Briefing/Architectural Programming
Ann T. W. Yu1; Qiping Shen2; John Kelly3; and Kirsty Hunter4
Downloaded from ascelibrary.org by UNIVERSIDADE FEDERAL DE MINAS on 07/04/14. Copyright ASCE. For personal use only; all rights reserved.
Abstract: Briefing is the process by which client requirements are identified, clarified, and articulated in the early design stage of
construction projects. It is crucial to the successful delivery of construction projects. Considerable research has been conducted in briefing
during the past two decades. However, researchers consider many current briefing practices to be inadequate, and little research has been
done in sufficient depth to explore briefing variables in the construction industry. This paper introduces a comprehensive framework of the
variables that have an impact on construction project briefing. A questionnaire survey was conducted to validate these variables among
project managers and architects in Hong Kong, the United Kingdom, and the United States. The results indicate that although no
significant differences existed between the samples in the United Kingdom and the United States on the variables for construction project
briefing, the views of the samples in Hong Kong deviated from the two Western countries. The Western professionals have more positive
answers to most statements in the questionnaire. The findings have significant implications for industry practitioners in producing their
guidelines for the briefing process and for writers in drafting how-to briefing guide for construction projects.
DOI: 10.1061/共ASCE兲0733-9364共2008兲134:2共122兲
CE Database subject headings: Construction management; Project management; Architecture; Best management practice;
Comparative studies.
Introduction projects can be traced back to briefing. The famous Pruitt Igoe
project in the United States, which solved the financial and image
Briefing 共known as architectural programming in the United problems of public housing, was demolished in 1976 because it
States兲 is the process by which a client informs others of his or did not respond to the behavioral and social needs of users 共Duerk
her needs, aspirations, and desires, either formally or informally; 1993兲. This incident illustrates well that systematic identification
and a brief is a formal document that sets out a client’s require- of client requirements during the briefing process is a prerequisite
ments in detail 共CIB 1997兲. Hershberger 共1999兲 defines architec- to project success. In the past two decades, briefing has received
tural programming as the first stage of the architectural design a great deal of attention from researchers and practitioners. Many
process in which the relevant values of the client, users, architect, briefing guides have been developed to improve existing briefing
and society are identified; important project goals are articulated; practices 共CIDA 1993; Duerk 1993; CIB 1997; Salisbury 1998;
facts about the project are uncovered; and facility needs are made Hershberger 1999; CRC 2001; Pena and Parshall 2001兲. Despite
explicit. these efforts, many researchers still consider the current briefing
The briefing process is crucial to the successful delivery of practice to be inadequate 共Smith et al. 1998; Barrett and Stanley
construction projects, as well as to the satisfaction of clients 1999; Kamara et al. 2002, Yu et al. 2005兲. Many project briefs
共Shen et al. 2004; Yu et al. 2005兲. Many problems in construction may not truly reflect client requirements. Kamara et al. 共2002兲
indicate that limitations exist in current practice and in the frame-
1
Tutor, Dept. of Building and Real Estate, The Hong Kong work for briefing. Yu et al. 共2005兲 pointed out that a lack of a
Polytechnic Univ., Hung Hom, Kowloon, Hong Kong. E-mail: comprehensive framework is one of the problems associated with
bsannyu@polyu.edu.hk briefing. The limitations in the existing framework for briefing
2
Professor, Dept. of Building and Real Estate, The Hong Kong can shift the focus away from the requirements of the client and
Polytechnic Univ., Hung Hom, Kowloon, Hong Kong. E-mail: can result in problems in briefing practice 共Kamara and Anumba
bsqpshen@polyu.edu.hk
3 2001兲. However, to date, little attention has been devoted to de-
Professor, School of the Built and Natural Environment, Glasgow
Caledonian Univ., City Campus, Glasgow, G4 0BA, Scotland. E-mail: veloping a comprehensive framework for investigating the vari-
J.R.Kelly@gcal.ac.uk ables of construction project briefing. Whereas there have been
4 many studies on briefing in the construction industry, little re-
Project Manager/Research Associate, Sustainability Centre, Glasgow
Caledonian Univ., City Campus, Glasgow, G4 0BA, Scotland. E-mail: search has been done to develop a theoretical framework and
khu@gcal.ac.uk subsequently produce a practical framework for construction
Note. Discussion open until July 1, 2008. Separate discussions must project briefing/architectural programming.
be submitted for individual papers. To extend the closing date by one In this paper, perceptions about variables in construction
month, a written request must be filed with the ASCE Managing Editor.
project briefing in Hong Kong, the United Kingdom, and the
The manuscript for this paper was submitted for review and possible
publication on May 16, 2006; approved on July 3, 2007. This paper is United States were investigated. A comparative study on the per-
part of the Journal of Construction Engineering and Management, Vol. ceptions of clients and architects on briefing variables using pro-
134, No. 2, February 1, 2008. ©ASCE, ISSN 0733-9364/2008/2-122– fessionals from Hong Kong and Western nations 共the United
138/$25.00. Kingdom and the United States兲 was conducted. Discussions of
making more efficient use of human knowledge that exists within criteria. This success criterion is most influenced by stakeholder
an organization. Fundamental to briefing therefore is the mapping satisfaction. For example, a government organization or a not-for-
of individuals contributions to organizational project knowledge profit organization will differ greatly in its success criteria from
to determine the membership of the project briefing team 共Kelly those in the team who aim to make a profit from the project.
and Duerk 2002兲. Teamwork, collaboration, face-to-face contact,
and effective communication structures are essential in ensuring Decision Making
that knowledge management is a success 共McCampbell et al.
1999兲. Briefing involves a lot of decision making by individuals and by
groups. Effective decision-making processes are the backbone of
an effective briefing strategy. Knowing when to make decisions
Risk and Conflict Management and what kinds of decisions must be made are crucial to the
The concept of risk is related to the activities that flow from success of any project 共Blyth and Worthington 2001兲. A good
decisions made by the client, where the outcomes of those activi- briefing team should not limit itself to just one decision-making
ties may differ from expectations 共Loosemore 1999兲. These dif- method and it should operate in contingency fashion by changing
ferences are the result of uncertainties that are inherent in the decision methods to best fit the problem and situation at hand.
formation on which the client bases his or her decision making. It
is widely accepted that during the initial appraisal phase, risk Communications
management is most valuable since a great deal of flexibility in
design and planning remains that allows consideration of ways in The briefing process is essentially one of communication. Effec-
which various risks might be avoided or controlled 共Thompson tive communications among all parties are needed to identify,
and Perry 1992兲. clarify, and represent the client requirements. The most important
In the briefing process, conflict occurs whenever disagree- critical success factor of briefing was open and effective commu-
ments exist in a social situation over issues of substance or when- nication in the questionnaire survey of this study. Active listening
ever emotional antagonisms create friction between individuals or should be encouraged in the briefing exercise to allow a free and
groups 共Schermerhorn 2003兲. It is most beneficial to construct complete flow of communication.
conflict management plans during the predesign stages of a
project, and such plans should incorporate preventive and reactive Culture and Ethics
elements 共Loosemore 1999兲. Collaboration and problem solving
are preferred to gain true conflict resolution during the briefing Culture and ethics may affect decision making in the briefing
process. process. In managing the briefing team, the influence of cultural
dimensions such as language, time orientation, use of space,
religion, power distance, uncertainty avoidance, individualism-
Postoccupancy Evaluation and Postproject Evaluation collectivism, and masculinity-femininity may be considered. An
Postoccupancy evaluation 共POE兲 has been defined as “a diagnos- ethical dilemma is a situation in which a person must de-
tic tool and system which allows facility managers to identify and cide whether to do something that, although benefiting that person
evaluate critical aspects of building performance systematically” or that organization, or both, may be considered unethical
共Preiser 1995兲. POE and postproject evaluation 共PPE兲 are 共Schermerhorn et al. 2003兲. The briefing team may encounter
management tools within the broader context of facilities man- ethical dilemmas that affect decision making in the briefing
agement. They aim to improve the performance and quality of process.
buildings. Successes, failures, and previous experiences of what These 13 variables were subsequently validated by a question-
does and does not work well should be used to aid in better naire survey 共see the Appendix兲 and formed the basis of the the-
decision making in the briefing process for subsequent projects. oretical framework for investigating construction project briefing
The more detailed a postoccupancy evaluation or postproject in this study.
evaluation, the more likely it will support and influence decisions
made in the briefing process.
Research Findings
Critical Success Factors and Key Performance
Indicators Profile of the Respondents
CSFs are the statements indicating how improved business Of the 89 respondents, more than half of them were from Hong
practice must be achieved if an organization is to be able to ac- Kong 共57%兲; the others were from the United Kingdom 共20%兲
complish its mission 共McCabe 2001兲. The CSFs in the briefing and the United States 共23%兲 共see Fig. 1兲. Fig. 2 provides a break-
Discussions
Projects
down of the valid responses by professional groups. Most respon-
According to Tables 2 and 3, the professionals in the United
dents were architects 共62%兲; the remainder were project managers
Kingdom, the United States, and Hong Kong agreed that the brief
共26%兲, architectural programmers, mainly from the United States
should act as a reference document that should be available to all
共6%兲, and others including surveyors, engineers, and contractors
project parties. The mean shows that respondents in the United
共6%兲. Regarding the respondents’ experience in briefing in the
States were as inclined towards “strongly agree.” All three re-
past five years 共measured by number of projects兲, 16% of the
gions did not believe that the brief document is for use by the
respondents have both coordinated 共written兲 and contributed 共not
design team only. This response was in line with HM Treasury
written兲; of this amount, 47% have coordinated and 37% have
共1997兲, which states that the project brief should be included in
contributed only in the briefing process. In addition, 40% of the
the project execution plan and used by all parties for reference
respondents have coordinated briefing and 21% of the respon-
when requiring project information. The project execution plan is
dents have contributed to briefing for more than six projects in the
the key management document that encompasses all activities
past five years.
related to the project. The project manager ensures that the project
is progressing according to the brief and focuses on areas that
Results need direction and control. The brief can also be used at the
To investigate whether significant differences existed between postproject review stage to audit project success.
perceptions in the United Kingdom and the perceptions in the
Stakeholder Management
United States on the variables of construction project briefing, a
Mann-Whitney test was conducted. The results in Table 1 re- The Western professionals considered that the individual stake-
vealed no significant statistical difference between the United holder’s commitment, interest, and power should be assessed be-
Kingdom and the United States except that American profession- fore the briefing process. It coincides with Boddy 共2002兲, in
als strongly believed that consensus building is a vital component which the author proposes to carry out a stakeholder analysis
of the briefing process. Two similar tests were carried out for during the early stages of the project and present it to the team.
Hong Kong and the United Kingdom, as well as for Hong Kong Important tasks for the project manager therefore include identi-
and the United States. Significant statistical differences were fying stakeholders in a project assessing their commitment, as-
found in both tests. Since no significant statistical difference ex- sessing their power to help and hinder change, assessing their
isted between the United Kingdom and the United States these interests and how their interests will affect what they think and do
two regions were grouped as the Western group to examine the about the change, managing relations with them to gain support,
differences between perceptions in Hong Kong and Western per- minimizing opposition, and generally creating favorable attitudes
ceptions on the variables of construction project briefing. In ad- to the change.
dition, for the sake of comparison, the United Kingdom and the
United States are taken to represent the West in the discussion Teams and Team Dynamics
because the United Kingdom and the United States are in the Professionals in the three regions believed that an understanding
same cultural cluster—Anglo—and have been classified as typical of team dynamics is crucial to working effectively within the
developed Western nations 共Chen and Partington 2004; Gupta stakeholder group in the briefing process. The Western profes-
et al. 2002; Ronen and Shenkar 1985兲. Table 2 shows the means sionals agreed that the stakeholder group should be empowered
by the client within precisely defined limits, whereas the profes-
sionals in Hong Kong had a neutral attitude. It was not surprising
to discover that the three regions’ professionals understand that
team dynamics is important to work effectively in the briefing
process. The Western professionals have more understanding that
the client should empower the stakeholder group within precisely
defined limits.
Client Representation
All three groups agreed that strict control by the brief writer is
needed to prevent the brief from becoming a wish list. Kelly and
Duerk 共2002兲 indicated that the wish-list syndrome is one of the
hazards commonly observed in the briefing process. User groups
Fig. 2. Respondents by professional groups tend to maximize their wish lists in anticipation of being bar-
2. Stakeholder management
The individual stakeholders commitment, interest, and power should 3.49 3.83 4.10 –2.809 0.005b
be assessed before the briefing process.
3. Teams and team dynamics
The stakeholder group should be empowered by the client within 3.50 3.94 4.05 –2.755 0.006b
precisely defined limits.
Understanding team dynamics is crucial for working effectively 3.82 4.17 4.45 –3.198 0.001b
within the stakeholder group in the briefing process.
4. Client representation
Strict control by the brief writer is needed to avoid the briefs 3.72 4.61 4.40 –4.221 0.000b
becoming a wish list.
The client should determine the time at which the brief becomes fixed. 3.55 3.44 3.60 –0.213 0.831
The brief should be fixed before sketch design commences. 3.37 2.89 3.20 –1.348 0.178
The brief should be fixed before detail design commences. 3.78 4.33 4.40 –3.294 0.001b
5. Change management
The brief should be flexible enough to reflect changing client 3.51 4.17 4.35 –4.004 0.000b
requirements.
The brief should describe the potential changes to the client 2.90 3.61 3.85 –4.222 0.007b
organization resulting from the construction project.
6. Knowledge management
Successful briefing is dependent on understanding the client’s 4.10 4.39 4.55 –2.503 0.012b
strategic goals.
Briefing is the integration of the skills, knowledge, and experience 3.69 4.17 4.35 -3.397 0.001b
of different stakeholders.
7. Risk and conflict management
Consensus building is a vital component of the briefing process. 3.52 3.94 4.40 –3.418 0.001b
8. Postoccupancy evaluation and postproject evaluation
Consultation with facility managers and end users benefits the briefing 4.16 4.35 4.60 –2.816 0.005
process.
9. Critical success factors and key performance indicators
The construction brief should include the key performance indicators by 3.55 4.00 4.15 –3.157 0.002b
which the success of the project will be measured.
10. Type of business and organizational theory
The briefing process must take into account that the stakeholder group 3.39 4.00 4.21 –4.974 0.000b
may be formed of many different types of organizations with different
success criteria.
11. Decision making
Effective decision making can only occur if the client representatives 3.84 3.50 2.89 –2.475 0.013b
are senior managers.
12. Communications
Communication among stakeholders is crucial to the success of the 3.82 4.18 4.45 –2.947 0.003b
briefing process.
A structured or facilitated workshop will improve communication 3.76 4.31 4.50 –4.099 0.000b
among stakeholders.
13. Culture and ethics
It is important that the stakeholder group consist of individuals of 2.82 2.61 2.25 –2.436 0.015b
common cultural and ethical outlook.
Culture and ethics affect decision making in the briefing process. 3.39 3.50 4.20 –2.930 0.003b
Note: A Likert scale was used 共1 to 5 represented “strongly disagree,” “disagree,” “neutral,” “agree,” and “strongly agree,” respectively兲.
b
Represents a p-value is less than 0.05, which indicates significant statistical differences.
commences rather than before sketch design commences. The lit- POE and PPE
erature review indicates that two schools of thought relate to Professionals in the three regions agreed that consultation with
briefing. One considers the brief as an entity in itself, which facility managers and end users benefits the briefing process. Suc-
should be frozen after a critical period, and briefing becomes a cesses, failures, and previous experiences of what does and does
stage or stages in the design process 共Hershberger 1999; RIBA not work well should be used to facilitate better decision making
2000; Hyams 2001; Yu et al. 2006兲. The other regards the brief as in the briefing process 共Blyth and Worthington 2001兲. POE should
a live and dynamic document that develops iteratively from an ensure that client requirements are being met and that the project
initial global brief in a series of stages; briefing is considered to team is clear about what they are. The information should be
be an ongoing activity that evolves during the design and con- documented in the project brief and communicated to the team.
struction process 共Barrett and Stanley 1999; Blyth and Worthing- PPE should be implemented throughout the building’s life cycle
ton 2001; Kamara et al. 2002; Othman, et al. 2004 and 2005兲. The
to ensure that no lessons are lost or forgotten. Previous experience
writers support the former so that redesign and abortive works
and lessons learned from past PPEs should be reviewed in the
attributable to late change of client requirements in the brief can
briefing process to improve project performance.
be avoided.
Critical Success Factors and Key Performance Indicators
Change Management
The Western professionals believed that the construction project
The Western professionals agreed that the brief should be flexible
brief should include the key performance indicators by which the
enough to reflect changing client requirements. Problems occur in
success of the project will be measured. Ten KPIs are currently
change management when change results from inaccuracies in
design caused by incomplete, unclear, or ambiguous project infor- being used 共CBPP 2003兲. They are client satisfaction—product,
mation generated at any stage of the project process. This may client satisfaction—service, defects, safety, predictability—cost,
result from, for example, the appropriate stakeholder’s informa- predictability—time, construction time, construction cost, produc-
tion not being incorporated at a particular stage in the develop- tivity, and profitability. The success of a project can be measured,
ment of the project 共Kelly et al. 2004兲. Notwithstanding the type and feedback can be used to improve the performance of subse-
of change, management structures must be in place to deal with quent projects.
change. Ideally, changes to client requirements should bring ben-
efits all parties engaged in the project. Type of Business and Organizational Theory
The professionals in the United States and the United King- The Western professionals perceived that the briefing process
dom perceived that the brief should describe the potential changes must take into account that the stakeholder group may be formed
to the client organization resulting from the construction project. of many different types of organizations with different success
This topic is discussed in the following section. criteria. The briefing process should consider the composition of
the team. Corporate clients make decisions to change their facili-
Knowledge Management ties to be cost effective and to enhance competitiveness and pro-
Western professionals considered that briefing is the integration of ductivity, and these goals should be considered in the briefing
the skills, knowledge, and experience of different stakeholders. process 共AIA 2001兲. Government organizations or not-for-profit
The mapping of the contributions of individuals to organizational organizations seek to serve the societies or communities.
project knowledge and experience is used to determine member-
ship of the project briefing team 共Kelly and Duerk 2002兲. Further- Decision Making
more, professionals in Hong Kong, the United Kingdom, and the Professionals in Hong Kong were inclined toward “agree” on the
United States agreed that successful briefing depends on under- statement that effective decision making can only occur if the
standing the client’s strategic goals. The writers believe that a client representatives are senior managers. Professionals in the
brief must capture the client’s strategic goals and must detail United Kingdom were neutral but professionals in the United
changes to the way in which the client organization must do States disagreed with this statement. This statement seems to
things to meet organizational needs and to reap the benefits of simplify briefing situations. The writers agreed with Blyth and
quality improvement, increased productivity, and enhanced com- Worthington 共2001兲 that there are three layers of decision making:
petitiveness that are a necessary part of the project. corporate, departmental, and individual. Corporate decision
makers are more concerned with strategic decisions affecting the
Risk and Conflict Management business, such as whether to build and where. Senior managers
Western professionals believed that consensus building is a vital are normally involved in the strategic briefing stage. Departmen-
component of the briefing process. Although this statement is true tal and individual managers operate at a more tactical level, while
to an extent, briefing should remain focused on the needs of they look for the detailed project performance and technical re-
the client. The client representatives should actively participate in quirements. Project managers or designers can manage the works
coincides with the results of the open-ended questions in the should describe the potential changes to the client organization
questionnaire that indicate that open and effective communication resulting from the construction project. The construction project
is the most important critical success factor of the briefing pro- brief should include key performance indicators by which the
cess. Professionals in the United States considered holding work- success of the project will be measured.
shops for stakeholders to be the second most important critical
success factor. Yu et al. 共2006兲 put forward facilitative briefing as Limitations of This Empirical Study
a beneficial option for construction project briefing. In facilitative
briefing, a facilitator independent of the client and the design This empirical study has two limitations. First, the sample size
team guides the whole team through the briefing process, largely of 89 respondents may not be entirely representative of the in-
by using the techniques of value, risk, and project management. tended population in the United Kingdom or the Untied States.
Nevertheless, every attempt was made to increase the responses
Culture and Ethics within the time limit. A more extensive study with a much larger
The Western professionals believed that culture and ethics affect sample size could be conducted in the near future. Second, group
decision making in the briefing process. However, professionals in sizes were not constant across the survey, and group size is a
Hong Kong and the West disagreed about whether the stakeholder potential explanatory variable for the differences in the results.
group should consist of individuals with a common cultural and To facilitate and balance the comparisons between groups, the
ethical outlook. In managing the briefing team, especially for United Kingdom and the United States were compared first and
international construction projects, the influence of cultural then combined to form the Western group 共38 responses兲 because
dimensions such as language, time orientation, use of space, and no major statistical differences exist between these two groups.
religion must be considered. Ethical decision making comes from This group was next compared with the Hong Kong group 共51
personal values, company organization, trade or professional responses兲.
organizations, government, and society 共Hong Kong Ethics
Development Centre兲. The briefing team would encounter ethical
dilemmas in their relationships with superiors, subordinates, Conclusions
customers, competitors, suppliers, and regulators. Common issues
underlying the dilemmas involve honesty in communications and In this study, a questionnaire survey was conducted to make a
contracts, gifts and entertainment, pricing practices, and employee comparative but exploratory study to understand the perceptions
terminations. of project managers and architects on the 13 variables in con-
struction project briefing in Hong Kong, the United Kingdom,
and the United States. The findings revealed no significant dif-
Implications for Industrial Practitioners in Briefing
ference between the United Kingdom and the United States.
The findings revealed in this paper may have implications for However, the results from professionals in Hong Kong deviated
helping practicing industry professionals draft their own guide- from these two countries. In general, the Western professionals
lines for the briefing process. The 13 briefing variables serve as a were more positive toward the proposed statements of briefing
framework for considering factors that may affect the process. practice, whereas professionals in Hong Kong were neutral to
Professionals in the United Kingdom, the United States, and these suggestions. Although the study has limitations, the findings
Hong Kong may refer to the perceptions of their own regions on and implications are significant so that practicing industry profes-
the 13 briefing variables. The professionals in Hong Kong may sionals can produce their own guidelines for the briefing process,
even look at the more positive answers from the United Kingdom as well as for the writers to draft a common ‘how-to’ briefing
and the United States as a reference for briefing practices. guide for construction projects. It is anticipated that the variables
Individual commitment, interest, and power of the stakehold- could be categorized in a different way, for example, a factor or
ers should be assessed before the briefing process. The individual cluster analysis can be used to group the variables for further
stakeholder contributions to organizational project knowledge and quantitative studies if the sample size can be extended to 100
experience should be considered to determine the membership of or more.
the project briefing team. The briefing process should consider the
stakeholder group may be formed of many different types of or-
ganizations with different success criteria. An understanding of
team dynamics is also crucial for working effectively with the Acknowledgments
stakeholder group in the briefing process.
In the briefing process, decisions should be made by the right The work described in this paper was supported by the Research
person at the right level and time. Culture and ethics affect deci- Grants Council of the Hong Kong Special Administrative Region,
sion making in briefing. In addition, consultation with facility China 共PolyU 5007/02E, PolyU5252/05E, PolyU 5264/06E兲.