Crawler Tractor PR 754

Job Report Creating four reservoirs


with the 3D GPS control system
in the Lérida region / Spain

EB_PR_754_3D_Bild.indd 11
EB_PR_754_3D_en.indd 12.10.2009 10:18:22
10:15:53 Uhr
Situation Solution
The company Desmontes del Cinca, S.L. headquartered in Biné- Most of the material at the construction site is limestone in various
far (Huesca, Spain) specialises in surveying work and the crea- sizes that must be moved and profiled to create the reservoirs.
tion of topographic models of terrain, and today is an important Since a motorgrader could not be considered for material trans-
regional provider of earthmoving and general construction serv- port and grading because of the hard subsurface layers, Des-
ices. Founded in 1976, the company has grown considerably and montes del Cinca decided to employ a Liebherr PR 754 crawler
enjoyed a truly prosperous time, since the assumption of man- tractor.
agement responsibility by Rámon Fernández, the current Man-
aging Director, in 1997. Today, the company is active primarily To move the rock precisely and simultaneously maximise produc-
in Aragon and Catalonia in the north-eastern part of the Iberian tivity, the PR 754 was equipped with a 3-D control system based
peninsula. The region around the city of Lérida, which is known on GPS technology. This way, a tractor in the 40 t class can be
for its orchards, is one of the most important agricultural regions used for fine levelling with an accuracy of 1.5 cm. A day’s work in
in Spain. a 10 to 11 hour shift is an exceptional 4,500 to 5,000 m3 of ma-
terial that is removed by 4 dumpers, each with a capacity of 40
tonnes, and all of this with the certainty that the required profile for
the terrain is being provided with the greatest accuracy.
Task
Thanks to its electronically controlled hydrostatic drive, the
To ensure a sustainable improvement of the water supply in the Liebherr PR 754 Litronic crawler tractor delivers maximum grad-
north-eastern part of Spain, plans call for construction of an ir- ing and ripping capability, even in the harshest operating condi-
rigation canal from the Segarra plateau to the Garrigues region. tions. The cooling system operates independently of the diesel
The 3,500 km of pipe, 43 retention ponds and 17 pumping sta- engine and provides cooling as needed to guarantee maximum
tions will supply over 17,000 irrigated plots of land in 70 com- availability, even at high ambient temperatures, low noise levels
munities. In construction stage 13, the contract for creating four and especially low fuel consumption. Compared to the conven-
reservoirs was awarded to the company Desmontes del Cinca, tional approach with a motorgrader, it was possible to nearly triple
S.L. Construction, this work is anticipated to take 3 years. The the daily output.
construction work will require the use of dumpers, wheel load-
ers, motorgraders, excavators and crawler tractors, including one Furthermore, the PR 754 can be used also for clearing, ripping
each of the excavators R 954 and A 904, as well as a PR 754 and grading with its capacity of 1,200 m3 (ripping and grading) to
crawler tractor from Liebherr. 2,000 m3 (clearing and grading). Today, the Desmontes del Cinca
employees responsible for this project appreciate that, thanks to
the Liebherr machinery being used and the very innovative proce-
dures employed on-site, construction will be completed one year
earlier, that is, in 2 years.

The Lérida region in north-eastern Spain.

Technical Data
PR 754 Litronic

Engine _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _Liebherr D946 L A6


Engine output (ISO 9249)_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _250 kW / 340 HP
Operating weight_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ 38,620 kg

Attachment
PR 754 Litronic

Semi-U blade with HD edges_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ 8.9 m³


1-shank ripper with pin puller
Air conditioning
Dust guard package, incl. automatic reversing fan
Maximum precision thanks to the latest satellite technology.

Printed in Austria BK-RP LWT/VM 10813481-di-10.09_enGB Subject to technical modifications.

Liebherr-Werk Telfs GmbH


Hans Liebherr-Straße 35, A-6410 Telfs
콯 +43 50809 6-100, Fax +43 50809 6-7772
www.liebherr.com, E-Mail: lwt.marketing@liebherr.com

EB_PR_754_3D_Bild.indd 22
EB_PR_754_3D_en.indd 12.10.2009 10:18:22
10:15:57 Uhr

You might also like