You are on page 1of 40

ONLINE APPLICATION OF

PERMIT TO OPERATE (PTO) FOR


AIR POLLUTION SOURCES AND
CONTROL INSTALLATIONS
Presented by:
Engr. Jan Karina L. Padla
PTO Focal Person,
Air & Water Permitting Section-CPD, EMB 10
Republic Act No. 8749
PHILIPPINE CLEAN AIR ACT OF 1999

• An act providing for a comprehensive air pollution control policy and for
other purposes.

• The mandate of the Environmental Management Bureau (EMB) in


implementing the Clean Air Act
• Prevention and control of stationary sources of air pollution
(industrial air pollution control)
Classification of
Air Pollution Sources
• Pollution is the introduction of • Stationary - such as power plants, oil
harmful materials into the refineries, industrial facilities, and factories.
environment. These harmful • Mobile - such as cars, buses, planes,
materials are called pollutants. trucks, and trains.
• Air pollution is the presence of • Area – such as agricultural areas, cities,
toxic chemicals or compounds and wood burning fireplaces.
(including those of biological
origin) in the air, at levels that
pose a health risk. Effects On Humans and Environment
• The release of pollutants such
as gases, particles, biological • Pollutants damage the quality of air, water, and land.
molecules, etc. into the air that
is harmful to human health and • Diseases – Air pollution has resulted in several
the environment. respiratory disorders and heart diseases among
humans. Many people die every year due to the direct
or indirect effects of air pollution.
Sources • Acid Rain – the burning of fossil fuels releases harmful
gases such as nitrogen oxides and sulfur oxides in the
air. The water droplets combine with these pollutants,
• Anthropogenic: Most air pollution become acidic and fall as acid rain which damages
is created by people, taking the human, animal, and plant life.
form of emissions from factories, • Like people, animals and plants, entire ecosystems can
cars, planes, or aerosol cans suffer effects from air pollution. Birth defects, diseases,
• Natural: smoke from wildfires or and lower reproductive rates have all been attributed to
ash from volcanoes, occur naturally air pollution.
Stationary Sources
➢ Emissions come from fuel combustion, production
process or both.
➢ Fuel-related emissions are generated by boilers, gen
sets, kilns and furnaces used in manufacturing activities,
and in electricity generation. Fuel used include coal,
bunker oil fuel, and fuelwood or bagasse.
➢ Process emissions depend on the inputs and processes
involved in production.
➢ Pollutants include PM, NOx, SOx, VOC, CO and other
toxic pollutants.
Stationary Point Sources
Republic Act No. 8749
PHILIPPINE CLEAN AIR ACT OF 1999

“ All sources of air pollution must have


a valid Permit to Operate issued by the
EMB Regional Director.”
Air Pollution Source Equipment

Fuel-Burning Equipment
➢ External Combustion
▪ boilers, furnaces, heaters, burners, ovens, etc.
➢ Internal Combustion
▪ diesel and gasoline engine generator sets, gas turbine, etc.

Non-Fuel Burning Equipment


➢ Fuel Storage Tanks
e.g. gas stations, oil depot, fuel day tanks
➢ Process equipment (MT/hr/eqpt)
e.g. stone crusher, rice or corn mills, & other industrial equipment/installations
➢ Odorous raw materials (kg/hr)
e.g. chicken dungs, and other agricultural by-products
➢ Waste destruction facilities (grate surface area sq.m.)
e.g. grinders, crushers, shredders
Air Pollution Control Facilities

Particulate Emissions Gaseous Chemical


▪ Fabric filtration including Contaminants
pulsejet & mechanical bag • Biofilters
filter units; • Thermal
Oxidizers/Flares/Cremator
▪ Electrostatic Precipitators • Chemical scrubbing devices
▪ Cyclone dust collectors (e.g. gas absorber, wet
▪ Water scrubbing devices scrubber, flue gas
desulfurization (FGD)
▪ Ceramic filters control)
▪ Fugitive dust control (e.g. • Adsorption (e.g. activated
water spray system) carbon adsorbent)
APCF for particulate emissions

Pulse-Jet Bag Filter


Cyclone dust collector

Electrostatic Precipitator
Water Scrubber
APCF for gaseous chemical contaminants

Thermal Oxidizer

Flue Gas Desulfurization (FGD)

Gas Absorber
Activated Carbon Adsorption System
GUIDELINES ON THE
ISSUANCE OF PTO
THROUGH OPMS
EMB Memorandum Circular No. 2020-17
Annex A
EMB Memorandum Circular No. 2020-17
(Annex A)
EXEMPTED FOR PTO
Fuel Burning APSI:
Standby stationary/portable/mobile/multi-purpose Generator set engines (1-15 kW)
Non-Fuel Burning APSI:
Day Tank Storage Tank < 1m3 (1,000 L)

▪ Exempted Fuel Burning and Non-Fuel Burning Equipment emit negligible air pollutants defined
under Section 5-A of RA 8749 and Section 1 Rule 6 of DAO 2000-81 and will not cause harmful,
detrimental, or injurious to human health and safety & will not adversely affect commercial,
industrial and other purposes.
REQUIREMENTS FOR NEW PTO APPLICATION
Exempted to Secure
PTO Small Source Medium Large or Environmentally Significant
Exempted for Source Emission Testing
as per Annex C of MC (as per MC 2007-003) (as per MC 2007-003) (as per MC 2007-003)
2020-17
Require Picture / Brochure instead of
Brochure Brochure Brochure
Engineer's Report

Engineer's Report prepared by the Pollution Engineer's Report prepared by the Pollution Engineer's Report prepared by the Pollution
Require Picture / Brochure instead of
Control Officer and approved by the Control Officer and approved by the Control Officer and approved by the
Drawing Requirement
President/General Manager* President/General Manager* President/General Manager*

Copy of the Certificate of Accreditation of Drawing requirements signed by the Drawing requirements signed by the Drawing requirements signed by the
the PCO, or appointment / designation as President/General Manager and duly signed President/General Manager and duly signed by President/General Manager and duly signed by
such by the Managing Head by PME/ChE/PCO PME/ChE/PCO PME/ChE/PCO

Environmental Compliance Certificate Copy of the Certificate of Accreditation of the Copy of the Certificate of Accreditation of the Copy of the Certificate of Accreditation of the
(ECC) or Certificate of Non-Coverage (CNC) PCO, or appointment / designation as such by PCO, or appointment / designation as such by PCO, or appointment / designation as such by
copy the Managing Head the Managing Head the Managing Head

Environmental Compliance Certificate (ECC) or Environmental Compliance Certificate (ECC) or Environmental Compliance Certificate (ECC) or
N/A Certificate of Non-Coverage (CNC) copy Certificate of Non-Coverage (CNC) copy Certificate of Non-Coverage (CNC) copy

For Private Sector, copy of DTI Registration


Proof of compliance to emission standards Proof of compliance to emission standards Proof of compliance to emission standards
Certificate, SEC Registration Certificate and
Cooperative Registration Certificate. For
EMB Receive test plan / test report with EMB Receive test plan / test report with EMB Receive test plan / test report with
Government Offices/GOCCs, Certification
Accreditation Certificate Accreditation Certificate Accreditation Certificate
that it is a Government owned Property

For Private Sector, copy of DTI Registration For Private Sector, copy of DTI Registration For Private Sector, copy of DTI Registration
Certificate, SEC Registration Certificate and Certificate, SEC Registration Certificate and Certificate, SEC Registration Certificate and
Cooperative Registration Certificate. For Cooperative Registration Certificate. For Cooperative Registration Certificate. For
Government Offices/GOCCs, Certification that Government Offices/GOCCs, Certification that it Government Offices/GOCCs, Certification that it
it is a Government owned Property is a Government owned Property is a Government owned Property

Air Dispersion Modelling for large or


environmentally significant new sources
Environmental Management Plan Environmental Management Plan Environmental Management Plan Environmental Management Plan
REQUIREMENTS FOR PTO RENEWAL APPLICATION
Exempted to Exempted for Source Emission
Small Medium Large or Environmentally Significant
Secure PTO Testing

Proof of compliance to emission Proof of compliance to emission Proof of compliance to emission


standards standards standards

EMB Receive test plan / test report EMB Receive test plan / test report EMB Receive test plan / test report
with Accreditation Certificate with Accreditation Certificate with Accreditation Certificate

Copy of Recent 'Permit to Operate' Copy of Recent 'Permit to Operate' Copy of Recent 'Permit to Operate' Copy of Recent 'Permit to Operate'
issued by the Office issued by the Office issued by the Office issued by the Office

Proof of compliance to permit Proof of compliance to permit Proof of compliance to permit Proof of compliance to permit
conditions conditions conditions conditions
N/A
Self Monitoring Report (if applicable) Self Monitoring Report Self Monitoring Report Self Monitoring Report

EMB received copy of RATA and CGA


Report
Ambient Air Test Result (IF Ambient Air Test Result (IF Ambient Air Test Result (IF Ambient Air Test Result (IF
NECESSARY) NECESSARY) NECESSARY) NECESSARY)

Copy of the Certificate of Copy of the Certificate of Copy of the Certificate of Copy of the Certificate of
Accreditation of the PCO, or Accreditation of the PCO, or Accreditation of the PCO, or Accreditation of the PCO, or
appointment / designation as such appointment / designation as such appointment / designation as such appointment / designation as such by
by the Managing Head by the Managing Head by the Managing Head the Managing Head
Environmental
Management Plan
• This is the plan or program for
achieving the environmental
objectives and targets of a
project or undertaking. It
includes the designation of
responsibility for achieving
objectives and targets and the
means and time-frame by which
they are to be achieved. It
details the prevention,
mitigation, compensation,
contingency and monitoring
measures to enhance positive
impacts and minimize negative
impacts of a project or
undertaking.
EMB Memorandum Circular No. 2007-003

POLICY ON COMPLIANCE AND PERMITTING FOR


INDUSTRIAL FACILITIES RELATING TO AIR QUALITY
EMB MC 2016-008
Clarification on MC 2007-003 for existing sources which do
not require stack testing for permitting purposes:

a) Boilers rated equal and less than 50 HP;


b) Diesel generator set equal to and less than 300 kW; and
c) Other sources that has the potential to emit equal to and
less than 10 tons/year of any regulated air pollutant under
RA 8749 and DAO 2000-81.
Compliance Testing
EMB MC 2016-008
Source specific air pollutants/parameters (SSAP) for fuel
combustion sources for permitting purposes:
APSE FREQUENCY OF FUEL TYPE SSAP
OPERATION

Internal Combustion Engine Stand-by with/> or Diesel/Natural CO, NOx


(Generator sets/Gas Turbine, <12” stack diameter Gas/LPG/Biogas etc.
etc.)

Continuous with /> or Bunker Fuel Oil (BFO) PM, CO, NOx, SOx
<12” stack diameter* or Mixed Fuel (BFO,
Used Oil, LSFO, DFO)
APSE FREQUENCY OF FUEL TYPE SSAP
OPERATION
EMB MC 2016-008
External Combustion (e.g.
Boilers, Fuel burning Steel
Liquid Fuel Oil: e.g. Bunker PM, CO, NOx, SOx***
Fuel Oil (BFO) or Mixed
Mill Furnace) Fuel (BFO, LSFO, DFO)

Solid Fuel PM, CO, NOx, SOx***,


e.g. Coal Metals****
Wood, Rice Hulls, PM, CO
Biomass, Bagasse, etc.

Textile Waste PM, CO, Metals****

Cement Kiln**** Solid Fuel e.g. Coal, AFRs PM, CO, NOx, SOx,
including liquid fuel for Metals****
start up.

Other sources (Waste to Fuel specified in the ECC Refer to EMoP/PTO


Energy, Pyrolysis, etc.) condition
PTO ONLINE APPLICATION
PROCESS FLOW CHART
Case handler evaluates Section chief reviews the
Applicant submits PTO and accepts the draft PTO certificate and
application through application after endorses to the division
OPMS payment, drafts the PTO chief for recommending
certificate and forwards approval
the application to the
section chief for further
evaluation and review
Unit admin screens the Division chief reviews and
recommends approval of
application to determine
the PTO certificate to the
completeness of the Regional Director
requirements and Client uploads the
forwards to the case payment receipt and
handler for evaluation returns the application
to the case handler
Regional Director approves
the PTO certificate

Case handler evaluates Client updates the


the application and the application/downloads
application is returned to order of payment and Client downloads and
the client for necessary pays the permit fees prints the approved PTO
corrections/additional either online or manually certificate through OPMS
information/payment at EMB 10 Cashier
PTO ONLINE APPLICATION
PROCEDURE
EMB Memorandum Circular No. 2020-17
Step 1: Register with the EMB’s
Company Registration System

URL address
https://client.emb.gov.ph/crs/

Click the “User Manual” for


the entire procedure of CRS

Step 2: Make an OPMS account by


clicking the “Register” button

URL address: https://opms.emb.gov.ph/

Download the EMB MC 2020-17 for


the entire procedure of PTO Online
Application through OPMS
Step 3: Sign in to your OPMS account
and link your CRS registration
Step 4: Click on the Permit to Operate navigation.
Step 5: Click on the Add Transaction
button.
Step 6: Fill in all the necessary fields.
Step 7: Once done, click on the Proceed button
Step 8: Click the Add button. Fill in all the necessary fields and click the Save button.
Step 9: Once done, click on the Proceed button
Step 10: Click on the Proceed button (if emission testing is not required) until Step 5
Step 11: Download application form and notarize the form. Then, click on the Proceed button.
Step 12: Scroll down to view and upload the requirements to be uploaded.
Step 13: Click the Add files button and select the file to be uploaded.
Step 14: Select the requirement for which the uploaded file is for.
Step 15: Then, click the Upload button. Repeat for all of the requirements.
Step 16: Click the Finalize Application button.
Step 17: Read and understand the Terms and Conditions. Agree to the Terms and Conditions and
certification. Then, click the Submit button.
Step 18: Wait for a notification from EMB for further action.
Order of Payment
➢Annual Permit fees
➢Surcharge (Penalty &
Arrears)
(total no. of months and years
of operating without valid PTO)
➢Filing Fee = 600.00
➢Legal Research Fee (PD 1856)
= 10.00
➢Documentary Stamp Tax =
30.00
Sample Approved PTO Certificate
For inquiries, call us at (088)856-
9362 or send a message at
cpdemb10@gmail.com

THANK YOU ☺