21-Jul-22

Balance

Item
Description Status/Remarks
no.
1 PWD Ramp Railings Baylosis will start on July 22, 2022
2 Tiles for PWD Ramp (5sq.m.) Installation for 5 square meter floor.
3 Roof panel for front of Elevator (2.5x2.3m)
4 Pavers - 200pcs
5 Door Knob for Guard's Quarter - 1set
6 Lavatory for 3rd Floor Toilet - 1pc.
7 Slab of Canal (Connection to road) On-going