Company HSE ZMDEI-Electrical Rebar was observed showing up after rain that Carefully remove and cleaning the area and
2 2/1/2022 Joint Co/Cntr ABG co. Other (see comments) Fall,Trip,Slip UC H N 4/1/2022 1 Closed 5/1/2022
Superv/inspection Substation means it was hided by the soil Send it to the metal dirt area
Company HSE ZMDEI-Electrical Electrical Panel was inspected and cover for A warning sign has been placed, identified
4 7/1/2022 Joint Co/Cntr ABG co. Tools/Equipment Electrical hazard PO H protection from rain and other weather N 6/1/2022 2 Closed 8/1/2022
Superv/inspection Substation conditions and wrapped with a rainproof material
11 22/1/2022 Company HSE Company ABG co. ZMDEI-Electrical Lifting Struck by/Hit by UA H Riggers was staying in the lorry body while N 22/1/2022 Rigger has left the lorry after finish slinging 1 Closed 23/1/2022
Superv/inspection Substation load been lifted.
Lack of lighting inside the building that may
ZMDEI-Electrical
12 22/1/2022 Joint HSE Walk down Joint Co/Cntr ABG co. Substation Other (see comments) N/A UC H cause injury due to trip and fall hazards N 22/1/2022 add more lighte on workplace 1 Closed 23/1/2022
because of the lack of lighting.
Company HSE ZMDEI-Electrical Temperature measurement device was not Battery was changed and device was
16 26/1/2022 Superv/inspection Company ABG co. Substation Covid19 management Covid19 UC H working and the register was filled with fake N 26/1/2022 operated 1 Closed 26/1/2022
records
Company HSE ZMDEI-Electrical Flowchart that was attached with all PTWs
17 26/1/2022 Superv/inspection Company ABG co. Substation PTW N/A UA H was not the last updated one. N 26/1/2022 ubdate flowchart 1 Closed 27/1/2022
Company HSE ZMDEI-Electrical Workers were not wearing proper PPE ABL HSE MGR. Was instructed to provide
18 6/2/2022 Superv/inspection Company ABG co. Substation PPE Chemical hazard UA H (disposable coverall, respirator mask) for the N 6/2/2022 the crew with proper PPE ASAP 1 Closed 7/2/2022
task.
The scaffold was not re-inspected moreover ABL HSE MGR was informed to remove the
Company HSE ZMDEI-Electrical green tag and install barricades around the
19 6/2/2022 Superv/inspection Company ABG co. Substation Working at Height Fall from height PO H tag was not updated at the main cables trench N 6/2/2022 scaffold access way till reinspect by the 1 Closed 7/2/2022
outside the substation.
scaffold inspector.
Electrical cables were left on the ground ABL HSE SPV was instructed to use a cables
Company HSE ZMDEI-Electrical
21 6/2/2022 Superv/inspection Company ABG co. Substation Other (see comments) Electrical hazard PO H randomly without sleeves or cables hangers at N 6/2/2022 hanger with isolation and lift it from the 1 Closed 7/2/2022
the cable’s trays area. ground to avoid an electrical hazard
Company HSE ZMDEI-Electrical The scaffold is slant on the second floor of the ABL HSE MGR was instructed to dismantle
23 7/2/2022 Company ABG co. Scaffolds/Ladders Fall from height UC H building and needs immediate dismantling and Y > 24h 7/2/2022 the scaffold tower (by today or tomorrow) 1 Closed 9/2/2022
Superv/inspection Substation
re-erecting and not allow anyone to use the scaffold
Company HSE ZMDEI-Electrical The main cable trench area was barricaded
25 9/2/2022 Contractor ABG co. Other (see comments) Fall,Trip,Slip PO H N 9/2/2022 and adequate safety signs were instilled 1 Closed 10/2/2022
Superv/inspection Substation along the trench area
29 11/2/2022 Company HSE Contractor ABG co. ZMDEI-Electrical PPE Chemical hazard PO H A worker was wearing full proper PPE during N 11/2/2022 Commitment as described in ( MSDS ) 1 Closed 12/2/2022
Superv/inspection Substation dealing with Add sealant for joints of concrete.
Company HSE ZMDEI-Electrical Despite the scaffold having been inspected, Stop using it and put a ( Do not oprate ) sign for
30 11/2/2022 Company ABG co. Working at Height Fall from height UC H the scaffold ladder contains broken steps as N 11/2/2022 The ladder is replaced 1 Closed 12/2/2022
Superv/inspection Substation shown in red marks. the next inspaction day
Scaffold materials and other materials need to ABL HSE MGR was instructed to arrange
31 11/2/2022 Company HSE Company ABG co. ZMDEI-Electrical Housekeeping Fall,Trip,Slip UC H be arranged properly furthermore the area did N 11/2/2022 the materials and use both safety signs and 2 Closed 12/2/2022
Superv/inspection Substation
not have proper barriers and safety signs. barricades by today.
Company HSE ZMDEI-Electrical The working area was clean and tidy and all
32 13/2/2022 Contractor ABG co. Housekeeping Fall,Trip,Slip PO M temporary storage materials were barricaded N 13/2/2022 1 Closed 14/2/2022
Superv/inspection Substation properly.
Some of the places inside the cables trays area ABG HSE MGR was instructed to increase
36 14/2/2022 Company HSE Joint Co/Cntr ABG co. ZMDEI-Electrical Lifting Other (see UC H inside the substation did not have sufficient N 14/2/2022 the number of lighting devices or changed 1 Closed 15/2/2022
Superv/inspection Substation comments) the lighting devices' location according to
lighting during the daily activity activities.
38 16/2/2022 Joint HSE Walk down Contractor ABG co. ZMDEI-Electrical Working at Height Fall from height UA N/A Workers were not unsafe action on scaffolding N 16/2/2022 ABL HSE MGR. Was instructed to provide 1 Closed 16/2/2022
Substation Use another base for sourcing
ZMDEI-Electrical The workplace Workers upon completion of ABL HSE MGR was informed to remove the
39 16/2/2022 Joint HSE Walk down Contractor ABG co. Substation Housekeeping Fall,Trip,Slip UC H previous work did not remove work materials N 16/2/2022 materials and good housekeeping
1 Closed 16/2/2022
The location of cables trays activity inside the ABG HSE MGR was instructed to increase
Company HSE ZMDEI-Electrical Other (see the number of lighting devices or changed
41 17/2/2022 Contractor ABG co. Other (see comments) UC H substation did not have sufficient lighting N 17/2/2022 1 Closed 18/2/2022
Superv/inspection Substation comments) during the daily activity. the lighting devices' location according to
activities immediately
The power cable was left on the ground ABG HSE MGR was instructed to install and
Company HSE ZMDEI-Electrical
42 17/2/2022 Superv/inspection Contractor ABG co. Substation Lifting Electrical hazard UC H without any protection during performing the N 17/2/2022 increase the number of (cables hanger) at a 1 Closed 18/2/2022
task work location
Company HSE ZMDEI-Electrical The (top rail) of the scaffold was not erected
43 17/2/2022 Superv/inspection Contractor ABG co. Substation Working at Height Fall from height UC H on the first floor of the substation N 1 Open
44
Please do not merge cells, please do not change cells' format Windows User:
If any, describe kind of
No. Date of event Event Notes Report details
report
1 16/1/2022 Company Management visit Lifting Operations HSE Site visit report
2 7/2/2022 Company Management visit TBT INDECTION (MR. MOHHAMED HATHAL ) HSE Site visit report Windows User:
3 Free text, describe
event
4
5
Please do not merge cells, please do not change cells' format
Contractor/ Dpt
Incident Date of Area/
Subcontr Involvem Task Type of Incident Priority
No. event Location
Involvement ent
ZMDEI-
Tools/
Electrical
1 26/01/2022 ABG co. A Equipmen First Aid Case H
Substatio
t
n
Description/Comments Immediate Action taken
During a drill activity, the worker Driller machine was not used properly by the worker
lost control of the tool which and gloves was not proper for the job
hooked and punctured the glove
and injured the PI in the thumb.
Fortunately, the tendon damage
and abrasions were minimal.
Work
Work
Reccomended corrective actions stoppage Target Date
stoppage
period
Company Contractor HSE Superv/inspection Access/Egress Biological hazard PO Near Mis H Y < 30 min Open N/A
Contractor Company HSE Superv/inspection Awareness/Behaviours Chemical hazard UA Damage to M N < 1h Closed Closed
Joint Co/Cntr Joint HSE Walk down Chemical products Cought by collapse UC Damage tL N/A < 5h N/A Draft
Other (see comments) Company Management visit Confined Space Covid19 Damage to N/A < 12h
Contractor Management visit Covid19 management Electrical hazard Fatality < 24h
Audit/Assesment Driving Fall from height First Aid Case > 24h
Drill/Exercises Energized System Fall,Trip,Slip Lost Time Injury
Health & Hygiene Insp. Excavation/Trenching Fire hazard Lost Workday Case
Firefighting Health Medical Treatment Case
Health-Hygiene Hearing hazard Restr Workday Case
Heat/cold environment Heat stroke/dehydration
Housekeeping Infection hazard
HSE MS Injury (generic)
Illumination Musculoskeletal Disease
Lifting Noise hazard
Lone working Pressure hazard
Manual Handling Struck by/Hit by
PPE Vibration hazard
PTW N/A
Re-Fuelling Other (see comments)
Safety signals/Barricades
Scaffolds/Ladders
SIMOPS
Tools/Equipment
Vehicle/Machinery Movement
Welding/Cutting
Working at Height
Other (see comments)
0.4
0.2
0
Company Management visit
اإل
Count of No.
visit
TABLE FOR WEEKLY REPORT, FILL THEM FROM GREEN LABELLED SHEETS
NS (No. of)
Last week
0
0
Years - all -
Quarters - all -
Months - all - اإلجمالي
Days - all - 1.2
0.4
0.2
0
(empty) First Aid Case
اإلجمالي
25
20
15
10
0
Company HSE Superv/ Joint HSE Walk down Company Management visit
inspection
ervations vs events 2020-2021
Kind of observation PO
UC
UA
10
8
Status of Obs.
6
0
PO UC UA
اإلجمالي
Total Result
50%
اإلجمالي
)(empty
50%
Kind of observation UA
Priority - multiple -
Date of event - all -
Total Result
50%
Safety observations vs. Tasks
Priority: all
June-July 2021
Lifting
17%
PPE
8%
otal Result
50%
PTW
8%
Scaffolds/Ladders
8%
Working at Height
8%
asks