Delineating
Bibliography Objective Factors/ Variables Methods Major Findings Recommendation/s
Alwan, Z., The aim of this Framework of This inquiry is FSSD IS a The design team
Jones, P., & research inquiry sustainable situated with an scientifically verified needs to help in the
Holgate, P. is to better strategic authentic case method, and has been education of the
(2017). Strategic understand how development study. A literature proven to work at a client, emphasizing
Sustainable BIM can be (FSSD)- it is a review was variety of scales of the importance of
Development in used within the comprehensive conducted of environmental and and providing
the UK FSSD to model for planning academic journals, industrial problems. information about
Construction facilitate bottom in complex systems industry However, the system sustainability
Industry, through up strategies for Sustainability publications and and success levels principles,
the Framework cleaner principles- government are not effectively particularly within
for Strategic production in the interpretation and reports, focusing on embedded within the the success level.
Sustainable construction consideration keywords which construction industry The business case
Development, industry of sustainable deve address the key at present. for sustainability is
Using Building lopment in terms of research aims often a good place
Information its three primary discussed. to start with clients;
Modelling. Journ aspects — by relieving the
al of Cleaner economic, pressure over time
Production, 140, environmental and this can lead to
349-358. social aspects economic as well as
Modern methods societal and ecology
of construction- benefits.
are methods that
are developed
in construction indu
stry with proper
planning and
design so that each
project reduces
Iliescu, M., & To improve Technology- the The methodology In conclusion the The focus should be
Ciocan, R. productivity and application of involves effect of increasing on the quality and
(2017). Modern quality control, scientific establishing four performance has control process
Technologies the repeated knowledge for axes for the four negative influences on through different
Innovation in process is used practical important factors, the quality of the methods to con firm
Use for Quality for short period production process. and capitalize at
purposes, such as; quality,
Control on of time, of maximum the
Construction monitoring, especially in quantity, time and performance level
Site. Procedia coordinating and industry price. For each assumed by the
Engineering, 181 control, to Innovation- the factor separately, actors involved in
, 999-1004. observe the action or process a daily mark is the processed.
advantages and of innovating assigned, which
disadvantages Modern- relating is noted with 1 for
of the studied to the present or non-compliance
objective and to recent times as
O’Connor, J. T., This study Modularization: The scope of the What follows is a Ideas for additional
O’Brien, W. J., & wants to “the preconstruction research concerns summary of the future research into
Choi, J. O. examine the of a complete primarily the research modularization
(2014). Critical changes or system industrial findings. include the
Success Factors adaptation in away from the job subsector, 1. The top five CSFs following:
and Enablers for traditional site that is then including process indicate that project 1. Are there links
Optimum and project work transported to the and manufacturing teams should pay between
Maximum processes that site. The modules facilities such as particular attention to modularization
Industrial are required to are large in size offshore facilities, module envelope CSFs and
Modularization. create and possibly may petrochemical limitations, team modularization
Journal of an optimum need to be broken plants, power alignment on project extent and
Construction environment for down in to plants, and drivers, adequate performance?
Engineering and broader and pharmaceutical owner planning 2. What expanded
several smaller
Management, more effective plants, among resources or revised CSFs are
pieces for
140(6), use of others. and processes, timely needed to better suit
transport”
04014012. modularization. The researchers freeze of scoping and the
Module: “a major compiled a list of design, and due other sectors of the
section of a plant impediments to the recognition of possible industry, such as
resulting from a wider use of early completion from commercial building,
series of modularization. modularization. residential, or
remote assembly This was done 2. More industry effort infrastructure
operations and may through an open is needed to sectors? Are there
include portions of discussion of the accomplish the different barriers
many status of the Occasional, to modularization for