Tebinbulak Complex

CONSTRUCTION OF MINING, MINERAL


PROCESSING AND METALLURGICAL COMPLEX IN
[Sub Contractor /Vendor’s
KARAUZYAK REGION LOGO]
Project name: Tebinbulak overall Project
Document name:
BASIC ENGINEERING DESIGN DATA
Subcontractor/Vendor
Doc. Number:
Date 19/04/2022
Document number: TBULAK-BD-EE-0000-GN-DBM-0001 Rev.: 02 Page 1 of 30

BASIC ENGINEERING DESIGN DATA

TEBINBULAK COMPLEX

CONSTRUCTION OF MINING, MINERAL


PROCESSING, AND METALLURGICAL
COMPLEX IN KARAUZYAK REGION

REV DATE PURPOSE OF ISSUE PREPARED CHECKED APPROVED


Habib Bolour/
02 19.04.2022 Issued for design Engineering Team Vladimir Ten
Kyle Park
Habib Bolour/
01 25.03.2022 Issued for design Nikolay Lugovskoy Ulugbek Sayidov
Kyle Park
Shakhzod Habib Bolour/
00 12.02.2022 Issued for review Ulugbek Sayidov
Mamasadikov Kyle Park
Shakhzod Habib Bolour/
0C 31.01.2022 Issued for Internal Circulation Ulugbek Sayidov
Mamasadikov Kyle Park
Tebinbulak Complex
CONSTRUCTION OF MINING, MINERAL
PROCESSING AND METALLURGICAL COMPLEX IN
[Sub Contractor /Vendor’s
KARAUZYAK REGION LOGO]
Project name: Tebinbulak overall Project
Document name:
BASIC ENGINEERING DESIGN DATA
Subcontractor/Vendor
Doc. Number:
Date 19/04/2022
Document number: TBULAK-BD-EE-0000-GN-DBM-0001 Rev.: 02 Page 2 of 30

Tabulation of Revised Page

Revisions Revisions
Sheet Sheet
00 01 02 03 04 05 00 01 02 03 04 05
1 41
2 42
3 43
4 X 44
5 X X 45
6 X 46
7 X X 47
8 X 48
9 X X X 49
10 X X 50
11 51
12 X 52
13 X 53
14 X X 54
15 X 55
16 56
17 X 57
18 58
19 59
20 60
21 61
22 62
23 X 63
24 64
25 X 65
26 X 66
27 X 67
28 68
29 69
30 70
31 71
32 72
33 73
34 74
35 75
36 76
37 77
38 78
39 79
40 80
Tebinbulak Complex
CONSTRUCTION OF MINING, MINERAL
PROCESSING AND METALLURGICAL COMPLEX IN
[Sub Contractor /Vendor’s
KARAUZYAK REGION LOGO]
Project name: Tebinbulak overall Project
Document name:
BASIC ENGINEERING DESIGN DATA
Subcontractor/Vendor
Doc. Number:
Date 19/04/2022
Document number: TBULAK-BD-EE-0000-GN-DBM-0001 Rev.: 02 Page 3 of 30

Table of Contents

1. General Site Data in Tebinbulak Area ....................................................................................... 4


1.1 Site Location ...................................................................................................................... 4
1.2 Operation Basis ................................................................................................................. 4
1.3 Meteorological Design Basis ............................................................................................ 5
1.4 Geotechnical Data ............................................................................................................. 9
1.5 General Site Co-ordinates and Levels .............................................................................. 9
1.6 Noise Level Limits ........................................................................................................... 10
1.7 Emission level limits........................................................................................................ 10
2. Utilities................................................................................................................................. 12
2.1 Water SYSTEMS............................................................................................................... 12
2.2 Electricity ......................................................................................................................... 15
2.3 Air and Nitrogen............................................................................................................... 16
2.4 Fuel Gas ........................................................................................................................... 17
3. System of Measurement ..................................................................................................... 18
4. Codes and Standard ........................................................................................................... 19
4.1 Piping ............................................................................................................................... 19
4.2 Furnaces........................................................................................................................... 21
4.3 Pressure Vessels and Tanks........................................................................................... 21
4.4 Mechanical Components and Machinery ....................................................................... 22
4.5 Rotary Equipment ............................................................................................................ 23
4.6 Heat Exchangers.............................................................................................................. 23
4.7 Instrumentation and Control ........................................................................................... 24
4.8 Electrical........................................................................................................................... 24
4.9 Safety Measures (Fire Fighting) ...................................................................................... 25
4.10 Pressure Safety Valves ................................................................................................... 25
4.11 Civil, Structural and Architectural .................................................................................. 25
5. ATTACHMENT 1: Preliminary site coordinat .................................................................... 29
6. ATTACHMENT 2: Geotechnical surveys report (HOLD) ................................................... 30
Tebinbulak Complex
CONSTRUCTION OF MINING, MINERAL
PROCESSING AND METALLURGICAL COMPLEX IN
[Sub Contractor /Vendor’s
KARAUZYAK REGION LOGO]
Project name: Tebinbulak overall Project
Document name:
BASIC ENGINEERING DESIGN DATA
Subcontractor/Vendor
Doc. Number:
Date 19/04/2022
Document number: TBULAK-BD-EE-0000-GN-DBM-0001 Rev.: 02 Page 4 of 30

1. General Site Data in Tebinbulak Area


1.1 Site Location

Please refer to Attachment (1) for preliminary site location and layout *.
The project is located in Tebinbulak deposit which is located approximately 740 km WNW of
Tashkent, Uzbekistan. The region is part of the central Asia and it is located at North-West
rumination of the Sultan Uvais mountains in the Karauzyak district. The nearest administrative
Centre is Nukus, which is the sixth largest city in Uzbekistan, it is located 75km west of Tebinbulak.

Note: * This layout is not finalized and has been attached just for information.

1.2 Operation Basis


Operating Basis
Hours/Day 24
Days/ Year 365
Shift Basis – Mine 3
Shift Basis – Process Plant 3
Process Plant Operating Time 8000 h/year
Tebinbulak Complex
CONSTRUCTION OF MINING, MINERAL
PROCESSING AND METALLURGICAL COMPLEX IN
[Sub Contractor /Vendor’s
KARAUZYAK REGION LOGO]
Project name: Tebinbulak overall Project
Document name:
BASIC ENGINEERING DESIGN DATA
Subcontractor/Vendor
Doc. Number:
Date 19/04/2022
Document number: TBULAK-BD-EE-0000-GN-DBM-0001 Rev.: 02 Page 5 of 30

1.3 Meteorological Design Basis

1.3.1 Temperature

Ambient Temperature
- Absolute Maximum Air Temperature : 45 °C
- Air temperature of hottest day with the probability of 0.98 : 37.3°C
- Minimum air temperature of coldest day with the
probability of 0,98 : -27°C
- Minimum air temperature of the coldest five days : -23°C
- Absolute minimum : -34°C

Maximum Design Temperature for structural stability, expansion etc.


- In shaded zone : +44°C
- Exposed to sun
(Maximum temperature of ground on open surface) : +68°C

Maximum Ambient Design Temperature (Dry bulb)


- Air cooled – Exchanger : 45°C
- Air Compressors : 40°C
- Cold Insulation : 44 °C (Hold)
- Other : 44 °C

Minimum Ambient Design Temperature (Dry bulb)


- Hot Insulation : -34 °C (Hold)
- Other : -24 °C 02

Design Wet Bulb Ambient Temperature


- Cooling Tower Design : 29 °C *
(* 29 °C @ max. temperature - 45°C & RH - 28%)

⮚ Note: maximum ambient design temperature (dry bulb) design wet bulb ambient
temperature data can be reviewed with engineering contractor upon request.
Tebinbulak Complex
CONSTRUCTION OF MINING, MINERAL
PROCESSING AND METALLURGICAL COMPLEX IN
[Sub Contractor /Vendor’s
KARAUZYAK REGION LOGO]
Project name: Tebinbulak overall Project
Document name:
BASIC ENGINEERING DESIGN DATA
Subcontractor/Vendor
Doc. Number:
Date 19/04/2022
Document number: TBULAK-BD-EE-0000-GN-DBM-0001 Rev.: 02 Page 6 of 30

1.3.2 Relative Humidity

- long term annual average RH in the area : 58%


- annual average RH maximum : 76-78% (@ January and
December)
- annual average RH minimum : 41-44% (@ June and July)
- average monthly RH of the hottest month : 28%
- average monthly RH of the coldest month : 65%

1.3.3 Barometric design pressure


- Average barometric pressure of the nearest meteorology station
- @ Nukus with elevation of 74 m above sea level : 101 000 Pa
- Considering site elevation at highest point @ 300.5 m | 20deg.C : 97 779 Pa

⮚ Note: The barometric design pressure should be calculated and verified by equipment
supplier/designer based on site elevation and temperature. Vendor should undertake the
responsibility of calculations.

1.3.4 Wind data


Winds are a characteristic feature of a desert climate. Winds are especially frequent in the
summer with the dominating direction being northeast and north. The average speed of
wind within a year is in the range of 3 - 5 m/s. Gusty winds with dust storms reach up to
34 m/s (average repeatability once in 25 years).
Max. Velocity of wind = 26 m/s (average repeatability once in 5 years)
Max. Velocity of wind = 29 m/s (average repeatability once in 10 years)
Max. Velocity of wind = 34 m/s (average repeatability once in 25 years)
Design wind speed pressure above 10m above surface is 380 Pa
Multiply by K =1.25 up to 20 meter
K =1.5 up to 40 meter
K =1.7 up to 60 meter
K =2.0 up to 100 meter
K =2.25 up to 150 meter
K =2.45 up to 200 meter
Tebinbulak Complex
CONSTRUCTION OF MINING, MINERAL
PROCESSING AND METALLURGICAL COMPLEX IN
[Sub Contractor /Vendor’s
KARAUZYAK REGION LOGO]
Project name: Tebinbulak overall Project
Document name:
BASIC ENGINEERING DESIGN DATA
Subcontractor/Vendor
Doc. Number:
Date 19/04/2022
Document number: TBULAK-BD-EE-0000-GN-DBM-0001 Rev.: 02 Page 7 of 30

Note: The above factors should be calculated and verified by appointed structural designer .
Prevailing wind direction : for summer North
for rest of the seasons: North-East as per below table

Values as per repeatability of wind

Annual
May

Aug

Nov
Sep

Dec
Mar
Feb

Jun
Jan

Apr

Oct
Jul
Month

average 4.2 4.8 4.9 5.6 5.4 5.2 4.9 4.6 3.6 3.5 4.4 4.5 4.5
Wind Speed(m/s)
*Repeat.% 34 33 27 28 28 32 36 36 32 30 34 37 31

Prevailing Wind Direction NE NE NE NE NE N N N NE NE NE NE NE

Registered maximum wind speed At Gust – 36 m/s

1.3.5 Rainfall
Average annual rainfall : 105 mm
Maximum quantity per day : 67 mm
Average rainfall days per annum : 69.2 days
02 Precipitation intensity (mm/min), duration (min), and frequency (year) curves.

02
Tebinbulak Complex
CONSTRUCTION OF MINING, MINERAL
PROCESSING AND METALLURGICAL COMPLEX IN
[Sub Contractor /Vendor’s
KARAUZYAK REGION LOGO]
Project name: Tebinbulak overall Project
Document name:
BASIC ENGINEERING DESIGN DATA
Subcontractor/Vendor
Doc. Number:
Date 19/04/2022
Document number: TBULAK-BD-EE-0000-GN-DBM-0001 Rev.: 02 Page 8 of 30

1.3.6 Snowfall

Min. Snow load for structures’ design : 1000 Pa


Maximum snow depth : 0.26 m

1.3.7 Frost

- Frost line depth @10 years : 1.17 m


- Frost line depth @ 50 years : 1.38 m
- Frost duration (below 0°C) : 90 days/yr

1.3.8 Lightning
- Lightning storm (thunderstorm) number hours with
02
thunderstorm per year : 10.5
02 - Lightning storm (thunderstorm) number days with
thunderstorm per year : 6.84
- Specific density thunderstorm in land (ground) : 1/(km2year)

1.3.9 Solar Radiation


Solar radiation (straight line/diffused) entering at July month on horizontal surface, W/m 2

Solar Radiation in July in straight line – 23.34 MJ\m2 per day


Solar Radiation in July in diffused – 5.49 MJ\m2 per day

Hours of the day a.m. (on solar time)


4-5 5-6 6-7 7-8 8-9 9-10 10-11 11-12
Solar radiation (straight line/diffused)
6/6 74/79 177/84 349/103 509/117 625/126 725/132 768/137
Hours of the day p.m.
19-20 18-19 17-18 16-17 15-16 14-15 13-14 12-13

1.3.10 Mean Visibility and Fog Days

- Average Fog Days per year : 21.16 days


- Average dust storm days per year : 27.5 days
Tebinbulak Complex
CONSTRUCTION OF MINING, MINERAL
PROCESSING AND METALLURGICAL COMPLEX IN
[Sub Contractor /Vendor’s
KARAUZYAK REGION LOGO]
Project name: Tebinbulak overall Project
Document name:
BASIC ENGINEERING DESIGN DATA
Subcontractor/Vendor
Doc. Number:
Date 19/04/2022
Document number: TBULAK-BD-EE-0000-GN-DBM-0001 Rev.: 02 Page 9 of 30

1.3.11 HVAC Data 02

General purpose Special rooms


(Electrical and Control buildings, UPS
Item buildings room)
Unmanned
Manned Rooms
Rooms
Winter design condition
Inside design temperature (°C) +22±2 +22±2 +5
Design RH (%)
50±10 50±10 (N.C.) 50±10 (N.C.)
(Precise RH control not needed)
Outside design temperature (°C) -24 -24 -24
Summer design condition
Inside design temperature (°C) 24±2 24±2 +35
Design RH (%) 50±10 50±10 (N.C.) 50±10 (N.C.)
Outside design temperature (°C) 40 40 40

Other Factors

- Winterization : Required
- Tropicalization : Required
- Dust storms : 27.5 days/year
Average continuance – 4 hours

1.4 Geotechnical Data

1.4.1 Soil conditions at Tebinbulak site


Site soil conditions are provided in the Attachment (2) after finalization of geotechnical
surveys (Hold).

1.4.2 Earthquake
Design seismic factor for Plant Site is 6 on the scale of MSK as per KMK. Repeatability
more than 1000 years. Precise data will be provided in next revision after finalization of
geotechnical surveys. (Hold)
1.5 General Site Co-ordinates and Levels

1.5.1 General site co-ordinates


General preliminary site coordinates are provided in the Attachment (1) (will be provided
later after finalization of master plan).
Tebinbulak Complex
CONSTRUCTION OF MINING, MINERAL
PROCESSING AND METALLURGICAL COMPLEX IN
[Sub Contractor /Vendor’s
KARAUZYAK REGION LOGO]
Project name: Tebinbulak overall Project
Document name:
BASIC ENGINEERING DESIGN DATA
Subcontractor/Vendor
Doc. Number:
Date 19/04/2022
Document number: TBULAK-BD-EE-0000-GN-DBM-0001 Rev.: 02 Page 10 of 30

1.5.2 Site Elevation

The absolute elevations at the investigate area varies in the range 248-300.5 m. There
is no Amu-Darya River flooding risk in the project area. There are no water courses and
water basins in the territory of the designed facility, and the latter falls outside the boundaries
of the water conservation and fishery conservation zones, as well as the protected shoreline
belt of the nearest one.

1.6 Noise Level Limits

The following noise pressure level limitations are applicable.

85 dB (A) from source at 1-meter distance.

1.7 Emission level limits (Hold)


Atmospheric air
In Tebinbulak complex, the maximum level of emissions shall be measured and should
not exceeds allowable amounts at the pollution source place. The below table indicates
these maximum permissible amounts.
Maximum permissible amount of pollutants (Hold for dispersion model outcomes)
02 No Pollutant Name Unit Maximum Permissible Limit
Dust at outlet Bag filters & ESPs (Electrostatic
1 mg/Nm3 50
Precipitator)
2 Dust at dust suppression units (water spray) mg/Nm3 240
3 Nitrogen oxides (NOx) mg/Nm3 700
4 Sulfur dioxides (SOx) mg/Nm3 200

All technological equipment and units shall be designed with environmental emissions in
compliance with the Law “On protection of atmospheric air” dtd. December 27, 1996, N 353-
I, according to which atmospheric air, as an integral part of natural resources, is national
wealth and protected by the state, as well as by other by laws.

In accordance with the normative act (DCM No. 14 of January 21, 2014 "On the procedure
for the development and approval of draft environmental standards") quotas for pollutants
emitted into the atmospheric air by enterprises of the Republic of Uzbekistan are indicated
in the table below:
Tebinbulak Complex
CONSTRUCTION OF MINING, MINERAL
PROCESSING AND METALLURGICAL COMPLEX IN
[Sub Contractor /Vendor’s
KARAUZYAK REGION LOGO]
Project name: Tebinbulak overall Project
Document name:
BASIC ENGINEERING DESIGN DATA
Subcontractor/Vendor
Doc. Number:
Date 19/04/2022
Document number: TBULAK-BD-EE-0000-GN-DBM-0001 Rev.: 02 Page 11 of 30

Quotas in MPC fractions depending on


Territories of the hazard class of emission
Republic of Uzbekistan
1st class 2nd class 3rd class 4th class
Republic of
0,25 0,33 0,5 1
Karakalpakstan

The MPC and hazard class of emitted substances is determined:


- by SanPiN RUz N 0293-11 dated May 16, 2011“Hygienic standards” in the atmospheric
air of populated areas;

- and by SanPiN 0294-11 dated May 8, 2011. “Hygienic standards. LIST of maximum
permissible concentrations (MPC) of harmful substances in the air of the work area” for
workspace area.

Below are excerpts MPC of some important pollutants. The given list is not limited the
requirements for emissions, and it is required to follow the complete list in accordance with
SanPiN RUz N 0293-11 and SanPiN 0294-11.

Ambient Air Standard for ground level concentration in settlements and work area.
Hazard MPC one-time for
No Units MPC for work area
class settlements
1 Nitrogen dioxide (NO2) 2 mg/m3 0,085 2
2 Nitrogen oxide (NO) 3 mg/m3 0,6 5
3 Sulfur dioxide (SO2) 3 mg/m3 0,5 10
4 Sulfuric acid vapor 2 mg/m3 0,3 1
5 Carbone oxide (CO) 4 mg/m3 5,0 20
6 Methane 4 mg/m3 50 7000
7 Hydrocarbons (in terms of C) 4 mg/m3 1,0 900 (300)
2 10
8 hydrogen sulfide (H2S) mg/m3 0,008
3 (mixed with hydrocarbons)
9 Carbon disulfide (CS2) 2 mg/m3 0,03 10
10 Fluorides 2 mg/m3 0,03 0,5
11 Hydrogen fluoride 2 mg/m3 0,02 0,5
12 Benzo(a)pyrene 1 mg/m3 0,000001 0,00015
13 Aldehydes 2 mg/m3 0,035 0,5
14 Iron oxide 3 mg/m3 0,2 6
15 Silicon oxide 2 mg/m3 0,02 3
16 Manganese oxide 2 mg/m3 0,005 0,3
17 Nickel oxide 2 mg/m3 0,005 0,05
18 Chromium oxide 1 mg/m3 0,0075 0,03
19 Abrasive dust 3 mg/m3 0,04 6
20 Bentonite dust 4 mg/m3 0,5 6
21 Lime dust 3 mg/m3 0,3 6
22 Rock dust 3 mg/m3 0,21 6
Tebinbulak Complex
CONSTRUCTION OF MINING, MINERAL
PROCESSING AND METALLURGICAL COMPLEX IN
[Sub Contractor /Vendor’s
KARAUZYAK REGION LOGO]
Project name: Tebinbulak overall Project
Document name:
BASIC ENGINEERING DESIGN DATA
Subcontractor/Vendor
Doc. Number:
Date 19/04/2022
Document number: TBULAK-BD-EE-0000-GN-DBM-0001 Rev.: 02 Page 12 of 30

23 Ore dust 3 mg/m3 0,21 4


24 Carbon soot 3 mg/m3 0,15 4

These indicators, taking into account the quota, should not exceed their values at the border
of the sanitary protection zone in case for settlements and in case for work area respectively.

Size of the sanitary protection zones in the Republic of Uzbekistan are defined by SanPiN
No. 0350-17 dated 10.25.17. "Sanitary norms and rules for the air protection in populated
areas of the Republic of Uzbekistan".

In addition, the vendor undertakes:


- to provide a safety ecological certificate, where will be defined permissible levels of
emissions from technological units and equipment into the environment based on Europe
ecology standards or similar standard and according with best available technology.
- ensuring the using for production facilities of dust and gas trapping installations at
stationary sources of atmospheric air pollution with an efficiency of at least 99.5%.

2. Utilities
2.1 Water SYSTEMS

2.1.1 Raw Water


The raw water is supplied from Amudarya river. The raw water will have the following specification.

⮚ It should be noted that these specifications have been measured at October 2021. Further
investigations would be required during the engineering of water treatment plant.

Item STD as per O’z Dst 950:2011.


Parameter (requirement) description UoM O’z Dst GOST
No. Standard Actual
1 Hydrogen ion exponent pH PН 6.0-9.0 7.72 0556:2012
2 Water temperature С° 20 3351
3 Color Transparent 3351
4 Flavour Light-salted 3351
5 Odor None 3351
6 Turbidity NTU 13.4 3351
7 Conductivity mS/cm 2.11 3351
8 TDS (Total Dissolved Solids), max. mg/dm3 1000 1370 0495:2010
9 Suspended substances mg/dm3 1.5 150.0 0696:2015
10 Dry residue mg/dm3 1000 1456 0495:2010
Tebinbulak Complex
CONSTRUCTION OF MINING, MINERAL
PROCESSING AND METALLURGICAL COMPLEX IN
[Sub Contractor /Vendor’s
KARAUZYAK REGION LOGO]
Project name: Tebinbulak overall Project
Document name:
BASIC ENGINEERING DESIGN DATA
Subcontractor/Vendor
Doc. Number:
Date 19/04/2022
Document number: TBULAK-BD-EE-0000-GN-DBM-0001 Rev.: 02 Page 13 of 30

11 Alkalinity 3.20 31957-2012


3
12 Nitrite-ions, max. mg/dm 50.0 31.0 0705:2016
13 Nitrite-ions mg/dm3 2.0 0.05 0265:2005
14 Bicarbonate-ion mg/dm3 195 31957-2012
15 Carbonate-ion mg/dm3 No 31957-2012
16 Sulfate-ions, max. (SO4) mg/dm3 400-500 502 0562:2012
17 Chloride-ions, max. mg/dm3 250-350 312 0418:2009
18 Calcium-ions mg/dm3 112 0597:2013
19 Magnesium-ions mg/dm3 90 0611:2013
20 Sodium + potassium-ions mg/dm3 229
21 Ammonium-ion mg/dm3 <0.01 0682:2015
22 Total hardness, max mg e/dm3 7.0-10.0 13.0 0591:2013
23 Carbonate (alkalinity) mg e/dm3 3.20 0591:2013
24 Non-carbonate mg e/dm3 9.80 0591:2013
25 Carbon dioxide (СО2); mg/dm3 9.0 23268
26 Dissolved oxygen mg/dm3 19.92
27 Phosphate mg/dm3 3.5 <0.01 18309-72
28 Fluorine mg/dm3 0.7 <0.05 4386

2.1.2 Potable water


Parameter Units Specification
pH at 25 oC 7.5 ~ 8.5
Free Res. Chlorine mg/l 0.5 ~ 1.0
Conductivity at 25 oC μS/cm 30 ~ 160
Total dissolved Solid (TDS) mg/l 50 ~ 170 02
Calcium Mg. equivalent/l
Chloride mg/l <40
Sulfate mg/l <40
Alkalinity Mg. equivalent/l 40
Iron mg/l <0.3
Clarity mg/l
Oxidability mg/l
Total hardness Mg. equivalent/l 40
- Constant Hardness Mg. equivalent/l 40
- Carbonate Hardness Mg. equivalent/l 20 ~ 40
Total copper mg/l Nil
Tebinbulak Complex
CONSTRUCTION OF MINING, MINERAL
PROCESSING AND METALLURGICAL COMPLEX IN
[Sub Contractor /Vendor’s
KARAUZYAK REGION LOGO]
Project name: Tebinbulak overall Project
Document name:
BASIC ENGINEERING DESIGN DATA
Subcontractor/Vendor
Doc. Number:
Date 19/04/2022
Document number: TBULAK-BD-EE-0000-GN-DBM-0001 Rev.: 02 Page 14 of 30

Sodium (as Na) mg/l 60


Silica mg/l <1.0
Coliform degree Nil
Magnesium Mg. equivalent/l Nil
Nitrate mg/l Nil
Nitrites mg/l <0.1
Overall saline mg/l
Tebinbulak Complex
CONSTRUCTION OF MINING, MINERAL
PROCESSING AND METALLURGICAL COMPLEX IN
[Sub Contractor /Vendor’s
KARAUZYAK REGION LOGO]
Project name: Tebinbulak overall Project
Document name:
BASIC ENGINEERING DESIGN DATA
Subcontractor/Vendor
Doc. Number:
Date 19/04/2022
Document number: TBULAK-BD-EE-0000-GN-DBM-0001 Rev.: 02 Page 15 of 30

2.2 Electricity

VOLTAGE
OF VOLTAGE FREQUENCY
SERVICE EQUIPMENT OF SYSTEM PHASE
(V) (Hz)
(V)

02 Power Supply Plant Incoming 35000 35000 3 50

FROM UPTO

Under
MOTORS 380/220 400/230 3/1 50
0.37kw*

0.37kw 150kw 380 400 3 50

151kw 5000kw 6000 6300 3 50

Over 5000kw**** 6000/10000 6300/10000

MOV’s All Power 380 400 3 50

Indoor 220 230 1 50


LIGHTING
Outdoor 380/220 400/230 3/1 50

Field Instruments &


24 VDC *** 24 VDC - -
INSTRUMENTATION Control Voltage

AC UPS 380/220 400/230 3/1 50


02
IPS 380/220 400/230 3/1 50

SAFETY LIGHTING (DC) 110 120 - -

MCC/HVAC CONTROL POWER (DC) 220/110 ** 230/120 - -


02

SWITCHGEAR CONTROL POWER (DC) 220/110 ** 230/120 - -

SINGLE SOCKETS 220 230 1 50

WELDING OUTLET 380 400 3 50

SPACE HEATER (>3KW) 380 400 3 50

SPACE HEATER (≤ 3KW) 220 230 1 50

Notes : * Power supply of motors for process areas and other facilities shall be 400V, 3ph, 50Hz
Tebinbulak Complex
CONSTRUCTION OF MINING, MINERAL
PROCESSING AND METALLURGICAL COMPLEX IN
[Sub Contractor /Vendor’s
KARAUZYAK REGION LOGO]
Project name: Tebinbulak overall Project
Document name:
BASIC ENGINEERING DESIGN DATA
Subcontractor/Vendor
Doc. Number:
Date 19/04/2022
Document number: TBULAK-BD-EE-0000-GN-DBM-0001 Rev.: 02 Page 16 of 30

** Where it is not practical to supply a load at 110 V D.C. due to voltage drop or thermal
constraints, 220 V D.C. shall be used.
*** In some particular cases, 220 VAC can be used based on vendor recommendation and
technical specification of instruments.
**** In some particular cases, 10 KV motors can be used based on vendor recommendation and
technical specification of electrical motor.

2.3 Air and Nitrogen


2.3.1 Nitrogen

Parameter Unit Specification


Nitrogen purity vol % 99.9 min
Temperature Deg. C 25
Pressure Bar g 10

Note: Nitrogen must be oil free


Dew point (at atmospheric pressure): ≤ - Later (Hold) oC

2.3.2 Oxygen

Parameter Unit Specification


Oxygen purity Vol % 99.5
Temperature Deg. C 25
Pressure Bar g 8

2.3.3 Instrument Air

● Clean and Oil free based on ISO 8573-1 Class 2 or Equivalent based on other standards
● Dew Point : - 40°C at dryer outlet pressure
● Pressure : 7 ~ 8 barg (at the outlet of dryer package)

2.3.4 Plant Air


● Clean and Oil free
● Pressure : 7 ~ 8 barg
Tebinbulak Complex
CONSTRUCTION OF MINING, MINERAL
PROCESSING AND METALLURGICAL COMPLEX IN
[Sub Contractor /Vendor’s
KARAUZYAK REGION LOGO]
Project name: Tebinbulak overall Project
Document name:
BASIC ENGINEERING DESIGN DATA
Subcontractor/Vendor
Doc. Number:
Date 19/04/2022
Document number: TBULAK-BD-EE-0000-GN-DBM-0001 Rev.: 02 Page 17 of 30

2.4 Fuel Gas


Natural gas physical properties:

№ @2020 Year \ items Average


1 Index Wobbe (kcal\nm3) 10578.25
2 Calorific value (lower point) - (kcal\nm3) 8195
3 Calorific value (highes point) - (kcal\nm3) 9081.667
4 Measured Temperature (deg.C) 12
5 Relative density @ 20 deg.C 0.59925
6 Gas density kg\m3 @ 20 deg.C & 760 mm. merсury) 0.722

Natural gas composition:

№ item Average
1 N2 1,66
2 CO2 0,704167
3 CH4 93,2445
4 C2H6 3,039167
5 C3H8 0,906667
6 C4H10 0,161167
7 iC4H10 0,149333
7 C5H22 0,03575
8 iC5H22 0,05275
9 C6H14 0,041917
10 C6+ Not Identified
11 O2 0,003
12 Molecular mass - (g\mol) 17,33017
13 H2S (mg\m3) Not Identified
14 Mercaptan sulphur - (mg\m ) 3
Not Identified

item December January May June


moisture dew point (deg.C) -15.1 -12.2 -14.4 -15.2
hydrocarbon dew point (deg.C) -13.2 - 9.2 -14.5 -15.8
sampled @ pressure 26 13.2 22.7 21.4
sampled @ temperature 11 6 15 15
Tebinbulak Complex
CONSTRUCTION OF MINING, MINERAL
PROCESSING AND METALLURGICAL COMPLEX IN
[Sub Contractor /Vendor’s
KARAUZYAK REGION LOGO]
Project name: Tebinbulak overall Project
Document name:
BASIC ENGINEERING DESIGN DATA
Subcontractor/Vendor
Doc. Number:
Date 19/04/2022
Document number: TBULAK-BD-EE-0000-GN-DBM-0001 Rev.: 02 Page 18 of 30

Pressure at tie in point (after reducing station) – 6 bar


● Since the NG is taken from central magistral pipeline, the temperature of the NG (in current
stage) is provided in the range as below:

Months Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

Deg. C 6 7 7 11 15 15 16 16 15 14 13 11

3. System of Measurement
● The SI system will be used with the following units:
● Temperature : degree Celsius °C
● Pressure : kPa , bar
● Weight : kilogram (kg), gram(g) or metric tonne (ton)
● Length : Meter, centimeter, millimeter (1)
● Power : Kilowatt
● Heat : kcal
● Viscosity : Centipoises
● Flow : Nm3/hr, m3/hr or kg/hr
● Electric current: Ampere
● Conductivity : μS/cm
● Density : kg/m3
02
● Level : Meter, centimeter, millimeter, %
02 ● Electric voltage : Volt

02
● Energy : Joule
(1) for pipes, usual diameter are in inches, and thickness in schedule or BWG.
Tebinbulak Complex
CONSTRUCTION OF MINING, MINERAL
PROCESSING AND METALLURGICAL COMPLEX IN
[Sub Contractor /Vendor’s
KARAUZYAK REGION LOGO]
Project name: Tebinbulak overall Project
Document name:
BASIC ENGINEERING DESIGN DATA
Subcontractor/Vendor
Doc. Number:
Date 19/04/2022
Document number: TBULAK-BD-EE-0000-GN-DBM-0001 Rev.: 02 Page 19 of 30

4. Codes and Standard

The latest editions of all codes and standards listed below are applicable unless there is no specific
requirement or local regulation. In terms of any conflict, vendors, contractors and manufacturer should
raise the matter with client in TQ (Technical Query) format. Other design codes and standard can be
implemented upon client/owner approval.

Codes and standard organizations


AISI American Iron and Steel Institute
ANSI American National Standards Institute
API American Petroleum Institute
ASME American Society of Mechanical Engineers
ASNT American Society for Non-destructive Testing
ASTM American Society for Testing Materials
AWS American Welding Society
BS British Standards
DIN Deutsches Institut für Normung (German Institute for Standardization)
EN European Standards
ISO International Standards Organization
NACE National Association of Corrosion Engineers
NEMA National Electrical Manufacturers Association
NFPA National Fire Protection Association
MSS Manufacture Standardization Society
PFI Pipe Fabrication Institute
UL Underwriters Laboratories
WRC Welding Research Counc
ABMA American Bearing Manufacturers Association
AGMA American Gear Manufacturers Association
AWS American Welding Society
BOD Basics of Design
BS British Standards
CEMA Conveyor Equipment Manufacturer's Association
CMAA Crane Manufacturer's Association of America
FEM European Materials Handling Federation
HEI Heat Exchange Institute
AWWA America Water Works Associations
ASHRAE America society of Heating, Refrigerating and Air conditioning Engineers

4.1 Piping
The current editions of the following international codes, standards, and specifications are
referenced as a part of these criteria.
Tebinbulak Complex
CONSTRUCTION OF MINING, MINERAL
PROCESSING AND METALLURGICAL COMPLEX IN
[Sub Contractor /Vendor’s
KARAUZYAK REGION LOGO]
Project name: Tebinbulak overall Project
Document name:
BASIC ENGINEERING DESIGN DATA
Subcontractor/Vendor
Doc. Number:
Date 19/04/2022
Document number: TBULAK-BD-EE-0000-GN-DBM-0001 Rev.: 02 Page 20 of 30

Code/Standard Description
ASME 16.5 Pipe Flanges and Flanged Fittings
ASME B16.9 Carbon Steel Butt-Weld Fittings
ASME B16.10 Face to face and end to end dimensions of valves
ASME B16.11 Forged fittings, socket welding and threaded
ASME B16.20 Metallic gaskets for pipe flanges
ASME B16.21 Non-metallic flat gaskets for pipe flanges
ASME B16.25 Buttwelding Ends
ASME B16.34 Valves – Flanged, threaded and welding end
ASME B16.36 Orifice Flanges
ASME B16.47 Large Diameter Steel Flanges
ASME B16.5 Pipe Flanges and Flanged Fittings (1/2” To 24”)
ASME B16.9 Wrought Buttwelding Fittings
ASME B16.48 Steel line blanks
ASME B18.22M Metric Plain Washers
ASME B31.3 Process Piping
ASME B31.4 Pipeline Transportation Systems for Liquids and Slurries
ASME B36.10 Welded and Seamless Wrought Steel Pipe
ASME B36.19 Stainless Steel Pipe
ASME BPV Code ASME Boiler Pressure Vessel Code
ASTM A105 Specification for Forgings, Carbon Steel, for Piping Components
ASTM A234 Piping Fittings of Wrought Carbon Steel and Alloy Steel for Moderate
and Elevated Temperatures
ASTM D3035 Specification for Polyethylene Plastic Pipe Based on Controlled
Outside Diameter
ASTM D3261 Specification for Polyethylene (PE) Plastic Pipe
API 5L Line Pipe
API 598 Valve Inspection and Testing
API 610 Centrifugal Pumps for Petroleum, Petrochemical and Natural Gas
Industries
API 620 Design and Construction of Large, Welded, Low Pressure Storage
Tanks
API 650 Welded Steel Tanks for Oil Storage
API 661 Air cooled Heat Exchangers
BS 5500 Specification for unfired pressure vessels
BS 13480 Metallic Industrial Piping
DIN 16963 Pipe joint assemblies and fittings for high-density polyethylene (PE-
HD) pressure pipes; adaptors for fusion jointing, flanges and sealing
elements; dimensions
DIN 8074 Polyethylene (PE) - Pipes PE 80, PE 100 - Dimensions
ISO 4427 Plastics piping systems for water supply, and for drainage and
sewerage under pressure — Polyethylene (PE)
MSS SP-43 Wrought stainless steel butt-welding fittings
Tebinbulak Complex
CONSTRUCTION OF MINING, MINERAL
PROCESSING AND METALLURGICAL COMPLEX IN
[Sub Contractor /Vendor’s
KARAUZYAK REGION LOGO]
Project name: Tebinbulak overall Project
Document name:
BASIC ENGINEERING DESIGN DATA
Subcontractor/Vendor
Doc. Number:
Date 19/04/2022
Document number: TBULAK-BD-EE-0000-GN-DBM-0001 Rev.: 02 Page 21 of 30

Code/Standard Description
MSS SP-44 Steel pipeline flanges
MSS SP-71 Cast iron swing check valves, flanged and threaded ends
MSS SP-80 Bronze gate, globe and check valves
MSS SP-83 Carbon steel pipe unions – socket welding and threaded ends
MSS SP-95 Swaged nipples and bull plugs
MSS SP-97 Integrally reinforced forged branch outlet fittings – socket welding,
threaded and butt welding ends
NEMA SM-23 Steam Turbines for Mechanical Drive Service
WRC 107 Local Stresses In Spherical And Cylindrical Shells Due To External
Loadings
WRC 297 Local stresses in cylindrical shells due to external loading on nozzles
WRC 429 3D stress criteria guidelines for application

4.2 Furnaces

Item Description
ASTM C177 Standard Test Method fort Steady State Heat Flux Measurements and Thermal
Transmission----Apparatus
ASTM C892 High Temperature Fiber Blanket Thermal Insulation
ASTM C27 Standard Classification of Fire Cray and High Alumina Refractory Brick
ASTM C155 Standard Classification of Insulation Firebrick
ASTM C332 Standard Specification for Light Weight Aggregate for Insulating Concrete
ASTM Sec. I
API 530 Calculation of Heater Tube Thickness in Refinery Services
API 560 Fire Heater
ASTM C401 Standard Classification of Alumina and Alumina- Silicate Castable Refractories
ASTM C612 Standard Specification for Mineral Fiber Block and Board Thermal

4.3 Pressure Vessels and Tanks

Item Description
ASME Boiler and PRESSURE Vessel Code Section Pressure Vessels
VIII,Div.1
ASME Boiler and PRESSURE Vessel Code Section Pressure Vessels, Alternative Rules
VIII,Div.2
ASME Boiler and PRESSURE Vessel Code Section Material Specifications
II Part A-D
ASME Boiler and PRESSURE Vessel Code Section Nondestructive Examination
V
ASME Boiler and PRESSURE Vessel Code Section Welding and Brazing Qualifications
Tebinbulak Complex
CONSTRUCTION OF MINING, MINERAL
PROCESSING AND METALLURGICAL COMPLEX IN
[Sub Contractor /Vendor’s
KARAUZYAK REGION LOGO]
Project name: Tebinbulak overall Project
Document name:
BASIC ENGINEERING DESIGN DATA
Subcontractor/Vendor
Doc. Number:
Date 19/04/2022
Document number: TBULAK-BD-EE-0000-GN-DBM-0001 Rev.: 02 Page 22 of 30

Item Description
IX
W.R.C. Bulletin 107 Local Stresses calculation in Spherical and
Cylindrical Shells due to External Loading
W.R.C. Bulletin 297 Local Stresses calculation in Spherical and
Cylindrical Shells due to External Loading
Uniform Building Code (U.B.C.) Vol.2 Calculation of wind loads and earthquake
loads
API 620 Low Pressure Storage Tanks
API 941 Steels for Hydrogen Service at Elevated
Temperature and Pressure
API 650 Atmospheric Storage Tanks

4.4 Mechanical Components and Machinery

Item Description
AGMA 2000-A88 Gear Classification and Inspection Handbook - Tolerances and Measuring
Methods for Unassembled Spur and Helical Gears (including Metric Equivalents)
AGMA 2001-C95 Fundamental Rating Factors and Calculation Methods for Involute Spur and
Helical Gear Teeth
AGMA 6013 Standard for Industrial Enclosed Drives
AGMA 6113-B16 Standard for Spur, Helical, Herringbone and Bevel Enclosed Drives Standard for
Industrial Enclosed Gear Drives METRIC
AGMA 6114-B15 Gear Power Rating for Cylindrical Shell and Trunnion Supported Equipment
METRIC
AGMA 6135-A02 Design, Rating and Application of Industrial Global Worm Gearing METRIC
ASME B73.1 Specifications for End Suction Centrifugal Pumps
ASTM A36M Standard Specification for Carbon Structural Steel
ASTM A193M Specification for Stainless steel bolts
ASTM A563M Standard Specification for carbon and Alloy Steel Nuts
ASTM A565M Specification for Stainless Steel bars for high temperature service
ASTM F436M Specification for hardened steel washers
AWS D1.1 Structural welding code - Steel
CMAA 70 Crane Manufacturers Association of America, Specification for Electric
Overhead Traveling Cranes
ISO 281 Rolling Bearings – Dynamic Loading Ratings and Rating Life
ISO 1000 The international system of units (SI) and its application
ISO 1422-1 Safety of machinery – permanent means of access to machinery – choices of
fixed means and general requirements of access.
ISO 1422-2 Safety of machinery – permanent means of access to machinery – working
platforms and walkways.
ISO 1422-3 Safety of machinery – permanent means of access to machinery – stairways,
stepladders and guard-rails.
ISO 1422-4 Safety of machinery – permanent means of access to machinery – fixed ladders.
Tebinbulak Complex
CONSTRUCTION OF MINING, MINERAL
PROCESSING AND METALLURGICAL COMPLEX IN
[Sub Contractor /Vendor’s
KARAUZYAK REGION LOGO]
Project name: Tebinbulak overall Project
Document name:
BASIC ENGINEERING DESIGN DATA
Subcontractor/Vendor
Doc. Number:
Date 19/04/2022
Document number: TBULAK-BD-EE-0000-GN-DBM-0001 Rev.: 02 Page 23 of 30

ISO 1977 Conveyor chains, attachment, and sprockets


ISO 4184 Belt Drives - Classical and narrow V-belts
ISO 8573-1 Compressed air - Part 1: Contaminants and purity classes

4.5 Rotary Equipment

Item Description
ASME B 73.1 Horizontal end-suction centrifugal pumps
API 610 Centrifugal Pumps for General Refinery Services
API 617 Centrifugal Compressors for General Refinery Services
API 618 Reciprocating Compressors for petroleum, chemical and Gas Industry Service,
4th Edition
API 619 Rotary Compressors
API 612 Special-Purpose Steam Turbines for Refinery Services (Compressor Drivers)
API 611 General-Purpose Steam Turbines for Refinery Services (Pump Drivers)
API 613 Special-Purpose Gear Box for Petroleum, Chemical and Gas Industry Service
API 614 Lubrication, Shaft-sealing, and Control Oil System for Special Purpose
Applications
API 670 Non-contacting Vibration and Axial Position Monitoring Systems
API 671 Special-Purpose couplings for petroleum, chemical and Gas Industry Service,
3rd Edition
API 673 Centrifugal Fans
API 674 Positive Displacement Pumps – Reciprocating
API 675 Positive Displacement Pumps – Controlled Volume
API 676 Positive Displacement Pumps – Rotary
API 682 Pump-Shaft Sealing System for Centrifugal and Rotary Pumps
API 686 Recommended Practices For Machinery and Installation Design
ISO 2858 End-suction and top discharge centrifugal pumps
NACE MR 0175 Sulfide Stress Cracking Resistant Metallic Materials for Oilfield Equipment
ASME PTC 10 Performance Test Code For Compressors and Exhausters
AMCA PUBLICATION Centrifugal Fans
201

4.6 Heat Exchangers

Item Description
API 661 Air Cooled Exchanger
TEMA Tubular Exchanger Manufacturers Association
HEI 2629 Heat Surface Condensers) Exchanger Institute (Standard for Steam
Tebinbulak Complex
CONSTRUCTION OF MINING, MINERAL
PROCESSING AND METALLURGICAL COMPLEX IN
[Sub Contractor /Vendor’s
KARAUZYAK REGION LOGO]
Project name: Tebinbulak overall Project
Document name:
BASIC ENGINEERING DESIGN DATA
Subcontractor/Vendor
Doc. Number:
Date 19/04/2022
Document number: TBULAK-BD-EE-0000-GN-DBM-0001 Rev.: 02 Page 24 of 30

4.7 Instrumentation and Control

Item Description 02
ISA Instrumentation and Automation systems and facilities
IEC International Electrical and Instrumentation 02
ISO 5167-1 Measurements of fluid flow by means of orifice plates, nozzles and
venturi tubes inserted in circular cross-section conduits running full
IEC Pub.60584-1,60584-2 & Thermocouples
60584-3
IEC Pub.60571 & Amd 1&2 Industrial Platinum Resistance Sensors
IEC 60529 Degrees of protecting provided by enclosures (IP code)
IEC 60079-0 Electrical apparatus for explosive gas atmosphere :Part 0, General
requirements
IEC 60079-10 Electrical apparatus for explosive gas atmosphere: Part 10,
Classification of hazardous areas
IEC 60534-1 & 60534-2 Sizing of control valves
IEC 60534-8-3 Section three – Control valves aerodynamic noise prediction method
IEC 60534-3-1 & IEC 60534- Part3: Dimensions, Section one –Face-to face dimensions for
3-2 flanged, two-way, globe type control valves
Section two- Face-to-face dimensions for flangeless control valves
except wafer butterfly
IEC 61285 Industrial-process control –Safety of analyzer house
IEC/TR 60079-16 Electrical apparatus for explosive gas atmosphere: Part 16, Artificial
ventilation for the protection of analyzer(s) houses
ANSI/FCI 70-2-1976 American national standards for control valve seat leakage 02
IEC 60364 Instrument Earthing
IEC 60079.11 Instrument Earthing for IS signals 02

4.8 Electrical

Item Description

API RP 505 Recommended Practice for Classification for Electrical Installations


Tebinbulak Complex
CONSTRUCTION OF MINING, MINERAL
PROCESSING AND METALLURGICAL COMPLEX IN
[Sub Contractor /Vendor’s
KARAUZYAK REGION LOGO]
Project name: Tebinbulak overall Project
Document name:
BASIC ENGINEERING DESIGN DATA
Subcontractor/Vendor
Doc. Number:
Date 19/04/2022
Document number: TBULAK-BD-EE-0000-GN-DBM-0001 Rev.: 02 Page 25 of 30

at Petroleum Facilities Classified as Class 1, Zone 0, Zone 1, and


Zone 2
IEC 60034 Rotating Machines
IEC 60364 Electrical Installations of Buildings
IEC 60079 Electrical Apparatus for Explosive Gas Atmospheres
NFPA 780 Standard for Installation of Lightning Protection System
IEEE Institute of Electrical and Electronics Engineers
NEMA National Electric Manufacturers Association

4.9 Safety Measures (Fire Fighting)

Item Description
NFPA 10 Standard for Portable Fire Extinguishers
NFPA 11 Standard for Low-Expansion Foam
NFPA 13 Standard for the Installation of Sprinkler Systems
NFPA 14 Standard for Installation of Standpipe and Hose Systems
NFPA 15 Standard for Water Spray Fixed Systems for Fire Protection
NFPA 20 Standard for the Installation of Stationary Pumps for Fire Protection
NFPA 24 Standard for the Private Fire Service Mains and Their
Appurtenances
NFPA 30 Flammable and Combustible Liquids Codes
NFPA 231 General Storage
NFPA 2001 Standard on Clean Agent Fire Extinguishing Systems
API 2001 Fire Protection in Refineries
API 2030 Application of Fixed Water Spray Systems for Fire Protection in the
Petroleum Industry
API 2218 Fire Proofing Practices in Petroleum and Petrochemical Processing
Plants
API 2510 Design and Construction of LPG Installations

4.10 Pressure Safety Valves

Item Description
API RP 520 &521 PSV for Vessels
API 2000 PSV for Storage Tanks

4.11 Civil, Structural and Architectural

Item Description
ACI 318M Building Code Requirements for Structural Concrete and Commentary
AASHTO 1993 Guide for Design of Pavement Structures
Tebinbulak Complex
CONSTRUCTION OF MINING, MINERAL
PROCESSING AND METALLURGICAL COMPLEX IN
[Sub Contractor /Vendor’s
KARAUZYAK REGION LOGO]
Project name: Tebinbulak overall Project
Document name:
BASIC ENGINEERING DESIGN DATA
Subcontractor/Vendor
Doc. Number:
Date 19/04/2022
Document number: TBULAK-BD-EE-0000-GN-DBM-0001 Rev.: 02 Page 26 of 30

ASTM American Society for Testing and Materials


UBC 97 Uniform Building Code
ASCE 7-05 Minimum Design Loads for Buildings and Other Structures
AISC 9 American Institute of Steel Construction
EN 1990 Eurocode 0: Basis of structural design
EN 1991 Eurocode 1: Actions on structures
EN 1991-1-1 Part 1-1 Densities self-weight imposed loads for buildings
EN 1991-1-2 Part 1-2 Actions on structures exposed to fire
EN 1991-1-3 Part 1-3 General actions - Snow loads
EN 1991-1-4 Part 1-4 General actions - Wind actions
EN 1991-1-5 Part 1-5 General actions - Thermal actions
EN 1991-1-6 Part 1-6 General actions - Actions during execution
EN 1991-1-7 Part 1-7 General actions - Accidental Actions
EN 1991-2 Part 2 Traffic loads on bridges
EN 1991-3 Part 3 Actions induced by cranes and machinery
EN 1991-4 Part 4 Silos and tanks
EN 1992 Eurocode 2: Design of concrete structures
EN 1992-1-1 Part 1-1 General rules and rules for buildings
EN 1992-1-2 Part 1-2 Structural fire design
EN 1992-1-3 Part 1-3 Precast concrete elements and structures
EN 1992-1-4 Part 1-4 Lightweight aggregate concrete with closed structure
EN 1992-1-5 Part 1-5 Structures with unbonded and external prestressing tendons
EN 1992-1-6 Part 1-6 Plain concrete structures
EN 1992-2 Part 2 Reinforced and prestressed concrete bridges
EN 1992-3 Part 3 Liquid retaining and containing structures
EN 1992-4 Part 4 Design of fastenings for use in concrete
EN 1993 Eurocode 3: Design of steel structures
EN 1993-1-1 Part 1-1 General rules and rules for buildings
EN 1993-1-2 Part 1-2 General rules - Structural fire design
EN 1993-1-3 Part 1-3 General rules - Supplementary rules for cold-formed members and sheeting
EN 1993-1-4 Part 1-4 General rules - Supplementary rules for stainless steels
EN 1993-1-5 Part 1-5 Plated structural elements
EN 1993-1-6 Part 1-6 Strength and Stability of Shell Structures
EN 1993-1-7 Part 1-7 General Rules - Supplementary rules for planar plated structural elements with out of plane
loading
EN 1993-1-8 Part 1-8 Design of joints
EN 1993-1-9 Part 1-9 Fatigue
EN 1993-1-10 Part 1-10 Material Toughness and through-thickness properties
EN 1993-1-11 Part 1-11 Design of Structures with tension components
EN 1993-1-12 Part 1-12 High Strength steels
EN 1993-2 Part 2 Steel Bridges
EN 1993-3-1 Part 3-1 Towers- masts and chimneys
EN 1993-3-2 Part 3-2 Towers-masts and chimneys - Chimneys
EN 1993-4-1 Part 4-1 Silos
EN 1993-4-2 Part 4-2 Tanks
Tebinbulak Complex
CONSTRUCTION OF MINING, MINERAL
PROCESSING AND METALLURGICAL COMPLEX IN
[Sub Contractor /Vendor’s
KARAUZYAK REGION LOGO]
Project name: Tebinbulak overall Project
Document name:
BASIC ENGINEERING DESIGN DATA
Subcontractor/Vendor
Doc. Number:
Date 19/04/2022
Document number: TBULAK-BD-EE-0000-GN-DBM-0001 Rev.: 02 Page 27 of 30

EN 1993-4-3 Part 4-3 Pipelines


EN 1993-5 Part 5 Piling
EN 1993-6 Part 6 Crane supporting structures
EN 1994 Eurocode 4: Design of composite steel and concrete structures
EN 1994-1-1 Part 1-1 General rules and rules for buildings
EN 1994-1-2 Part 1-2 Structural fire design
EN 1994-2 Part 2 General rules and rules for bridges
EN 1997 Eurocode 7: Geotechnical design
EN 1997-1 Part 1 General rules
EN 1997-2 Part 2 Ground investigation and testing
EN 1997-3 Part 3 Design assisted by field testing
EN 1998 Eurocode 8: Design of structures for earthquake resistance
EN 1998-1 Part 1 General rules- seismic actions and rules for buildings
EN 1998-2 Part 2 Bridges
EN 1998-3 Part 3 Assessment and retrofitting of buildings
EN 1998-4 Part 4 Silos- tanks and pipelines
EN 1998-5 Part 5 Foundations- retaining structures and geotechnical aspects
EN 1998-6 Part 6 Towers, masts and chimneys
Russian Steels Standards (Hot rolled Sections, profiles and plates)
GOST 57837-17 Beams and Columns
GOST 8240-97 Channels
GOST 8509-93 Equal angles
GOST 8510-86 Un-equal angles
GOST 32931-15 Hollow sections
GOST B2-70 Plates
GOST 27772-88 Rolled products for structural steel constructions. General specifications
GOST 14637-89 Rolled plate from carbon steel of general quality. Specifications
GOST 535-2005 Common quality carbon steel bar and shaped sections. General specifications
GOST 19281-2014 High strength rolled steel. General specification
GOST 16523-97 Rolled sheets from quality and ordinary carbon steel for general purposes. Specifications
GOST 17066-94 Rolled sheet of high-strength steel. Specifications
GOST 11474-76 Bent-steel sections. Specifications
GOST 30245-2012 Steel bent closed welded square and rectangular section for building. Specifications
Uzbekistan National Codes (Where ever applicable)
ShNK 2.03.05-13 Steel structures. Design standards
KMK 2.09.03-02 Industrial buildings and structures
KMK 2.03.11-96 Corrosion protection of buildings and structures.
SNiP 2.09.02-85 Industrial Buildings
KMK 3.04.02-97 Corrosion protection of buildings and structures
KMK 3.03.02-98 Metal structures. Rules of manufacturing and acceptance
KMK 2.01.07-96 Loads and effects
KMK 2.01.03-96 Construction in seismic areas
KMK 3.03.01-98 Bearing and enclosing structures
ShNK 3.01.01-03 Organization of construction
KMK 2.01.01-94 Climatic and physical-geological data for designing
Tebinbulak Complex
CONSTRUCTION OF MINING, MINERAL
PROCESSING AND METALLURGICAL COMPLEX IN
[Sub Contractor /Vendor’s
KARAUZYAK REGION LOGO]
Project name: Tebinbulak overall Project
Document name:
BASIC ENGINEERING DESIGN DATA
Subcontractor/Vendor
Doc. Number:
Date 19/04/2022
Document number: TBULAK-BD-EE-0000-GN-DBM-0001 Rev.: 02 Page 28 of 30

SP 53-102-2004 General rules for the design of steel structures


Other applicable standards
API 620 Design and construction of large welded low-pressure storage tanks
API 650 Welded steel tanks for oil storage
ISO 2631-1 Evaluation of human exposure to whole body vibration – General requirements
ISO 2631-2 Evaluation of human exposure to whole body vibration – Continuous and shock induced
vibration in buildings (1 to 80 Hz)
CD 225 Design for new pavement foundations
CD 226 Design for new pavement construction
CD 521 Hydraulic design of road edge surface water channels and outlets
CD 529 Design of outfall and culvert details
DMRB Design Manual for Roads and Bridges
BS EN 12056-3 Gravity drainage systems inside buildings roof drainage layout and calculation
BS EN 13001 Cranes general design
BS 8002 Code of practice for earth retaining structures
BSI PD 6698 Recommendations for design of structures for earthquake resistance to BS EN 1998
ISO 2631-1 Evaluation of human exposure to whole body vibration – General requirements
Supplementary Specifications
GOST 25192-2012 Concretes. Classification and technical requirements
GOST 26633-2015 Heavy-weight and sand concretes. Specifications
GOST 31384-2017 Protection of concrete and reinforced concrete structures against corrosion. General
technical requirements
Cement shall conform to:
GOST 22266-94 Sulphate-resistant cements. Specifications
GOST 10178—85 Portland and slag-portland cement. Specifications
Aggregate shall conform to:
GOST 8267-93 Crushed stone and gravel of solid rocks for construction works.
GOST 8736-2014 Sand for construction works. Specifications
GOST 31424-2010 Non-metallic construction materials from sifting of crushing solid stone in aggregate
manufacturing.
Water shall conform to:
GOST 23732-2011 Water for concrete and mortars. Specifications
Admixture shall conform to:
GOST 24211-2008 Admixtures for concretes and mortars. General specifications
Tebinbulak Complex
CONSTRUCTION OF MINING, MINERAL
PROCESSING AND METALLURGICAL COMPLEX IN
[Sub Contractor /Vendor’s
KARAUZYAK REGION LOGO]
Project name: Tebinbulak overall Project
Document name:
BASIC ENGINEERING DESIGN DATA
Subcontractor/Vendor
Doc. Number:
Date 19/04/2022
Document number: TBULAK-BD-EE-0000-GN-DBM-0001 Rev.: 02 Page 29 of 30

5. ATTACHMENT 1: Preliminary site coordinate


Tebinbulak Complex
CONSTRUCTION OF MINING, MINERAL
PROCESSING AND METALLURGICAL COMPLEX IN
[Sub Contractor /Vendor’s
KARAUZYAK REGION LOGO]
Project name: Tebinbulak overall Project
Document name:
BASIC ENGINEERING DESIGN DATA
Subcontractor/Vendor
Doc. Number:
Date 19/04/2022
Document number: TBULAK-BD-EE-0000-GN-DBM-0001 Rev.: 02 Page 30 of 30

6. ATTACHMENT 2: Geotechnical surveys report (HOLD)