Project : Write Kebele name (Specific local name of the site )-Cattel Crush Construction

Name of Woreda : __________________

Name of the client________________

Source of Budget :FSRP

BILL OF QUANTITY AND SPECIFICATION FOR CATTEL CRUSH CONSTRUCTION

Total
Item Description unit Qnty Rate amount

A.SUB-STRUCTURE

1 Excavation &Earth Work

clearing site by removing the top soil to an average


1.1 depth of 20cm m2 56 -
Bulk excavation in common soil and decomposed
rock up to 0.4 cm depth
1.2 m3 22.4 -
Excavation for 25cm dia. pit hole and bulk
excavation in ordinary soil depth of 50 cm starting
1.3 from NGL. m3 22 -

Back filling with good dry selected materials ram in


1.4 layers not exceeding 20cm thick. m3 11.2 -

cart away surplus excavated materials and deposite


1.5 at distance of 1km from the site. m3 55.6 -
25cm thick basaltic or equivalent stone hard core
well rolled consolidated and blinded crush stone.
1.6 m2 45 -

sub-total -

2 Concreat Work -

10cm thick floor slab,concrete quality C-20,230kg


2.1 cement/m3 of concrete evenly spread m2 45 -

2.2 cut and fix zigba formwork m2 5 -


Apply mass concrete class C-7 15KG of cement/m2
well compact under &around 4"galvaized pipe
2.3 post. m3 1.5 -

sub-total -

B.SUPPER STRUCTURE -

3 Metal Work -

4" galvanized pipe posts size10cm and 100cm


3.1 ml 49 -

2" galvanized pipe purlin in 4 rows placed at 45cm


3.2 ml 99 -

RHS 60*60*5mm poles


3.3 ml 31 -

RHS 40*40*2.5mm purlines


3.3 ml 57 -

Metal gate as to be fixed using galvanized steel pipe


3.4 Pcs 2 -

Fix G28 GIS roof cover on c/c 90 cm diagonal &vertica


3.5 M2 17.6 -

3.6 sub-total -

TOTAL -

VAT15% -

GRAND TOTAL -
Cost Summary of Cattle Crush
Item Description No. Total amount
1 Excavation 1 -
2 Concreat W 1 -
3 Metal Work 1 -
Total Summary -