You are on page 1of 2

Republic of the Philippines

DEPARTMENT OF EDUCATION
Region I
SCHOOLS DIVISION OFFICE URDANETA CITY
ANONAS NATIONAL HIGH SCHOOL
Urdaneta City

WEEKLY HOME LEARNING PLAN


TECHNOLOGY LIVELIHOOD EDUCATION
ELECTRICAL INSTALLATION AND MAINTENANCE

Week 6 Quarter 1
November 8 - 12

Subjec Learning Learning Tasks Mode of Delivery


t Competency

TLE – 8 Interpret  Lets’s Review  Printed activity sheets given


E.I.M Technical Common Electrical to parents
Drawings Symbols
 Online class
 Task 1: Identify Me
Identify different  The parents will submit the
symbols and sign output in a scheduled date
and put in a designated drop
 Electrical Diagram box in school
 Pictorial Diagram
 Schematic Diagram
 Types of circuit
 Series Circuit
 Parallel Circuit

 Task 2: Let’s Draw


Draw schematic diagram

 What I have learned


What are the things the
electrical plan is indicating?

 Task 3: Analyze Me
Interpret electrical Plan

TLE – 9 Rigid Non-  Pre-test (Multiple choice)  Printed activity sheets given
EIM Metallic to parents
Conduit  Looking back to your
lesson  Online class
Reviewing the pass lesson

 Lay-out and install rigid  The parents will submit the


non-metallic conduit output in a scheduled date
Non-metallic conduits are and put in a designated drop
electrical materials which are box in school
manufactured to be resistant
to moisture and chemical
atmosphere.

 Installation of Non-
Metallic conduit PEC
Requirements

 Checking your
understanding
Read and understand each
statement

 Post – Test (Multiple


choice)

TLE – Lay-out and  Pre-test (Multiple choice)  Printed activity sheets given
10 EIM Install to parents
Intermediate  Looking back to your
Metallic lesson  Online class
Conduits Reviewing the pass lesson

 Activity 1  The parents will submit the


Cutting Intermediate output in a scheduled date
Metallic Conduit and put in a designated drop
box in school
 Job Sheet 1
Layout and Install
Intermediate Metallic
Conduits

 Work Sheet 1
Two bulbs controlled in two
locations using two three-
way switches

 Checking your
understanding

 Post – Test (Multiple


choice)

Prepared by: Checked by:

EARL CEDRICK C. JUATAN ESTER F. CACHO


Teacher I TLE Coordinator

Verified by: Noted by:

RODEL B. MADRIAGA REY C. VALDEZ


Head Teacher III Principal II

You might also like