You are on page 1of 5

Note: Essential Training Syllabus of each Course on Separate Catalogue

AutoCAD {Design and Drafting}:


Complete Essential Training (You will be able to design and draw anything)
including
Land Mapping
 Terrain Design and Contouring
 Trace Map Plotting
 Land Division
 Complete Municipal Drawing
 Design and Drafting Architectural, Structural and MEP Drawing
(Complete) As per Municipal and NBC norms
 Complete process procedure to pass the drawing in Municipality

Sketchup {3d Modeling):


Complete Essential Training
Including
 Interior Designing and Modeling of the Floor
 Exterior Designing and Modeling of the Building
 KeyFrame Animation
 Detailing using Enscape Software

Lumion/Vray {rendering}
Complete Essential Training
Including
 Hyperrealist Exterior Rendering
 Detailed Walkthrough Animation
 Photo and Video Detailing
ETAB {Structure Analysis}
Complete Essential Training
Including
 Structural Analysis of RCC residential Building using Is Code
 Structural Analysis of Commercial Building using NBC Code 105
 Structural Analysis Report with Detailed Calculation of RCC Structures

Safe {Footing Analysis}


Complete Essential Training
Including
 Isolated, Combined, Matt and Strap Footing Design and Detailing
 Calculation and Report Making of Footing

Prokon {Steel Structure Analysis}


Complete Essential Training
Including
 Structural Analysis of Steel Structure Building
 Structural Analysis of the Structure with Calculation based on Is code
Estimation and Valuation using Excel
 Detailed Estimation of the Building including Bar Bending Schedule and
Detailed Rate Analysis
 Preparing and Studying the Tender {opening, bidding, Closing, and others
aspects required for the quotation}
 Detailed Valuation of the Land
 Detailed Valuation of the Building
 Requirement and process for Being Valuator and how the Valuation
works

Primavera and MS Project {Project Management}


Complete Essential Training Including
 Project Scheduling and Cost Management of the Project
 Report Making
 Project Optimization and Modification
 Cost Management

Package 1
Autocad + Sketchup +Lumion/Vray{including
Enscape}
Cost -Npr10000
Duration: 45 Days
Package 2-
Etab + Safe + Prokon
Cost: Npr10000
Duration: 45 Days

Package -3 Pricing -8000


Estimation and Valuation
Duration: 30 Days

Package -4 -Pricing -6000


Primavera and Ms Project
Duration: 20 Days

Package-5
Package 1+2
Cost: 20000 17000
Package-6
Package 1+2+3
Cost :28000
Discount Cost :20000

You might also like