Related Posts
BOP Control System Acceptance
BOP Stack Acceptance Guidelines
Choke Manifold Acceptance Guidelines
Mud Circulation System Inspection Guidelines
Cementing Unit Acceptance Guidelines
Prime movers acceptance guidelines
Workover & Drilling Rig Inspection Checklist For Onshore
Rigs Content
Drilling Rig Inspection Checklist For Drilling Equipment
1 Drawworks
2 Rotary Table
3 Top Drive System
4 Swivel
5 Kelly Spinner
6 Kelly And Kelly Drive Bushing
7 Crown Block
8 Travelling Block
9 Hook
10 Drilling Instrumentation
11 Derrick
12 Casing Stabbing Board
13 Tuggers And Sheaves. Man-Riding Winches.
14 Survey Line
1 Mud Pumps
2 Shale Shaker
3 Mud Cleaner
4 Desilter
5 Desander
6 Degasser
7 Centrifugal Pumps
8 Mud Agitators
9 Mud Mixing System
10 Standpipe Manifold And Rotary Hoses.
11 Bulk Air System And Tanks
12 Centrifuge
13 Cementing Unit
4 Choke Manifold
8 Diverter System
1 Diesel Engine
2 Emergency Generator Set
3 Air Compressors / Air System
4 Refrigerating And Air-Conditioning
5 Watermaker
6 Mobile Crane
1 Elmago Brake
2 Main Generators
3 Main Transformer, 3 Phase
4 Converters (Scr And Variable Frequency Drives)
5 Main Switch Boards
6 Emergency Switch Boards
7 Dc Motors
8 Ac Motors
9 Motor Control (Mcc’s And Motor Starters)
10 Lighting System (Main)
11 Lighting System (Emergency)
12 Electrical Outlets
13 Cables And Cable Trays
14 Batteries, Battery Chargers And Ups
15 Alarm Systems: Fire, Gas And General
17 Communication: Telephone And Pa Systems
18 Electric Welding And Welding Distribution
19 Earthing And Earth Bounding
20 Hazardous Areas
21 Miscellaneous Items
Maintenance System
Spare Parts
Lifting Equipment
1210 Drawworks
1220 Drawworks Brakes And Clutches
1230 Catheads
1240 Drilling Line
1250 Deadline Anchor/Weight Indicator
1260 Crown Protection/Emergency Stop System Ess
1270 Crown Block, Travelling Block And Hook
1280 Stabbing Board
Tubular Handling
Other Equipment
Mud System
Cementing System
Brine System
Bulk System
Oilbased Mud Obm (If Applicable)
2310 General
2320 Drill Floor Area
2330 Mud & Shaker Area
2340 Personal Protection
2350 Fire Protection
2360 Electrical Earthing
2370 Well Control With Obm
2410 Contractor
2420 Bsp
2430 Third Party Equipment
Mooring System
Accommodation
2610 General
2620 Offices
2630 Living Quarters
2640 Galley
2650 Medical
Safety Equipment
2710 General
2720 Fire Fighting Equipment
2730 Emergency Shut Down
2740 Personnel Lifts Belts/Baskets
Miscellaneous
2810 Certificates
2820 Lifting Equipment Certification And Inspection
2830 Pressure Vessels Inspection And Certification
2840 Manuals And Books
2910 General
2920 Main Deck
2930 Helideck
2940 Cranes & Fork Lifts
2950 Workshops & Stores
2960 Fuel Storage
3010 General
3020 Safety Management
3030 Training – General
3040 New Arrivals Introduction
3050 Personnel Accounting
3060 Communications
3070 Contingency/Emergency Planning
3080 Personnel
3090 First Aid