OUT STANDING ELECTRO MECHANICAL ISSUES TO BE ATTENDED UNDER DLP BY THE AGENCY M/s MEIL.

Under Package 1
S.NO Location of the Pumping Station No of Pump Details of the defects to Date from which References of notices No of Target date Action Remar
Sets requires be be attended by the the defctes are issues to the Habitations fixed for taken if not ks
repair/rectificati Agency not attended by Agencies/Contractor affected due to Rectification attended
on/replacement/ Agency/Contrator not attending Rectification within
having defects the defects done (Yes/No) target date

1 Karkalpahad -- Kadthal GLBR 1 Bottom Casing crack 7/1/2023 T/o No habitations


( 1542 HP Pump ) Lr.No:T1/MB/MBNR/Yellore / are affected as
E&M/Pumpsets/2023-24, the stand by
2 Karkalpahad -- Mucherla WTP 1 Soft starter under repair 6/28/2023 Dt:22.02.2024 addressed to Pumpsets are
(470 HP - Pump ) the M/s.MEIL, Hyderabad. under repair.
3 Gouridevipally -- Raw water GLBR 1 Motor under repair 12/5/2023
8500KL Gudipaly gutta ( 2500 HP
Pump )

4 Gudipally Gutta -- Raw water 1 Pump under repair, 12/20/2023


GLBR 4500 KL ( 1200 HP Pump ) impeller and bearing
effected

5 Dharagattu (215 HP Pump 1 On/off Control problem of 9/1/2023 Lr No : J1/MB/2023-24, Dt


Soft Starter Problem 04.01.2024 of SE, MB,
Wanaparthy addressed to
MEIL

Note:Any new identified defect shall be added along with target date of rectification that is issued in the notice
OUT STANDING ELECTRO MECHANICAL ISSUES TO BE ATTENDED UNDER DLP BY THE AGENCY M/s Raghava Constructions India Pvt.Ltd. Under Package 3
S.NO Location of the Pumping Pump Sets Details of the defects to be be Date from which the defctes are References of notices issues to the No of Habs Target date Action taken if
Station requires repair/ attended by the Agency not attended by Agency/Contrator Agencies/Contractor affected due fixed for not attended
rectification/ to not Rectification Rectification within target Remarks
replacement/ attending the done (Yes/No) date
having defects defects

CE-5 B.C.Gnan Kumar


IX SRSP ADILABAD Segment
1.Lr.No.AEE1/EE/MB GRID/SRSP ADB/O&M/2023-
low Discharge, Shaft Alignment, Motor 24, Dt:19.02.2024 of Executive Engineer ,MB Grid
The defects mentioned
and Pump bearings, Flow meter not Division,Adilabad
1 Daheguda 3 9/10/2022 29 are applicable to all the
working , Pump Control Valves, 2.Lr.No.AEE3/DEE/SE/MB (Adilabad)/O&M/EM
3 pumps
Suction pipe repair and Painting Works/2022-23,Dt:29.02.2024 of Superintending
Engineer ,MB Circle Office ,Adilabad

1.Lr.No.AEE1/EE/MB GRID/SRSP ADB/O&M/2023-


low Discharge, Leakages through
24, Dt:19.02.2024 of Executive Engineer ,MB Grid
pump, Shaft Alignment, Flow meter The defects mentioned
Division,Adilabad
2 Jandaguda 3 not working , Pump Control Valves 3/15/2022 63 are applicable to all the
2.Lr.No.AEE3/DEE/SE/MB (Adilabad)/O&M/EM
leakages, Suction pipe repair and 3 pumps
Works/2022-23,Dt:29.02.2024 of Superintending
Painting
Engineer ,MB Circle Office ,Adilabad
p
1.Lr.No.AEE1/EE/MB GRID/SRSP ADB/O&M/2023- r
e
Failure of internal cable connection in 24, Dt:19.02.2024 of Executive Engineer ,MB Grid v
panel board,Flow meter not Division,Adilabad i
3 Dahegom 1 7/1/2019 12 o
working ,Water level Indicator not 2.Lr.No.AEE3/DEE/SE/MB (Adilabad)/O&M/EM
u
working , leakages through pump Works/2022-23,Dt:29.02.2024 of Superintending s
Engineer ,MB Circle Office ,Adilabad
c

1.Lr.No.AEE1/EE/MB GRID/SRSP ADB/O&M/2023-


24, Dt:19.02.2024 of Executive Engineer ,MB Grid
Division,Adilabad
4 Addagutta 1 Pump problem,Flow meter not working 1/12/2024 42
2.Lr.No.AEE3/DEE/SE/MB (Adilabad)/O&M/EM
Works/2022-23,Dt:29.02.2024 of Superintending
Engineer ,MB Circle Office ,Adilabad
a
1.Lr.No.AEE1/EE/MB GRID/SRSP ADB/O&M/2023- f
f
24, Dt:19.02.2024 of Executive Engineer ,MB Grid e
Pump Problem,Impeller Problem,Shaft
Division,Adilabad c
5 Babuldhole 1 starter problem,Shaft 6/25/2023 0 t
2.Lr.No.AEE3/DEE/SE/MB (Adilabad)/O&M/EM
Alignment,Vacuum Pump repair, e
Works/2022-23,Dt:29.02.2024 of Superintending d
Engineer ,MB Circle Office ,Adilabad
h
p
1.Lr.No.AEE1/EE/MB GRID/SRSP ADB/O&M/2023- r
e
24, Dt:19.02.2024 of Executive Engineer ,MB Grid v
Shaft Starter Problem,Vacuum Pump Division,Adilabad i
6 Bhutai 1 5/2/2023 8 o
repair,flow meter not working 2.Lr.No.AEE3/DEE/SE/MB (Adilabad)/O&M/EM
u
Works/2022-23,Dt:29.02.2024 of Superintending s
Engineer ,MB Circle Office ,Adilabad
c
p
1.Lr.No.AEE1/EE/MB GRID/SRSP ADB/O&M/2023- r
e
24, Dt:19.02.2024 of Executive Engineer ,MB Grid v
Pump Control valve repair,Butter fly
Division,Adilabad i
7 Karathwada 1 valve repair,Shaft Starter Cable 7/12/2023 32 o
2.Lr.No.AEE3/DEE/SE/MB (Adilabad)/O&M/EM
Problem u
Works/2022-23,Dt:29.02.2024 of Superintending s
Engineer ,MB Circle Office ,Adilabad
c
p
1.Lr.No.AEE1/EE/MB GRID/SRSP ADB/O&M/2023- r
e
24, Dt:19.02.2024 of Executive Engineer ,MB Grid v
Division,Adilabad i
8 SuryaNagar 1 Pump Problem ,damage of incomer 8/7/2023 28 o
2.Lr.No.AEE3/DEE/SE/MB (Adilabad)/O&M/EM
u
Works/2022-23,Dt:29.02.2024 of Superintending s
Engineer ,MB Circle Office ,Adilabad
c
p
1.Lr.No.AEE1/EE/MB GRID/SRSP ADB/O&M/2023- r
e
24, Dt:19.02.2024 of Executive Engineer ,MB Grid v
Pump Problem, Impeller problem ,
Division,Adilabad i
9 Damanguda 1 Butterfly valve repair,Flow meter not 10/19/2023 11 o
2.Lr.No.AEE3/DEE/SE/MB (Adilabad)/O&M/EM
working & Vacuum pump repair u
Works/2022-23,Dt:29.02.2024 of Superintending s
Engineer ,MB Circle Office ,Adilabad
c
AMBUGAON
10 1 Motor winding problem 12/11/2023 4
(MEDANPUR)
11 Belgaom 1 Motor winding problem 2/13/2024 3
12 Beltharoda 1 Soft starter problem 2/15/2024 5
Bhainsa (V and M), Nirmal
13 1 pump problem 12/11/2023 0 standby
dist-14
14 Bidrelli 1 Motor winding problem 12/2/2023 1
Bolsa to BOREGAON
15 1 pump problem 12/22/2023 11
OHBR 2
Bolsa to BOREGAON
16 1 pump problem 12/18/2023 16
OHBR 1
Cable burusted, require replacement
17 Edbid 1 2/15/2024 15
of cable
18 Karegaon 1 Pump shaft problem 12/26/2023 14
Kubeer to DODARNA Lr.No:AEE3/DEE/SE/MB(Adilabad)/O&M/EM
19 1 PUMP impeller problem 12/16/2023 8
OHBR Works/2022-23, Dated:29.02.2024 of SE, MB Circle
Kubeer to KUBEER 40KL Adilabad &
20 1 Ball valve problem 2/13/2024 Lr.No:AEE1/Pumpset Raghava/2024, 9
OHBR
Dated:20.02.2024 of Executive Engineer,MB Grid
1.All pumps butter fly valves disc division Nirmal. Agency is not
Local Velmal (new)-34 x damges
21 2 11/2/2023 0 responding for standby
12 PN-25 - 6 valves
pump repairs.
2.Soft starter problem
22 LOKESHWARAM 1 Pump problem 12/5/2023 16
Pump1: butter fly valve disc damged
PN-25 Agency is not
Madegaon-130 MLD to
23 2 Pump5: Shaft machining work is in 11/7/2023 0 responding for standby
Arepally GLBR
progress pump repairs.
& butter fly valve disc damged PN-25
RAJURA to PARDI B 40
24 1 Pump problem 11/12/2023 29
KL OHBR
25 RANGASHIVINI 1 Motor winding problem 12/20/2023 3
26 Sirpally -(Palsi) 1 Motor winding problem 12/25/2023 6
27 VEEREGAOM 1 Motor winding problem 12/12/2023 11
28 WADJHARI 1 Motor winding problem 12/12/2023 3
Sub Total 34 379
OUT STANDING ELECTRO MECHANICAL ISSUES TO BE ATTENDED UNDER DLP BY THE AGENCY M/s Raghava Constructions India Pvt.Ltd. Under Package 4
S.NO Location of the Pumping Pump Sets requires Details of the defects to Date from which the References of notices issues to the No of Habs affected Target date fixed for Action taken if not Remarks
Station repair/ rectification/ be be attended by the defctes are not attended by Agencies/Contractor due to not attending Rectification Rectification done attended within target
replacement/ having Agency Agency/Contrator the defects (Yes/No) date
defects
CE-4 G.Chenna Reddy
I Augumentation Udayasamudram Segment
167 HP-Impeller under
1 Panagal (Old)-29 MLD WTP 1 12/22/2023 1. Lr.No:
servicing
TA/Elect/Repairs/Pumpsets/Summer/2024,Dt:19-02-
370 HP-Shaft & impeller Nill habitations affected,
2 Panagal (Old)-29 MLD WTP 1 9/19/2023 2024.
issue Repairs are under stand
2. Lr.No:
by pumps. Rectification
Alignment issue while TA/2/Elect/Repairs/Pumpsets/Summer/2024,Dt:27-02-
3 Chilpakuntla (Old)-20 MLD 1 15.10.2023 of repairs will be
installing 2024.
completed by
3. Lr.No:
Nayakaniguda 15.03.2024
4 1 285 HP-Motor winding Issue 01.07.2022 TA/3/Elect/Repairs/Pumpsets/Summer/2024,Dt:01-03-
Intakewell(Paleru) 2024

Sub Total 4 0
II Tail Pond Segment
Panel board rectification and
5 Avanthipuram-90 MLD(PH 24) 1 10/2/2023 1. Lr.No: TA/Elect/Repairs/Pumpsets Nill habitations affected,
NRV Issue.
/Summer/2024,Dt:19-02-2024. Repairs are under stand
2. Lr.No: TA/2/Elect/Repairs/ Pumpsets / by pumps. Rectification
1 rectified, 1 Soft starter Summer/2024,Dt:27-02-2024. of repairs will be
6 Chityal (new)-28.85 x 16.6 2 24-12-2023 3. Lr.No: TA/3/Elect/Repairs/ Pumpsets completed by
installation pending
/Summer/2024,Dt:01-03-2024 10.03.2024

Sub Total 3 0
CE-1 A.Vijay Prakash
III Sangareddy Segment
Busareddypalli (new)-14 to 370 HP-3rd pump Soft 1)Lr. No.AEE-I/MB GRID/Sangareddy 0 because standby
1 1 22.02.2024 /Raghava/Pumpsets/2024, Dt:-12.01.02024 of EE, MB
WTP 100 MLD Busareddypally starter Problem pump
Grid, Sangareddy.
Busareddypally-100 MLD to 610HP- 4th Pump Shaft 2).Lr. No.AEE-I/MB GRID/Sangareddy 0 because standby
2 1 10.02.2024
Bhudera OHBR broken /Raghava/Pumpsets/2024, Dt:-09.01.02024 of EE, MB pump
RAGHAVAPUR WTP to OHBR 180 HP- 2nd pump Grid, Sangareddy.
3 1 10.02.2024
at MIRZAPUR impellers damage 3)Lr.No.AEE-2/DEE/MB Grid/SRD-EM/Raghava
Notice/2024,Dt:28.02.2024 of SE, MB Circle, 24
RAGHAVAPUR WTP to OHBR 120 HP-3rd Pump neck
4 1 21.02.2024 Sangareddy.
at MIRZAPUR rings damaged
Sub Total 4 24
IV Medak Segment

No habs are being


1 Rachapally (25HP) 1 Soft starter problem 02.02.2024 NA affected as other pumps
are in working condition

No habs are being


2 Pathoor (336 HP) 1 Soft starter problem 10.02.2024 NA affected as other pumps
are in working condition

No habs are being


1. Lr.No.DB/AEE/MB Grid/MDK/O&M/Raghava/2024,
3 Lingsanpally (20 HP) 1 Motor winding burntout 28.02.2024 affected as other pumps
Dt:18.02.2024 of the EE, MB grid, Medak
are in working condition

1. Lr.No.AEE/DB/MB
Grid/Electromechanical/Notice/Medak&Narsapur/2023,
No habs are being
Dt: 11.08.2023 of EE, MB Grid, Medak
4 Gorrekal (180HP) 2 Less discharge 15.12.2023 affected as other pumps
2. Lr.No:AEE2/DEE/MB
are in working condition
Grid/Electromecanical/Notice/Medak/2023, dt:14.08.2023
of SE, MB Circle, Sangareddy.
OUT STANDING ELECTRO MECHANICAL ISSUES TO BE ATTENDED UNDER DLP BY THE AGENCY M/s Raghava Constructions India Pvt.Ltd. Under Package 4
S.NO Location of the Pumping Pump Sets requires Details of the defects to Date from which the References of notices issues to the No of Habs affected Target date fixed for Action taken if not Remarks
Station repair/ rectification/ be be attended by the defctes are not attended by Agencies/Contractor due to not attending Rectification Rectification done attended within target
replacement/ having Agency Agency/Contrator the defects (Yes/No) date
defects

1. Lr.No.AEE/DB/MB
Grid/Electromechanical/Notice/Medak&Narsapur/2023,
Dt: 11.08.2023
2.2. Lr.No:AEE2/DEE/MB
P1 and P5 pumps discharge insufficiant supply to 36
5 Peddareddypet (370HP) 2 03.08.2023 Grid/Electromecanical/Notice/Medak/2023, dt:14.08.2023
problem Habs
of SE, MB Circle, Sangareddy.
3. Lr.No.AEE/DB/MB
Grid/Electromechanical/Notice/Peddareddypet/2024, Dt:
26.02.2024

1. Lr.No.AEE/DB/MB
Grid/Electromechanical/Notice/Medak&Narsapur/2023,
Dt: 11.08.2023
No habs are being
Non return valve and pump 2. Lr.No:AEE2/DEE/MB
6 New Hunnapur 1 25.02.2024 affected as other pumps
sleeves Grid/Electromecanical/Notice/Medak/2023, dt:14.08.2023
are in working condition
of SE, MB Circle, Sangareddy.
3. Lr.No.DB/AEE/MB Grid/MDK/O&M/Raghava/2024,
Dt:18.02.2024 of the EE, MB grid, Medak

Sub Total 8 36
V Narsapur Segment 1.Addressed notice to M/s Raghava Constructions on
Pump Impeller and Shaft 11.08.2023,14.02.2024,27.02.2024 of EE, MB Grid,
1 Borpatla WTP 1 10.12.2023
Problem Medak. Alternate days supply to
Less Discharge issue of 2. Lr.No.AEE2/DEE/MB 50 habs out of 496
2 Borpatla WTP 3 01.12.2023 Grid/Electromechanical/Narsapur/Notice/2024,
Pumps
Sub Total 4 Dt:01.03.2024 of SE MB Circle, Sangareddy 50
CE-7 G.Lalitha
VI AKBR Segment 1.T1/TDWSP/AKBR/Surge Analysis/16-17 Dt:05-10-2018
stand by pumpset set 2.T1/TDWSP/AKBR/Surge Analysis/16-17 Dt:22-10-2018
coupling breakdown issue , 3.T1/TDWSP/AKBR/Surge Analysis/16-17 Dt:24-12-2018
Batlapally (SW Lingotam)-70 4.T1/TDWSP/AKBR/Surge Analysis/16-17 Dt:31-12-2019 135 habs falling under
1 2 present erection under 28.11.2023
MLD(440 lvl) 5.T1/TDWSP/AKBR/Surge Analysis/16-17 Dt:24-02-2020 yellow and orange
progress and 1 working
pumpset low discharge 6.T1/TDWSP/AKBR/Surge Analysis/16-17 Dt:27-04-2020 category due to less
7.T1/TDWSP/AKBR/Surge Analysis/16-17 Dt:09-09-2020 discharge
Impellers damaged work 8.T2/MB/AKBR/Notices/Raghava Constructions/2021-
2 Dharma thanda 1 15.01.2021
under progress 22Dt: 23-08-2021
9.T2/MB/AKBR/Notices/Raghava Constructions/2021-22
stand by pumpset set Dt: 18-10-2021
92habs falling under
coupling breakdown issue , 10.T2/MB/AKBR/Notices/Raghava Constructions/2021-22
Batlapally (SW Lingotam)-70 yellow and orange
3 2 present erection under 27.12.2023 Dt:12-01-2022
MLD(470 lvl) category due to less
progress and 1 working 11.T2/MB/AKBR/Notices/Raghava Constructions/2021-22
discharge
pumpset low discharge Dt:15-07-2022
12.T2/MB/AKBR/Notices/Raghava Constructions/2021-22
Dt:19-07-2022 18habs falling under
Kodandapur Offtake (new)- stand by pumpset shaft 13.T2/MB/AKBR/Notices/Raghava Constructions/2021-22 yellow and orange
4 1 15.2.2023 Dt:13-02-2023
15.75 x 7 damaged category due to less
14.T2/MB/AKBR/Notices/Raghava Constructions/2021-22 discharge
Dt:11-05-2023
15.DB/AKBR/RC/E&M/O&M/2021 Dt:25-07-2023 14habs falling under
stand by pumpset body
16.DB/AKBR/RC/E&M/O&M/2021 Dt:06-11-2023 yellow and orange
5 PD Pally (Old)-9 MLD 1 damaged ,require to take 21.12.2023
new pumpset 17.T2/MB/AKBR/Notices/Raghava Constructions/2021-22 category due to less
Dt:06-02-2024 discharge
Sub Total 7 259
TOTAL 30 369
Note:Any new identified defect shall be added along with target date of rectification that is issued in the notice
Abstract of Outstanding Electromechanical issues to be attended by Agencies
Pack Segment Total No.of Total No.of Defects identified during Details of various Defects identified
age Pump sets Habs the From
period yet to attended
To
under Effected
Bottom Casing crack, soft starter under
1 Yellore 5 0 6/28/2023 12/20/2023 repair, Repairs to motor, pump, umpeller
and bearings
Motor winding and bearing problem,
breaker problem in panel board, butterfly
Korutla Jagityal valve gear box problem, soft starter in
3 15 350 9/13/2020 2/17/2024 panel board, fuse problems
Dharmapuri

3 Karimnagar Ramadugu 4 12 3/25/2022 1/15/2024 Repairs to pumpsets, less discharge,


Diffuser plates problem

LMD- Manakondur Pumpsets under repair, soft starter


3 12 45 3/25/2022 1/20/2024 problem, PCVs problem less discharge
Huzurabad Husnabad
fuses problem

3 Peddapally Ramagundam 10 0 5/1/2020 9/25/2023 Low discharge, Pumpset bearing issue,


Pumpset repair-Thyrister problem

Siricilla Vemulawada Low discharge, impeller damage,


3 9 121 7/21/2022 10/21/2023 pumpset coupling problem, motor
Choppadandi
winding damage
Motor bearings replacement, motor
3 Kaddam Khanapur 1 0 1/27/2024 - rewinding, motor need to be overhauled,
rectification of teflon bushes, bearing
pump shaft under
hub, electrical repair
issue in panel board,
Komuram Bheem - bearing housing of pump need to be
3 12 391 6/1/2023 2/29/2024
Asifabad replaced
Pump control valve leakages, Repairs in
Pumps, impellers, motor winding, pump
shaft, soft starter, ball valves, butterfly
3 SRSP Adilabad 34 379 7/1/2019 2/15/2024 valves problems, shaft alignmets, flow
meters, leakages through pumps, internal
cable failures, vaccum pump repairs,
cable bursted require replacement
3 Yellampally - Mancherial 2 0 3/25/2023 1/7/2024 Butterfly valve, impeller & base bolt to be
replaced
3 Singur Jukkal 1 0 1/12/2022 - Impeller erection pending
3 SRSP Balkonda 14 0 2/24/2022 12/25/2023 Mechanical problems, Diffuser with guide
wane problem
Package 3 Total 114 1298
Augumentation
4 4 0 7/1/2022 12/22/2023 Impellers issue, Alignment issue, Motor
Udayasamudram winding issue
4 Tailpond 3 0 10/2/2023 12/24/2023 Panel board rectification, NRV issue, soft
starter installation pending
4 Sangareddy 4 24 2/10/2024 2/22/2024 Soft stater problem, Pump shaft,
impellers, neck rings damaged

4 Medak 8 36 8/3/2023 2/28/2024 Soft starter problems, motor winding


burntout, less discharge, leakages in non
return valve and pump sleeves
4 Narsapur 4 50 12/1/2023 12/10/2023 Pump impellers and shaft problems, Less
discharge issue

Low discharge, impeller damages, stand


4 AKBR Segment 7 259 1/15/2021 12/27/2023 by pump set couling beakdown, shaft
damages
Package 4 Total 30 369
TOTAL 149 1667