The consolidated condition wise comPliance report for


the segment- zLlT (Madegaom) is submitted to
the District Forest Officer, Nirmal District as Follows:
Compliance
Description of the Condition

f.g-rf rt.t,,r the diverted forest land shall Will be io*plied with. An undertaking is
remain unchanged.
"t sub mitted.

The demaication of the forest area proposed Th.ll.langa na Drinking water supply
has deposited an
for diversion shall be carried out by erecting Corporation Ltd., Hyderabad
cement concrete pillars duly numbered at an amount of R5.L8,7O,OOO|- (Part of
of 20 meters at the cost of User Rs"3.9, L2,000/- with UTR No" lDlBl1L7279L784L4
interval
Agency. Dt: 06. L0. 2OL7l, into the accou nt of Forest
Divisional officer, Nirmal for the Demarcation of
the forest area proposed for diversion by
concrete Pillars.
Maximum number of trees to be felled shall will be
."*plied with. An undertaking is i
I

not be more than fiftY Per hectare' submitted i

r$ is.tlsi
"

felling shall be done only when it is witl be complied with. An undertaking


ffi.. Further The Telangana Drinking
unavoidable and that too under strict submitted"
supervision of the Forest department" Water Supply Corporation Ltd., Hyderabad has
deposited a n a mou nt of Rs.42,000/-(part of
Rs.19, L2,0001- with UTR No. lDlBHL7279L784L4
Dt: 06" L0. 2OI7l, into the accou nt of Forest
Divisional officer, Nirmal for Extraction and

The user agency shall be responsible for any will be complied with. An undertaking is
loss to the fl oralfauna in the surroundings' submitted.
The user agency shall plant and maintain two Th. T.langa na Drinking water supply
times the no of trees felled on the diverted Corporation Ltd., Hyderabad has deposited an
land to maintain the green cover at the amount of RS.L0,31-,000, into the account of
project cost. Plantlng size for the TELANGANA STATE Ad-hOC CAMPA, NCW DCIhi
(part of Rs. 50,02,0001- with UTR No.
lDlB HL727gL78L4g Dt: 06.10.20L7) for the
rising of double No of lrees.
Purpose will be identified by the forest The Tela nga na Drinking water su pply

department (Preferably within or in the Corporation Ltd., Flyderabad has deposited an


surroundings area of the project).only amount of Rs.3.0,31,000, into the account of
indigenous forest tree specles shall be used TELANGANA STATE Ad-hoc CAMPA, New Delhi
for such plantation trees, if planted on the (part of Rs.50,02,0001- with UTR No"

lDlB H!727gL78L4g Dt: 06.10.20L7) for the


diverted area,will not be felled without the felling of
rising of double No" of trees in lieu of
permission of the Forest department.Trees,
planted in surrounding area, will belong to tre es.
Forest department
(viii) The user agency shall pay the Net Present Th- J.lrngana Drinking water supply

value(NPV) of the diverted forest land as per Corporation Ltd., Hyderabad has deposited an
the orders of the Hbn,ble supreme amount of Rs.39,7L,OOO1' Towards NPV into the
court,Dt.28"03.2008 and 09.05.2008 in lA- account of TELANGANA STATE Ad-hoc CAIU!&
Nos.826 in 566 with related lA's in writ New Delhi (part of Rs. 50,02 ,0001- with UTR No.
petition (civil) No.202/1995 and as per the I D I B H17 27 9I7 8149 Dt: 06. 10. 2017)

orders issued by state govern ment vide


Go.MS.No.L24 EFS&T (For.l) DePt.
Dt:27.07.20L0.
(ix) Additional amount of net present value (N PV) Will be complied with. An undertaking is

of the diverted forest land, if any , becoming submitted.


due after revision of the same by the Hon'ble
supreme court of lndia in future, shall be paid
by the user agency and deposited either in SB
alc mo. 037100 \0L029963 of corporation
bank, CGO Complex, Loadhi Road, New Delhi-
110003(RTGS/IFSC No.CORP0000371) or in
the SB A/c.No.344902010106351 of Union
Bank of lndia, Sunder Nagar, New Delhi-
1,10003(RTGS/IFSC No. UBlN0534498). The
user agency shall furnish an under taking to
this effect.
(x) The proposal shall be examined under Will be complied with. An undertaking is

scheduled tribes and other traditional forest submitted.


dwelle rs (Recogn itionof Forest Rights)
Act, 2006, as per the guidelines issued by
'

MinistrrT of Environment and forest vide letter


No. L1-91L998-FC (pt) dated.05 .07.20L3 and
requisite certificates/ documents be
furnished.
(xi) Other conditions specified in the GOl, MoEF , Will be complied with. An undertaking is
letters Dated:03.0L.2005, L3.05.201I, submitted.
16.06 .}OIL, L3.02"201'4 and 07 .LL.20L4 shall
also be complied with by Principal chief
Conservator of Forest (HoFF),Telangana State,
Hyderabad and the user agency with which
they are concerned.
(xii) Total forest area utilized for the project shall Will be complied with. An undertaking is
not exceed 4.945 Ha. ln case the land is not submitted.
taken over by the user agency or the same is
not used for the stipulated purpose within a
period of two years, then the area shall be
taken back by the Forest Department.
(xiii) The forest land shall not be used for any Will be complied with. An undertaking is
purpose other than that specified in the submitted.

(xiv} The forest land to be diverted shall under no Will be complied with. An undertaking is

circumstances be transferred to any other su b m itted.


ageflcy, department or person without prior
approval of the Government.
(xv) The Forest department may impose l1gln time Will be complied with. An undertq(rng-i!
to time any other condition(s) in the intrest of su b m itted.
conservation,protection and/or development
of forests.
(xvi) Transfer of forest land to the user agency shall Will be complied with. An undertaking is
not be affected prior to the issue of f ina I submitted.
approval. This approval shall be valid for a
period of 5 years. In the event of non
compliance of the above conditions, this
approval shall automatically stand revoked.

ecutrve t
MB Grid Division,
Undertakine to Condition-(i)

I hereby undertake and confirm that, the legal status of the diverted forest land will
remain

Nirmal District for


unchangedjn respect diversion of 4.945 Ha of forest land in in Kawal Tiger Reserve,
(Madegaom) for Providing safe
laying of pipeline and construction of structures in segment-2u7
Telangana Drinking Water
drinking water to erstwhile Adilabad District presently Nirmal District under

supply Project in favour of superintending Engineer, TDWSP (RWS&S) Circle, Adilabad.

Executive
lherebyundertake,thefollowingsinrespectdiversionof4'g45HaofforestlandininKawal
pipeline and construction of structures in segment-2L17
Tiger Reserve, Nirmal District for laying of
District
erstwhire Adirabad District presently Nirmal
(Madegaom) for providing safe drinking water to
project in favour of superintending Engineer, TDwsP (Rws&s)
under Terangana Drinking water suppry

Circle, Adilabad'
of trees to be felled shall not be more than
fifty per hectare'
a) Maximum number
b)Anytreefellingshallbedoneonlywhenitisunavoidableandthattoounderstrict
supervision of the Forest department'
loss to the flora/fauna in the surroundings'
c) The user agency shall be responsible for any

Grid Division, Nirmal"


@B
L

Value (NPV) of the diverted


I hereby undertake to pay the additional amount of Net Present
Hon'ble supreme court of lndia in
forest land if any, becoming due after revision of the same by the

f utu re.

to pay the differential NPV amount, if any, due to escalation or revision


I alsb hereby undertake
diversion of 4'945 Ha of forest
of NpV, as and when demanded by the Forgst Department in respect
rand in in Kawar Tiger Reserve, Nirmar District for raying
of piperine and construction of structures in

segment-21/7 (Madegaom) for providing safe drinking water


to erstwhile Adilabad District presentlrT
in favour of Superintending Engineer,
Nirmal District under Telangana Drinking Water Supply Project

TDWSP (RWS&S) Circle, Adilabad.

MB Grid Divisioh, Nirmal.


{
Undertakine to cqnditions-(xl & (xil

I hereby undertake, the followings in respect diversion of 4.945 Ha of forest land in in Kawal
Tiger Reserve, Nirmal District for laying of pipeline and construction of Structures in segm ent'ZV7
(Madegaom) for providing safe drinking water to erstwhile Adilabad District presently Nirmal District
(RWS&S)
under Telangana Drinking Water Supply Project in favour of Superintending Engineer, TDWSP

Circle, Adilabad.

a) fne requisite certificates/ documents will be furnished against the proposal shall be
examined under scheduled tribes and other traditional forest dwellers (Recognition of

Forest Rights) Act,2006, as per the guidelines issued by Ministry of Environment and

forest vide letter No.L1-9lL998-FC (pt) dated.05.07.2013 and

b) Other conditions specified in the GOl, MoEF , lette rs

Dated:03.01.2005,13.05.2OIt,L6.06.2OIL, 73.O2.2OL4 and 07.11.20L4 shall also be


complied with by Principal chief Conservator of Forest (HoFF),Telangana State,
Hyderabad and the user agency with which they are concerned.

MB Grid Division, Nir


W
Undertakinp to conditions-(xiil, (xiiil' (xiv!' (,xvl &
(xvi!

Ha of forest land in in Kawal


I hereby undertake, the followings in respect diversion of 4.945
in segment-2L17
Tiger Reserve, Nirmal District for raying of piperine and construction of structures
District presently Nirmal District
(Madegaom) for providing safe drinking water to erstwhile Adilabad
project in favour of superintending Engineer, TDWSP (RWs&s)
under Terangana Drinking water suppry

Circle, Adilabad.
Ha' ln case the land is not
a) Total forest area utilized for the project shall not exceed 4.945
purpose within a
taken over by the user agency or the same is not used for the stipulated
' period of two years, then the area shall be taken back by the Forest Department'
shall not be used for any purpose other than that specified
in the
b) The forest land
proposal.

c) The forest land to be diverted shall under no circumstances be transferred to any other
. agency, department or person without prior approval of the
Government.
in the
d) The Forest department may impose from time to time any other condition(s)
interest of conservation, protection and/or development of forests.
prior to the issue of final
e) Transfer of forest land to the user agency shall not be affected
' approval. This approval shall be valid for a period of 5 years'
ln the event of non
stand revoked'
compliance of the above conditions, this approval shall automatically

Grid Division, Nirmal'