Placing 50%
1) Removing template for anchor bolt
2) Preparation of foundation
3) Setting sliding plate, if required
4) Placing vessel and tank
Final Check 1) Cleaning and checking the inside of vessel and tank 10%
2) Replacing temporary gaskets of such opening
flanges as follows with permanent gaskets;
- man-hole
- hand-hole
- other opening parts
3) Cleaning flanges surfaces where gaskets are
installed at site
4) Lapping ring gasket to be set installed at site
5) Final check as per the Technical Documents