The document outlines 9 phases of a project to design, build, deploy and manage a Genesys solution. It includes 1) designing infrastructure and functional requirements, 2) building the Genesys environment, 3) testing the system, 4) updating requirements documents, 5) configuring the final system, 6) providing project management documents, and 7) transitioning to the customer. Each phase produces materials like design documents, test plans, configuration documents and project reports to guide the work and document the progress and results.
The document outlines 9 phases of a project to design, build, deploy and manage a Genesys solution. It includes 1) designing infrastructure and functional requirements, 2) building the Genesys environment, 3) testing the system, 4) updating requirements documents, 5) configuring the final system, 6) providing project management documents, and 7) transitioning to the customer. Each phase produces materials like design documents, test plans, configuration documents and project reports to guide the work and document the progress and results.
The document outlines 9 phases of a project to design, build, deploy and manage a Genesys solution. It includes 1) designing infrastructure and functional requirements, 2) building the Genesys environment, 3) testing the system, 4) updating requirements documents, 5) configuring the final system, 6) providing project management documents, and 7) transitioning to the customer. Each phase produces materials like design documents, test plans, configuration documents and project reports to guide the work and document the progress and results.
Deploy Final “As-Built” System Configuration Document
7
8 Project Management Project Management Documents
9 Deploy Customer Transition
Content
The planned technical infrastructure design that will satisfy the
underlying business requirements documented in the previous phase based on a conclusive project and product scope of the Genesys environment
The planned technical functional design that will satisfy the underlying business requirements documented in the previous phase based on a conclusive project and product scope of the Genesys environment
Identifies project phases and tasks, assigned resources, and
durations specific to the Genesys platform and services outlined in this document. Installation and Configuration of the following Genesys environments: Development Environment Production Environment Standard set of tests to verify proper function of installed Genesys components.
Additions or changes to the TDS (IDD, and/or FDD) following sign-off.
A point in time document delivered at project closure that
explains how the Genesys system was configured while Genesys was engaged based on the Genesys Configuration Management Environment (CME) export
Formal means of communicating overall project status specific to the
Genesys platform and services outlined in this document.
Required Project Management Documentations include
- Project Management Plan - Project implementation Plan (mpp) - Kick-off meeting - Detail plan
Transfer of Information (TOI) based on the “train-the-trainer” model
Status Review Deliverable
Two (2) review cycles, sign-off required Done
Two (2) review cycles, sign-off required Done
Baseline upon sign-off of the FDD, and/or IDD Done
Not Delivered yet
Not Delivered yet Published upon completion of System Integration Testing Done
Published upon completion of Deployment
Published upon completion of Deployment Not Complete
Published <Weekly, Monthly, End of Package Phase> Done