by OSHAD-SF–
competent electrician only. Element 6-
 Ensure Fire Point is nearby and Emergency
carpenters are trained fire fighters Management

Musanada Key H
Requirements

OSHAD-SF - C
40.0 – False Wor
 Ensure that a safe working platform is (Formwork) -
provided for the workers who are Version 3.0
going to erect the shutters.
 Ensure that the platform has a safe OSHAD-SF – C
access, toe boards, Top rails, mid 26.0 – Scaffolding
Falling from Carpenters, rails. Version 3.0
3 4 12 H AEGC 1 3 3 L
heights Inspectors
 Scaffolds to be erected by competent OSHAD-SF –
Scaffolders and inspected and tagged Element 2 - Risk
by scaffolding supervisor. Management
 Workers to wear safety harness if the
working platform is above 2 meters. OSHAD SF-
Element- 5 –
Training and
awareness and

12
RISK ASSESSMENT
Document Risk Assessment
Abu Dhabi Future School Program - Phase 8,
Ref: No AEGC-KG-RA - 010
Package 1, Al  Falah KG Sector 1C plot P3
Rev. 00

RISK LEVEL RESIDUAL RISK LEVEL


S.No Activity HAZARD & RISK Groups Exposed Control Measures Action By Legal Reference
P S R RL P S R RL

competency

OSHAD-SF –
Element 6 -
Emergency
Management

Musanada Key H
Requirements

OSHAD-SF - C
40.0 – False Wor
(Formwork) -
Version 3.0

OSHAD-SF- Co
22.0 – Barricading
 Ensure that all shutters are
of Hazards –
adequately secured with tie rods. Version 3.0
Opening of Carpenters,  Ensure that works are carried out
2 4 8 H AEGC 1 3 3 L OSHAD SF-
shutters Inspectors under adequate supervision.
 Ensure that area is barricaded to Element- 5 –
prevent unauthorized access. Training and
awareness and
competency

OSHAD-SF –
Element 6 -
Emergency
Management

13
RISK ASSESSMENT
Document Risk Assessment
Abu Dhabi Future School Program - Phase 8,
Ref: No AEGC-KG-RA - 010
Package 1, Al  Falah KG Sector 1C plot P3
Rev. 00

RISK LEVEL RESIDUAL RISK LEVEL


S.No Activity HAZARD & RISK Groups Exposed Control Measures Action By Legal Reference
P S R RL P S R RL

OSHAD-SF –COP
08.0 – General
Workplace
 Proper body position and safety glass Amenities – V 3.0
with side shields. OSHAD-SF –COP
 Tool to be suitable for the purpose 14.0 – Manual
Striking hand or intended and maintained in good Handling and
arms when using
working order. Tools to be inspected Ergonomics – V 3
hammer
regularly in accordance with
OSHAD-SF– CO
Struck by flying manufacturer’s instructions.
47.0 – Machine
object metals chips  Hand gloves should be used when
Guarding Version
etc. using hand tools.
Workers, 3.0
Use of Hand  All operatives to be given instructions
5 Eye injuries Personnel 3 3 9 H 1 2 2 L
Tools in the safe use of hand tools as part AEGC OSHAD-SF – C
walking nearby 36.0 – Plant and
Laceration when of their skill training. Tools which may
using sharp tools deteriorate are to be checked on a Equipment – V 3.
regular basis and maintained or 3.0
Defective tools
replaced as necessary. OSHAD-SF –
 First Aider and First Aid items to be COP 35.0 –
made available on site. Portable Power
 Ensure that cables are routed safely Tools – Version 3
and don’t pose a tripping hazard for
the workers/engineers etc OSHAD-SF –
Element 6 -
Emergency
Management

OSHAD-SF –

14
RISK ASSESSMENT
Document Risk Assessment
Abu Dhabi Future School Program - Phase 8,
Ref: No AEGC-KG-RA - 010
Package 1, Al  Falah KG Sector 1C plot P3
Rev. 00

RISK LEVEL RESIDUAL RISK LEVEL


S.No Activity HAZARD & RISK Groups Exposed Control Measures Action By Legal Reference
P S R RL P S R RL

COP 4.0 – First A


and Medical
Emergency
Treatment - V 3.0

Musanada Key H
Requirements

OSHAD SF –
CoP 15.0 –
Electrical Safety –
Version 3.0
 Ensure that all power tools are OSHAD-SF –
inspected and approved by CoP 35.0 – Porta
Electrocution
competent Electrician prior to the Power Tools –
Hand Injury start of the works. Version 3.0
Use of Power Workers,  Ensure appropriate PPE (Safety
Eye Injury 3 4 12 H 1 3 3 L OSHAD-SF –
Tools Engineers Glasses, safety shoes, Hand gloves, AEGC
Element 2 - Risk
Body Injury Ear plugs, etc ) is worn by workers Management
using hand tools.
 All Hand tools must be in good OSHAD SF-
working condition. Element- 5 –
Training and
awareness and
competency

OSHAD-SF –
Element 6 -

15
RISK ASSESSMENT
Document Risk Assessment
Abu Dhabi Future School Program - Phase 8,
Ref: No AEGC-KG-RA - 010
Package 1, Al  Falah KG Sector 1C plot P3
Rev. 00

RISK LEVEL RESIDUAL RISK LEVEL


S.No Activity HAZARD & RISK Groups Exposed Control Measures Action By Legal Reference
P S R RL P S R RL

Emergency
Management

Musanada Key H
Requirements

6 Plant and heavy Collision (men & Workers, 3 4 12 H  Ensure that Internal Traffic AEGC 1 3 3 L OSHAD-SF –
equipment materials ) Engineers, management plan is implemented COP 44.0 Traffic
movement Inspectors,  Provide pedestrian ways for workers Management and
(During Roll over Property Logistics – Versio
to avoid any Collision with moving
Concreting) Over speeding/ equipment’s. 3.0
Over loading  All equipment & Operators to have OSHAD-SF –
3rd party certifications. COP 36.0 – Plant
Bad Weather
 Ensure that pump outriggers are and Equipment –
Defective extended fully and are on an even Version 3.0
Equipment stable ground.
 Keep the work area clean, proper OSHAD-SF –
Mechanical Failure COP 38.0 –
housekeeping and area should be
Concrete Placing
Puncture injury by free from obstructive material prevent
Equipment –
falling on incidents.
Version 3.0
protruding steel  Ensure that operators obey site
pins speed limits (10 kmph).Signage to be OSHAD-SF –
displayed at strategic locations Element 2 - Risk
 Assess the weight before moving Management
vehicle from site only carry load
OSHAD SF-
which vehicle design for. Element- 5 –
 Proper Lifting posture, avoid Training and
repetitive task and do not use awareness and

16
RISK ASSESSMENT
Document Risk Assessment
Abu Dhabi Future School Program - Phase 8,
Ref: No AEGC-KG-RA - 010
Package 1, Al  Falah KG Sector 1C plot P3
Rev. 00

RISK LEVEL RESIDUAL RISK LEVEL


S.No Activity HAZARD & RISK Groups Exposed Control Measures Action By Legal Reference
P S R RL P S R RL

excessive force
 Work should be stopped in bad
wheatear because of poor visibility,
high vent, sand storm etc. competency
 Defective equipment should NOT be
allowed to enter the site. OSHAD-SF –
 Daily operator/driver checklist must Element 6 -
Emergency
follow by operator to detect any
Management
Defects and rectified immediately.
 In case of any machine failure Musanada Key H
immediately inform supervisor and Requirements
stop activity.
 Ensure protruding pins are protected
by caps to prevent puncture injury

Noise  Air compressors shall be to be OSHAD-SF –


operated and maintained in Codes of Practice
Leaks (Soil accordance with the original CoP 35.0 – Porta
Contamination). equipment manufacturer’s Power Tools –
Using High High pressure air. instructions. Version 3.0
Pressure Public, Workers,  Ensure that the manufacturers safe
Eyes may be OSHAD-SF– Cod
7 Supervisors& 3 4 12 H operating pressure for hoses and AEGC 1 3 3 L
(Air Compressor seriously damaged of Practice CoP 2
Inspectors
by direct exposure accessories shall not be exceeded
) – Personal
 Workers using the Air compressor Protective
Unguarded parts of and workers/ Inspectors nearby to Equipment - Vers
Compressor.
wear appropriate PPE ( Safety 3.0
Glasses, Masks, Ear Plugs )
 Noise Monitoring to be done and OSHAD-SF –

17
RISK ASSESSMENT
Document Risk Assessment
Abu Dhabi Future School Program - Phase 8,
Ref: No AEGC-KG-RA - 010
Package 1, Al  Falah KG Sector 1C plot P3
Rev. 00

RISK LEVEL RESIDUAL RISK LEVEL


S.No Activity HAZARD & RISK Groups Exposed Control Measures Action By Legal Reference
P S R RL P S R RL

appropriate measures to be taken i.e. Codes of Practice


Zone to be declared an Ear Plug CoP 17.0 – Safet
Zone, Signage displayed etc. Signage and
 Unauthorized access into the area to Signals – Version
be restricted by barrication and 3.0
signage. OSHAD SF-
 Competent personnel to carry out this Element- 5 –
activity. Training and
 Never use air compressor on awareness and
cleaning your clothes. competency
 A shut off valve shall be fitted at the
OSHAD-SF –
connection between the hose and the
Codes of Practice
tool
COP 36.0 – Plant
 Ensure that compressed air shall not
and Equipment –
be used for cleaning purposes except Version 3.0
where reduced to less than 30 P.S.I.
 All parts should be guarded OSHAD-SF –
 Whip arrestor should be installed. Codes of Practice
 All hoses exceeding 12mm inside CoP 3.0 –
diameter shall have a safety device at Occupational Noi
the source of supply or branch line to – Version 3.0
reduce pressure in case of hose OSHAD-SF– Cod
failure. of Practice CoP
 All guards to be in place and securely 47.0 – Machine
attached. Guarding Version
 Regular inspection by competent 3.0
person.
OSHAD-SF– Cod

18
RISK ASSESSMENT
Document Risk Assessment
Abu Dhabi Future School Program - Phase 8,
Ref: No AEGC-KG-RA - 010
Package 1, Al  Falah KG Sector 1C plot P3
Rev. 00

RISK LEVEL RESIDUAL RISK LEVEL


S.No Activity HAZARD & RISK Groups Exposed Control Measures Action By Legal Reference
P S R RL P S R RL

 Ensure that the compressor is well


maintained.
 Ensure that 3rd party certificate for
the Air compressor is available. of Practice CoP 1
 Ensure that there are no leaks. Drip – Hazardous
trays to be kept beneath the Materials - Versio
Compressor. In case of leaks, it has 3.0
to be ensured that the waste oil is OSHAD-SF- Cod
disposed of as per the requirements of Practice CoP
of Centre of waste management Abu 22.0 – Barricading
Dhabi. of Hazards –
 Toolbox talks to be given to workers Version 3.0
prior to the start of the work.
OSHAD-SF– Cod
 Competent forman/ Supervisor to
of Practice CoP
supervise the work.
54.0 – Waste
 Ensure that there are no cracks, Management –
damage on the Hose. Version – 3.0
 Ensure pressure gauges are working.
 Ensure that the Air compressor has a
3rd party certificate.

8 Concreting at Falling from Masons, 3 4 12 H  Ensure that a safe working platform is AEGC 1 3 3 L OSHAD-SF–COP
heights heights, Vibration Foreman, provided for the workers who are 1.0 – Hazardous
Inspectors going to do concreting works at Materials - V 3.0
Contact with
height.
foreign particles OSHAD-SF - C
(eye injury)  Ensure that the platform has a safe 40.0 – False Wor
access, toe boards, Top rails, mid (Formwork) -
Unauthorized

19
RISK ASSESSMENT
Document Risk Assessment
Abu Dhabi Future School Program - Phase 8,
Ref: No AEGC-KG-RA - 010
Package 1, Al  Falah KG Sector 1C plot P3
Rev. 00

RISK LEVEL RESIDUAL RISK LEVEL


S.No Activity HAZARD & RISK Groups Exposed Control Measures Action By Legal Reference
P S R RL P S R RL

Version 3.0

OSHAD-SF– Co
rails.
2.0 – Personal
 Scaffolds to be erected by competent
Protective
Scaffolders and inspected and tagged
Equipment - V 3.0
by scaffolding supervisor.
 Incomplete scaffolds to have safety OSHAD-SF –
signage ( Incomplete scaffold, DO CoP 17.0 – Safet
NOT USE) and red tag Signage and
 Workers to wear safety harness if the Signals – V 3.0
working platform is above 2 meters. OSHAD-SF – C
 Regular breaks to be given to 26.0 – Scaffolding
access
workers who are using the vibrator Version 3.0
Fatal injury by prevent hand-arm vibration
falling on syndrome, circulatory disorders in OSHAD-SF –CoP
protruding nails fingers. 23.0 – Working at
Heights– Version
 Workers to wear hand gloves and eye
3.0
protection while handling chemicals
( concrete ) OSHAD-SF – CoP
 Safety Signage to be displayed and 3.1 – Vibration -
barrication to be done to prevent Version 3.0
unauthorized access into the
OSHAD-SFCOP
concreting zone.
22.0 – Barricading
 All protruding Rebars to be protected
of Hazards – V 3.
by rebar caps.
OSHAD-SF –
Element 2-Risk
Management

20
RISK ASSESSMENT
Document Risk Assessment
Abu Dhabi Future School Program - Phase 8,
Ref: No AEGC-KG-RA - 010
Package 1, Al  Falah KG Sector 1C plot P3
Rev. 00

RISK LEVEL RESIDUAL RISK LEVEL


S.No Activity HAZARD & RISK Groups Exposed Control Measures Action By Legal Reference
P S R RL P S R RL

OSHAD SF-
Element- 5 –
Training and
awareness and
competency

OSHAD-SF –
Element 6 -
Emergency
Management

Musanada Key H
Requirements

9. Curing Works Fire Hazard Workers, 3 3 9 H  Ensure that No smoking signage are HSE, 1 3 3 L OSHAD-SF –
( Absorptive mats Property displayed in the vicinity. Engineer Codes of Practice
of fabric ) after the  Ensure fire Extinguishers are kept. , CoP 17.0 – Safet
mat is dry  Ensure that no hot works are carried Workers Signage and
out near the absorptive mats Signals – Version
 Ensure regular housekeeping is 3.0
carried out OSHAD-SF –
Codes of Practice
CoP 08.0 – Gene
Workplace
Amenities – Versi
3.0

OSHAD SF-
Element- 5 –
Training and

21
RISK ASSESSMENT
Document Risk Assessment
Abu Dhabi Future School Program - Phase 8,
Ref: No AEGC-KG-RA - 010
Package 1, Al  Falah KG Sector 1C plot P3
Rev. 00

RISK LEVEL RESIDUAL RISK LEVEL


S.No Activity HAZARD & RISK Groups Exposed Control Measures Action By Legal Reference
P S R RL P S R RL

awareness and
competency

OSHAD-SF –
Element 6 -
Emergency
Management

OSHAD-SF –
CoP 1.0 –
Hazardous
 MSDS for Concrete & form oil, to be Materials - Versio
made available and the workers to be 3.0.
trained regarding the safe usage
OSHAD-SF – C
( PPE, emergency preparedness )
2.0 – Personal
 Ensure that PPE( Respirators, Hand
Handling of Protective
Gloves, Safety glasses etc) is worn
chemicals Equipment - Vers
Contact with Workers, Staff, as mentioned in the MSDS while 3.0
10 ( Concrete & 3 3 9 H AEGC 1 3 3 L
chemicals Visitors handling the chemicals.
approved Form OSHAD-SF –
 Ensure that Chemicals are stored in a
oil) Element 2 - Risk
safe storage area as recommended
in the MSDS (Material Safety Data Management
Sheet). OSHAD SF-
 Ensure that the area is barricaded Element- 5 –
while carrying out Concreting works Training and
awareness and
competency

OSHAD-SF –

22
RISK ASSESSMENT
Document Risk Assessment
Abu Dhabi Future School Program - Phase 8,
Ref: No AEGC-KG-RA - 010
Package 1, Al  Falah KG Sector 1C plot P3
Rev. 00

RISK LEVEL RESIDUAL RISK LEVEL


S.No Activity HAZARD & RISK Groups Exposed Control Measures Action By Legal Reference
P S R RL P S R RL

Element 6 -
Emergency
Management

Musanada Key H
Requirements

 Ensure all materials are stored safely OSHAD-SF – C


 Access and egress to be kept clear at 8.0 – General
Tripping hazards Workers, Staff 2 4 8 H all times. AEGC 1 2 2 L Workplace
 Regular housekeeping to be carried Amenities Version
out. 3.0

OSHAD-SF - C
22.0 – Barricading
 Ensure the area is barricaded and of Hazards –
Unauthorized Workers, Public, Suitable Signage is displayed to Version 3.0
2 4 8 H AEGC 1 2 2 L
access Staff prevent unauthorized access is OSHAD-SF –
prohibited. CoP 17.0 – Safet
Signage and
Signals – V 3.0

Environment  All chemicals must be received, OSHAD-SF – C


Concerns. stored and handled according to 54.0 – Waste
Disposal of prescribed procedures in the MSDS. Management –
concrete waste Noncompliance to Environment 3 3 9 H AEGC 1 3 3 L Version – 3.0
11  All workers will be trained how to
in normal trash Estidama , Centre
of waste segregate hazardous waste and its OSHAD-SF– C
management proper disposal as per the Main 1.0 – Hazardous
guidelines Contractors and Abu Dhabi Materials - V 3.0

23
RISK ASSESSMENT
Document Risk Assessment
Abu Dhabi Future School Program - Phase 8,
Ref: No AEGC-KG-RA - 010
Package 1, Al  Falah KG Sector 1C plot P3
Rev. 00

RISK LEVEL RESIDUAL RISK LEVEL


S.No Activity HAZARD & RISK Groups Exposed Control Measures Action By Legal Reference
P S R RL P S R RL

Municipality guidelines. OSHAD SF-


 TBT to be conducted and instructions Element- 5 –
to be given to workers regarding the Training and
safe disposal of waste as mentioned awareness and
in the MSDS. competency

24
RISK ASSESSMENT
Document Risk Assessment
Abu Dhabi Future School Program - Phase 8,
Ref: No AEGC-KG-RA - 010
Package 1, Al  Falah KG Sector 1C plot P3
Rev. 00

RISK LEVEL RESIDUAL RISK LEVEL


S.No Activity HAZARD & RISK Groups Exposed Control Measures Action By Legal Reference
P S R RL P S R RL

Method Statement & Risk Assessment handover


Date: _ _ / _ _ /_ _ _

I have read, understood and accept the conditions of this method statement & Risk Assessment.
Name of Job Supervisor/Foremen/Site Engineer: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Signature: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
All operatives involved with this job must sign below
I have read, understood and accept the conditions of this method statement and Risk Assessment.

Sr. Emirates ID
Name Emp. No. Designation Date Signature Remarks
No. No
1
2
3
4
5
6
7
8
9
10
11
12
13

25
RISK ASSESSMENT
Document Risk Assessment
Abu Dhabi Future School Program - Phase 8,
Ref: No AEGC-KG-RA - 010
Package 1, Al  Falah KG Sector 1C plot P3
Rev. 00

RISK LEVEL RESIDUAL RISK LEVEL


S.No Activity HAZARD & RISK Groups Exposed Control Measures Action By Legal Reference
P S R RL P S R RL

26
RISK ASSESSMENT