Workover Department of Anton DMCC (Iraq) Doc No.

HSE-WO-801D

Version AWO001
Pre Rig Move checklist
Issue date 2018-1-1

The purpose of this checklist is to safely conduct Rig Move activities, while ensuring the safety of the workers performing the work & the general public.
Rig Name Date & Time
Current Location: Total Number of Rig Loads:
New Location: Total Loads for Highway Convoy:
Route Power line Minimum Maximum Trucks per Convoy:
Height:
Distance To Travel: Police Contact Phone No:
Company Man Phone No.: Nearest Medical Facility Contact
Fiel Phone: Fiel
Rig Move Rig Move Meeting Checklist
Aud Aud
Checklist:
Have the following been acted: Y N N/ C N Has the following been observed: Y N N C N
A C / C
A
Has Well sites prepared a Route Survey Sheet & Map? Is the Pre-rig move Checklist complete?

Has the route been checked by all required Supervisors? Is there Trucking Supervisors On location?

Has a rig-move meeting been held with all related personnel? Is there Trucking Safety Advisor On location?

All lifts sling Have been checked? Is there HSE Advisor On location?

Has the rig move plan been completed? Is there Transportation Supervisors On location?

Will a power-line need to be de-energized? Is there an KOC Foreman On location?

Have all hazards been identified along the route & documented? Have Convoy Route Hazards identified been discussed?

Obtained / Reviewed necessary crossing agreements? Have all personnel attended a documented Safety Meeting daily?

Are all loads loaded on the suited trucks? Has a load list been prepared to identify load out sequence?

Located and marked overhead power lines? Are there enough pilot trucks with flashing lights for rig moving?

Has a documented Safety meeting been held daily with all Are there enough lighting equipment on the location ?
personnel?
Have enough cranes been supplied for the move? Are all pilot truck drivers supplied with high visibility vest?

Have enough pull rope ready for loading or off loading big loads? Have enough ropes for tighten the loads ?

Are all Supervisors aware of Emergency contact numbers? Are there adequate numbers of trailers available?

Are all dollys air pressure enough? Do all Cranes have valid inspection certification?

Has transportation for stranded drivers been arranged? Are all Crane Operators certified?

Have all transport drivers know the move way clear? Is there any permission for rig moving during dark?
Have all Skid Road Loads been identified for Convoy? Are the master&substrcture Riggers on the location?

Are direction signs visible & placed? Are there enough communication equipment available for escorting?

Heavy Bed Trucks Required = Are all workers equipped with mandatory PPE?

Heavy Live Roll Trailers KW Required = Have all drivers been instructed in convoy movement only?

Highway Trucks Required = Have all trucks been inspected for deficiencies?

Lowboy Trailers Required = Has all cranes been inspected for deficiencies?

Are all drivers aware that there is No Night Rig Moves? Are tag lines available & used?

Is there a mechanic travelling behind each convoy? Is the Medic equipped & available for mobile treatment?

Safety And Environmental Hazard Assessments Are all secured loads inspected by the truck push before moving?

Convoy Route Control Act Do all convoy supervisors have communication between them?

Hazards Identified Measur Y N ed


N C N Are all cranes being utilized during Rig Move?

Number of Power lines = es / C Do all trucks have wood blocking material available?

Number of Road Crossings = Have Traffic Police been notified & utilized for upcoming crossings?

Number of KOC gate need to be opened = Are all critical operations supervised by senior personnel?

Road Conditions Are all trucks fully fueled at the end of each day?

Police Contacted Has all high equipment been lowered before loading?

Pre-Rig Move Meeting


Responsible Party Print Name Attendance Signatu Phone Number Da
re te
Company
Man
Rig Manager

Rig Master

Trucking Supervisor

Lifting Supervisor