14 10.52 147.28
Supporting Coloumns for sitting stair case
Total Qty 3079.98 Sqft
OR 293.89 Sqm
Providing and laying in position specified grade
of reiforced cement concrete including curing
compaction, finishing with rendering in
cement san mortar 1:3 (1 cement : 3 coarse
7 sand) and making good and joints exluding the Rs 2,519.00
cost of centering, shuttering and
reinforcement with 1: 1.5:3 (1 cement : 1.5
coarse sand : 3 graded stone aggregate 20mm
nominal size)
Building Plan at DPC Level 1'9"
- Pedestal
C-2 5 16.03 80.16
C-8 1 96 96.0
Prismoid
C-2 5 5.53 27.66
C-8 1 17.76 10.3
Rectangular Coloumn
C-2 5 2.06 10.3
C-8 1 14.08 14.1
Building Plan at DPC Level 0'0"
Pedestal
C-1 1 10.666667 10.67
C-2 5 16.03125 80.16
Prismoid
C-1 1 2.76 2.76
C-2 5 5.53 27.66
Rectangular Coloumn
C-1 1 2.67 2.671875
C-2 5 3.38 16.875
Building Plan at DPC Level 5'1"
- Pedestal
C-2 12 16.03 192.375
C-3 2 13.50 27
C-4 2 22.92 45.8
Prismoid
C-2 12 5.53 66.38
C-3 2 4.73 9.47
C-4 2 9.48 18.96
Rectangular Coloumn
C-2 12 0.50 6
C-3 2 0.63 1.25
C-4 2 0.63 1.25
Building Plan at DPC Level 3'3"
- Pedestal
C-2 2 16.0 32.0625
C-5 2 28.6 57.2916667
C-6 4 27.1 108.3
C-7 2 24.0 48.0
C-8 1 96.0 96.0
C-9 2 58.6 117.2
Prismoid
C-2 2 5.53 11.06
C-5 2 12.29 24.58
C-6 4 14.38 57.50
C-7 2 9.56 19.13
C-8 1 17.76 17.76
C-9 2 10.16 20.31
Rectangular Coloumn
C-2 2 0.94 1.88
C-5 2 2.50 5.00
C-6 4 1.67 6.67
C-7 2 3.91 7.82
C-8 1 3.52 3.52
C-9 2 0.78 1.56
Beam at DPC Level -3'3" 1 178'8" 2'6" 1' 446.67
Building Plan at DPC Level -1'9"
Partition Walls plinth beam
Toilets 1 34'10" 9" 6" 13.06
1 16'8" 9" 6" 6.25
1 7'6" 9" 6" 2.81
1 13'7" 9" 6" 5.09
1 11'4" 9" 6" 4.25
Building Plan at DPC Level 0'0"
Partition Walls plinth beam
Store and Toilets 1 12'11" 9" 6" 4.84
1 9'9" 9" 6" 3.66
1 10'3" 9" 6" 3.84
Sitting Staircase for rise -3'3" to 4'11" 1 27'11" 30' 8" 558.33
…do… 1 27'11" 22' 8" 409.44
…do… 1 27'11" 22' 8" 409.44
Total Qty 1377.2 Cft
OR 38.99 Cum
Providing anf fabricating reinforcement for
RCC work including straingthning cutting,
bending, placing in position and binding
20
(including cost of binding wire) all complete
upto floor three level hot rolled deformed bars
(IS:1786) Rs 44.00
Qty of RCC in foundation work 73.21 cum
Qty of RCC in super structure work 370.43 cum
Total Qty of RCC 443.64 cum
Steel weight as 2% of RCC weight 22182.14 Kg
Providing and fixing anodized aluminium work
(Anodizing to be done from approved
anodizer) for doors, windows, ventillators and
partition with extruded built up standard
tubular and other sections of approved make
conforming to IS 733 and IS 1285 anodized
transparent 81 dyed to required shade
according to IS 1868 (Minimum anodic coating
to be AC 15), fixed with rawl plugs and screws
or with expansion hold fasteners including
necessary filling up of gas at junctions at top,
21 bottom and sides with required PVC Rs 285.00
/neoprene felt etc :Alumnium section should
be smooth rust free, straight, mitred and
jointed mechanically wherever required
including cleat angle ,alumnium snap beading
for glazing/panelling,CP brass/stainless
screws,All tower bolt & Al handle & Al. Aldrop
etc all complete as per arcitectural drawings
and directions of Engineer in charge
4
P&F Bevelod edge Mirror of special glass of
approved make (Atul/equivalent) complete
4 Nos 230.00 920.00
with 6mm thick asbestos cement sheet
ground fixed to wooden screws & washers.
Size 600x450x4mm thick.
5
P&F Toilet shelf or approved quality/make 4 Nos 145.00 580.00
WVC (IS:2556 Mark) size 300 mm
6 P&F Towell rail or ring of approved
quality/make C.P. Brass Towel rail elbow
4 Nos 295.00 1180.00
type with brackets 450 mm. heavy duty