PROJECT
SCHOOL
LOCATION
SUBJECT : BILL OF MATERIALS
Item I.D. Item Description % of Total Quantity Unit Total Cost Remarks
I General Requirements
A Mobilization & Demobilization Err:509 1 lot Err:509
B Safety Productive Measures / PPE Err:509 1 lot Err:509
C Tools & Equipment Support Err:509 1 lot Err:509
D Temporary Facilities & Utilities Err:509 1 lot Err:509
E Supervision and Support Err:509 1 lot Err:509
Sub-Total of General Requirements Err:509 Err:509
II Direct Cost
A Site Works Err:509 1 lot -
B Forms and Scaffolds Err:509 1 lot Err:509
C Structural Concrete Err:509 1 lot Err:509
D Structural Steel Err:509 1 lot Err:509
E Masonry & Plastering Works Err:509 1 lot Err:509
F Doors and Windows Err:509 1 lot Err:509
G Electrical Works Err:509 1 lot Err:509
H Steel Truss Err:509 1 lot Err:509
I Roofing Works & Accessories Err:509 1 lot Err:509
J Plumbing Works Err:509 1 lot Err:509
K Painting Works Err:509 1 lot Err:509
L Ceiling Works Err:509 1 lot Err:509
M Tile Works & Concrete Topping Err:509 1 lot Err:509
N Stair Railing Works Err:509 1 lot Err:509
Sub-Total of Direct Cost Err:509 Err:509
SUMMARY
I GENERAL REQUIREMENTS Err:509
II DIRECT COST Err:509
III OVERHEAD, CONTINGENCY & MARK-UP Err:509
TOTAL CONSTRUCTION COST (I+II+III) Err:509
PROJECT
SCHOOL
LOCATION
SUBJECT : BAR CHART WITH S-CURVE
1ST MONTH
2ND WEEK
3RD WEEK
4TH WEEK
1ST WEEK
I General Requirements 16 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
II Direct Cost
A Site Works 2 Err:509 Err:509 Err:509 Err:509
B Forms and Scaffolds 12 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
C Structural Concrete 5 Err:509 Err:509 Err:509 Err:509 Err:509
D Structural Steel 4 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
E Masonry & Plastering Works 6 Err:509 Err:509 Err:509 Err:509 Err:509
F Doors and Windows 10 Err:509 Err:509
G Electrical Works 15 Err:509 Err:509 Err:509 Err:509 Err:509
H Steel Truss 7 Err:509 Err:509 Err:509 Err:509
I Roofing Works & Accessories 4 Err:509 Err:509
J Plumbing Works 15 Err:509 Err:509 Err:509 Err:509 Err:509
K Painting Works 14 Err:509 Err:509 Err:509 Err:509
L Ceiling Works 6 Err:509 Err:509
M Tile Works & Concrete Topping 6 Err:509 Err:509
N Stair Railing Works 3 Err:509 Err:509
Grand Total Err:509 Err:509
PROJECTED WEIGHT PERCENTAGE PER WEEK 0% Err:509
0.00% Err:509
0.00% Err:509
0.00% Err:509
0.00% 0.00%
PROJECTED WEIGHT PERCENTAGE PER MONTH Err:509
PROJECTED CUMULATIVE PERCENTAGE PER WEEK 0% Err:509 Err:509 Err:509 Err:509
PROJECTED CUMULATIVE PERCENTAGE PER MONTH Err:509
PROJECTED CASH FLOW Err:509 Err:509 Err:509 Err:509
PROJECTED ACCUMULATED CASH FLOW Err:509 Err:509 Err:509 Err:509
2ND MONTH 3RD MONTH 4TH MONTH
2ND WEEK
2ND WEEK
2ND WEEK
3RD WEEK
3RD WEEK
3RD WEEK
4TH WEEK
4TH WEEK
4TH WEEK
1ST WEEK
1ST WEEK
1ST WEEK
Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
0.00% 0.00%
Err:509 0.00%
Err:509 0.00%
Err:509 0.00%
Err:509 0.00%
Err:509 0.00%
Err:509 0.00%
Err:509 0.00%
Err:509 0.00%
Err:509 0.00%
Err:509 0.00%
Err:509 0.00%
Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509