Al ESLAH GEN. CONT .

Est
Lifting Plan

Location: Al Falah Abu Dhabi Area: Al Falah

Permit Number: Risk Assessment Number:

Generic Lifting Plan No: Method Statement Number:

is Diagram/Sketch/Calculations Of Lifting Operation Enclosed? YES/NO nr.:


Description Of Lifting Operation:

Lift Category: Routine: Non-Routine:

Weight Of Load: Actual / Assessed (delete as appropriate)

Sketch of the lift( lifting point to release point)

AE/PSAF/AD/EHS/LP/F-046 Rev: 0 Dated : 20.09.2016 Page: 1 of 1


Al ESLAH GEN. CONT .Est
Lifting Plan

Lifting Equipment & Accessories to be used (specify type ,SWL and colour code

All Lifting Operations Require The Following To Be Considered But This List Is Not Exhaustive.

Cultural, communication and language difficulties Conflicting tasks in area

Weight, size, shape and centre of gravity of load   Environmental conditions including weather and
permissible limits
Availability of approved lifting points on load Lighting in the pick-up and lay-down areas;
Proximity hazards, obstructions, path of load
Method of slinging/attaching/detaching the load
Working under suspended loads
Overturning/load integrity/need for tag lines
Access and emergency escape routes
Suitability & condition of lifting equipment be used Experience, competence and training of personnel

Initial & final load positions & how it will get there Number of personnel required for task
Pre-Use Inspection of equipment by operator
Ground and underground considerations
Visibility of the load
Lifting over live equipment wind speed

Number and duration of lift(s) 




Task Details (Step By Step)
As per method statement.

Method(s) Of Communication To Be Used Radio Verbal Hand Signals 

Steps Taken To Eliminate Danger To Personnel Involved and Others (including barriers where appropriate):

De-brief and learning points:

Prepared By/Name signature: Noted By:

Approved By/Name: Signature: Date:

Closure
Name: Signature: Date:

TBT to be attached along with this plan with the signature of all workforces involved in lifting operation.

AE/PSAF/AD/EHS/LP/F-046 Rev: 0 Dated : 20.09.2016 Page: 1 of 1