Permit No.
WORK DETAILS
1 PROJECT/AREA:
LOCATION:
2 HOTWORK DETAILS:
Tools/Equipment to be used:
Flammable liquids, dust, lint, oily deposits removed Pressurised vessels, piping and equipment removed
from service, isolated and vented
Explosive atmosphere in area is eliminated
Fire watch/Hot work area monitoring
Floors swept clean
Fire watch will be provided during and for 60 minutes
Combustible floors wet down, covered with damp after work, including any meal breaks
sand or fire resistive sheets
Fire watch has suitable extinguishers and, where
Other combustibles removed where possible or practical, a charged small hose
protected with fire resistive tarpaulins
Fire watch is trained in use of equipment and
All floor and wall openings covered sounding alarm
Fire resistive tarpaulins suspended beneath work Fire watch provided in adjoining areas as needed
Ducts and conveyors shut down or protected to Area to be monitored for 4 hours after job completed
prevent passage of sparks to other combustibles
PERMIT ACCEPTANCE
6 ACCEPTANCE by Performer-[Execution incharge/ site engineer]
I have read and understood this permit
I will undertake to work in accordance with the precautions/ conditions defined in this permit and in associated approvals
I will undertake to brief all those in the hot work team to ensure compliance
Name: Signature Date Time
PERMIT CLOSURE
7 CLOSURE
A] Declaration by performer
Work Complete*/ Not Complete Name: Date
Work site clear & equipment left in safe condition
Housekeeping is satisfactory Signature Time