This document is a strip map for a road improvement project from Sidomulyo to Sidoarjo to Bumidayato Palas in Indonesia. The strip map shows the existing and proposed conditions along the road corridor in 100 meter segments and notes the different construction activities planned for each section, including replacing the base, patching, leveling, adding lean concrete, and widening the shoulders. Standard symbols are used to indicate features like culverts, slopes, and the road body.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
399 views10 pages

Strip Map

This document is a strip map for a road improvement project from Sidomulyo to Sidoarjo to Bumidayato Palas in Indonesia. The strip map shows the existing and proposed conditions along the road corridor in 100 meter segments and notes the different construction activities planned for each section, including replacing the base, patching, leveling, adding lean concrete, and widening the shoulders. Standard symbols are used to indicate features like culverts, slopes, and the road body.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd

STRIP MAP PENANGANAN

BERDASARKAN GAMBAR RENCANA


PEKERJAAN PENINGKATAN JALAN KORIDOR SIDOMULYO - SIDOARJO - BUMIDAYA - PALAS

00+000

00+100

00+200

00+300

00+400

00+500

00+600

00+700

00+800

00+900

01+000
SIRING/ TALUD
BAHU
2.25 2.25
BADAN JALAN

BADAN JALAN
BAHU
SIRING/ TALUD

BASE A FULL
BASE B FULL
PATCHING AGG. A
LEVELING AGG. B
LEAN CONCRETE T:1OCM
PELEBARAN BAHU AGG. A
PELEBARAN BAHU AGG. B
01+000

01+100

01+200

01+300

01+400

01+500

01+600

01+700

01+800

01+900

02+000
GORONG2
1+950

SIRING/ TALUD
BAHU
2.25 2.25

BADAN JALAN

BADAN JALAN
BAHU
SIRING/ TALUD

BASE A FULL
BASE B FULL
PATCHING AGG. A
LEVELING AGG. B
LEAN CONCRETE T:1OCM
PELEBARAN BAHU AGG. A
PELEBARAN BAHU AGG. B
02+000

02+100

02+200

02+300

02+400

02+500

02+600

02+700

02+800

02+900

03+000
SIRING/ TALUD
BAHU
2.25 2.25

BADAN JALAN

BADAN JALAN
BAHU
SIRING/ TALUD

BASE A FULL
BASE B FULL
PATCHING AGG. A
LEVELING AGG. B
LEAN CONCRETE T:1OCM
PELEBARAN BAHU AGG. A
PELEBARAN BAHU AGG. B

Catatan SIRING RIGID BAHU RABAT


GORONG-GORONG
AC-BC + AC-WC TALUD BAHU BASE A

PLAT DEKKER SIRING + PLAT DEKKER CAP


STRIP MAP PENANGANAN
BERDASARKAN GAMBAR RENCANA
PEKERJAAN PENINGKATAN JALAN KORIDOR SIDOMULYO - SIDOARJO - BUMIDAYA - PALAS

03+000

03+100

03+200

03+300

03+400

03+500

03+600

03+700

03+800

03+900

04+000
SIRING/ TALUD
BAHU
2.25 2.25
BADAN JALAN

BADAN JALAN
BAHU
SIRING/ TALUD

BASE A FULL
BASE B FULL
PATCHING AGG. A
LEVELING AGG. B
LEAN CONCRETE T:1OCM
PELEBARAN BAHU AGG. A
PELEBARAN BAHU AGG. B
04+000

04+100

04+200

04+300

04+400

04+500

04+600

04+700

04+800

04+900

05+000
GORONG2 GORONG2
4+750 4+950

SIRING/ TALUD
BAHU
2.25 2.25

BADAN JALAN

BADAN JALAN
BAHU
SIRING/ TALUD

BASE A FULL
BASE B FULL
PATCHING AGG. A
LEVELING AGG. B
LEAN CONCRETE T:1OCM
PELEBARAN BAHU AGG. A
PELEBARAN BAHU AGG. B
05+000

05+100

05+200

05+300

05+400

05+500

05+600

05+700

05+800

05+900

06+000
GORONG2
5+225

SIRING/ TALUD
BAHU
2.25 2.25

BADAN JALAN

BADAN JALAN
BAHU
SIRING/ TALUD

BASE A FULL
BASE B FULL
PATCHING AGG. A
LEVELING AGG. B
LEAN CONCRETE T:1OCM
PELEBARAN BAHU AGG. A
PELEBARAN BAHU AGG. B

Catatan SIRING RIGID BAHU RABAT


STA 3+500 - 3+700 Lebar 5m GORONG-GORONG
AC-BC + AC-WC TALUD BAHU BASE A

PLAT DEKKER SIRING + PLAT DEKKER CAP


STRIP MAP PENANGANAN
BERDASARKAN GAMBAR RENCANA
PEKERJAAN PENINGKATAN JALAN KORIDOR SIDOMULYO - SIDOARJO - BUMIDAYA - PALAS

06+000

06+100

06+200

06+300

06+400

06+500

06+600

06+700

06+800

06+900

07+000
SIRING/ TALUD
BAHU
2.25 2.25
BADAN JALAN

BADAN JALAN
BAHU
SIRING/ TALUD

BASE A FULL
BASE B FULL
PATCHING AGG. A
LEVELING AGG. B
LEAN CONCRETE T:1OCM
PELEBARAN BAHU AGG. A
PELEBARAN BAHU AGG. B
07+000

07+100

07+200

07+300

07+400

07+500

07+600

07+700

07+800

07+900

08+000
SIRING/ TALUD
BAHU
2.25 2.25

BADAN JALAN

BADAN JALAN
BAHU
SIRING/ TALUD

BASE A FULL
BASE B FULL
PATCHING AGG. A
LEVELING AGG. B
LEAN CONCRETE T:1OCM
PELEBARAN BAHU AGG. A
PELEBARAN BAHU AGG. B
08+000

08+100

08+200

08+300

08+400

08+500

08+600

08+700

08+800

08+900

09+000
SIRING/ TALUD
BAHU
2.25 2.25

BADAN JALAN

BADAN JALAN
BAHU
SIRING/ TALUD

BASE A FULL
BASE B FULL
PATCHING AGG. A
LEVELING AGG. B
LEAN CONCRETE T:1OCM
PELEBARAN BAHU AGG. A
PELEBARAN BAHU AGG. B

Catatan SIRING RIGID BAHU RABAT


STA 3+500 - 3+700 Lebar 5m GORONG-GORONG
AC-BC + AC-WC TALUD BAHU BASE A

PLAT DEKKER SIRING + PLAT DEKKER CAP


STRIP MAP PENANGANAN
BERDASARKAN GAMBAR RENCANA
PEKERJAAN PENINGKATAN JALAN KORIDOR SIDOMULYO - SIDOARJO - BUMIDAYA - PALAS

09+000

09+100

09+200

09+300

09+400

09+500

09+600

09+700

09+800

09+900

10+000
SIRING/ TALUD
BAHU
2.25 2.25
BADAN JALAN

BADAN JALAN
BAHU
SIRING/ TALUD

BASE A FULL
BASE B FULL
PATCHING AGG. A
LEVELING AGG. B
LEAN CONCRETE T:1OCM
PELEBARAN BAHU AGG. A
PELEBARAN BAHU AGG. B
10+000

10+100

10+200

10+300

10+400

10+500

10+600

10+700

10+800

10+900

11+000
SIRING/ TALUD
BAHU
2.25 2.25

BADAN JALAN

BADAN JALAN
BAHU
SIRING/ TALUD

BASE A FULL
BASE B FULL
PATCHING AGG. A
LEVELING AGG. B
LEAN CONCRETE T:1OCM
PELEBARAN BAHU AGG. A
PELEBARAN BAHU AGG. B
11+000

11+100

11+200

11+300

11+400

11+500

11+600

11+700

11+800

11+900

12+000
SIRING/ TALUD
BAHU
2.25 2.25

BADAN JALAN

BADAN JALAN
BAHU
SIRING/ TALUD

BASE A FULL
BASE B FULL
PATCHING AGG. A
LEVELING AGG. B
LEAN CONCRETE T:1OCM
PELEBARAN BAHU AGG. A
PELEBARAN BAHU AGG. B

Catatan SIRING RIGID BAHU RABAT


STA 3+500 - 3+700 Lebar 5m GORONG-GORONG
AC-BC + AC-WC TALUD BAHU BASE A

PLAT DEKKER SIRING + PLAT DEKKER CAP


STRIP MAP PENANGANAN
BERDASARKAN GAMBAR RENCANA
PEKERJAAN PENINGKATAN JALAN KORIDOR SIDOMULYO - SIDOARJO - BUMIDAYA - PALAS

12+000

12+100

12+200

12+300

12+400

12+500

12+600

12+700

12+800

12+900

13+000
SIRING/ TALUD
BAHU
2.25 2.25
BADAN JALAN

BADAN JALAN
BAHU
SIRING/ TALUD

BASE A FULL
BASE B FULL
PATCHING AGG. A
LEVELING AGG. B
LEAN CONCRETE T:1OCM
PELEBARAN BAHU AGG. A
PELEBARAN BAHU AGG. B
13+000

13+100

13+200

13+300

13+400

13+500

13+600

13+700

13+800

13+900

14+000
SIRING/ TALUD
BAHU
2.25 2.25

BADAN JALAN

BADAN JALAN
BAHU
SIRING/ TALUD

BASE A FULL
BASE B FULL
PATCHING AGG. A
LEVELING AGG. B
LEAN CONCRETE T:1OCM
PELEBARAN BAHU AGG. A
PELEBARAN BAHU AGG. B
14+000

14+100

14+200

14+300

14+400

14+500

14+600

14+700

14+800

14+900

15+000
SIRING/ TALUD
BAHU
2.25 2.25

BADAN JALAN

BADAN JALAN
BAHU
SIRING/ TALUD

BASE A FULL
BASE B FULL
PATCHING AGG. A
LEVELING AGG. B
LEAN CONCRETE T:1OCM
PELEBARAN BAHU AGG. A
PELEBARAN BAHU AGG. B

Catatan SIRING RIGID BAHU RABAT


GORONG-GORONG
AC-BC + AC-WC TALUD BAHU BASE A

PLAT DEKKER SIRING + PLAT DEKKER CAP


STRIP MAP PENANGANAN
BERDASARKAN GAMBAR RENCANA
PEKERJAAN PENINGKATAN JALAN KORIDOR SIDOMULYO - SIDOARJO - BUMIDAYA - PALAS

15+000

15+100

15+200

15+300

15+400

15+500

15+600

15+700

15+800

15+900

16+000
SIRING/ TALUD
BAHU
2.25 2.25
BADAN JALAN

BADAN JALAN
BAHU
SIRING/ TALUD

BASE A FULL
BASE B FULL
PATCHING AGG. A
LEVELING AGG. B
LEAN CONCRETE T:1OCM
PELEBARAN BAHU AGG. A
PELEBARAN BAHU AGG. B
16+000

16+100

16+200

16+300

16+400

16+500

16+600

16+700

16+800

16+900

17+000
SIRING/ TALUD
BAHU
2.25 2.25

BADAN JALAN

BADAN JALAN
BAHU
SIRING/ TALUD

BASE A FULL
BASE B FULL
PATCHING AGG. A
LEVELING AGG. B
LEAN CONCRETE T:1OCM
PELEBARAN BAHU AGG. A
PELEBARAN BAHU AGG. B
17+000

17+100

17+200

17+300

17+400

17+500

17+600

17+700

17+800

17+900

18+000
SIRING/ TALUD
BAHU
2.25 2.25

BADAN JALAN

BADAN JALAN
BAHU
SIRING/ TALUD

BASE A FULL
BASE B FULL
PATCHING AGG. A
LEVELING AGG. B
LEAN CONCRETE T:1OCM
PELEBARAN BAHU AGG. A
PELEBARAN BAHU AGG. B

Catatan SIRING RIGID BAHU RABAT


GORONG-GORONG
AC-BC + AC-WC TALUD BAHU BASE A

PLAT DEKKER SIRING + PLAT DEKKER CAP


STRIP MAP PENANGANAN
BERDASARKAN GAMBAR RENCANA
PEKERJAAN PENINGKATAN JALAN KORIDOR SIDOMULYO - SIDOARJO - BUMIDAYA - PALAS

18+000

18+100

18+200

18+300

18+400

18+500

18+600

18+700

18+800

18+900

19+000
SIRING/ TALUD
BAHU
2.25 2.25
BADAN JALAN

BADAN JALAN
BAHU
SIRING/ TALUD

BASE A FULL
BASE B FULL
PATCHING AGG. A
LEVELING AGG. B
LEAN CONCRETE T:1OCM
PELEBARAN BAHU AGG. A
PELEBARAN BAHU AGG. B
19+000

19+100

19+200

19+300

19+400

19+500

19+600

19+700

19+800

19+900

20+000
SIRING/ TALUD
BAHU
2.25 2.25

BADAN JALAN

BADAN JALAN
BAHU
SIRING/ TALUD

BASE A FULL
BASE B FULL
PATCHING AGG. A
LEVELING AGG. B
LEAN CONCRETE T:1OCM
PELEBARAN BAHU AGG. A
PELEBARAN BAHU AGG. B
20+000

20+100

20+200

20+300

20+400

20+500

20+600

20+700

20+800

20+900

21+000
SIRING/ TALUD
BAHU
2.25 2.25

BADAN JALAN

BADAN JALAN
BAHU
SIRING/ TALUD

BASE A FULL
BASE B FULL
PATCHING AGG. A
LEVELING AGG. B
LEAN CONCRETE T:1OCM
PELEBARAN BAHU AGG. A
PELEBARAN BAHU AGG. B

Catatan SIRING RIGID BAHU RABAT


GORONG-GORONG
AC-BC + AC-WC TALUD BAHU BASE A

PLAT DEKKER SIRING + PLAT DEKKER CAP


STRIP MAP PENANGANAN
BERDASARKAN GAMBAR RENCANA
PEKERJAAN PENINGKATAN JALAN KORIDOR SIDOMULYO - SIDOARJO - BUMIDAYA - PALAS

21+000

21+100

21+200

21+300

21+400

21+500

21+600

21+700

21+800

21+900

22+000
SIRING/ TALUD
BAHU
2.25 2.25
BADAN JALAN

BADAN JALAN
BAHU
SIRING/ TALUD

BASE A FULL
BASE B FULL
PATCHING AGG. A
LEVELING AGG. B
LEAN CONCRETE T:1OCM
PELEBARAN BAHU AGG. A
PELEBARAN BAHU AGG. B
22+000

22+100

22+200

22+300

22+400

22+500

22+600

22+700

22+800

22+900

23+000
SIRING/ TALUD
BAHU
1.75 1.75

BADAN JALAN

BADAN JALAN
BAHU
SIRING/ TALUD

BASE A FULL
BASE B FULL
PATCHING AGG. A
LEVELING AGG. B
LEAN CONCRETE T:1OCM
PELEBARAN BAHU AGG. A
PELEBARAN BAHU AGG. B
23+000

23+100

23+200

23+300

23+400

23+500

23+600

23+700

23+800

23+900

24+000
GORONG2
23+150

SIRING/ TALUD
BAHU
1.75 1.75

BADAN JALAN

BADAN JALAN
BAHU
SIRING/ TALUD

BASE A FULL
BASE B FULL
PATCHING AGG. A
LEVELING AGG. B
LEAN CONCRETE T:1OCM
PELEBARAN BAHU AGG. A
PELEBARAN BAHU AGG. B

Catatan SIRING RIGID BAHU RABAT


GORONG-GORONG
AC-BC + AC-WC TALUD BAHU BASE A

PLAT DEKKER SIRING + PLAT DEKKER CAP


STRIP MAP PENANGANAN
BERDASARKAN GAMBAR RENCANA
PEKERJAAN PENINGKATAN JALAN KORIDOR SIDOMULYO - SIDOARJO - BUMIDAYA - PALAS

24+000

24+100

24+200

24+300

24+400

24+500

24+600

24+700

24+800

24+900

25+000
SIRING/ TALUD
BAHU
1.75 1.75
BADAN JALAN

BADAN JALAN
BAHU
SIRING/ TALUD

BASE A FULL
BASE B FULL
PATCHING AGG. A
LEVELING AGG. B
LEAN CONCRETE T:1OCM
PELEBARAN BAHU AGG. A
PELEBARAN BAHU AGG. B
25+000

25+100

25+200

25+300

25+400

25+500

25+600

25+700

25+800

25+900

26+000
SIRING/ TALUD
BAHU
1.75 1.75

BADAN JALAN

BADAN JALAN
BAHU
SIRING/ TALUD

BASE A FULL
BASE B FULL
PATCHING AGG. A
LEVELING AGG. B
LEAN CONCRETE T:1OCM
PELEBARAN BAHU AGG. A
PELEBARAN BAHU AGG. B
26+000

26+100

26+200

26+300

26+400

26+500

26+600

26+700

26+800

26+900

27+000
GORONG2
26+425

SIRING/ TALUD
BAHU
1.75 1.75

BADAN JALAN

BADAN JALAN
BAHU
SIRING/ TALUD

BASE A FULL
BASE B FULL
PATCHING AGG. A
LEVELING AGG. B
LEAN CONCRETE T:1OCM
PELEBARAN BAHU AGG. A
PELEBARAN BAHU AGG. B

Catatan SIRING RIGID BAHU RABAT


GORONG-GORONG
AC-BC + AC-WC TALUD BAHU BASE A

PLAT DEKKER SIRING + PLAT DEKKER CAP


STRIP MAP PENANGANAN
BERDASARKAN GAMBAR RENCANA
PEKERJAAN PENINGKATAN JALAN KORIDOR SIDOMULYO - SIDOARJO - BUMIDAYA - PALAS

27+000

27+100

27+200

27+300

27+400

27+500

27+600

27+700

27+800

27+900

28+000
SIRING/ TALUD
BAHU
1.75 1.75
BADAN JALAN

BADAN JALAN
BAHU
SIRING/ TALUD

BASE A FULL
BASE B FULL
PATCHING AGG. A
LEVELING AGG. B
LEAN CONCRETE T:1OCM
PELEBARAN BAHU AGG. A
PELEBARAN BAHU AGG. B
28+000

28+100

28+200

28+300

28+400

28+500

28+600

28+700
SIRING/ TALUD
BAHU
1.75 1.75

BADAN JALAN

BADAN JALAN
BAHU
SIRING/ TALUD

BASE A FULL
BASE B FULL
PATCHING AGG. A
LEVELING AGG. B
LEAN CONCRETE T:1OCM
PELEBARAN BAHU AGG. A
PELEBARAN BAHU AGG. B

Catatan SIRING RIGID BAHU RABAT


GORONG-GORONG
AC-BC + AC-WC TALUD BAHU BASE A

PLAT DEKKER SIRING + PLAT DEKKER CAP

You might also like