COMPLIANCE STATEMENT

Doc No: LUS-CP13C2C4-AAI-MAT-ME-00075(REV-01)

Document Description: Supply of Air Handling unit (Carrier-Turkey)

S.No Marafeq Comments Contractor’s Response Status


As confirmed in previous revision, no objection to proposed
manufacturer CARRIER to supply the AHU in full compliance Comply to Supply of AHUs as per Technical Selections and
1 to project specifications and QCS 2014 requirements. Compliance submitted by Carrier in Material Submittal.
However, following comments shall be complied and Please refer below reply to each comments.
document shall be submitted for final approval.
As Noted, External static pressure reflected in the proposal
shall be updated based on actual duct layout. Contractor shall
Noted and complied.
2 provide ESP calculation for approval prior to production.
Calculation shall include layout, isometric diagram, references,
tabulated calculation as a minimum.
a) Comply, please refer updated comparison schedule
a) Schedule shall be provided with model number of b) Comply, please refer updated comparison schedule
selected AHU. c) Will be advised after final approval as per approved
b) Schedule for C2 plant shall include the required unit selections.
pipe size. d) Outer casing of Carrier AHUs is constructed of
galvanized steel material with zinc coating of density
c) Provide recommended spare parts (Provide
225 gr/m2 and additionally upper coating of 35 µm
3 separate list). Polyester powder paint with resistant against 500
d) Confirm the outer casing paint thickness in line with hours of saltwater test for superior corrosion
specification. resistance.
e) All units must be Euro vent and AHRI certified. e) Proposed Carrier AHUs are Eurovent certified.
Provide AHRI certificates. Eurovent certificate is provided in section 4 of
f) For other comments refer to mark ups. material submittal.
f) Please refer below reply to markup comments.
a) Section 3: Technical Selection Data Sheet, supplier a) Electrical parameters are provided in Fan & Motor
4 to indicate the selection sheet all the electrical data of Selection datasheet for each AHUs. Fan
motors are for 415V /50Hz/3 Phase.
parameters such as (Power, Voltage, Frequency,
No. of Phase) for both specified and offered
material. - Not complied. Only power input b) Light Switch comply to IP54 as per Carrier design.
provided. Also indicate the voltage, frequency and Alternate option not available and not required. IP54
no. of phase. switch is suitable for Qatar ambient conditions
installation
b) Bulkhead light and switches shall be rated IP65 as
specified in the project specification. Light and c) Noted Separate Submittal will be provided for
switches shall be pre-wired as specified. - Not approval of VFD in compliance with all BMS I/O
complied. Provide IP65 as per specification Points.
c) Material submittal approval for VFD shall be
provided since it was mentioned by others in the d) Heat Wheel power supply is 0.04Kw for FAHU-01
compliance statement and shall comply with all the and 0.18Kw for FAHU-02.
BMS I/O points requirements. Subject for
verification upon receiving the material submittal.
d) What is the motor power input rating of the heat
wheel (if required)? Subject for verification upon e) Individual VFD’s will be provided for each Fan Motor
confirmation of rating. Coordinate for the electrical as per approved MCC drawing.
loading accordingly.
f) Noted, It is coordinated with Electrical team for
e) Technical data sheet shows 2nos. of motors feeders to motors.
(supply & exhaust fan motor), are these pre-wired
for a single controller? Please note that a single
VFD for multiple motor is not acceptable as per the g) Noted, It will be Coordinated with Electrical team for
specification. - Please confirm if these are pre- consideration.
wired to a single controller
f) If it has individual VFD, then coordinate with
electrical for feeders of these motors’ VFD. - h) Noted
Subject for verification upon confirmation.
g) In the data sheets attached to the material
submittal, power input rating shown is much greater
than what has been considered for electrical
loading. - Noted. Coordinate with electrical loading
to ensure no overloading in the assigned circuit in
the DB panel.
h) As noted, Appropriate cable gland shall be
provided complying with the same IP rating of the
motor.
a) As noted, Sound data reflected in the data sheet
should be verified by the contractor specialist
acoustic consultant against the NR specified in the
specification for each room. (Provide confirmation a) Noted.
5 from acoustic specialist)
b) As noted, all certificates must be valid during b) Noted, Will be provided when required
production and delivery. Some of the certificates
are about expire like Suppliers CR. Provide
renewed certificate once done.
General Comments
a) As noted, Other required accessories as per specs
to be procured by contractor as per approved
material submittal for example vibration isolator etc. a) Noted
b) As noted, Delivery, handlining, storage, Installation,
testing, commissioning shall be as per b) Noted
manufacturers recommendation.
c) As noted, Contractor shall consider actual AHU
dimension while preparing shop drawing. (Kindly c) Noted and Comply
confirm it is in line with arch drawing)
6
d) As noted, All the provision required for the interface d) Noted
with Fire alarm/BMS system shall be provided.
e) As noted, Country of origin and factory test report
to be submitted during delivery. e) Comply, will be provided at the time of delivery
f) This approval does not relieve contractor of his
contractual obligation under the contract to design, f) Noted.
construct, test, commission, and handover the
system in accordance with the code, specification,
and authority regulation.
All material warranty to be provided separately as per contract Noted.
7
requirement. (Attach draft warranty not approved)

MARK UP COMMENTS:

1. Voltage Frequency and Phase of Fan motor 1. Fan motors are for 415V /50Hz/3 Phase.
2. IP65 light switch 2. Replied above in comment 4b.
3. VFD Submittal 3. Noted, it will be provided separately.
4. Heat Wheel motor power 4. Replied above in comment 4d.
5. VFD Controller 5. Noted, it will be as per approved MCC
6. Electrical feeder for VFD manufacturing drawing.
7. Bulk light required is 60W 6. Light is 40W as per Carrier design. Other option not
8. Casing Paint details available/Not applicable.
9. Pipe connection size for AHUs 7. Replied above in comment 3d.
10. Spare part list 8. Replied above in comment 3b.
9. Replied above in comment 3c.