You are on page 1of 36

W h i t e pa p e r

ATS021-ATS022
Automatic transfer switching
1


Index

002 1. Introduction

003 – 024 2. Description of ATS


006 – 024 Switching logics
007 – 011 Transformer for the main line
and generator for the
emergency line
012 – 015 Transformer for the main lin
and transformer for the
emergency line
016 – 019 Use of a bus-tie for the
exclusion of non-priority loads
(with ATS02)
020 – 024 Use of a bus-tie to manage
two independent supply lines
(with ATS022)

025 – 026 3. Field of application

027 – 031 4. Application example


2 AT S 0 2 1 - AT S 0 2 2 A u to m at i c t r a n s f e r s w i tc h i n g


1. Introduction

Over the past few years, service continuity in low


-- reduces the effects caused by network faults
voltage electrical installations has played an in-
on parts of the installation (voltage reduction
creasingly leading role.
leads to loss of stability in the rotating ma-
In actual fact, this requirement is a fundamental
chines, a higher voltage drop, faults in the
characteristic if economically and functionally ef-
equipment, etc…)
ficient installations are to be created.
-- achieves a good compromise amongst reli-
ability, simplicity and cost-effectiveness
A system able to switch the supply from the main
-- provides the maintenance staff and managing
line to an emergency line reduces problems
system with a power source able to supply the
caused by faulty conditions in the public network
installation or part of it when the transformer
to the minimum.
is being serviced.

These operations, commonly known as “auto-


To achieve automatic transfer switching, the in-
matic switching”, comprise sequences that auto-
stallation can be fitted with an Automatic Trans-
matically control the installation components (the
fer Switch ATS (available in versions 021 and 022)
circuit-breakers play a fundamental role) without
featuring microprocessor-based technology.
interventions from the operator.
If the main line is lost, this device can control gen-
erator startup and can handle switching from one
To guarantee that power is supplied to the loads,
network to another by means of the commands
a fundamental requirement in an installation is to
transmitted to the circuit-breakers.
have a redundancy in supply sources type N+1,
This solution has been developed in order to en-
usually consisting of a transformer + emergency
sure a much higher degree of reliability than the
generator (or, as an alternative, a second trans-
“traditional” solutions using wired logic (with
former).
time delay relays, contactors, voltage sensors,
etc.), which are often complicated to make and
An installation with an automatic switching sys-
depend on several devices being integrated.
tem:
This White Paper deals with the concept of auto-
-- prevents the industrial production process matic switching in plant engineering and then
from being stopped continues with a practical analysis so as to ex-
-- provides a power supply with high quality plain how the ATS units integrate with all the de-
voltage if the main network is out of service vices involved in the switching process.
W h i t e pa p e r 3


2. Description of ATS

As mentioned previously, to achieve automatic main and the emergency line from occurring.
switching, the installation can be provided with The ATS unit continuously monitors the voltage
an Automatic Transfer Switch ATS (available in value of the system and automatically switches to
versions 021 and 022) with microprocessorbased the generator or transformer, after a preset delay.
technology. This delay allows the activation time of the proce-
This solution has been designed to ensure dure in case of faults to be regulated, thus
a high degree of reliability thanks to the intrinsic preventing unwanted switching due to voltage
safety systems linked to the operation of the variations accepted by the installation *.
software and hardware. When the main voltage returns within acceptable
The switching logic is inhibited and an alarm is limits, the ATS transmits a signal to activate
activated if the state of a circuit-breaker (or a back-switching so as to return to the initial condi-
switch-disconnector) operating as the actuator tions**.
of the system fails to match the command trans-
mitted by the ATS. Moreover, use of the mechani- These phases can be summarized as follows:
cal interlock prevents any parallel between the

SWITCHING:

Main supply Emergency Supply


Main supply Generator
available supply from an
missing start-up
available emergency line

Absence of generator

BACK-SWITCHING:

Opening Supply Generator


Main supply
of CB on from switch-off
returns
emergency line the main line (if present)

* this analysis must be performed according to the type of load and the type of installation considered
** in the case of ATS022, you can decide whether to remain on the switched emergency linè once the initial conditions have
been restored by activating the dedicated function (“no priority line” set to “on”).
4 AT S 0 2 1 - AT S 0 2 2 A u to m at i c t r a n s f e r s w i tc h i n g


2. Description of ATS

ATS (021 or 022) activates the switching proce- These faults can cause irreparable damage in an
dure when one of the following faults occurs by electrical installation. Just think of electrical/
means of its internal sensors: electronic devices supplied by voltages that are
lower or higher than the rated operating voltage,
Settings or faults that affect electrical machines:
Maximum and minimum voltage control With ATS021:
MIN/MAX: +/-10%, +/-15%, -- thermal stress
U +/-20%, +/-30% -- internal temperature rise
UL1 UL2 UL3 -- variations in speed or rotation that also affect
With ATS022:
MIN: -30%…-5% di Un, the connected devices
MAX: +5% … +30% Un -- interference when starting-up
with step ± 1% Un
t
Electrical networks that can be managed by the
ATS
The characteristics of the networks controlled
must be accurately entered to allow the ATS to
function correctly in the plant in which it is in-
stalled.
Voltage imbalance No adjustment required
ATS units can manage three-phase systems,
U three-phase systems without neutral or sin-
UL1 UL2 UL3 gle-phase systems.
The ATS also functions in the absence of auxiliary
supply, since it can draw voltage directly from the
network (as shown in the table, with
t
ATS021 the shunted power supply must be con-
nected to the relative terminals).
With ATS022, the auxiliary supply is only required
in the following cases:
-- use of Modbus RS485 communication
-- use in systems with 16 2/3Hz rated frequency
Maximum and minimum frequency control With ATS021:
MIN/MAX: 0.9fn>f>1.1fn -- use in single-phase systems with Un 57.5 to
U
109Vac
With ATS022:
A 24Vdc to 110Vdc (-10%, +15%) emergency power
MIN: -10% …-1% di fn
MAX: +1% … +10% di fn supply can be used.
with step ± 1%

t The maximum operating voltage for both ATS021


and ATS022 is 480Vac. Transformers must be
used at higher voltage values.

Consult technical manuals CODE:


1SDH000759R0001 (for ATS021) and
1SDH000760R0001 for (ATS022) for the correct
Phase loss No adjustment required
settings
U
UL1 UL2 UL3

IL3

t
W h i t e pa p e r 5

The following table shows the connections to the power supply source for both the main and emer-
gency lines.

ATS021 ATS022

Three-phase Connections LINE 1 LINE 2 LINE 1 LINE 2


L1 L2 L3 N L1 L2 L3 N L1 L2 L3 N L1 L2 L3 N
system with

Measurements

Measurements
Measurements

Measurements
neutral L1 L1 L1 L1

4 3 2 1

4 3 2 1

4 3 2 1

4 3 2 1
conductor L2 L2 L2 L2

X12
X11

X12
X11
L3 LN1 LN2 L3 L3 LN1 LN2 L3
N N N N
External AUX power supply only if:
- Modbus communication is required

Supply

Supply
L

Supply
L L - 16 2/3 Hz rated frequency

X14
X13

X41
2 1
2 1

2 1
N N N - use in single-phase systems with
Un=57.5….109Vac

Settings S24
ON DIP Number of phases

3 phases with N

1 2 3 4 Cancel Edit

Three-phase Connections LINE 1 LINE 2 LINE 1 LINE 2


system with L1 L2 L3 L1 L2 L3 L1 L2 L3 L1 L2 L3

Measurements

Measurements
Measurements

Measurements

neutral L1 L1 L1 L1

4 3 2 1

4 3 2 1
4 3 2 1

4 3 2 1

conductor L2 L2 L2 L2

X11

X12
X12
X11

L3 LN1 LN2 L3 L3 LN1 LN2 L3


(*) N N (*) N N
External AUX power supply only if:
- Modbus communication is required

Supply
- 16 2/3 Hz rated frequency
Supply

Supply

L L L
X14

X41
X13

2 1
2 1
2 1

N N N - use in single-phase systems with


Un=57.5….109Vac

Settings S24
ON DIP Number of phases

3 phases without N

1 2 3 4 Cancel Edit

Single-phase Connections LINE 1 LINE 2 LINE 1 LINE 2


system L1 N L1 N L1 N L1 N
Measurements

Measurements
Measurements

Measurements

L1 L1 L1 L1
4 3 2 1

4 3 2 1
4 3 2 1

4 3 2 1

L2 L2 L2 L2
X12
X11
X12
X11

LN1 LN2 L3 L3 LN1 LN2 L3


L3
N N N N
External AUX power supply only if:
- Modbus communication is required
Supply
Supply

Supply

L L L - 16 2/3 Hz rated frequency


X14

X41
X13

2 1
2 1
2 1

N N N - use in single-phase systems with


Un=57.5….109Vac

Settings S24
ON DIP Number of phases

1 phase

1 2 3 4 Cancel Edit

* The characteristics of the external transformer for sole supply of ATS021 are:
- transformer (from network voltage to phase voltage)
- isolation transformer or insulator
- the Sn of the transformer must be 40VA.

NOTE: ATS022 allows the main and emergency networks to be set as two different types of network (e.g. main line 3P+N and emergency line PN).
6 AT S 0 2 1 - AT S 0 2 2 A u to m at i c t r a n s f e r s w i tc h i n g


2. Description of ATS

-- a transformer for the main line and another


Switching logics transformer for the emergency line
Since the ATS can control different plant engi- -- use of a bus-tie to exclude non-priority loads
neering configurations, the following pages de- (with ATS022 only)
scribe the sequences of operations carried out by -- use of a bus-tie to manage two independent
this unit. Special attention is given to the most supply lines (with ATS022 only). The following
common plant engineering configurations that table shows the time settings required to im-
the ATS can manage. plement the switching logics described in the
These configurations are: following pages:

-- a transformer for the main line and a genera-


tor for the emergency line

Setting range

Time delays Description ATS021 ATS022 Remarks

Time delay before the start of the 0...30s The delay, which lasts a few seconds, prevents the
switching procedure. In the absence of switching procedure from starting due to transient
TS a generator, this time corresponds to voltage dips.
the opening delay of the circuit-breaker
on the main line. If a generator is instal-
led, this time corresponds to the genera-
tor start-up delay.

Time delay before the circuit-breaker on 3.5s 0..60s It is advisable to select a short delay to reduce the break
ATS021
the generator side or transformer side fixed in power supply to the loads.
closes.
TF
ATS022

TCE

Time delay before the circuit-breaker on 0...30s 0...59s The time delay before the circuit-breaker on the emer-
the generator side or transformer side o 1,2,3... gency side opens, after the main voltage returns, must
TBS opens (start of back-switching proce- 300s 30min be as long as possible to ensure complete stabilization
dure). of the main voltage.

Time delay before the circuit-breaker on 3.5s 0..60s The time delay before the circuit-breaker on the main
ATS021
the main line closes. fixed line closes, after the circuit-breaker on the emergency
side has opened, must be as short as possible so as to
TF reduce the time in which the loads are not supplied to
the minimum.
ATS022

TCN

Time delay before the bus-tie closes (if ATS 022 only: Time TC must only be set for management of two inde-
installed). 0…60s pendent supply lines separated by a bus-tie – for further
TC information refer to page 20.

Generator switch-off time (if installed). 0...30s 0...59s The time delay before the generator (if installed)
o 1,2,3... switches off should be long enough to ensure that it is
TGoff 300s 30min still running should a further power failure occur in the
main network.
W h i t e pa p e r 7

The following table gives examples of time delay Transformer for the main line and
settings (with ATS022) for a network with a trans- generator for the emergency line
former for the main line and a generator for the According to the operating logic, under standard
emergency line: operating conditions, the network is powered by
transformer TR1 and, if a failure occurs, the loads
Time delays Description Setting range Setting examples are supplied by the emergency line through the
GS1 (generator able to deliver the same current
as the transformer).
Time delay before
the switching
0…30s 5s
TS procedure starts with Wiring diagram Switching logic
generator start-up.

TR1 GS1
normal G stand by QF1 QF2
TCE
TS line line
O O
ATS

Time delay before the QF1 QF2


Normal I O
TBS circuit-breaker on the 0…60s 1s Emergency O I
TCE
TS generator side closes.
O = circuit-breaker open
QF3 I = circuit-breaker closed
TCN
TBS
TCE to the loads
TS Time delay before
TGoff the circuit-breaker
TCN on the generator side
0…59s,
45s
TBS opens (start of back-
1,2,3…30min
TCE
TS switching procedure). Under normal operating conditions, the ATS mon-
TGoff itors the main network and, if a fault occurs,
TCN
TBS transmits a signal to start the generator after a
TCE time TS. When the emergency line becomes
Time delay before the
TGoff circuit-breaker on the 0…60s 1s
available, the ATS activates line circuit-breaker
TCN main line side closes. opening and emergency line circuit-breaker clos-
TBS ing after a time TCE (TF for ATS021). From that
moment on, the network is supplied by the gener-
TGoff
TCN ator and QF2 becomes the main circuit-breaker of
the installation.
Generator switch- 0...59s,
5 min
TGoff off time. 1,2,3...30min
When the electrical parameters of the main line
return within acceptable limits (depending on the
setting) and once time delay TBS has elapsed, the
ATS activates the back-switching procedures by
As can be seen, from the moment a fault occurs in opening circuit-breaker QF2 on the emergency
the main network, assuming that the generator line and subsequently closing circuit-breaker QF1
starts in 10 seconds, the supply for priority loads on the main line after the set delay TCN (TF for
is provided in about 16 seconds (TS+10s+TCE). ATS021) has elapsed.

The moment in which the installation is supplied


by the main network, the ATS commands genera-
tor switch-off after time TGoff has elapsed.
8 AT S 0 2 1 - AT S 0 2 2 A u to m at i c t r a n s f e r s w i tc h i n g


2. Description of ATS

The following table illustrates the operating sequences and the various commands performed by the
ATS:

Switching – from TR1 to GS1 Back switching – from GS1 to TR1

TR1 Failure detected in The conditions of


GS1
G stand-by TR1 GS1
G stand-by
normal the main network. normal the main network
line line
V ATS
line V line
ATS return within
TS acceptable limits.
QF1 QF2 QF1 QF1
(closed) (open) (open) (closed)

to the loads
TCE
to the loads

The ATS waits for set


TS The ATS waits for set TBS
delay TS to elapse. delay TBS to elapse.

TCE GS1 TCN The ATS commands


TR1
normal
The ATS transmits TR1 TS GS1
line
stand-by line a command normal
line
G stand-by
line
emergency line circuit-
G V which activates ATS breaker QF2 opening.
ATS
TBS the generator. QF1
TGoff QF2
QF1 QF2
(open)
The emergency (open) TCE (open)
(closed)
power supply
TCN becomes available TC
to the loads
once start-up has to theTBS
loads
been completed.

TGoff The ATS waits for


TCN set delay TCN (TF for
TS
The ATS commands ATS021) to elapse.
TR1 GS1
normal
line
TC G stand-by circuit-breaker QF1
TGoff
line The ATS commands
ATS opening the moment TR1 GS1
QF1 QF2 the emergency normal
line
TCE G stand-by circuit-
line
(open) (open) ATS breaker QF1 closing.
power supply
becomes available. QF1 TC QF2
The ATS waits for (closed) TBS (open)
set delay TCE (TF for
to the loads
ATS021) to elapse.
TS
TCN
to the loads

The ATS waits for


TCE set delay TCE (TF for TGoff
The ATS waits for set
delay TGoff to elapse
ATS021) to elapse.

TBS TC
TR1 GS1 The ATS commands GS1 The ATS commands
normal G stand-by circuit- breaker TR1 stand-by
line
the generator to stop.
line line normal
ATS QF2 closing. G V
QF1 TCN QF2
line
ATS
(open) (closed)
QF1 QF1
(closed) (open)
TGoff
to the loads
to the loads
TC
W h i t e pa p e r 9

From an operational point of view The bill of materials could also be completed with
To implement the switching logic, in addition to external devices that are not accessories of the
the ATS021-022 units, the circuit-breakers must circuit-breakers.
be equipped with the following accessories (for The number and types of components not only
each circuit-breaker): depends on whether an emergency power supply
source for energizing the motor operators is used
-- a motor operator with key lock against manual
or not, but also on the types of circuit-breakers
operation
used. Consult the following documents for
-- an open/closed contact and a "trip unit
details about these connections:
tripped" contact or, alternatively, an S51 con-
tact if available -- 1SDH000087R0001 for switching between
-- in case of withdrawable circuit-breakers, a CB SACE Tmax XT moulded-case circuit-breakers
racked-in/out contact -- 1SDH000086R0001 for switching between
-- a mechanical interlock. Emax air circuitbreakers, Tmax T circuit-break-
ers and circuit-breakers T7 and X1.

The following figures give an overall view of the connections between ATS021 and all the components
involved in transfer switching (three-phase system + neutral conductor).

LINE 1

LINE 2

L1 L2 L3 N
ATS 021 Measurements
L1 L2 L3 N
Measurements

L1 L1
4 3 2 1

L2 L2 4 3 2 1
X12
X11

L3 LN1 LN2 L3
N N

Output to control QF1


YO
Supply

Supply

L L
2 1

X14
X13

2 1

N N
M

+ Output to control
o Gen Start/Stop
COM D05
3 2 1

3 2 1
X23
X21

D01 COM
YC D02 D05

COM D06
3 2 1
3 2 1

Alarm
X24
X22

D03 COM signaling


Output to control QF2 D04 D06

YO Logic
enabled/disabled
DI3 COM Manual/auto mode signaling
4 3 2 1

3 2 1
X25

DI1 D07
X31

DI2 D08 Logic enabled


M
DI
o + Supply
X61
1

Earth connection

YC

State QF1-QF2
Logic
enabled/
disabled COM
input
10 AT S 0 2 1 - AT S 0 2 2 A u to m at i c t r a n s f e r s w i tc h i n g


2. Description of ATS

The following figures give an overall view of the connections between ATS022 and all the components
involved in transfer switching (three-phase system + neutral conductor).

LINE 1

LINE 2

ATS 022
L1 L2 L3 N L1 L2 L3 N
LN1 LN2
L1 L1

Measurements

Measurements
4 3 2 1

4 33 2 1
L2 L2

X12
X11

L3 L3
AUX* N N
Output to control QF1 Output to control
Gen Start/Stop
YO
CP-E 24/0.75
Supply

+ D005 Start

3 2 1
X41
2 1

X23
– COM
D005 Stop

M
COM D011 3 2 1
3 2 1

Output to control the third CB,


X24
X21

o + D03 COM
in this case not wired
D04 D011

YC
COM
3 2 1
X22

D03
D04

D06
7 6 5 4 3 2 1

Output to control QF2 DI13 D07


4 3 2 1

DI11 D08
X31

X29

YO DI12 D09
DI D010
Supply D012
COM
M DI11 Modbus
9 8 7 6 5 4 3 2 1

DI10
+ DATA B
3 2 1

o DI9
X51

DATA A
DI8 CND
X32

DI7
YC DI6
DI5 Earth
DI4 connection X61
1

DI
Supply

X31 X32 X29


1 Logic enabled/disabled input 1 State QF3 (not wired) 1 Alarm signaling
2 State QF1 2 Programmable input 2 Not used
3 State QF2 3 Command to force transfer switching 3 Not used
4 COM 4 Generator alarm 4 CB alarm signaling
5 QF2 inserted 5 Manual mode signaling
6 QF1 inserted 6 Logic enabled/disabled signaling
* External AUX power supply only if: 7 QF2 tripped 7 COM
- Modbus communication is required
- 16 2/3 Hz rated frequency 8 QF1 tripped
- use in single-phase systems with Un=57.5….109Vac 9 COM
W h i t e pa p e r 11

Network settings
Network specification:
transformer line: 400Vac, three-phase+N
generator line: 400Vac, three-phase +N
frequency: 50Hz

System configuration System configuration


with ATS021 with ATS022

Generator in use S24


ON DIP System configuration 6/6 Generator usage
Protection devices
Generator usage Generator in use
Line priority
1 2 3 4 Cancel Edit

Electrical system S24


3F+N ON DIP System configuration 1/6 Number of phases
Rated voltage
Rated frequency
3 phases with N
Number of phases line 1
1 2 3 4 Cancel Edit

S24
ON DIP System configuration 1/6 Number of phases
Rated frequency
Number of phases line 1 3 phases with N
Number of phases line 2
1 2 3 4 Cancel Edit

Rated frequency S23


50Hz ON DIP System configuration 1/6 Rated frequency
Rated voltage
Rated frequency 50 Hz
Number of phases
1 2 3 4 Cancel Edit

Protection devices No settings


to be carried out System configuration 6/6 Protection devices
Protection devices
Line priority 2 CBs
Generator usage
Cancel Edit

Network voltage S23


ON DIP System configuration 1/6 Rated voltage
Rated voltage
Rated frequency 400/230 V
Number of phases
1 2 3 4 Cancel Edit
12 AT S 0 2 1 - AT S 0 2 2 A u to m at i c t r a n s f e r s w i tc h i n g


2. Description of ATS

Transformer for the main line and The following table illustrates the operating se-
transformer for the emergency line quences and the various commands performed
According to the operating logic, under normal by the ATS:
operating conditions the network is supplied by Switching – from TR1 to TR2
the transformer while in case of faults, the loads TR1 TR2 Fault detected
normal stand-by on the main
are supplied by the emergency network. line line
V ATS network.
This sort of network consists of a transformer
with the same power rating as the main line QF1 QF2
(closed) (open)
transformer.
to the loads
Wiring diagram Switching logic The ATS waits for
TS set delay TS
TR1 TR2 to elapse
normal stand-by QF1 QF2
line line
ATS
O O TR1 TCE TR2 The ATS commands
normal stand-by circuit-breaker
Normal I O line line
QF1 QF2 ATS QF1 on the main
Emergency O I line to open
QF1 TBS QF2
O = circuit-breaker open (open) (open)

I = circuit-breaker closed TS
QF3
toTCN
the loads
The ATS waits for
to the loads TCE set delay TCE
TGoff to elapse (TF
for ATS021)
TBS The ATS commands
TR1 TR2
The ATS monitors the main network and when a normal TC stand-by circuit-breaker
line line
ATS QF2 to close
fault occurs it waits for set TS time to elapse, af- TCN
QF1 QF2
ter which it transmits an opening command to (open) (closed)
circuit-breaker QF1 (main circuit-breaker of the
main supply). If an emergency power supply is TGoff
to the loads
available, once the TCE time setting (TF for Back switching – from TR2 to TR1
ATS021) has elapsed, the ATS transmits a closing TR1 TC TR2 The conditions
normal stand-by of the main
command to circuit-breaker (QF2) on the emer- line TS line
V ATS
network return
gency line. within acceptable
In these conditions, the installation is supplied by QF2 QF2 limits
(open) (closed)
transformer TR2 and circuit-breaker QF2 be- TCE
comes the circuit-breaker on the supply side of all to the loads
the outgoing feeders. TBS The ATS waits for
set delay TBS
When the electrical parameters of the main line
TS to elapse
return within acceptable limits (depending on the
setting) and once time delay TBS has elapsed, the TR1
TCN TR2
After time delay
normal stand-by TBS has elapsed,
ATS activates the back-switching procedures by line TCE
ATS
line the ATS commands
opening circuit-breaker QF2 on the emergency QF1 TGoff QF2 CB QF2 on
line and then by closing circuit-breaker QF1 on the (open) (open) the emergency
TBS line to open.
main line after set delay TCN (TF for ATS021) has
elapsed. TC
to the loads
The ATS waits for
TCN set delay TCN
(TF for ATS021)
to elapse
TGoff The ATS commands
TR1 TR2
normal stand-by circuit-breaker
line line QF1 closing.
ATS
QF1
TC QF2
(closed) (open)

to the loads
W h i t e pa p e r 13

From an operational point of view The bill of materials could also be completed with
To implement the switching logic, in addition to external devices that are not accessories of the
ATS021-022 units, the circuit-breakers must be circuit-breakers. The number and type of compo-
equipped with the following accessories (for each nents not only depends on whether an emergency
circuit-breaker): power supply source for energizing the motor op-
erators is used or not, but also on the types of cir-
-- a motor operator with key lock against manual
cuit-breakers used. Consult the following docu-
operation
ments for details about these connections:
-- an open/closed contact and a “trip unit
tripped” contact or, alternatively, an S51 con- -- 1SDH000087R0001 for switching between
tact if available SACE Tmax XT moulded-case circuit-breakers
-- in case of withdrawable circuit-breakers, a CB -- 1SDH000086R0001 for switching between
racked-in/out contact Emax air circuitbreakers, Tmax T circuit-break-
-- a mechanical interlock. ers and circuit-breakers T7 and X1.

The following figures give an overall view of the connections between ATS021 and all the components
involved in transfer switching.

LI NE 1 LINE 2

L1 L2 L3 N L1 L2 L3 N

ATS 021
Measurements
Measurements

L1 L1
4 3 2 1

4 3 2 1
L2 L2
X12
X11

L3 LN1 LN2 L3
N N

Output to control QF1


YO
Supply

Supply

L L
X14
X13
2 1

2 1

N N
M

o +
COM D05
3 2 1

3 2 1
X21

Output to control Gen Start/Stop


X23

D01 COM
YC (not wired)
D02 D05

COM D06
3 2 1
3 2 1

Alarm
X24
X22

D03 COM signaling


Output to control QF2 D04 D06

YO Logic
enabled/disabled
DI3 COM Manual/auto mode signaling
4 3 2 1

3 2 1
X25

DI1 D07
X31

M DI2 D08 Logic enabled


DI
o + Supply
X61
1

Earth
connection
YC

X31
1 Logic enabled/disabled input
2 State QF1
3 State QF2
4 COM
14 AT S 0 2 1 - AT S 0 2 2 A u to m at i c t r a n s f e r s w i tc h i n g


2. Description of ATS

The following figures give an overall view of the connections between ATS022 and all the components
involved in transfer switching.

LINE 1 LINE 2

ATS 022
L1 L2 L3 N L1 L2 L3 N
LN1 LN2
L1 Measurements L1

Measurements
4 3 2 1

4 33 2 1
L2 L2
X11

X12
L3 L3
AUX* N N
Output to control QF1
CP-E 24/0.75

YO D005 Start
Supply

3 2 1
X41
2 1

Output to control Gen Start/Stop


X23
– COM
D005 Stop (not wired)

M
COM D011
3 2 1
3 2 1

Output to control the third CB,


X21

+
X24

o D03 COM
in this case not wired
D04 D011

YC
COM
3 2 1
X22

D03
D04

D06
7 6 5 4 3 2 1

Output to control QF2 DI13 D07


4 3 2 1

DI11 D08
X31

X29

YO DI12 D09
DI D010
Supply D012
COM
M DI11 Modbus
9 8 7 6 5 4 3 2 1

DI10
+ DATA B
o
3 2 1

DI9
X51

DATA A
DI8 CND
X32

DI7
YC DI6
DI5 Earth
DI4 connection X61
1

DI
Supply

X31 X32 X29

1 Logic enabled/disabled input 1 State QF3 (not wired) 1 Alarm signaling


2 State QF1 2 Programmable input 2 Not used
3 State QF2 3 Command to force transfer switching 3 Not used
4 COM 4 Generator alarm 4 CB alarm signaling

5 QF2 inserted 5 Manual mode signaling

6 QF1 inserted 6 Logic enabled/disabled signaling


* External AUX power supply only if: 7 COM
7 QF2 tripped
- Modbus communication is required
- 16 2/3 Hz rated frequency 8 QF1 tripped
- use in single-phase systems with Un=57.5….109Vac 9 COM
W h i t e pa p e r 15

Network settings
Network specification:
transformer line 1: 400Vac, three-phase+N
transformer line 2: 400Vac, three-phase+N
frequency: 50Hz

System configuration System configuration


with ATS021 with ATS022

Generator not in use S24


ON DIP System configuration 6/6 Generator usage
Protection devices
Generator usage No generator
Line priority
1 2 3 4 Cancel Edit

Electrical system S24


3F+N ON DIP System configuration 1/6 Number of phases
Rated voltage
Rated frequency
3 phases with N
Number of phases line 1
1 2 3 4 Cancel Edit

S24
ON DIP System configuration 1/6 Number of phases
Rated frequency
Number of phases line 1 3 phases with N
Number of phases line 2
1 2 3 4 Cancel Edit

Rated frequency S23


50Hz System configuration 1/6 Rated frequency
ON DIP Rated voltage
Rated frequency 50 Hz
Number of phases
1 2 3 4 Cancel Edit

Protection devices No settings


to be carried out System configuration 6/6 Protection devices
Protection devices
Line priority 2 CBs
Generator usage
Cancel Edit

Network voltage S23


ON DIP System configuration 1/6 Rated voltage
Rated voltage
Rated frequency 400/230 V
Number of phases
1 2 3 4 Cancel Edit
16 AT S 0 2 1 - AT S 0 2 2 A u to m at i c t r a n s f e r s w i tc h i n g


2. Description of ATS

Use of a bus-tie for the exclusion of From an operational point of view


non-priority loads (with ATS022) To implement the switching logic, in addition to
According to the operating logic, under normal the ATS022 unit, the circuit-breakers must be
operation conditions, the network is supplied by equipped with the following accessories (for each
the transformer and bus-tie QF3 is closed. If circuit-breaker):
faults occur, the loads are supplied by the emer- -- a motor operator with key lock against manual
gency network (generator) with the bus-tie open. operation
The generator is sized to continuously supply the -- an open/closed contact and a “trip unit
priority loads only, thus its power rating is lower tripped” contact or, alternatively, an S51 con-
than that of the transformer. tact if available
-- in case of withdrawable circuit-breakers, a CB
Wiring diagram Switching logic
racked-in/out contact
-- a mechanical interlock (interlocking cir-
TR1 GS1
normal G stand by QF1 QF2 QF3 cuit-breakers 1 and 2).
line line
O O O
QF1 QF2 Normal I O I The bill of materials could also be completed with
Emergency O I O external devices that are not accessories of the
QF3 O = circuit-breaker open circuit-breakers.
I = circuit-breaker closed The number and type of components not only de-
pends on whether an emergency power supply
non-priority prority
source for energizing the motor operators is used
loads loads or not, but also on the types of circuit-breakers
used. Consult the following documents for
details about these conditions:
The 022 version of the ATS must be used for this
-- 1SDH000087R0001 for switching between
type of configuration.
SACE Tmax XT moulded-case circuit-breakers
The operating sequences are the same as the pre-
-- 1SDH000086R0001 for switching between
vious ones (depending on whether a generator or
Emax air circuitbreakers, Tmax T circuit-break-
a transformer are installed).
ers and circuit-breakers T7 and X1.
The only difference is that if the “CB+NPL Bus Tie”
function is enabled via the display and there is a
Since the third device, used as a bus-tie, must
line voltage failure, besides transmitting the
also be controlled, an additional connection must
opening command to the main circuitbreaker,
be made to include time delay relays and contac-
the ATS also transmits an opening command to
tors. Consult document 1SDM000088R0001).
the bus-tie (after time delay TC has elapsed).
When the network conditions return within the
rated parameters, the ATS starts the back-switch-
ing procedures to allow the installation to return
to its initial conditions (main circuitbreaker and
bus-tie closed).
W h i t e pa p e r 17

The following table shows the operating se- Back-Switching – from GS1 to TR1
quence and the various commands transmitted The conditions
by the ATS: TR1 G GS1 of the main
normal stand-by
V line line network return
within acceptable
ATS
Switching – from TR1 to GS1 limits.
QF1 QF2
Fault detected (open) (closed)
TR1 G GS1 in the main
normal stand-by
V line line network.
QF3
ATS
TS(open)
QF1 QF2 non-priority priority
(closed) (open)
loads loads
TCE
QF3
(closed)
The ATS waits for
non-priority priority TBS set delay TBS
loads loads to elapse

The ATS waits for TCN


The ATS commands
TS set delay TS to
TR1
normal G GS1
stand-by circuitbreaker QF2
elapse. line line on the emergency
TGoff
ATS line to open.
TCE The ATS transmits
TR1 GS1 QF1 QF2
G stand-by a command (open) (open)
V normal
line line
V that starts the TC
TS
ATS
TBS generator. The
emergency QF3
power supply (open)
becomes available
TCE
QF1
(closed)
TCN QF2
(open)
non-priority priority
once start-up loads loads
has been completed.
QF3 TBS
TGoff
(closed)

non-priority priority
The ATS waits for
loads loads TCN set delay TCN to
TC elapse

The moment in which TR1


TGoff The ATS commands
TR1 G GS1 normal G GS1
stand-by
normal stand-by the emergency line line
circuit-breaker QF1
line line and QF3 to close.
power supply
ATS becomes TS
TC
ATS
available, the ATS
QF1 QF2 QF1 QF2
commands (closed) (open)
(open) (open)
circuit-breakers QF1 TCE
and QF3 to
QF3 open. QF3
(closed)
(open) TBS
non-priority priority non-priority priority
loads loads loads loads
TS TCN

The ATS waits for The ATS waits


TCE set delay TCE TGoff for time delay
TF for ATS021) TGoff to elapse.
to elapse.
TBS TC
The ATS commands The ATS stops
TR1 G GS1
normal stand-by circuit-breaker TR1 GS1 the generator
normal G stand-by
line line QF2 closing. V
TCN
ATS
line line
ATS

QF1 QF2
QF1 QF2
(open)
TGoff (closed) (closed) (open)

QF3
QF3
TC
(open)
(closed)
non-priority priority
non-priority priority
loads loads
loads loads
18 AT S 0 2 1 - AT S 0 2 2 A u to m at i c t r a n s f e r s w i tc h i n g


2. Description of ATS
The following figures give an overall view of the connections between ATS022 and all the components
involved in transfer switching.

LINE 1

LINE 2

ATS 022
L1 L2 L3 N L1 L2 L3 N
LN1 LN2
L1 L1
Measurements

Measurements
4 3 2 1

4 33 2 1
L2 L2

X12
X11

L3 L3
AUX* N N
Output to control QF1 Output to control
YO
CP-E 24/0.75
Gen Start/Stop
Supply

+ D005 Start

3 2 1
X41
2 1

X23
– COM
D005 Stop

M Output to control QF3


COM D011 3 2 1
3 2 1

X24
X21

o + D03 COM
D04 D011 YO
YC o +
COM
3 2 1
X22

D03
D04

D06
7 6 5 4 3 2 1

Output to control QF2 DI13 D07


4 3 2 1

DI11 D08
X31

X29

YO DI12 D09
DI D010
Supply D012
COM
M DI11 Modbus
9 8 7 6 5 4 3 2 1

DI10
+ DATA B
3 2 1

o DI9
X51

DATA A
DI8 CND
X32

DI7
YC DI6
DI5 Earth
DI4 connection X61
1

DI
Supply

X31 X32 X29


1 Logic enabled/disabled input 1 State QF3 1 Alarm signaling
2 State QF1 2 Programmable input 2 Not used
3 State QF2 3 Command to force transfer switching 3 Not used
4 COM 4 Generator alarm 4 CB alarm signaling
5 QF2 inserted 5 Manual mode signaling
6 QF1 inserted 6 Logic enabled/disabled signaling
7 QF2 tripped 7 COM
8 QF1 tripped
* External AUX power supply only if: 9 COM
- Modbus communication is required
- 16 2/3 Hz rated frequency
- use in single-phase systems with Un=57.5….109Vac
W h i t e pa p e r 19

Network settings
Network specification:
transformer line 1: 400Vac, three-phase+N
generator line 2: 400Vac, three-phase+N
frequency: 50Hz

System configuration with ATS022

Generator in use
System configuration 6/6 Generator usage
Protection devices
Generator usage Generator in use
Line priority
Cancel Edit

Electrical system
3F+N System configuration 1/6 Number of phases
Rated voltage
Rated frequency
3 phases with N
Number of phases line 1
Cancel Edit

System configuration 1/6 Number of phases


Rated frequency
Number of phases line 1 3 phases with N
Number of phases line 2
Cancel Edit

Rated frequency
50Hz System configuration 1/6 Rated frequency
Rated voltage
Rated frequency 50 Hz
Number of phases
Cancel Edit

Protection devices
System configuration 6/6 Protection devices
Protection devices
Line priority 3 CBs NPL-BUS TIE
Generator usage
Cancel Edit

Network voltage
System configuration 1/6 Rated voltage
Rated voltage
Rated frequency 400/230 V
Number of phases
Cancel Edit
20 AT S 0 2 1 - AT S 0 2 2 A u to m at i c t r a n s f e r s w i tc h i n g


2. Description of ATS
Use of a bus-tie to manage two inde- From an operational point of view
pendent supply lines (with ATS022) To implement the switching logic, in addition to
According to the operating logic, under normal the ATS021-022 units, the circuit-breakers must
operating conditions, the half-bus bars are sup- be equipped with the following accessories (for
plied by the relative upstream transformers (bus- each circuit-breaker):
tie open). -- a motor operator with key lock against manual
If faults occur in one of the two lines and since operation
both transformers are sized for the total power -- an open/closed contact and a “trip unit
absorbed by the installation, the bus-tie will be tripped” contact or, alternatively, an S51 con-
closed and the power supply will be provided by tact if available
the transformer that is not affected by the fault. -- in case of withdrawable circuit-breakers, a CB
racked-in contact
-- a mechanical interlock type C.
Wiring diagram Switching logic
The bill of materials could also be completed with
external devices that are not accessories of the
TR1 TR2
normal normal QF1 QF2 QF3 circuit-breakers.
line line
O O O The number and type of components not only de-
QF1 QF2 Normal I I O pends on whether an emergency power supply
Failure TR1 O I I source for energizing the motor operators is used
Failure TR2 I O I or not, but also on the types of
QF3
O = circuit-breaker open circuit-breakers used.
I = circuit-breaker closed
Consult the following document for details about
these connections:
-- 1SDM000086R0001 for the switching b tween
Emax air circuit-breakers, Tmax T cir-
The ATS monitors the networks (both TR1 and
cuit-breakers and circuit-breakers T7 and X1.
TR2) and, if a fault occurs in one of the two trans-
formers, the ATS022 starts to time according to
Since the third device, used as a bus-tie (QF3),
set delay TS, after which it transits an opening
must also be controlled, an additional connection
command to the circuit-breaker on the secondary
must be made to include time delay relays and
of the transformer affected by the fault. After
contactors.
time delay TC has elapsed, the ATS closes bus-tie
Consult document 1SDM000088R0001).
QF3. Thus, all the loads are supplied by the line
(transformer) without faults.
When the electrical parameters of the faulty line
return within acceptable limits (according to the
settings made) and once time delay TBS has
elapsed, the ATS starts the back-switching
procedure. It opens bus-tie QF3 and then, after
time delay TCN has elapsed, commands the cir-
cuit-breaker on the secondary of the faulty line to
close.
W h i t e pa p e r 21

The following table shows the operating se- Back Switching – from TR2 to TR1
quence and the various commands transmitted The conditions
TR1 TR2
by the ATS: normal normal of line 1 return
V line line within acceptable
Switching - from TR1 to TR2 ATS limits.

Fault detected QF1 QF2


(open) (closed)
TR1 TR2 in line 1.
normal normal
V line line V
ATS QF3
(closed)
QF1 QF2 non-priority
TS priority
(closed) (closed)
loads loads

QF3 TCE
(open)

non-priority priority
loads loads TBS The ATS waits for
set delay TBS
to elapse.
The ATS waits for
TS set delay TS to
TCN The ATS commands
TR1 TR2
elapse. normal normal circuit-breaker
line line QF3 opening.
TS TGoff
TR1
TCE TR2
The ATS commands
ATS

normal stand-by circuit-breaker QF1 QF2


line line (open) (closed)
QF1 opening.
TCE
TBS
ATS TC
QF1 QF2 QF3
(open) (closed) (open)
TBS
TCN non-priority priority
loads loads
QF3
(open)
TCN
non-priority
TGoff
priority
loads loads
TGoff
TC
The ATS commands
TC to elapse. TR1 TR2
TC normal
line
normal
line
circuit-breaker
QF1 opening
ATS line 1 to close.

The ATS commands QF1 QF2


TR1 TR2 (closed) (closed)
normal stand by circuit-breaker
line line
QF3 closing.
ATS QF3
(open)
QF1 QF2
(open) (closed)
non-priority priority
loads loads
QF3
(closed)

non-priority priority
loads loads
22 AT S 0 2 1 - AT S 0 2 2 A u to m at i c t r a n s f e r s w i tc h i n g


2. Description of ATS
Fault in line 2 Back Switching – from TR2 to TR1

The conditions
Switching - from TR1 to TR2 TR1 TR2 of line 2 return
line N line N
Fault detected V within acceptable
TR1 TR2 in line 2. limits.
normal normal ATS
V line line V
QF1 QF2
ATS (closed) (open)

QF1 QF2
(closed) (closed)
TS
QF3
(closed)

QF3 non-priority priority


(open)
loads TCE loads
non-priority priority
loads loads
TBS The ATS waits for
set delay TBS
The ATS waits for
TS set delay TS to
to elapse.
elapse. TCN The ATS commands
TS TR1 TR2
circuit-breaker
TR1 TCE TR2 The ATS commands line N line N
QF3 opening.
normal stand-by circuit-breaker TGoff
line line ATS
QF2 opening.
TCE
TBS
ATS
QF1 QF2
(closed) (open)
QF1 QF2 TC
(closed) (open)
TBS
TCN QF3
(open)
QF3
TCN
(open)
TGoff non-priority priority
non-priority loads loads
priority
loads loads
TGoff TS
TC

The ATS waits for The ATS waits for


TC TCE
set delay TC to set delay TCE
elapse. to elapse.

The ATS commands TBS The ATS commands


TR1 TR2 TR1 TR2
normal stand-by circuit-breaker line N line N circuit-breaker
line line QF3 closing. QF1 on line 2
ATS TCN
AT3 to close.

QF1 QF2 QF1 QF2


(closed) (open) (closed) (closed)
TGoff
QF3 QF3
(closed)
TC
(open)
non-priority priority non-priority priority
loads loads loads loads
W h i t e pa p e r 23

The following figures give an overall view of the connections between ATS022 and all the components
involved in transfer switching.

LINE 1 LINE 2

L1 L2 L3 N
ATS 022 L1 L2 L3 N

LN1 LN2
L1 L1

Measurements
Measurements
4 3 2 1

4 33 2 1
L2 L2

X12
X11
L3 L3
AUX* N N
Output to control QF1
YO
CP-E 24/0.75

Supply
+ D005 Start

3 2 1
X41
2 1 Output to control Gen Start/Stop

X23
– COM
(not wired)
D005 Stop

M Output to control QF3


COM D011

3 2 1
3 2 1

X24
X21

o + D03 COM
D04 D011 YO
YC o +
COM
3 2 1
X22

D03
D04

D06
7 6 5 4 3 2 1
Output to control QF2 DI13 D07
4 3 2 1

DI11 D08
X31

X29

YO DI12 D09
DI D010
Supply D012
COM
M DI11 Modbus
9 8 7 6 5 4 3 2 1

DI10
+ DATA B
3 2 1

o DI9
X51

DATA A
DI8 CND
X32

DI7
YC DI6
DI5 Earth
DI4 connection X61
1

DI
Supply

X31 X32 X29


1 Logic enabled/disabled input 1 State QF3 1 Alarm signaling
2 State QF1 2 Programmable input 2 Not used
3 State QF2 3 Command to force transfer switching 3 Not used
4 COM 4 Generator alarm 4 CB alarm signaling
5 QF2 inserted 5 Manual mode signaling
6 QF1 inserted 6 Logic enabled/disabled signaling
7 QF2 tripped 7 COM
8 QF1 tripped
* External AUX power supply only if:
- Modbus communication is required 9 COM
- 16 2/3 Hz rated frequency
- use in single-phase systems with Un=57.5….109Vac
24 AT S 0 2 1 - AT S 0 2 2 A u to m at i c t r a n s f e r s w i tc h i n g


2. Description of ATS
Network settings
Network specification:
transformer line 1: 400Vac, threephase+N
transformer line 2: 400Vac, threephase+N
frequency: 50Hz

System configuration with ATS022

Generator not in use


System configuration 6/6 Generator usage
Protection devices
Generator usage No generator
Line priority
Cancel Edit

Electrical system
3F+N System configuration 1/6 Number of phases
Rated voltage
Rated frequency
3 phases with N
Number of phases line 1
Cancel Edit

System configuration 1/6 Number of phases


Rated frequency
Number of phases line 1 3 phases with N
Number of phases line 2
Cancel Edit

Rated frequency
50Hz System configuration 1/6 Rated frequency
Rated voltage
Rated frequency 50 Hz
Number of phases
Cancel Edit

Protection devices
System configuration 6/6 Protection devices
Protection devices
Line priority 3 CBs BUS TIE
Generator usage
Cancel Edit

Network voltage
System configuration 1/6 Rated voltage
Rated voltage
Rated frequency 400/230 V
Number of phases
Cancel Edit
W h i t e pa p e r 25


3. Field of application
As already mentioned, an increasing number of Besides providing indications about the precau-
industrial electrical installations consist of sys- tions that must be taken to prevent parallel con-
tems able to perform automatic transfer switch- nection of the generator with the network, Stan-
ing. dard IEC 60364 also includes a classification
The operating characteristics of these systems which defines 5 types of transfer switching ac-
differ case by case since they depend on the cording to the periods of time within which the
types of load they must supply in an emergency. stand-by supply becomes available for the prior-
For example, it is evident that in an installation ity loads.
where continuity of service is a fundamental as- As already mentioned, this distinction refers to
pect, sudden breaks caused by main line outage the power supply of safety services.
cannot be permitted. In particular, the “automatic” safety power supply
Therefore, before analyzing how the standards can be classified as follows:
deal with break times (see the following pages) it -- no-break: supply available without a break
is advisable to find out how the Standard govern- -- very short break: supply available within 0.15s;
ing electrical installations (IEC60364) classifies -- short break: supply available within the 0.15s
the types of supply that characterize a low volt- to 0.5s time range;
age electrical system. -- medium break: supply available after more
In a low voltage installation, the supply can be di- than 0.5s but within less than 15s;
vided into the following types: -- long break: supply available after more than
-- safety power supply – includes all electrical 15s.
components (sources, circuits and compo- According to this classification, at least a “me-
nents), the purpose of which is to ensure dium break supply” can be obtained by setting all
power is supplied to equipment or parts of in- the time delays of the ATS to the minimum.
stallations required for the safety of people The following table gives an example of this:
-- stand-by supply – a type of power supply pro-
vided when the purpose for which it is used
differs from the safety of people, e.g. the sup- Setting Setting
Time delays Description range example
ply of loads allowing production continuity to
Time delay
be achieved. before the
switching 0...30s 1s
TS procedure
A generic definition, which includes both the
starts.
above mentioned types of power supply, is to call
any supply source which represents an “alterna- ATS021

tive” to the main supply and which is used when- Time delay
ever necessary, regardless of the type of load it TF before the
0...60s 1s (with
circuit-breaker
will power, by the name of “emergency power ATS022 (TF=3.5s) TF=3.5s)
on the generator
supply". side closes

TCE
While the safety power supply is classified ac-
cording to the time within which the supply be- total 2s (4.5s with
ATS021)
comes available for the loads (see the following
pages), there are no standards of this type
for the stand-by supply since functional perfor- As it can be seen, the ATS provides stand-by sup-
mance is usually analyzed and adapted, by mutual ply to the loads within about 2s (with ATS022) and
agreement between the customer and the plant 4.5s (with ATS021).
engineering designer, to suit the importance of If there is a generator in the emergency line, the
the case in question. time it requires for providing voltage to the loads
must also be considered.
However, there is nothing to prevent these cate-
gories from also being used in the case of
stand-by supply. In fact, this distinction can be
useful for assessing the time delay settings
for the ATS with regard to the types of load.
26 AT S 0 2 1 - AT S 0 2 2 A u to m at i c t r a n s f e r s w i tc h i n g


3. Field of application
Medium and long break power supply, obtained Examples of installations in which continuity of
by using the generator set alone, is a common service is essential are:
type in industrial plants and in the services-pro- -- hospital applications
viding sector, where continuity of service is re- -- applications in the data processing field (data
quired but not necessarily within short times. centers, work stations, servers, etc.)
In fact, when no-break, very short and short break -- telecommunications systems
automatic supplies are required, the installation -- industrial applications (process control)
must be provided with devices capable of deliver- -- safety lighting in special environments.
ing immediate power by feeding the priority
loads with a UPS (Uninterruptible Power Supply) The following figure shows a typical application
able to guarantee a ready-to-use power source, in which UPS are used to supply priority loads.
which may be limited in time, but such as to make
up for the time required to start the generator
set.

Sgen = SStrafo Sgen = SStrafo

Network G Generator Network G Generator


380 V 50Hz ATS 380 V 50Hz ATS

non-priority loads non-priority loads

UPS UPS

priority loads priority loads


W h i t e pa p e r 27


4. Application example
The application example shown on the following The installation includes non-priority loads (out-
pages is given with the intention of explaining door lighting, air-conditioning plant, etc.) and pri-
and providing further information about the con- ority loads linked to the production cycle.
nections between the components involved in Use of a bus-tie allows the “load line” to be di-
switching (auxiliary contacts, motor operator, vided into two half busbars so that in an emer-
etc.) and the ATS unit. gency, only the priority loads are powered by the
There are also indications about the time delay generator.
settings required for correct switching.
This example does not go into detail about how to The need to manage the third device implies use
interact with the display menu of the ATS022 since of the ATS022 since, as already specified in the
this is not the subject of this document (this infor- previous pages, the ATS commands simultaneous
mation is given in document 1SDH000760R0001). opening of both the circuitbreaker on the main
line (QF1) and the bus-tie (QF3), as well as their si-
In this case, we wish to describe a 400Vac indus- multaneous re-closing if the initial conditions are
trial application in a three-phase system with dis- restored (see page 16 for the switching opera-
tributed neutral, consistingof a transformer for tions).
the main line and a generator for the emergency The electrical system in question is shown in the
one. simplified diagram below:

TRAFO G GEN

T5N 630 PR222 In=630 T4N 320 PR222 In=320


QF1 QF2

T5D 400
QF3

non-priority loads priority loads


28 AT S 0 2 1 - AT S 0 2 2 A u to m at i c t r a n s f e r s w i tc h i n g


4. Application example
The following table shows the complete bill of materials, considering the choice of withdrawable cir-
cuit-breakers and all the components required for connection to the ATS022 (220 Vac supply phase-
neutral):

Q.ty PRODUCT DESCRIPTION ABBREVIATION CODE


1 ATS 022 Automatic switching device ATS 022 1SDA065524R1
1 T5N 630 PR222 LSIG In=630 Circuit-breaker QF1 QF1 1SDA054403R1
1 T5 630 W FP EF Fixed part withdrawable circuit-breaker - 1SDA054771R1
(QF1) (with EF terminals)
1 KIT W MP T5 630 Kit for converting a fixed circuit-breaker - 1SDA054850R1
into the moving part of a withdrawable
one (QF1)
1 T4N 320 PR222 LSIG In=320 Circuit-breaker QF2 QF2 1SDA054124R1
1 T4 W FP EF 4p Fixed part withdrawable - 1SDA054746R1
circuit-breaker (QF2) (with EF terminals)
1 KIT W MP T4 Kit for converting a fixed circuit-breaker - 1SDA054842R1
into the moving part of a withdrawable
one (QF2)
1 T5D 400 Switch-disconnector QF3 QF3 1SDA054600R1
1 T5 400 W FP EF Fixed part withdrawable - 1SDA054758R1
circuit-breaker (QF3) (with EF terminals)
1 KIT W MP T5 400 Kit for converting a fixed circuit-breaker - 1SDA054846R1
CB into the moving part of a withdrawable one
(QF3)
3 ADP 10-way adapter (left side) for QF1-QF2-QF3 - 1SDA054924R1
1 ADP 12-way adapter (right side) for QF3 - 1SDA054923R1
2 ADP 6-way adapter (right side) for QF1-QF2 - 1SDA054922R1
3 MOE Stored energy motor operator T4-T5 - 1SDA054897R1
(for circuit-breakers QF1-QF2 and bus-tie QF3)
3 MOL-M Key lock against manual operation for - 1SDA054909R1
MOE for T4-T5 (for circuit-breaker QF2
and bus-tie QF3)
2 AUX 250V AC/DC 1 open/closed changeover contact + 1 Q/1 1SDA054910R1
“trip unit tripped” changeover contact
(this latter is not used) for QF1-QF2
2 AUX SA 250V AC 1 electronic release SA trip contact S51 1SDA055050R1
(for QF1-QF2)
2 AUP-I Contact signaling circuit-breaker S75I/1 1SDA054918R1
racked-in for plug-in and withdrawable
versions (for circuit-breakers QF1 and QF2)
1 AUX 250V AC/DC 3 open/closed changeover Q/1 1SDA054911R1
contacts + 1 “trip unit tripped” Q/2
changeover contact (using only 2 changeover
contacts) for switch-disconnector QF3
1 MIR-HB frame unit Horizontal mechanical interlock (to interlock - 1SDA054946R1
QF1 with QF2)
1 MIR-P plates Plates for mechanical interlock - 1SDA054950R1
2 S204P C6 4-pole modular circuit-breakers Q61/1 Q61/1 2CDS284001R0064
and Q61/2 (Ik single-phase 16kA) Q61/2
2 NF22E-13 K1-K2 contactors used for external K1 1SBH 137 001 R1322
wiring of ATS K2
2 CT-AWE Timed relays to command KO3 1SVR 550 141 R1100
switch-disconnector QF3 KC3
(suggested time delay range from
200ms to 300ms)
W h i t e pa p e r 29

Refer to document 1SDM000086R0001 for the gency source is used to supply the motor opera-
wiring diagram. tors or not.
This document also contains all the diagrams for
transfer switching between Emax, Tmax T cir- The connections shown on the following pages
cuit-breakers and between circuit-breakers T7 must be made in this particular installation, since
and X1. the auxiliary supply voltage is branched from ei-
The wiring diagrams in the document have been ther the main line or emergency line (there is no
divided, depending on whether an auxiliary emer- auxiliary supply source for feeding the motors).

The following connections concern the measuring and motor operator supply part of the installation:

Normal supply
from transformer from generator

Q61/1 N L1 L2 L3 N L1 L2 L3 Q61/2
6 5 5 6
4 3 3 4
2 1 1 2
8 7 7 8

M M
QF1 QF2

A
X61

1 1
13 13 2 2
X12
X11

K1 K2 3 3
14 14 4 4

1
X41

2
21 21
K2 K1 1
22 22 001
X21

XAB 5 3 4 2 XAB 5 3 4 2 2
002
3
A1 A1 A1 7 A1 7
K1 K2 1
A2 A2 003
X22

S1 S1
2
3 004
S2 S2

M YC M YC
ATS022
43 43
K1 K2 S3 S3
44 44

QF1 XAB 1 QF2 XAB 1


30 AT S 0 2 1 - AT S 0 2 2 A u to m at i c t r a n s f e r s w i tc h i n g


4. Application example
These INPUTs and OUTPUTs of the ATS must also be wired in order to complete the connection.

1 1

X61
2 2
See previous page See previous page

X11

X12
3 3
4 4

Safety auxiliary power supply is obligatory with: 1 Gen start-up command


1
- Modbus RS485 communication

X41
D05

X23
- use in systems with 16 2/3 Hz rated frequency 2 2
- use in single-phase systems with Un= 57.5….109 Vac 3 Gen stop command
1
001

X21
See previous page 2 1 QF3 command
002 D011

X24
3 2 See previous page
3
1
001 D06
See previous page X22
2 1 ATS022 alarm signaling
D07
002
3 2 Not used
D08
3 Not used
X2/XA2 Q/1 X2/XA2 D09

X29
Switching contact QF3 1 4 CB alarm signaling
5 1 D010
5 Manual mode signaling
S13 D012
Programmable input * 2 6 Logic enabled/disabled signaling
7
S14
Command to force transfer 3
1
switching input modbus
S15
X51

2
Generator alarm input 4
3
XV S751/1 XV
X32

QF2 inserted/removed contact 5


1 4
XV S751/1 XV S11
QF1 inserted/removed contact 6 1 Logic enabled
1 4
X2/XA2 S51 X2/XA2 X2/XA2 Q/1 X2/XA2
Switching
QF2 tripped relay contact 7 2
7 4 5 1 contact QF1
X31

X2/XA2 S51 X2/XA2 X2/XA2 Q/1 X2/XA2


Switching
QF1 tripped relay contact 8 3
7 4 5 1 contact QF2

9 ATS022 3

* the following functions can be associated with this input via the display menu:
• forced generator start-up
• activation of the automatic switching logic
• remote reset
• emergency lock
W h i t e pa p e r 31

Besides, the ATS must be wired as follows to command the switch-disconnector used as bus-tie:

A
˜
16 18 16 18
1
KO3 KC3

X24
2 Impulse-OFF Impulse-OFF
15 15
3
XA2 2
XAB 5 3 4 2
X2 2

XV 21 XV

Q2 A1 7
QF3
ATS022 XV 24 22

X2 4 3
S1
XA2 4 3
S2

M YC

S3
A1 Y2 A1 Y2
XV
* Timing suggested from 200 to 300 ms kO3 * kC3 *
A2 A2 XAB 1
QF3
˜

Once the connections have been made and the Setting Setting
ATS has been given the main settings regarding Time delays Description range example
the network (voltage, system, presence of genera- Time delay before 0…30s 2s
TS the beginning
tor, bus-tie, etc.), the time delays settings must
of the switching
be entered accurately in order to ensure correct procedure with
TCE
switching. TS generator start-up.

TBS Time delay before 0…60s 1s


Indicative time delays are given in the table below: TCE
As it can be seen, and assuming that the genera-
TS the circuit-breaker
on the generator
TCN side closes.
tor starts within 10 seconds from the moment the TBS
fault in the main network occurs, the power sup- TCE
TGoff
ply becomes available for the priority loads in TS
TCN
TBS Time delay before 0…59s 15s
about 13 seconds ( TS+10s+TCE). the circuit-breaker 1,2,3...
TC on the generator 30 min.
TGoff
TCE
TCN
TS side opens
(start of the
TBS
TC back-switching
TGoff
TCE procedure).
Time delay before 0…60s 1s
TCN
TC
TBS the circuit-breaker
on the main line
TGoff side closes.
TCN
TC Time the 0…59s 5min.
TGoff generator takes 1,2,3...
to switch off. 30 min.
TC

ABB S.p.A.
L.V. Breakers
Via Pescaria, 5
24123 Bergamo - Italy
Tel.: +39 035 395 111
Fax: +39 035 395306-433
www.abb.com

1SDC007408G0201 - 04/2019

© Copyright 2019 ABB. All rights reserved.


The data and illustrations are not binding. We reserve
the right to modify the contents of this document on
the basis of technical development of the products,
without prior notice.

You might also like