INTEGRATED MONITORING
Advanced forecasting and
asset management
The Flow of Energy: a European
Concern
23/11/2018
The Flow of Energy – also a Local
Concern
TRANSMISSION SYSTEM Consumers DISTRIBUTION SYSTEM
23/11/2018
The BLOCAUX substation in the heart of the french energetic transition
23/11/2018
Local P/C (MW) 2016
23/11/2018
The BLOCAUX substation : The first full digital substation in France
23/11/2018
Key drivers for TSO
• Operational performance
• Safety
• Availability
• Global CAPEX/OPEX
• Assets management
7
Iteration
2000
1950 1975 First steps in
Electromécanical Electronic semi digital
substation
3 technologies for faster an more reliable solution, decreasing cost but similar
architecture and same limits.
23/11/2018
Digital = Disruption
New
expectations
New needs
New
Technologies
New
uses
23/11/2018
Introducing the Technologies
Global
Wide-Area
Automation
Inter-Substation
Communication
Infrastructure
HV Apparatus
Full Digital
System with
Advanced
Local
Functions
Local
Digital integration from process to
wide area Wide area Controller
Primary Equipments
and sensors
Merging Units Protection Relays
Bay Controllers
Monitoring
Optical
CTs/VTs Switchgear
Control Unit
23/11/2018
Full redundant architecture
Control
Control Active
Standby
In Test
SYSTEM 1 SYSTEM 2
Protection
ProtectionIn
Protection
Active
Active
Test
RTE Smart Substation
23/11/2018
Sensors on Power Transformer
23/11/2018
Power transformer control & monitoring
Buchholz relay (*) Temperature sensors (*) Bushings monitoring (BMT300)
- fault gas accumulation - oil temperature - Power dissipation (tgdelta)
- increase rate trend & alarms - head-mount signal converter - Power factor
IEC61850 - fast process coupler - Capacitance
- Partial discharge
monitoring
Note * : monitoring functions realized by 3rd party devices, able to communicate with DS Agile system (dry contacts, 4-20mA, legacy protocols, IEC ...).
Digital twin
The Smart Cooling Control
• Controlling each individual fan
• Optimize fan life time, cooling, and power consumption
• Optimize maintenance by using lower fan first
• Limit ageing of transformers by anticipating the cooling stage
• Dynamic Overload capacity calculation using :
– Rated current, Load factor K
– Transformer losses (HV/MV, HV/LV, MV/LV)
– Thermal transfer times
• Predictive values (Hot spot and top oil temperature)
• Advanced alarms (Cooling system alarm, Top oil alarm, hot-spot alarm)
• Oil level & Cooling group temperature discrepancy
23/11/2018
CB control and World first
monitoring 61850 Disconnector
• Open close contact With Torque control
• Real time current
• Motor/pump start
information
• SF6 information
23/11/2018
Optical CT World first
Optical CT/VT
Disconnector
23/11/2018
Effet FARADAY
23/11/2018
IR Hot Spot Detection
23/11/2018
Condition Monitoring
CMU DS Agile Framework
(Condition Monitoring Unit)
Station bus
IEC GTW
BCU
BCU
Meteorological
sensors
MU SCU MU SCU
Real-Time
acquisition Ampacity CIGRE TB204
Substation 1 Substation 2 computation inputs-output
data model
Ambient
temperature
Wind speed
DLR
Wind
Substation n Substation 3 direction
Solar
emission
Relative
humidity 23/11/2018
…Wide area interconnections and controls
150%
100%
50%
0%
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
-50%
-100%
23/11/2018
Next generation substation : Toolbox for Industrial
Modular Solution
2800 digital substations in France in 2030
3 Billions Euros investment program
23/11/2018
https://www.rte-france.com/