Rig EDC-61 inspection /Well Name: Kahraman-C183

Inspection Date: Prepared by Khalda HSE Reviewed by Khalda HSE


drilling support team Ass.General Manager
1. 15-6-2020. 1. Amr Mortada. Sary El-Sayed
2. Ahmed Ibrahim
Abstract
As part of Khalda Drilling HSE department activities full condition survey had been
carried out on Rig EDC-17 starting 08/06-2020 while the operation was drilling bridge
plugat Well name: Kahraman-C183.
. the survey covering rig overall condition, safety & environmental training, personnel
competency assessment, HSE and operational management system & critical safety,
mechanical lifting, drilling equipment, high pressure mud system and machinery
spaces in terms of certificates of compliance & capability of running safe & efficient
operations.
Applicable Standards
The inspection criteria which have been used as reference during this inspection
Khalda land rig checklist.
Purpose
Check rig equipment condition & integrity, determine lacks, spot on areas requiring
improvement, assist in the continuous improvement of the company HSE and
operation procedures through identification of risks and their potentials within the
work place, identification of strengths and weaknesses in related policies & compare
current documentation and practices against best practices and legal obligations to
ensure that resources devoted to health and safety are being utilized effectively.
Report includes action plan clarifying findings description, required corrective action
& risk potential rank to assist the team to easily track & follow up corrective actions as
required.
Action Items Ranking Criteria
Critical: hazard which may lead to fatality, or any recordable injury or severe
environmental impact or complete equipment failure.
Major: hazard which may lead to first aid or significant environmental impact or
significant damage to equipment or loss of production or complete absence of
management system element or significant failure of implementation of management
system element.
Minor: hazard which may lead to minor environmental impact or minor damage to
equipment or deviation from company management system element.
Strength points

 General arrangement of the rig is in good order


 Proper fire extinguishers are available at rig site and main camp site,
however fire extinguishers need to be well displayed along the area.
 Safety lines with safety pins are provided where needed
 Rig safety induction including the data you may need to know at the
rig.
 Clinic visit log is available and updated
 Medical check is being conducted and recorded for the visitors
Attachment 2:Non-conformance Notice & Corrective or Preventive Actions Sheet

Rig Survey Findings


Inspection location: EDC-61 / Kahramana -C183 Date: 15-June-2020

Inspector: Amr Mortada / Ahmed Ibrahim. Effect Verification


Inspected Inspection and Corrective/Prev Scheduled Item
NO. Photos Responsibility Verification Signature
Items check result entive Actions time Classification
Minor

Safety induction to
be reviewed by
There is no standard safety EDC
1 Safety Induction EDC management 30-06-2020
induction along EDC rigs management
level, to avoid
confusion

Web sling to be
used under control
Unattended web sling was of PTW, designated
2 Rig pad 30-06-2020 EDC STP
thrown at rig site, box with pad lock to Critical
be provided for web
slings
Major

Unattended tools Muster point area to


3 Muster point making trip hazards at be free from any Closed EDC STP
muster point area tripping hazard

Minor

Rig camp water Water tank is not Identification label


4 30-06-2020 EDC HSE
tank labeled to be provided

Critical

Electric connection
Rig Camp water must be weather Rig
5 Poor electric connection Immediate
tank proof, need to be electrician
replaced
Critical

Rig camp water Earthing cable to be Rig


6 No earthing cable Immediate
tank connected electrician

Critical

Unprotected electric Rig


7 Public toilet To be replaced Immediate
socket located outdoor electrician

Critical
Improper
implementation for
PTW procedures: EDC to raise safety
- not signed properly. campaign in order
EDC
8 PTW - SJA not specific to the to raise people’s 30-06-2020
management
job awareness toward
- TBT not signed by all PTW and SJA
people involved in the
job
Major

No emergency light
Emergency light to
9 Koomey unit provided to koomey 30-06-2020 STP
be provide
unit

Major

No drip pan
underneath oil hoses Drip pan to be
10 Koomey unit 20-06-2020 STP
connection to catch any provided
oil leak

Critical

No earthing cable
High pressure Earthing must be Rig
11 connected to the Immediate
washing machine provided electrician
machine
Critical

Wire robe clamp is not


To be replaced by
12 Climb assist line fit to the wire “big Immediate STP
proper size
clamp”

Minor

Diesel tank is missing


Missing sign to be
13 Diesel tank safety signs and 30-06-2020 EDC HSE
provided
identification label

Critical

-no fence line


- no MSDS EDC STP /
Chemical storage - dangerous chemicals
14 30-06-2020 Mud
area are not labeled
- no plastic liner below Engineer
the chemicals
Major

Poor housekeeping at Derrick man


More attention is
mixing area, empty
15 Mixing area needed toward Immediate / mud
drums and sacks were
housekeeping engineer
throwing at the area

Critical

Extra hoses to be
One fire hose is
16 Main Camp provided to cover Immediate EDC HSE
provided at main camp,
the main camp area

Critical

No fir pump is
Fire pump is a must
17 Main Camp provided at main camp Immediate EDC / KPC
at main camp area
area
Critical

junction box with live


source is missing
To be fixed Rig
18 Laundry protection, laundry Immediate
immediately electrician
man is exposed to
electric shock

Critical

Dryer control panel is


malfunctioned, and
running is being To be fixed Rig
19 Laundry Immediate
conducted through its immediately electrician
junction box that
having a live source

Critical

Smoke detectors are in


poor condition in To be checked and Rig
20 Main camp Immediate
different places at main fixed electrician
camp
Critical

Designated area to
Positive chiller Vegetable store is being be provide for
21 30-06-2020 EDC
room used as butcher area butcher and
defrosting meat

Critical

Improper storing for


catering grocery, no
22 Main camp EDC to take action 30-06-2020 EDC
separation for different
products

Critical

Improper securing for


water line feeding the Line to be clamped
rig floor, clamp is out of otherwise proper
23 Rig floor stair Immediate STP
order and small roper is securing to be
being used providing provided
dropped hazard
Major

Inspection
certificates, filling
All SCBAs are missing certificates,
24 SCBA 30-06-2020 STP HSE
certificates hydrotest
certificates to be
provided

Critical

MPI inspection to be
applied to snub line
each 6 months, post has
25 Snub line post Issue to be fixed Immediate STP
been painted with
coming color code with
applying MPI

Critical

This body harness


A body harness was to be kept out of
checked for certification work and all body
26 Full body harness Immediate STP/HSE
and no inspection harnesses to be
certificate is provided checked/inspected
by third party
Major

Web check is missing


27 Rig floor To be installed Immediate Rig mechanic
for hydraulic hoses

Critical

Area to be covered
No fire extinguishers at
28 Mud pump by fire Immediate Rig HSE
mud pump area
extinguishers

Minor

Improper storing for


To be stored
29 BOP area pipe rams, throwing at Immediate STP
properly “indoor”
subbase area
Minor

A lot of missing safety Lot of safety signs


30 Safety sign 30-06-2020 HSE
signs at the rig to be provided