No Phase Material

Design Infrastructure Design Document (IDD)


1

Design Functional Design Document (FDD)


2

Design Master Project Schedule


3

4 Build Genesys Solution Install

5 Build System Test Plan (STP)

6 Deploy Updated TDS

Deploy Final “As-Built” System Configuration Document


7

8 Project Management Project Management Documents

9 Deploy Customer Transition


Content

The planned technical infrastructure design that will satisfy the


underlying business requirements documented in the previous phase
based on a conclusive project and product scope of the Genesys
environment

The planned technical functional design that will satisfy the underlying
business requirements documented in the previous phase based on a
conclusive project and product scope of the Genesys environment

Identifies project phases and tasks, assigned resources, and


durations specific to the Genesys platform and services outlined in
this document.
Installation and Configuration of the following Genesys
environments:
Development Environment
Production Environment
Standard set of tests to verify proper function of installed Genesys
components.

Additions or changes to the TDS (IDD, and/or FDD) following sign-off.

A point in time document delivered at project closure that


explains how the Genesys system was configured while Genesys
was engaged based on the Genesys Configuration Management
Environment (CME) export

Formal means of communicating overall project status specific to the


Genesys platform and services outlined in this document.

Required Project Management Documentations include


-         Project Management Plan
-         Project implementation Plan (mpp)
-         Kick-off meeting
-         Detail plan

Transfer of Information (TOI) based on the “train-the-trainer” model


Status
Review
Deliverable

Two (2) review cycles, sign-off required Done

Two (2) review cycles, sign-off required Done

Baseline upon sign-off of the FDD, and/or IDD Done

Not Delivered yet


Not Delivered yet
Published upon completion of System Integration Testing Done

Published upon completion of Deployment

Published upon completion of Deployment Not Complete

Published <Weekly, Monthly, End of Package Phase> Done

Customer Transition Done