form Manufacturer lectures section, contractor shall provide complete data Datasheets are All the material Still valid, all sheet for all items under the project attached in section Comply Not complete, items data sheet the product scope including EMC2 Equipment 14, Remaining items 1 contractor to add already added in to be added Comply archive node and accessories, all used are the part of Isilon all products section 14 of as per the mounting Kits and supports, Node so their datasheets Code 2 Rev0. SOE Filler, Licenses, and contractor shall are not available. update the Equipment Schedules Section accordingly. Operation Sections shall include EMC2 Proper storage node/unit’s operation /user It’s provided in document guide (In addition to the Submitted Comply Comment is still 2 section 7 of index to be Comply parts) valid code2 Rev0. provided for all sections In the name and index drawing section, It’s provided in Still Valid, no drawing references to be provided Comply section 12 of drawing 3 Not Done Comply Attached code 2 Rev0. included for storage rack
Missing the Draft
warrant section, T&C Report section and Equipment schedules section All the sections Still valid to 4 and all other are provided in be updated in Comply sections.......etc code 1 the document as per section no. 1 (index), contractor shall provide/update accordingly