TECHNICAL BID EVALUATION SHEET FOR FUEL GAS SCRUBBER Rev No 01


REQ No.
BIDDER-1 BIDDER-2 BIDDER-3 BIDDER-4 BIDDER-5
DESCRIPTION REQ'N REQUIREMENT
SHIRAWI ARABIAN INDUSTRIES DESCON ELCO KANOO
A GENERAL:
1) Origin M.R
2) Delivery 7 MONTHS
3) Delivery condition Daleel Field
4) Applicable code & std. ASME SEC . VIII Div. 1 + "U" Stamp, latest edition
5) Table of compliance to RFQ Required
6) Filled in scrubber datasheet provided Required

B GENERAL:
SUPPLIED ITEMS
1) V-1258 : Fuel Gas Scrubber Required

C SCOPE OF SUPPLIES required by Vendor


1) Equipment Proper with Standard Accessories Required
2) All Internals including piping with hardwares indicated on data sheets Required
3) Internals for filtration along with its supports Required
4) Top body flange with removable cover Required
5) Earth lugs, Lifting lugs, Nameplates and its bracket Required
All temporary reinforcements, protections, transportation saddles and packing
6) Required
required for shipping and transportation to jobsite
Cleats for platforms, ladders and piping supports and all parts welded directly to
7) Required
the vessel
8) Blind flanges, bolts/nuts and gaskets for blinded nozzles Required
9) PWHT (if required), Inspection, testing and certification Required
10) Name Plates with Brackets Required
11) Tailing lug with bracing beam, as required Required
12) Touch up paint Required
13) Painting, Marking, packing, preservation for shipment, and transportation Required
Vessel shall be assembled to the maximum possible extent at the shop to
14) Required
minimize the installation time at site
Supply of commissioning spares for top body flange and nozzles with blind
15) Required
flanges, and other spares
16) Companion flanges with gasket and bolting, if non-ASME flanges are used Required
17) Supply of 2 years operational /maintenance spares Required
18) Special tools, tackles and consumables, if any (see Appendix-5) Required

19) Co-ordination & control of all sub-vendors to satisfy contractual requirements Required

Performance, workmanship and mechanical guarantee of the New Fuel Gas


20) Required
scrubber shall be by vendor
21) All statutory approvals as applicable in the country of fabrication / installation Required

22) Handing over of New Fuel Gas scrubber to the owner to owner’s satisfaction. Required

D SCOPE OF WORKS
1) Mechanical Design including Nozzle load analysis Required
2) Fabrication Drawings Required
3) Material Procurement and Manufacturing Required
4) All Test & Inspections required in Specifications Required
5) Painting (Up to Final Coat) Required
6) Government Approval Required
7) Tranportation with Shipping Saddle Design and Drawings Required
8) ASME Stamp Required
9) Guarantee for Mechanical design and Workmanship Required
10) Others required in Purchaser's requisition Required

E DESIGN CODE AND STANDARD


1) ASME SEC.VIII Div.1 Required
2) Material - ASME / ASTM Required
3) ASME CODE (U) Stamp Required

F GENERAL DESIGN CONDITIONS (Applicable to all items)


1) Minimum Ambient Temperature ℃ 0
2) Wind Design Condition APPLICABLE (Note.24)
- Applicable Standard BS 6399
- Basic Wind Speed m/s 15 / 26
3) Seismic Design Condition N.A

G DESIGN AND CONSTRUCTION


1 Design Condition
- Design pressure / Temperature (Internal) barg / ℃ 6 / 82
- Design pressure / Temperature (External) barg / ℃ FV / 82
- PWHT AS PER DESIGN CODE
- Radiography (shell / head) Full - 100%
- MDMT for Impact testing ℃ -20
- Corrosion Allowance (Shell / Head) mm 3
- NACE / HIC Resistant Material Required
2 Material
- Shell & Head SA-516 Gr. 70 N
- Pad plate SA-516 Gr. 70 N
- Baseplate SA-36/CS
- Demister 22 CHROME DSS
- Fittings SA-234 Gr. WPB
- Internal / External attachments' SA-516 Gr. 70
- Nozzle neck SA-106 Gr. B
- Flanges SA-105 N
- Gaskets SS 316/316L Spiral wound with Graphite Filler & SS Hoops
- Bolts/Nuts SA-193 Gr. B7 / SA-194 Gr. 2H
- Name plate SS 316
3 Dimension & Thickness
- Shell I.D mm 650 (VTC)
- T.L to T.L mm 2150 (VTC)
- Min. th'k (shell / head) mm M.R
- Empty weight kg M.R
4 Nozzle Flanges
- Type WN-RF
- Rating ASME B 16.5 & ASME B 16.47 Series A
5 Process Requirments
- Internals Demister
- Size M.R
- Process Guarantee Required
- Separation Efficeincy 99%
- Supports for internals Required
- Design Code API
- Filter mesh size 20 mesh
- Allowable Pressure Drop bar 0.1(VTC)
- Turn Down Design

H INSPECTION AND TEST


1) Hydrostatic Test as per UG-99C Required
2) N.D.T Required
3) Magnetic particle Examination Required
4) Dye Penetration Test Required
5) Air test of Reinforcement plates Required
6) Visual examination Required
7) Imact test, if required As per code
8) Radiographic examination Required
9) Ultrasonic examination, if required As per code
10) Others indicated in specification Required
11) Hardness check Required
12) Painting (Up to Final Coat) Required
13) Rust prevention & Packing inspection Required

I SPARE PARTS
1) For Erection & Commissioning
- Gasket for flange 200%
- Bolts and Nuts 10% (Min. 2 no's)
2) For Two(2) years operation
- Gasket for flange 200%
- Bolts and Nuts 10% (Min. 2 no's)

J PAINTING AND COATING (PRODUCTION SEPARATOR)


1) EXTERNAL
-Surface Preparation As Per Data sheet
-Primer As Per Data sheet
2) INTERNAL
-Surface Preparation As Per Data sheet
-Internal Coating As Per Data sheet

H DEVIATIONS LIST FROM VENDOR BY VENDOR

TECHNICAL ACCEPTANCE
LEGEND: V : IN ACCORDANCE WITH REQUIREMENT M.R: MFR'S RECOMMENDATION N.S: NOT SPECIFIED IN QUOTATION