M ateri al SUBMIT TA L SHE ET

Submittal Ref. Contractor No,


SRM/Shell/STR/MS/001 STRUCTO-BUILD [STR/Shell/SRM/CC007/
/MS/0001]
To: Shell

SUBMITTAL CONTENTS DESCRIPTION Submittal issue Response


Date: Requested By:

Push button and switch in the offices for lighting retrofit 18 Dec 2019 Shell

Enclosure
We confirm that the Shop drawing / Enclosure hereby submitted is suitable for the conditions of use Signed
and conforms with the contract specifications and all applicable codes, standards and statutory
 Drawing
requirements. We confirm that no variation in the contract sum is implied or claimed by this
submittal sheet. Acceptance of this material submittal does not alter in any way whatsoever our Name:  Other
contractual or common obligations and responsibilities. Where the submittal is in any way in
Eyad Mohammed Refai  Calculation
variance with the specification, such variations must be identified and brought to the attention of the
project management representative on this form. Project management acceptance will be invalidated  Schedule
if such variations are not identified Contract Specification Clause Ref.:
Signature:
Eyad Mohammed Refai

ITEM Submittal REF REV DATE TITLE

Switch box -water SRM/Shell/STR/MS/001/A 00 18 Dec 2019 GEWISS Switch-Box GW27 041
tight enclosure
switch Visual inspection 00 18 Dec 2019 GEWISS one- way Switch GW20 501

Project Manager Representative COMMENTS

RETURNED TO CONTRACTOR: DOCUMENT STATUS

Project Manager REPRESENTATIVE A: Work may C: Revise and Resubmit Work may
DATE RECEIVED proceed not proceed

B: Revise and D: For Information Only - Review


resubmit work not required
SIGNATURE may proceed
subject to
incorporation of
changes
indicated
IMPORTANT: Permission to proceed does not constitute
acceptance of design details calculations analyses test methods
or materials developed or selected by the Contractor / supplier
DISTRIBUTION: To : Mohammed Ghanim , Ahmed Gamal , Ahmed Hekal and does not relieve Contractor / supplier from full compliance
Cc: Amr Wagih , Beshoy Makram , Essam Abdelkader , Mamdouh Ali
with contractual obligations
Project Manager REPRESENTATIVE

Signature________________________________Date______
_________

SRM/Shell/STR/MS/001 Date of Issue: 18 Dec.2019


Rev.00