Reabilitation of 7 Churches Latrine of 2 seat Latrine by Corrugated Iron Sheets ne

Rehablitated water System Labor Cost

Location:Gambela Region, Abobo and Lare, Different Kebeles


Qty
Description Unit

Earth work

site preapartion and clearance upto 20cm m2 16

Bulk excavation upto 0.20cm below ground level m2 16

Bulk excavation upto 3m depth m3 4.32

Backfill around Masonary or structure upto the m2 16

25cm Hardcore filling around the structure M3 16

Cart away surpluss material away from the site m3 2.16

Masonary Work

Above ground level(AGL) m3 3.2

Below Ground Levele(BGL) m3 6.336

Concreat Work
C15 class concreat cast for the Apron to be
locally Vibrated and mix properly upto 20cm M3 0.576

Pavement Work

Stone Pavement around the Aprone work ml 16

Cement Sceed to the top upto 5cm (C-10, 150 k m2 4.8

Flooring and finishing of Edge work ml 12

Wall work

a) 12cm diameter eucalyptus No 14


b) 10cm diamter eucalyptus No 18

c) 8cm diameter ecualyptus No 14

Roofing and Door Work

Roof truss work


a) 12cm diameter eucalyptus lower and upper
chord ml 17.82
b) 8cm diamter eucalyptus vertical and
diagonal memebers ml 8.28

c) 5x7 cm zigba purline ml 38.6

d) Corrugated Iron Sheets No 2


Roof cover in G32 CIS Nailed to 5*7cm battens
as proposed by the engineer No 15

Vent pipe

a) PVC vent pipe 110mm m 6

Hand thick
40cm washing Facility
trachytic or equivalent stone
masonry above ground level bedded in cement
bedded in cement mortar (1:3) in full joint m3 1.44
Apply three coats of plastering of External
throgh surface
Supply & install a 20 lit jerican ground water No. 7
tank with a all its necessary Accessories to
make the system workable. No. 1

Total

Grand Total
Corrugated Iron Sheets near by the
abor Cost

Unit Rate Amount(ETB)

-
-

Grand Total
Shallow Well Rehablitation specification and BOQ for Labor cost

Location:Gambela Region, Abobo and Lare, Different Kebeles

Description Unit

Demolitioning the Existing structure

Demoliting super structure or Head work upto 60 cm Depth lumpsum

Earth work

site preapartion and clearance upto 0.20cm m2

Bulk excavation upto 0.20cm below ground level m2


Bulk excavation for Masonary upto 0.60cm including the Top
surface m3

Backfill around Masonary or structure upto the depth of 0.20c m2

25cm Hardcore filling around the structure m3

Cart away surpluss material away from the site upto 500 meter

Masonary Work

Above ground level(AGL) m3

Below Ground Levele(BGL) m3

Concreat Work
C15 class concreat cast for the Apron to be locally Vibrated
and mix properly m3

Pavement Work

Stone Pavement around the Aprone work m3

Cement Sceed to the top upto 5cm (C-10, 150 kg/M3) m2

Flooring and finishing of Edge work ml


Pavement for water discarge to the cattel trough upto 3meter
length with 0.40cm width with 2%slop screed M3

Supply and Installation of Pump


Supply and fix Handpump or Installation of Handpump Lumpsum

Total Material and Labor cost for Shallow Well

Gra
and BOQ for Labor cost

FX Rate

Quantity Unit Rate Amount(ETB)

1 -

25 -

25 -

48 -

25 -

25 -

8 -

4 -

3.75 -

1.5 -

20 -

20 -

0.6 -
1.00 -

ell -

Grand Total
Construction of 2 seat Latrine by Corrugated Iron Sheets near by the Rehablitate
System Labor Cost

Location:Gambela Region, Abobo and Lare, Different Kebeles


Qty
Description Unit

Earth work

site preapartion and clearance upto 20cm m2 16

Bulk excavation upto 0.20cm below ground level m2 16

Bulk excavation upto 3m depth m3 4.32

Backfill around Masonary or structure upto the m2 16

25cm Hardcore filling around the structure M3 16

Cart away surpluss material away from the site m3 2.16

Masonary Work

Above ground level(AGL) m3 3.2

Below Ground Levele(BGL) m3 6.336

Concreat Work
C15 class concreat cast for the Apron to be
locally Vibrated and mix properly upto 20cm M3 0.576

Pavement Work

Stone Pavement around the Aprone work ml 16

Cement Sceed to the top upto 5cm (C-10, 150 k m2 4.8

Flooring and finishing of Edge work ml 12

Wall work
a) 12cm diameter eucalyptus No 14

b) 10cm diamter eucalyptus No 18

c) 8cm diameter ecualyptus No 14

Roofing and Door Work

Roof truss work


a) 12cm diameter eucalyptus lower and upper
chord ml 17.82
b) 8cm diamter eucalyptus vertical and
diagonal memebers ml 8.28

c) 5x7 cm zigba purline ml 38.6

d) Corrugated Iron Sheets No 2


Roof cover in G32 CIS Nailed to 5*7cm battens
as proposed by the engineer No 15

Vent pipe

a) PVC vent pipe 110mm m 6

Hand thick
40cm washing Facility
trachytic or equivalent stone
masonry above ground level bedded in cement
bedded in cement mortar (1:3) in full joint m3 1.44
Apply three coats of plastering of External
throgh surface
Supply & install a 20 lit jerican ground water No. 7
tank with a all its necessary Accessories to
make the system workable. No. 1

Total

VAT(15%)

Grand Total
ets near by the Rehablitated water

Unit Rate Amount(ETB)

-
-

VAT(15%) -

Grand Total -
Construction of Animal Cattel trough labor cost

Location:Gambela Region, Abobo and Lare, Different Kebeles

Description Unit QuantityUnit Rate

Earth work

site preapartion and clearance upto 0.20cm m2 16

Bulk excavation upto 0.20cm below ground level m2 16

Bulk excavation upto 50cm depth m3 9

Backfill around Masonary or structure upto the depth o m2 4

25cm Hardcore filling around the structure M3 3.2

Cart away surpluss material away from the site upto 500 meter

Masonary Work

Above ground level(AGL) m3 2

Below Ground Levele(BGL) m3 2.4

Pavement Work

Stone Pavement around the Aprone work ml 6

Cement Sceed to the top upto 5cm (C-10, 150 kg/M3) m2 4

Flooring and finishing of Edge work ml 8


Reinforncement work

Installing Re-bar Dia 8 Berga 6

Installing Black wire roll 1

Total

Grand Total
Amount(ETB)

-
-

-
Bill of Quantity for water point Maintenance Labor cost

B. Water point Maintenance work with Six Faucets Tap Stand with F

1.- Excavation&Earth Work


1.1 Clear the site to remove the top soil to an average depth of 20cm.
1.2 Excavation for foundation

1.3 Backfilling and well compacting with normal excavated material from the site
1.4 Cart away excavated material
1.5 25cm thick Hard core

2. Masonary Works

Provide and fill hard core with hard basaltic or equivalent stone, well
2.1 compacted and blinded with crushed stone to a finished thickness of 25 cm

6- Fitting and Pipe Installation


Supply and install GI Class-B pipes
6.1 Diameter 1 1/2"
6.2 Diameter 3/4"
Supply and install GI Class-B connecting fittinges
6.3 Diameter 1 1/2" gate valve
6.4 Diameter 1 1/2" Nipples
6.5 Diameter 1 1/2" elbow
6.6 GI Reducer 1 1/2"-3/4"
6.7 Diameter 1 1/2" Cross Tee
6.8 Diameter 1 1/2" Tee
6.9 Diameter 3/4" Coupling
6.10 Diameter 3/4" Faucet
6.11 HDPE adapter 40mm to 1.5" GI pipe PN10

7.0 Valve Chamber

7.1 Foundation excavation for valve chamber


Hard basaltic or equivalent stone masonry wall bedded and jointed in
7.2 cement mortar 1:3.
10cm thick mass concrete casting on the floor of valve chamber 1:2:4 mix
7.3 ratio
7.4 Pionting external wall of Valve chamber box
7.5 Plastering internal wall of valve chamber

Supply and install metal manhole cover (75cm X 75cm ) made of 2mm thick
flat sheet metal having 25mm X 25mm angle iron frame. unit price shall
7.6 include two coats of anti rust and sentetic paint with approved type of lock

8.0 Fencing
8.1 Foundation excavation for concrete pole

Supply and install 2.7m long and 15cmX15cm thick reinforced concrete
fencing poles. Price shall incude 40cm deep concrete foundation having mix
ratio 1:2:3 .The mix ratio for concrete pole production shall be 1:2:3 and
8.2 reinforcement bar size shall be 10mm fixed with 6mm stirrup c/c20cm
Supply and install metal fence door having size of 230cmX110cm made of
1.5mm thick flat sheet metal and hollow metal frame as shown on the
8.3 drawing.

Fencing around tap stands using stadium type diamond sahped tension
fencing wires (3/4'' Hexagonal mesh wire ) of at least 1.8 meters high above
the ground level and 10 cm clearnace from the ground. Price includes the
costs of all necessary angle iron, the tension wire and other materials and
8.4 works like welding, tying with wire, drilling for provision of holes;

9.Soak Away Pit


9.1 Bulk Excavation
place boulder, crashed aggregate and sand to form the soakaway as per the
9.2 drawing

Sub Total for Pipe line extention and water point construc
Gra
nance Labor cost

cets Tap Stand with Fence


Unit Qty Unit price Total Price
Work ETB
m2 15 -
m 3
3.584 -
m 3

1.666 -
m 3
1.918 -
M3 19.6 -
Sub-Total -
ks
m2

4.046 -
Sub Total -
allation

ml 12 -
ml 12 -

no 2 -
no 6 -
no 4 -
no 12 -
no 4 -
no 2 -
no 12 -
no 12 -
no 2 -
Sub – Total -
er
m3
2.04188 -
m3
1.04 -
m3
0.049 -
m2 1.56 -
m2 1.82 -
Ls

1 -
Sub Total -

m3 0.576 -
no

9 -
no

1 -
m2

27.2 -
Sub Total -

m3 2.352 -
m3
2.35 -
Sub Total -
water point construction with fencing -
GrandTotal For One
GENDER SEGREGATED LATRINE 8 STANCE BOQ

Item No Description Unit Quantity Unit rate Amount


A. SUB STRUCTURE
1 EXCAVATION AND EARTH WORK

1.1 Clear off the site to remove top soil to an averge dapth of 200mm. m2 110.87 -
Bulk excavation in ordinary soil to reduce level to a depth is not
1.2 exceeding 1000mm. m3 54.42 -
Trench excavation ordinary soil to adepth not exceeding 1500mm
1.3 from reduced ground level . m3 35.69 -
Trench excavation ordinary soil to adepth not exceeding 1500mm
1.4 from reduced ground level . m3 10.23 -
Pit excavation in ordinary soil to depth not exceeding 1500mm
1.5 from reduced ground level. m3 13.5 -
1.6 Pit excavation in ordinary soil to adepth exceeding 1500mm but m3 9.45
not exceeding 3000mm from reduced ground level . -
1.7 m3 54.42
Fill under slab with borrowed selected material from quarry
waste. The filling shall be per formed in layer of 200mm with
watering and compacting each layer property. -
Load and cart away surplus excavated material and deposit at an
1.8 appropriate tip. m3 57.87 -
250 mm thick basaltic or equivalent stone hard core well rolled
1.9 consolidated with crusher stone. m2 73.01 -
Sub Total -
2. CONCRETE WORK -
50mm thick lean concrete in C-5 with minimum cement content
2.1 of 150kg/m3 of cocrete under. -
a] Under floor slab. m3 73.01 -
b] Under footing pad. m3 6 -
c] Under masonry. m3 20.21 -
10x100 styroper foam expansion joint filter between grad beam
2.2 and floor slab. ml 52.88 -

Reinforcement concrete class C-25 [With a 28 day 150mm cube


crushing strength os 25 MP ] awidth minimum cement content of
360 kg /m3 cast in to form work and vibrated around road
2.3 rinforcement bar. -
a] In footing pad m3 1.5 -
b] In foundation column m3 0.6 -
c] In grade beam m3 2.95 -
e] Steps m3 0.25 -
f] In 120mm thick ground floor slab m2 73.01 -
g] In 100mm thick ramp m2 0.25 -
Provide, cut and fix in position swan strucutral timber or steel
2.4 form work which ever is appropriate; -
a] To footing pad m2 4.8 -
b] To foundation column m2 12 -
c] To grade beam m2 18.41 -
d] Steps m2 -
e] Ramp m2 0.74 -
Steel rinforcement bar acording to structural drowing .price
includes cutting ,bending ,placing in position and tying
2.5 wirse ,concrete spacers and chairs; -
a] 8mm diameter deformed bar Kg 110.07 -
b] 10mm diameter deforemed bar Kg 0 -
c] 12mm diametre deformed bar Kg 173.74 -
d] 14mm diameter defored bar Kg 366.19 -
Sub Total -
3. MASONRY WORK -
500mm thick trachytic or equivalent stone masonry well below
ground level bedede in cement mortar [1:3]in full joints.price
3.1 shall inculde pointing. m3 9.6 -
500mm thick trachytic or equivalent well dressed stone masonry
above ground level bedded in cement mortar [1:3] in full joint.
3.2 price shall include poiniting. m3 28.79 -
Masonry for steps and Ramps, price inculde pointing and other
3.3 necessary activites. m3 2.1 -
Sub Total -
TOTAL SUB STRUCTURE -
B. SUPER STRUCTURE -
1. CONCRETE WORK -
Reinforced concrete class C-25 [with 28 -day 150mm cube
crushing strength of 25 MP]with minimum cement content of
360kg/m3 ordinary port land cement cast into form work and
1.1 vibrated around reinforcement bar; -
a] To footing pad m2 0.77 -
b] In roof beam m2 1.28 -
c] Lintels m2 0.55 -
Providing, cut and fix in position sawn structural timber or steel
1.2 form work whichever is appropraite : -
a] To Elevation Column m2 15.36 -
b] To Roof Beam or Top Tie Beam m2 19.19 -
c] Lintels m2 8.2 -
Steel reinforcemnet bar acoording to structural drawing .price
include cutting bending, Placing in position and tying wires and
1.3 concrete spacers: -
a] 6mm diametere diforemed bar kg 0 -
b] 8mm diameter diformed bar kg 343.12 -
c] 10mm diameter diformed bar kg 0 -
d] 12mm diameter diformed bar kg 337.28 -
e] 14mm diameter diformed bar kg 0 -
Sub Total -
2.BLOCK WORK -
200mm thick class-B HCB wall dedded in cement mortar mix
[1:3] and both sides left for plastering . HCB quality shall be
2.1 tested and approved by the Engineer. m2 63.16 -
2.2 Ditto but 150mm thick including paraphate wall. m2 92.68 -
2.3 Ditto but 100mm thick for paraphate wall m2 90 -
Sub Total -
3.ROOFING WORK -
Roofing cover in G28 C.I.S nailed to zigba purlins, Price shall
include ridge cover and roofing measured in horizontal
3.01 projection. m2 78.28 -
3.02 Sheet metal coping with devlopemental length of 2.914 ml 28.84 -

G28 ribbed sheet ceiling under eave nailed to zigba purlins,price


shall include 40x50 mm zigba wood battens with c/c spacing of
3.03 600mm both ways ,corner list and all other necessary accessores. m2 35.71 -
Sub Total -
4.CARPENTARY AND JOINERY -
Supply, assemble and mount ø120mm eucalyptus wooden truss
as per the detail drawing ,price shall include anti termite
4.01 treatmenet ,tie bar of ø6mm and other necessary accessories. ml 202.83 -
Supply ,assemble and mount ø80mm eucalyptus wooden truss as
per the detail drawing price shall include anti tremite
4.02 treatement ,tie bar of ø6mm and other necessary. ml 115.23 -
Supply and fix 50x70 mm zigba wooden purlins as per the detail
drawing price shall include anti tremite treatement and all other
4.03 necessary accessories. ml 108.8 -
Supply and fix fascia board 250x25mm. Price include one coat
primer and two coats of oil paint and other necessary activity
4.04 needed to complet the work. ml 42.84 -

Supply and fix 8mm thick chip wood ceilinig as per the engineers
approval ,price shall include 40x50mm zigba wood battens with
c/c spacing of 600mmboth way middle and corner list ,and all
4.05 other necessary accessories. m2 37.62 -
Supply and fix 20mm thick styrofoam insulating panels over the
4.06 chipwood ceiling as indicated on the drawing. m2 37.62 -
Sub Total -
5.METAL WORKS -
5.1 Metal window and doors made of 38x1.5mm LTZ profiles shown
on the drawing .price include approved quality locks and all iron
mongry works, two coats of anti rust ,three coats of synthetice
paint, 1mm thick sheet metal and door stopper. All according to
detail drawing and the approval of the engineer.
-
WINDOWS -
a] Type W1=size:1720x815mm pcs 4 -
b] Type TW1= size : 815x645mm pcs 9 -
DOORS -
a] Type D1=size :2150x845mm pcs 4 -
b] Type D2= size :700x2150mm pcs 8 -
5.2

Ventilation window manufactured from 38x1.2mm LTZ profiles


frame and chicken wire mesh. Price shall include one coat of anti
rust and two coats of syntetic enamel paint size 350x400mm No 4 -
5.3
Fix pathway ramps handcap handrails in both sides of ramps.
Price include one coat of anti rust and two coats of syntetic
enamel point. ml 5 -
5.4 RHS 80*3mm thickness for vernda poles Kg 70 -
5.5 RHS 60*60*3mm thickness Kg 76.7 -
5.6 plate size 20*20*5mm thickness No 8 -
Sub Total -
6.FINISHING WORKS -
Apply three coats of plastring in cement sand mortar [1:3].price
6.01 shall include pre-cleaning and preparation of the surface. -
a]To internal wall surface m2 49.44 -
b]To exposed beams and column [intrenal and external] m2 22.26 -
6.02 Ditto but two coats to receive ceramic wall tile m2 106.54 -
Apply one coats [3rd coats Gypsum plastring in cement sand
mortar [1:3] plastring.Price shall include pre-cleaning and
6.04 preparation of the surface. -
6.05 a]To internal wall surface m2 49.44 -
6.06 b] To internal beam and column m2 22.26 -
Apply one coats 3rd coats]plastering in cement sand mortar
[1:3]above ceramic wall . Prices shall include pre-cleaning and
6.07 preparation of the surface. -
Apply one coats of plastering and one coats tyroline rendring in
6.08 cement sand mortar [1:3]to external paraphet wall. m2 11.06 -
Apply pointing for external HCB wall with cement sand mortar
6.09 [1:3]. m2 52.11 -
50mm thick smooth finished cement sand screed [1:3] floor finish
6.1 .all as per engineers instruction. m2 73.01 -
Supply and fix the window sill is granite with 3cm
thickness ,chamfered at the edge ,with dripping groove and
6.11 sloped out side and bedded on cement mortar to HCB wall. ml 10.6 -

100mm wide and 80mm thick C-20 pre-cast concrete pavement


around the building bedded on 100mm thick sand /red ash base
and joint pointed in cement and sand mortar mix 1:3 price
include the sand /red ash base and pointing all as per the detail
6.12 drawing. m2 32.5 -

8mm thick approved Quality 0f 300*200 mm Tabor ceramic wall


tiles to different rooms as per the finishing schadual.Price include
6.13 cement mortar backing and joint grouted in white cement. m2 106.54 -

Best and approved Quality type 300*200*8mm or 400*400*8mm


6.14 thick non slippery ceramic flooring for toilets and shower. m2 35.86 -
100x20mm ceramic tile skirting stuck to wall with cement mortar
6.15 [1:3]mix and chamfered at the edge. ml 24.3 -

Construct 1.5m width walk way with requaired rump with RC


diam 8 RC bar C-25 cm and masonry suitable for moving trolley in
the compound with all necessary work including drainage as per
6.16 the ouner need. ml 35 -
Sub Total -
7.GLAZING -
Supply and fix 4mm thick frosted glass window and door
according to the drawing.Price shall include putty and all the
7.01 necessary fixing accessorice m2 17.17 -

Supply and fix 4mm clearglass to internal window according to


the drawing price shall include putty and all the necessary fixing
7.02 accessorices. m2 5 -
Sub Total -
8.PAINTING -

Apply three coats of synthetic emulsion paint to internal plastring


8.01 wall surface as per Engineers and clints selection and approval . m2 49.44 -
8.02 Ditto but external wall surface m2 52.11 -
8.03 Ditto but to chip wood ceiling. m2 37.62 -
Sub Total -
9. SANITARY AND INSTALLATION &FITTING -
9. INTERNAL -
Supply and install Galvanized steel pipse for cold water
diseribution all sanitary fixture accordind to the drawing compete
with the necessary price such as trees ,bends,unions ,etc The unit
price shall include all necessary asisstance to the installation work
such support for horizontal and vertical pipes,chiseling of
wall ,slab beam,floor ,etc and closing them with concrete or
cement mortar to normal condition .The installation shall be
9.01 tested at apressue of 10kg /cm at the expense of the contructor . -
Diameter 15mm [1/2''] ml 47 -
Diameter 20mm [3/4''] ml 37 -
Supply and fix Gate valve of approved Quality complete with
9.02 union hand wheels etc. -
Diameter 15mm[1/2''] No 23 -
Diameter 20mm [3/4''] No 3 -

Supply and fix Gold Deragen or equvalent hand wash basine


made of white vitreous china ceramic ,with milano or equvalent
stainless steel cold water mixer tap with wrist action handel
complete with pedastel stand chrome plated china holder ,60cm
long flx-italy or equvalent flexibel hose P-smell trap with
connection pipe and with all other necessary accessories that
9.03 complete the set. -
Size 405*500mm No 9 -
Ditto but for diseabel pepole No 1 -
Supply & fix Tabor Turkish sit made of enammelled cast iron
complete with high flush cistren trap ,and the necessary
9.04 accessories . No 7 -
Supply and fix Gold Deragen or equvalent water clost [WC]of
wash down action floor mounted [S-Trap] close coupled made of
white vitrous china .The fixture shall conform to BS5503-2or
equvalent insititution .The plastic seat cover ,low flush cistren
waste fitthing connecting price ,fixing and supporeting element
60cm long flex-italy or equivalent flexible hose ,approved Quality
shut up hose and other accessories which complete the set shall
comply with the relvant clauses of BS standardor equivalent
institution for desiabel pepole . No 1 -
Supply & fix enamelled cast iron shower tary complete with
9.05 chrome plated arm valve and adjustabel shower head. No 2 -
Ditto but for diseabel pepole No 1 -
supply &fix floor drains made of enamelled cast iron with smell
9.06 trap complete with all the accessories. -
Diameter 50mm No 4 -
Supply &fix crystal glass mirrors 500*400mm complete with
9.07 chrome plated brass clips and screws . No 8 -
Supply and fix 10mm reinforcement bar as towel rail embed in
9.08 wall with cement mortar ,length 60cm. No 4 -
Supply &fix Tabor ceramic soap holder complete with fixing
9.09 accessories. No 2 -
9.1 Providing floor drainage . No 4 -

Providing laying and joint of internal u PVC PN-4 waste pipes with
all uPVC pipes fitting including jointing with solvent cement joint
and testing of joints etc.according to where shown on the
drawing s,complete with all necessary fitting .provide cleaning
details for all wast water riser pipes as per the detail drawing .the
9.11 pipes diameter is external. -
Diameret 50mm m.l 27 -
Diameter 75mm m.l 10 -
Diameter 110mm m.l 28 -
Diameter 150mm m.l 25 -
Sub Total -
10.ELECTRICAL INSITALLATION -

All distiribution board ,breaker switches,accessories etc should be


genuine legrand ABB siemens or approved equivalent compplying
with IEC standard distribution board ,should be made of sheet
metal /PCV board ]and have separate neutral and ground bus bar
/phase bar .All units in the distirbution boards should be labeled
to give the refernce and duty of the unit -

Flush mounted main distirbution PTO in sheet steel enclouser


with lockable door .bus bar rating of 50A/3ph ,Earthing lead and
with all its accessories and enough ample space for future
10.1 expansion consisting of : -
1pc m.c.b of 25A/1ph -
4pcs m.c.b of 16A/1ph -
2pcs m.c.b of 10A/1ph -
2pcs m.c.b of 10A/1ph No 1 -
LIGHT POINT -

Surface mounted light point fed through PVC insulated copper


conductor of 3x2.5 sg.mm inside PVC conduit of 16mm diameter
10.2 including junction boxes with covers,insulating screw caps etc. No 17 -
LIGHT FITTINGS -
10.03 RZB 56120.00x0.5-56150,Q*60W LAMP No 9 -
10.04 Florcent PELSAN 5012-909 wth 1xTLD 36W/840 Lamps No 8 -
Sub Total -
11.Water tanker construction ( 5000 littre) -
Construction of 3 meter hight colum 20*20 column size 5000
11.1 littre tanker stand Lump sum 1 -
11.2 Purchase and install 5000 verticla water tanker Lump sum 1 -
-
Installation of pipe for inlate of the water to the water tanker
11.3 including, Gate valve, Elbow, Adabter, Nipples and Reducer Lump sum 1 -
Installation of pipe and accesorries for the latrine water oulet to
11.4 the eight latrine room and internal Handwashing station Lump sum 1 -
Sub Total -
Super structure( B) -
TOTAL ( A+B) Sub +super -
VAT -
Grand Total -