PERINCIAN KEBUTUHAN MATERIAL
PROYEK : MAKO KOPASSUS
LOKASI : SEMPLAK - BOGOR

Sement @40 Bata merah Multiplek Besi beton Besi beton Wiremesh 8 Scafolding Pipa Keramik Cat tembok
Tenaga kerja Pasir beton Split 1/2 Pasir urug Pasir pasang Batu Kali Base Coarse Sirdam Plastik cor Balok 6/12 Kaso 5/7 Paku 5 cm Paku 7 cm Benrat Ember cor Troli
NO URAIAN PEKERJAAN Volume Sat kg cikarang 9mm dia 13 mm dia 8 mm mm (MF & LF) support 30x30 interior
org m3 m3 zak m3 m3 bh lbr m3 m3 m3 roll btg btg kg kg btg btg lbr kg bh set bh bh dus ltr
Pondasi Tapak 1,2m x 1,2m tebal 20cm, kedalaman 1,2
I.1.1
meter, besi ex SNI 16mm
1 Galian Pondasi 16.20 m3 6.00 - - - - - - - - - - - - - - - - - - - - - - - - -
2 Pasir Urug di bawah pondasi 1.52 m3 - - - - 1.83 - - - - - - - - - - - - - - - - - - - - -
3 Urugan kembali bekas galian 11.51 m3 4.00 - - - - - - - - - - - - - - - - - - - - - - - - -
4 Urugan tanah peninggian lantai gudang 56.73 m3 - - - - - - - - - - - - - - - - - - - - - - - - - -
5 Lantai Kerja 1:3:5 0.60 m3 - 0.40 - 3.60 - - - - - - - - - - - - - - - - - - - - - -
Beton K225 ex Holcim atau setara (Included pembesian +
6 3.78 m3 - 1.98 2.50 40.48 - 0.76 1,398.60 - - - - - - - - - 26.00 26.00 - 0.95 - - - - - -
bekisting)
I.1.2 Galian Sloof 170x300 mm
1 Galian Pondasi 8.99 m3 - - - - - - - - - - - - - - - - - - - - - - - - - -
2 Pasir Urug di bawah pondasi 1.08 m3 - - - - 1.30 - - - - - - - - - - - - - - - - - - - - -
3 Urugan kembali bekas galian 6.29 m3 - - - - - - - - - - - - - - - - - - - - - - - - - -
4 Lantai Kerja 1:3:5 0.54 m3 - 0.36 - 3.24 - - - - - - - - - - - - - - - - - - - - - -
I.1.3 Pelat Lantai tebal 12cm 7.20 m3 - 3.77 3.97 64.80 - - - - - - - - - 28.00 2.00 1.00 - - 6.00 0.25 - - - - - -
1 Pelat Rabat beton 10cm 5.17 m3 - 3.21 2.75 31.00 - - - 8.00 - - - - - 20.00 1.50 0.75 - - - - - - - - - -
2 Beton SLOOF K225 ex Holcim atau setara 1.88 m3 - 0.98 1.24 17.40 - - - 6.00 - - - - - 7.00 6.00 3.00 21.00 40.00 - 0.50 - - - - - -
3 Beton KOLOM PEDESTAL K225 ex Holcim atau setara 0.91 m3 - 0.48 0.60 8.47 - - - 4.00 - - - - - 18.00 0.25 0.13 31.00 31.00 - 0.25 - - - - - -
II Pekerjaan Beton Dak Atap
1 Beton K225 Dak 11.94 m3 - 6.25 7.89 110.71 - - - 22.00 - - - - 24.00 68.00 18.00 9.00 - - 8.00 0.25 - 20.00 24.00 - - -
2 Kolom Beton K225 2.03 m3 - 1.06 1.34 18.85 - - - 5.00 - - - - - 8.00 6.00 3.00 16.00 - - 0.50 - - - - - -
3 Balok Beton K225 1.94 m3 - 1.02 1.28 18.02 - - - 7.00 - - - - - 60.00 5.00 2.50 24.00 40.00 - 0.50 - - - - - -
4 Listplank Beton K225 1.50 m3 - 0.78 0.99 13.88 - - - 8.00 - - - - - 55.00 8.00 4.00 - - 1.50 0.25 - - - - - -
III PEKERJAAN ARSITEK
III.1 Pekerjaan Pasangan dan Plesteran
1 Pasangan Dinding 1 Bata merah 91.96 m2 - - - 52.86 - 11.77 13,334.20 - - - - - - - - - - - - - 4.00 - - - - -
2 Plesteran + Acian Dinding Bata 183.92 m2 - - - 28.60 - 4.23 - - - - - - - - - - - - - - 4.00 - - - - -
3 Ring balk 15x15 cm 0.72 m3 - 0.38 0.48 6.68 - - - 2.00 - - - - - 6.00 0.50 - - - - - - - - - - -
4 Kolom praktis 15x15 cm 0.91 m3 - 0.48 0.60 8.46 - - - 2.00 - - - - - 6.00 0.25 - - - - - - - - - - -
5 Pengecatan Dinding 203.92 m2 - - - - - - - - - - - - - - - - - - - - - - - - - 88.21
6 Pengecatan Bawah Dak 0.00 m2
III.2 Pekerjaan Jalusi & Pintu -
1 Rangka Jalusi uk. 60 x 120 cm 9.00 bh - - - - - - - - - - - - - - - - - - - - - - - - - -
3 Piintu Besi uk. 180 x 220 cm + Jalusi 1.00 unit - - - - - - - - - - - - - - - - - - - - - - - - - -
III.3 Pekerjaan Finishing Lantai
1 Finishing Lantai Gudang Floor Hardener 3 kg.m2 60.00 m2 - - - - - - - - - - - - - - - - - - - - - - - - - -
2 Keramik Mulia Putih 30x30 cm 7.20 m2 - 3.00 - 0.50 - - - - - - - - - - - - - 8.00
2 Plin Keramik Mulia 10x30 cm 28.40 m' - - - - - - - - - - - - - - - - - - - - - - - - 1.00 -
III.5 PEKERJAAN ELEKTRIKAL
1 Instalasi & Lampu TL 12.00 ttk - - - - - - - - - - - - - - - - - - - - - - - - - -
2 Instalasi & Stop Kontak 2.00 bh - - - - - - - - - - - - - - - - - - - - - - - - - -
3 Instalasi & Saklar Doubel 2.00 bh - - - - - - - - - - - - - - - - - - - - - - - - - -
IV PEKERJAAN PRASARANA
IV.1 Pekerjaan Tanah
1 Pekerjaan Striping Tanah existing 95.00 m3 4.00 - - - - - - - - - - - - - - - - - - - - - - - - -
2 Pemadatan Tanah 190.00 m2 2.00 - - - - - - - - - - - - - - - - - - - - - - - - -
3 Perkerasan Tanah :
- Basecoarse t = 20 cm 22.80 m3 - - - - - - - - - 22.80 - - - - - - - - - - - - - - - -
- Sirdam agregat 7 cm, t = 5 cm 13.30 m3 - - - - - - - - - - 13.30 - - - - - - - - - - - - - - -
IV.2 Pekerjaan Bongkaran
1 Bongkaran dudukan akses garasi uk. 50x500 cm 2.00 bh - - - - - - - - - - - - - - - - - - - - - - - - - -
2 Bongkaran Atap garasi 1.00 ls - - - - - - - - - - - - - - - - - - - - - - - - - -
3 Bongkaran Decker existing 1.00 ls - - - - - - - - - - - - - - - - - - - - - - - - - -
4 Tebang Pohon 6.00 bh - - - - - - - - - - - - - - - - - - - - - - - - - -
IV.3 Pekerjaan Badan Jalan
1 Plastik Cor 190.00 m2 - - - - - - - 3.00 - - - 2.00 - - - - - - - - - - - - - -
2 Beton K225 + Tulangan M8 Single 19.00 m3 - 8.29 10.47 171.00 - - - - - - - - - - - - - - 19.00 1.00 - - - - - -
3 Bekisting 15.20 m2 - - - - - - - - - - - - - 0.02 0.40 - - - - - - - - - - -
4 Kansteen uk. 13x15x30x40 cm 66.00 m' - - - - - - - - - - - - - - - - - - - - - - - - - -
5 Saluran u 30 cm 100.00 m' - - - - - - - - - - - - - - - - - - - - - - - - - -
IV.4 Pekerjaan Pagar Keliling
1 Galian Tanah pondasi batu kali 26.85 m3 - - - - - - - - - - - - - - - - - - - - - - - - - -
2 Pemadatan Tanah 41.30 m2 - - - - - - - - - - - - - - - - - - - - - - - - - -
3 Pasir Urug di bawah pondasi 4.25 m3 - - - - 5.10 - - - - - - - - - - - - - - - - - - - - -
4 Lantai kerja 0.04 m3 - 0.02 - 0.20 - - - - - - - - - - - - - - - - - - - - - -
5 Pondasi Batu Kali 11.80 m3 - - - 81.42 - 6.42 - - 12.98 - - - - - - - - - - - - - - - - -
6 Pagar Panel t = 40x240 cm 150.00 bh - - - - - - - - - - - - - - - - - - - - - - - - - -
7 Tiang Panel 26.00 bh - - - - - - - - - - - - - - - - - - - - - - - - - -
8 Kawat Duri 354.00 m' - - - - - - - - - - - - - - - - - - - - - - - - - -
9 Besi Siku 40x4x4 3.00 btg - - - - - - - - - - - - - - - - - - - - - - - - - -
10 Pintu Utama uk. 2100x3000 mm, Slidding Door 1.00 unit - - - - - - - - - - - - - - - - - - - - - - - - - -
V PEKERJAAN POS JAGA
V.1 Pekerjaan Tanah
1 Pekerjaan Striping Tanah existing 28.00 m3 - - - - - - - - - - - - - - - - - - - - - - - - - -
2 Pemadatan Tanah 56.00 m2 - - - - - - - - - - - - - - - - - - - - - - - - - -
3 Galian Tanah Pondasi Bt. Kali 5.50 m3 - - - - - - - - - - - - - - - - - - - - - - - - - -
4 Pemadatan Tanah ex,. Galian 10.00 m2 - - - - - - - - - - - - - - - - - - - - - - - - - -
V.2 Pekerjaan Struktur Pos Jaga
1 Pasir Urug t = 10 cm 4.20 m3 - - - - 5.04 - - - - - - - - - - - - - - - - - - - - -
2 Lantai kerja t = 5 cm 2.10 m3 - 1.17 - - - - - - - - - - - - - - - - - - - - - - - -
3 Pondasi Batu Kali 7.50 m3 - - - 51.75 - 4.08 8.25 - - - - - - - - - - - - - - - -
4 Sloof uk. 17x20 cm 1.00 m3 - 0.52 0.66 9.28 - - - 6.00 - - - - - 7.00 3.00 1.50 9.00 12.00 - 2.00 - - - - - -
5 Pasangan Dinding Bata + Kolom Praktis + Ringbalk 64.66 m2 - - - 37.17 - 8.28 4,720.18 - - - - - - - - - 10.00 5.00 - - - - - - - -
6 Plesteran + Acian 129.32 m2 - - - 20.11 - 2.97 - - - - - - - - - - - - - - 4.00 - - - -
7 Pengecatan 129.32 m2 - - - - - - - - - - - - - - - - - - - - - - - - - 55.99
V.3 Pekerjaan Lain - Lain
1 Bak Mandi 1.00 bh - - - - - - - - - - - - - - - - - - - - - - - - - -
2 Closet jongkok 1.00 bh - - - - - - - - - - - - - - - - - - - - - - - - - -

Page 1 of 4
D:\BUMN\KOPASSUS\Kebutuhan Material

PT. TRUST BUILDING INDONESIA


PERINCIAN KEBUTUHAN MATERIAL
PROYEK : MAKO KOPASSUS
LOKASI : SEMPLAK - BOGOR

Sement @40 Bata merah Multiplek Besi beton Besi beton Wiremesh 8 Scafolding Pipa Keramik Cat tembok
Tenaga kerja Pasir beton Split 1/2 Pasir urug Pasir pasang Batu Kali Base Coarse Sirdam Plastik cor Balok 6/12 Kaso 5/7 Paku 5 cm Paku 7 cm Benrat Ember cor Troli
NO URAIAN PEKERJAAN Volume Sat kg cikarang 9mm dia 13 mm dia 8 mm mm (MF & LF) support 30x30 interior
org m3 m3 zak m3 m3 bh lbr m3 m3 m3 roll btg btg kg kg btg btg lbr kg bh set bh bh dus ltr
3 Keramik Lantai Ruangan + Teras uk. 30x30 cm 39.30 m2 - - - - - - - - - - - - - - - - - - - - - - - - - -
4 Keramik Lantai Toilet uk. 20x20 cm 2.70 m2 - - - - - - - - - - - - - - - - - - - - - - - - - -
5 Kitchen Zink 1 lobang 1.00 bh - - - - - - - - - - - - - - - - - - - - - - - - - -
6 Kran air 2.00 bh - - - - - - - - - - - - - - - - - - - - - - - - - -
7 Jendela Kaca Nako 2.00 bh - - - - - - - - - - - - - - - - - - - - - - - - - -
8 Pintu kayu uk. 90x210 cm + Accessories 1.00 bh - - - - - - - - - - - - - - - - - - - - - - - - - -
9 Kusen Jendela Kayu 2.00 bh - - - - - - - - - - - - - - - - - - - - - - - - - -
10 Pintu PVC uk. 70x210 cm 1.00 bh - - - - - - - - - - - - - - - - - - - - - - - - - -
11 Plafond gypsum 9 mm + Rangka 17.30 m2 - - - - - - - - - - - - - - - - - - - - - - - - - -
12 Plafond kalsiboarg 4 mm + Rangka 2.70 m2 - - - - - - - - - - - - - - - - - - - - - - - - - -
13 Pengecatan 42.00 m2 - - - - - - - - - - - - - - - - - - - - - - - - - -
14 Instalasi Listrik + Lampu 4.00 ttk - - - - - - - - - - - - - - - - - - - - - - - - - -
15 Instalasi Stop Kontak 3.00 ttk - - - - - - - - - - - - - - - - - - - - - - - - - -
16 Instalasi Saklar Tunggal 4.00 bh - - - - - - - - - - - - - - - - - - - - - - - - - -
JUMLAH KEBUTUHAN 16.00 31.15 34.79 800.97 13.26 39.01 19,452.98 73.00 21.23 22.80 13.30 2.00 24.00 283.02 50.90 24.88 137.00 154.00 34.50 6.45 12.00 20.00 24.00 - 9.00 144.20
HARGA SATUAN ( Rp. ) 270,000 185,000 56,000 165,000 275,000 750 125,000 185,000 235,000 185,000 148,000 85,000 17,500 17,500 17,500 94,000 55,000 480,000 15,500 8,000 68,000 5,500 375,000 40,000 34,000
JUMLAH HARGA ( Rp. ) 8,411,677 6,435,702 44,854,176 2,187,702 10,728,047 14,589,735 9,125,000 3,927,550 5,358,000 2,460,500 296,000 2,040,000 4,952,917 890,750 435,313 12,878,000 8,470,000 16,560,000 99,898 96,000 2,720,000 132,000 0 360,000 4,902,789
JUMLAH KEBUTUHAN ANGGARAN BELANJA MATERIAL ( Rp. ) 180,622,205 2 bln

1 Instalasi & Lampu TL 12.00 ttk 215,000 2,580,000


2 Instalasi & Stop Kontak 2.00 bh 235,000 470,000
3 Instalasi & Saklar Doubel 2.00 bh 235,000 470,000
4 Saluran u 30 cm 100.00 m' 65,000 6,500,000
5 Pagar Panel t = 40x240 cm 150.00 bh 156,000 23,400,000
6 Tiang Panel (Kolom) 26.00 bh 334,719 8,702,694
7 Pintu Utama uk. 2100x3000 mm, Slidding Door 1.00 unit 7,245,000 7,245,000
TOTAL 49,367,694.00

8 Bak Mandi 1.00 bh 160,000 160,000


9 Closet jongkok 1.00 bh 130,000 130,000
10 Keramik Lantai Ruangan + Teras uk. 30x30 cm 39.30 m2 40,000 1,572,000
11 Keramik Lantai Toilet uk. 20x20 cm 2.70 m2 40,000 108,000
12 Kran air 2.00 bh 25,000 50,000
13 Jendela Kaca Nako 2.00 bh 175,000 350,000
14 Pintu kayu uk. 90x210 cm + Accessories 1.00 bh 1,500,000 1,500,000
15 Kusen Jendela Kayu 2.00 bh 375,000 750,000
16 Pintu PVC uk. 70x210 cm 1.00 bh 175,000 175,000
17 Plafond gypsum 9 mm + Rangka 17.30 m2 87,500 1,513,750
18 Plafond kalsiboarg 4 mm + Rangka 2.70 m2 72,500 195,750
19 Pengecatan 42.00 m2 24,000 1,008,000
20 Instalasi Listrik + Lampu 4.00 ttk 215,000 860,000
21 Instalasi Stop Kontak 3.00 ttk 235,000 705,000
22 Instalasi Saklar Tunggal 4.00 bh 225,000 900,000
TOTAL 5,357,500.00

23 Upah / Jasa Gudang Amunisi 60.00 m2 900,000 54,000,000


24 Upah / Jasa Pos Jaga 20.00 m2 900,000 18,000,000
25 Upah / Jasa Prasarana 171.00 m2 175,000 29,925,000
26 Opersional & Meeting 1.00 ls 2,500,000 2,500,000
27 Mobdemob material & Tenaga kerja 1.00 ls 3,500,000 3,500,000
28 Akomodasi Pekerja 3.00 bln 1,200,000 3,600,000
29 Fee Korlap 3.00 bln 1,500,000 4,500,000
TOTAL 116,025,000
GRAND TOTAL 351,372,399
NILAI PROYEK 406,700,000
SELISIH 55,327,601

Page 2 of 4
D:\BUMN\KOPASSUS\Kebutuhan Material

Cat tembok Besi CNP Besi Hollow Besi Hollow Besi Siku Cat meni Dynabolt M Plat besi 1.2 Sika hardener Kunci
Engsel pintu Grendell Kawat duri Kansteen
exterior 100x50 60x40 40x40 50x50 besi 12 / Stek besi mm @25KG gembok
ltr btg btg btg btg ltr bh lbr zak 12.00 bh m' bh bh

- - - - - - - - - - - - - -
- - - - - - - - - - - - - -
- - - - - - - - - - - - - -
- - - - - - - - - - - - - -
- - - - - - - - - - - - - -
- - - - - - - - - - - - - -
-
- - - - - - - - - - - - - -
- - - - - - - - - - - - - -
- - - - - - - - - - - - - -
- - - - - - - - - - - - - -
- - - - - - - - - - - - - -
- - - - - - - - - - - - - -
- - - - - - - - - - - - - -
- - - - - - - - - - - - - -
-
- - - - - - - - - - - - - -
- - - - - - - - - - - - - -
- - - - - - - - - - - - - -
- - - - - - - - - - - - - -

- - - - - - - - - - - - - -
- - - - - - - - - - - - - -
- - - - - - - - - - - - - -
- - - - - - - - - - - - - -
61.30 - - - - - - - - - - - - -

- 6.00 - - 2.00 36.00 - - - - - - -


- 2.00 2.00 2.00 3.00 1.00 8.00 2.00 - 6.00 2.00 - - 2.00

- - - - - - - - 4.00 - - - - -
- - - - - - - - - - - - - -
- - - - - - - - - - - - - -

- - - - - - - - - - - - - -
- - - - - - - - - - - - - -
- - - - - - - - - - - - - -

- - - - - - - - - - - - - -
- - - - - - - - - - - - - -

- - - - - - - - - - - - - -
- - - - - - - - - - - - - -

- - - - - - - - - - - - - -
- - - - - - - - - - - - - -
- - - - - - - - - - - - - -
- - - - - - - - - - - - - -

- - - - - - - - - - - - - -
- - - - - - - - - - - - - -
- - - - - - - - - - - - - -
- - - - - - - - - - - - 165.00 -
- - - - - - - - - - - - -

- - - - - - - - - - - - - -
- - - - - - - - - - - - - -
- - - - - - - - - - - - - -
- - - - - - - - - - - - - -
- - - - - - - - - - - - - -
- - - - - - - - - - - - - -
- - - - - - - - - - - - - -
- - - - - - - - - - - 354.00 - -
- - - - - - - - - - - - - -
- - - - - - - - - - - - - -

- - - - - - - - - - - - - -
- - - - - - - - - - - - - -
- - - - - - - - - - - - - -
- - - - - - - - - - - - - -

- - - - - - - - - - - - - -
- - - - - - - - - - - - - -
- - - - - - - - - - - - - -
- - - - - - - - - - - - - -
- - - - - - - - - - - - - -
- - - - - - - - - - - - - -
38.92 - - - - - - - - - - - - -

- - - - - - - - - - - - - -
- - - - - - - - - - - - - -

Page 3 of 4
D:\BUMN\KOPASSUS\Kebutuhan Material

Cat tembok Besi CNP Besi Hollow Besi Hollow Besi Siku Cat meni Dynabolt M Plat besi 1.2 Sika hardener Kunci
Engsel pintu Grendell Kawat duri Kansteen
exterior 100x50 60x40 40x40 50x50 besi 12 / Stek besi mm @25KG gembok
ltr btg btg btg btg ltr bh lbr zak 12.00 bh m' bh bh
- - - - - - - - - - - - - -
- - - - - - - - - - - - - -
- - - - - - - - - - - - - -
- - - - - - - - - - - - - -
- - - - - - - - - - - - - -
- - - - - - - - - - - - - -
- - - - - - - - - - - - - -
- - - - - - - - - - - - - -
- - - - - - - - - - - - - -
- - - - - - - - - - - - - -
- - - - - - - - - - - - - -
- - - - - - - - - - - - - -
- - - - - - - - - - - - - -
- - - - - - - - - - - - - -
100.21 8.00 2.00 2.00 3.00 3.00 44.00 2.00 4.00 6.00 2.00 354.00 165.00 2.00
50,000 236,500 141,900 102,300 172,150 57,000 7,500 352,000 132,000 15,000 75,000 3,750 38,500 75,000
5,010,600 1,892,000 283,800 204,600 516,450 171,000 330,000 704,000 528,000 90,000 150,000 1,327,500 6,352,500 150,000

Page 4 of 4