Extent of Work
Work elements to be included are as follows
Work Component Work Element Weighted Value %
01 : Boiler Unit
100%
/conversion/tmp/activity_task_scratch/656279635.doc Page 1 of 4
o
Ampa Fairley Rationalisation Project
Section 1.2 Document No.
Commercial Bid Requirements
Attachment 5
100%
03 : Inlet Duct
Installation 50%
1) Preparation of Foundation
2) Installation of Divertor Assembly
3) Connecting and welding By pass Stack sections
4) Placing of By Pass Stack
Alignment 40%
1) Alignment of stack
2) Attaching accessories to
stack by bolting and/or welding;
3) Assembling and installing parts as
follows to stack by bolting and/or welding;
10%
Final Check
100%
/conversion/tmp/activity_task_scratch/656279635.doc Page 2 of 4
o
Ampa Fairley Rationalisation Project
Section 1.2 Document No.
Commercial Bid Requirements
Attachment 5
100%
FINAL CHECK
02 : Gallery
1) Gallery
a) columns, beams and braces - prefabricated in several members with flange plates,
gusset plates and bolt holes
b) stair - prefabricated in pieces
c) ladder - prefabricated in pieces
d) safety cage - prefabricated cage rings and flat bars
e) handrail - prefabricated in pieces
f) grating - prefabricated in pieces
03 : Inlet Duct
/conversion/tmp/activity_task_scratch/656279635.doc Page 3 of 4
o
Ampa Fairley Rationalisation Project
Section 1.2 Document No.
Commercial Bid Requirements
Attachment 5
Work Measurement
1. Quantity to be measured Erection of installed component