You are on page 1of 18

PT.

5-05 RENCANA PENGADAAN

Kabupaten : Garut Nama KKM : Jatisari


Kecamatan : Karangpawitan Jenis Kegiatan : Pipanisasi
Desa : Jatisari

No. Paket Uraian: Material/ Barang/ Jasa Volume Satuan Harga Satuan Jumlah Biaya Metoda Pengadaan Waktu
Pengadaan (Rp) (Rp) Pelaksanaan

1 Paket 1 1. Pipa PVC Dia. 3 Inch S-12,5 18.00 m' 78,900 1,420,200 termin 1,2,3
Pipa 2. Pipa PVC Dia. 2 Inch S-12,5 36.00 m' 38,600 1,389,600 termin 1,2,3
3. Pipa PVC Dia. 1½ Inch S-10 234.00 m' 29,500 6,903,000 termin 1,2,3
4. Pipa PVC Dia. 1 Inch S-10 36.00 m' 12,200 439,200 termin 1,2,3
5. Pipa PVC Dia½ Inch S-10 36.00 m' 4,700 169,200 termin 1,2,3
Subtotal 10,321,200 termin 1,2,3
Asesories Tee Pvc 3'' RRJ 1.00 bh 115,000 115,000 termin 1,2,3
Tee Pvc 2" RRJ 2.00 bh 75,000 150,000 termin 1,2,3
Tee Pvc 1,5" SCJ 2.00 bh 50,000 100,000 termin 1,2,3
Reducer Pvc 3"x2" RRJ 2.00 bh 80,000 160,000 termin 1,2,3
Shopping
Reducer Pvc 2"x1.5" RRJ 3.00 bh 52,000 156,000 termin 1,2,3
Reducer Pvc 1,5"x1" SCJ 4.00 bh 42,000 168,000 termin 1,2,3
Dop / End Cap 1,5" 2.00 bh 40,000 80,000 termin 1,2,3
Knee PVC 1.5" SCJ 90◦ 3.00 bh 48,500 145,500 termin 1,2,3
Knee PVC 2" SCJ 90◦ 2.00 bh 55,000 110,000 termin 1,2,3
Knee PVC 1" SCJ 90 ◦ 5.00 bh 19,000 95,000 termin 1,2,3
All Bell Bend 3" 2.00 bh 179,700 359,400 termin 1,2,4
Clam Saddle 1.5"x1/2" 5.00 bh 48,500 242,500 termin 1,2,5
Subtotal 1,881,400
Total paket 1 12,202,600
2 Paket 2 m3 1,500,000 0 termin 1,2,3
Bahan kg 12,000 0 termin 1,2,3
Material m3 225,000 0 termin 1,2,3
m3 300,000 0 termin 1,2,3
zak 75,000 0 termin 1,2,3
Shopping
m3 360,000 0 termin 1,2,3
m3 350,000 0 termin 1,2,3
Shopping
No. Paket Uraian: Material/ Barang/ Jasa Volume Satuan Harga Satuan Jumlah Biaya Metoda Pengadaan Waktu
Pengadaan (Rp) (Rp) Pelaksanaan
bh 50,000 0 termin 1,2,3
bh 35,000 0 termin 1,2,3
kg 32,000 0 termin 1,2,3
No. Paket Uraian: Material/ Barang/ Jasa Volume Satuan Harga Satuan Jumlah Biaya Metoda Pengadaan Waktu
Pengadaan (Rp) (Rp) Pelaksanaan
Paket 2 kg 19,000 0 termin 1,2,3
Bahan kg 35,000 0 termin 1,2,3
Material kg 8,000 0 termin 1,2,3
Bh 868,500 0 termin 1,2,3
m 83,400 0 termin 1,2,3
unit 600,000 0 termin 1,2,3
unit 8,000,000 0 termin 1,2,3
bh 1,200 0 termin 1,2,3
bh 25,000 0 termin 1,2,3
Batang 74,000 0 termin 1,2,3
kg 25,000 0 termin 1,2,3
lb 78,000 0 termin 1,2,3
lb 47,000 0 termin 1,2,3
m2 90,000 0 termin 1,2,3
kg 20,000 0 termin 1,2,3
m3 2,500,000 0 termin 1,2,3
bh 15,000 0 termin 1,2,3
bh 30,000 0 Shopping termin 1,2,3
bh 250,000 0 termin 1,2,3
bh 37,500 0 termin 1,2,3
bh 50,000 0 termin 1,2,3
unit 361,000 0 termin 1,2,3
bh 2,000,000 0 termin 1,2,3
bh 70,500 0 termin 1,2,3
bh 188,500 0 termin 1,2,3
m 126,000 0 termin 1,2,3
bh 250,000 0 termin 1,2,3
bh 50,000 0 termin 1,2,3
bh 50,000 0 termin 1,2,3
m 84,000 0 termin 1,2,3
Kaleng 85,000 0 termin 1,2,3
bh 169,000 0 termin 1,2,3
bh 30,450 0 termin 1,2,3
bh 1,100 0 termin 1,2,3
bh 3,000 0 termin 1,2,3
No. Paket Uraian: Material/ Barang/ Jasa Volume Satuan Harga Satuan Jumlah Biaya Metoda Pengadaan Waktu
Pengadaan (Rp) (Rp) Pelaksanaan
Paket 2 bh 1,000 0 termin 1,2,3
Bahan bh 45,500 0 termin 1,2,3
Material bh 11,000 0 termin 1,2,3
bh 4,000 0 termin 1,2,3
bh 5,500 0 termin 1,2,3
bh 12,500 0 termin 1,2,3
m 30,333 0 termin 1,2,3
bh 3,000 0 termin 1,2,3
bh 1,000 0 termin 1,2,3
bh 29,250 0 termin 1,2,3
bh 11,000 0 termin 1,2,3
bh 12,500 0 Shopping termin 1,2,3
kg 35,000 0 termin 1,2,3
bh 1,800,000 0 termin 1,2,3
m 55,000 0 termin 1,2,3
bh 1,900,000 0 termin 1,2,3
m 100,800 0 termin 1,2,3
Unit 650,000 0 termin 1,2,3
Unit 30,000 0 termin 1,2,3
Unit 3,000 0 termin 1,2,3
Unit 40,000 0 termin 1,2,3
Tube 7,500 0 termin 1,2,3
Total paket 2 0
No. Paket Uraian: Material/ Barang/ Jasa Volume Satuan Harga Satuan Jumlah Biaya Metoda Pengadaan Waktu
Pengadaan (Rp) (Rp) Pelaksanaan
3 Paket 3 m' 15,000 0 termin 1,2,3
Pekerjaan bh 3,000,000 0 termin 1,2,3
Elektrikal paket 20,000,000 0 Shopping termin 1,2,3
unit 25,000,000 0
Total Paket 3 0 termin 1,2,3
4 Paket 4 m' 25,600 0 termin 1,2,3
APBDES m' 16,100 0 termin 1,2,3
m' 4,100 0 Shopping termin 1,2,3
paket 576,000 0 termin 1,2,3
Total Paket 4 0
5 Paket 5 paket 3,723,000 3,723,000 termin 1,2,3
Shopping
Total Paket 4 - 3,723,000 termin 1,2,3
6 Paket 5 bh 200,000 0 termin 1,2,3
bh 200,000 0 termin 1,2,3
bh 250,000 0 termin 1,2,3
unit 80,000 0 Shopping termin 1,2,3
termin 1,2,3
unit 350,000 0
termin 1,2,3
Total paket 5 0

Dibuat oleh, Mengetahui, Meyetujui


Ketua Tim Pengadaan Barang dan Jasa Fasilitator Teknik Senior Fasilitator

………………………………… Ade Muhamad Marjanudin Andri Budiman


DAFTAR VOLUME DAN SPESIFIKASI
Kabupaten : Garut Nama KKM : Jatisari
Jenis Pekerjaan: Pengadaan Pipa dan
Kecamatan : Karangpawitan
aksesoris
Desa : Jatisari

No. Nama Jenis Barang/Jasa Volume Satuan Spesifikasi teknis


PIPA
1 1. Pipa PVC Dia. 3 Inch S-12,5 18.00 m' SNI
2 2. Pipa PVC Dia. 2 Inch S-12,5 36.00 m' SNI
3 3. Pipa PVC Dia. 1½ Inch S-10 234.00 m' SNI
4 4. Pipa PVC Dia. 1 Inch S-10 36.00 m' SNI
5 5. Pipa PVC Dia½ Inch S-10 36.00 m' SNI
ACCESORIS
1 Tee Pvc 3'' RRJ 1.00 bh SNI
2 Tee Pvc 2" RRJ 2.00 bh SNI
3 Tee Pvc 1,5" SCJ 2.00 bh SNI
4 Reducer Pvc 3"x2" RRJ 2.00 bh SNI
5 Reducer Pvc 2"x1.5" RRJ 3.00 bh SNI
6 Reducer Pvc 1,5"x1" SCJ 4.00 bh SNI
7 Dop / End Cap 1,5" 2.00 bh SNI
8 Knee PVC 1.5" SCJ 90◦ 3.00 bh SNI
9 Knee PVC 2" SCJ 90◦ 2.00 bh SNI
10 Knee PVC 1" SCJ 90 ◦ 5.00 bh SNI
DAFTAR VOLUME DAN SPESIFIKASI
Kabupaten : Garut Nama KKM : Jatisari

Kecamatan : Karangpawitan Jenis Pekerjaan: Pengadaaan Material


Desa : Jatisari

No. Nama Jenis Barang/Jasa Volume Satuan Spesifikasi teknis

Bahan Material
1 0 0.00 m3 SNI
2 0 0.00 kg SNI
3 0 0.00 m3 SNI
4 0 0.00 m3 SNI
5 0 0.00 zak SNI
6 0 0.00 m3 SNI
7 0 0.00 m3 SNI
8 0 0.00 bh SNI
9 0 0.00 bh SNI
10 0 0.00 kg SNI
11 0 0.00 kg SNI
12 0 0.00 kg SNI
13 0 0.00 kg SNI
14 0 0.00 Bh SNI
15 0 0.00 m SNI
16 0 0.00 unit SNI
17 0 0.00 unit SNI
18 0 0.00 bh SNI
19 0 0.00 bh SNI
20 0 0.00 Batang SNI
21 0 0.00 kg SNI
22 0 0.00 lb SNI
23 0 0.00 lb SNI
24 0 0.00 m2 SNI
25 0 0.00 kg SNI
26 0 0.00 m3 SNI
27 0 0.00 bh SNI
28 0 0.00 bh SNI
29 0 0.00 bh SNI
30 0 0.00 bh SNI
31 0 0.00 bh SNI
32 0 0.00 unit SNI
33 0 0.00 bh SNI
34 0 0.00 bh SNI
35 0 0.00 bh SNI
36 0 0.00 m SNI
37 0 0.00 bh SNI
38 0 0.00 bh SNI
39 0 0.00 bh SNI
40 0 0.00 m SNI
41 0 0.00 Kaleng SNI
42 0 0.00 bh SNI
43 0 0.00 bh SNI
44 0 0.00 bh SNI
45 0 0.00 bh SNI
46 0 0.00 bh SNI
47 0 0.00 bh SNI
48 0 0.00 bh SNI
49 0 0.00 bh SNI
50 0 0.00 bh SNI
51 0 0.00 bh SNI
52 0 0.00 m SNI
53 0 0.00 bh SNI
54 0 0.00 bh SNI
55 0 0.00 bh SNI
56 0 0.00 bh SNI
57 0 0.00 bh SNI
58 0 0.00 kg SNI
59 0 0.00 bh SNI
60 0 0.00 m SNI
61 0 0.00 bh SNI
62 0 0.00 m SNI
63 0 0.00 Unit SNI
64 0 0.00 Unit SNI
65 0 0.00 Unit SNI
66 0 0.00 Unit SNI
67 0 0.00 Tube SNI
RINCIAN HARGA PENAWARAN
KKM : Jatisari
Desa/Kelurahan : Jatisari
Kecamatan : Karangpawitan
Kabupaten : Garut
Propinsi : Jawa Barat
Paket Pekerjaan : Pipanisasi
Toko/ Suplier : CV. Numeila Jaya Abadi

Harga Satuan Spesifikasi teknis


No. Nama Barang/ Alat Volume Satuan (Rp) Jumlah Harga (Rp) **
PIPA

1 1. Pipa PVC Dia. 3 Inch S-12,5 18.00 m' 68,500 1,233,000 SNI
2 2. Pipa PVC Dia. 2 Inch S-12,5 36.00 m' 33,000 1,188,000 SNI
3 3. Pipa PVC Dia. 1½ Inch S-10 234.00 m' 25,300 5,920,200 SNI
4 4. Pipa PVC Dia. 1 Inch S-10 36.00 m' 9,800 352,800 SNI
5 5. Pipa PVC Dia½ Inch S-10 36.00 m' 5,000 180,000 SNI
ACCESORIS -
1 Tee Pvc 3'' RRJ 1.00 bh 341,000 341,000 SNI
2 Tee Pvc 2" RRJ 2.00 bh 135,000 270,000 SNI
3 Tee Pvc 1,5" SCJ 2.00 bh 23,000 46,000 SNI
4 Reducer Pvc 3"x2" RRJ 2.00 bh 35,000 70,000 SNI
5 Reducer Pvc 2"x1.5" RRJ 3.00 bh 13,000 39,000 SNI
6 Reducer Pvc 1,5"x1" SCJ 4.00 bh 18,000 72,000 SNI
7 Dop / End Cap 1,5" 2.00 bh 18,000 36,000 SNI
8 Knee PVC 1.5" SCJ 90◦ 3.00 bh 18,000 54,000 SNI
9 Knee PVC 2" SCJ 90◦ 2.00 bh 7,500 15,000 SNI
10 Knee PVC 1" SCJ 90 ◦ 5.00 bh 47,000 235,000 SNI

Total : 10,052,000
Dibulatkan : 10,052,000
Terbilang : Delapan puluh dua juta sembilan ratus empat puluh empat ribu delapan ratus rupiah

*) Upah Angkut/Biaya Transfortasi bahan/material sampai lokasi proyek.


**) Penjelasan detail lihat lampiran [Lampiran, Form: PT.5-20]

yang melakukan survey;


No. Nama Jabatan Tandatangan
1. Ketua

2. Sekretaris

3. Anggota

4. Anggota

5. Anggota
RINCIAN HARGA PENAWARAN
KKM : Jatisari
Desa/Kelurahan : Jatisari
Kecamatan : Karangpawitan
Kabupaten : Garut
Propinsi : Jawa Barat
Paket Pekerjaan : Pipanisasi
Toko/ Suplier : ……………………………………………
j
Harga Satuan Spesifikasi teknis
No. Nama Barang/ Alat Volume Satuan Jumlah Harga (Rp)
(Rp) **

Bahan Material
10 0.00 m3
20 0.00 kg
30 0.00 m3
40 0.00 m3
50 0.00 zak
60 0.00 m3
70 0.00 m3
80 0.00 bh
90 0.00 bh
10 0 0.00 kg
11 0 0.00 kg
12 0 0.00 kg
13 0 0.00 kg
14 0 0.00 Bh
15 0 0.00 m
16 0 0.00 unit
17 0 0.00 unit
18 0 0.00 bh
19 0 0.00 bh
20 0 0.00 Batang
21 0 0.00 kg
22 0 0.00 lb
23 0 0.00 lb
24 0 0.00 m2
25 0 0.00 kg
26 0 0.00 m3
27 0 0.00 bh
28 0 0.00 bh
29 0 0.00 bh
30 0 0.00 bh
31 0 0.00 bh
32 0 0.00 unit
33 0 0.00 bh
34 0 0.00 bh
35 0 0.00 bh
36 0 0.00 m
37 0 0.00 bh
38 0 0.00 bh
39 0 0.00 bh
40 0 0.00 m
41 0 0.00 Kaleng
42 0 0.00 bh
43 0 0.00 bh
44 0 0.00 bh
45 0 0.00 bh
46 0 0.00 bh
47 0 0.00 bh
48 0 0.00 bh
49 0 0.00 bh
50 0 0.00 bh
51 0 0.00 bh
52 0 0.00 m
53 0 0.00 bh
54 0 0.00 bh
55 0 0.00 bh
56 0 0.00 bh
57 0 0.00 bh
58 0 0.00 kg
59 0 0.00 bh
60 0 0.00 m
61 0 0.00 bh
62 0 0.00 m
63 0 0.00 Unit
64 0 0.00 Unit
65 0 0.00 Unit
66 0 0.00 Unit
67 0 0.00 Tube

Total :
Dibulatkan :
Terbilang :

*) Upah Angkut/Biaya Transfortasi bahan/material sampai lokasi proyek.


**) Penjelasan detail lihat lampiran [Lampiran, Form: PT.5-20]

yang melakukan survey;


No. Nama Jabatan Tandatangan
1. Ketua

2. Sekretaris

3. Anggota

4. Anggota

5. Anggota
PT.5-03 DAFTAR PENDATAAN HARGA SATUAN BAHAN/MATERIAL
KKM : Jatisari
Desa/Kelurahan : Jatisari
Kecamatan : Karangpawitan
Kabupaten : Garut
Propinsi : Jawa Barat
Toko/Suplier : ……………………………………….. (stempel toko/supplier dan tandatangan)
Tanggal Pendataan : ………………………………………..

Upah
Harga Satuan Angkut/Biaya Spesifikasi teknis
No. Nama Barang/ Alat Satuan Total harga (Rp) Keterangan
(Rp) transportasi **
(RP)
-1 -2 -3 -4 -5 (6)=(4)+(5) -7 -8
A Pipa
1 1. Pipa PVC Dia. 3 Inch S-12,5 m'
2 2. Pipa PVC Dia. 2 Inch S-12,5 m'
3 3. Pipa PVC Dia. 1½ Inch S-10 m'
4 4. Pipa PVC Dia. 1 Inch S-10 m'
5 5. Pipa PVC Dia½ Inch S-10 m'
ACCESORIS
1 Tee Pvc 3'' RRJ bh
2 Tee Pvc 2" RRJ bh
3 Tee Pvc 1,5" SCJ bh
4 Reducer Pvc 3"x2" RRJ bh
5 Reducer Pvc 2"x1.5" RRJ bh
6 Reducer Pvc 1,5"x1" SCJ bh
7 Dop / End Cap 1,5" bh
8 Knee PVC 1.5" SCJ 90◦ bh
9 Knee PVC 2" SCJ 90◦ bh
10 Knee PVC 1" SCJ 90 ◦ bh

*) Upah Angkut/Biaya Transfortasi bahan/material sampai lokasi proyek.


**) Penjelasan detail lihat lampiran [Lampiran, Form: PT.5-20]

yang melakukan survey;


No. Nama Jabatan Tandatangan
1. Ketua

2. Sekretaris

3. Anggota

4. Anggota

5. Anggota
PT.5-04 DAFTAR PERBANDINGAN HARGA BAHAN/ALAT, UPAH
KKM : Jatisari
Desa/Kelurahan : Jatisari
Kecamatan : Karangpawitan
Kabupaten : Garut
Propinsi : Jawa Barat
Tanggal Penetapan : …………………………………….

TOTAL HARGA (RP)


Harga satuan
No. Nama barang/alat/jasa Satuan ditetapkan (Rp)

A Pipa
1 1. Pipa PVC Dia. 3 Inch S-12,5 m'
2 2. Pipa PVC Dia. 2 Inch S-12,5 m'
3 3. Pipa PVC Dia. 1½ Inch S-10 m'
4 4. Pipa PVC Dia. 1 Inch S-10 m'
5 5. Pipa PVC Dia½ Inch S-10 m'
ACCESORIS
1 Tee Pvc 3'' RRJ bh
2 Tee Pvc 2" RRJ bh
3 Tee Pvc 1,5" SCJ bh
4 Reducer Pvc 3"x2" RRJ bh
5 Reducer Pvc 2"x1.5" RRJ bh
6 Reducer Pvc 1,5"x1" SCJ bh
7 Dop / End Cap 1,5" bh
8 Knee PVC 1.5" SCJ 90◦ bh
9 Knee PVC 2" SCJ 90◦ bh
10 Knee PVC 1" SCJ 90 ◦ bh
yang menetapkan;

No. Nama Jabatan Tandatangan


1. Ketua

2. Sekretaris

3. Anggota

4. Anggota

5. Anggota
PT.5-03 DAFTAR PENDATAAN HARGA SATUAN BAHAN/MATERIAL
KKM : Jatisari
Desa/Kelurahan : Jatisari
Kecamatan : Karangpawitan
Kabupaten : Garut
Propinsi : Jawa Barat
Toko/Suplier : ……………………………………….. (stempel toko/supplier dan tandatangan)
Tanggal Pendataan : ………………………………………..

Upah
Harga Satuan Angkut/Biaya Spesifikasi teknis
No. Nama Barang/ Alat Satuan Total harga (Rp) Keterangan
(Rp) transportasi **
(RP)
-1 -2 -3 -4 -5 (6)=(4)+(5) -7 -8
A Bahan Bangunan
1 0 m3
2 0 kg
3 0 m3
4 0 m3
5 0 zak
6 0 m3
7 0 m3
8 0 bh
9 0 bh
10 0 kg
11 0 kg
12 0 kg
13 0 kg
14 0 Bh
15 0m
16 0 unit
17 0 unit
18 0 bh
19 0 bh
20 0 Batang
21 0 kg
22 0 lb
23 0 lb
24 0 m2
25 0 kg
26 0 m3
27 0 bh
28 0 bh
29 0 bh
30 0 bh
31 0 bh
32 0 unit
33 0 bh
34 0 bh
35 0 bh
36 0m
37 0 bh
38 0 bh
39 0 bh
40 0m
41 0 Kaleng
42 0 bh
43 0 bh
44 0 bh
45 0 bh
46 0 bh
47 0 bh
48 0 bh
49 0 bh
50 0 bh
51 0 bh
52 0m
53 0 bh
54 0 bh
55 0 bh
56 0 bh
57 0 bh
58 0 kg
59 0 bh
60 0m
61 0 bh
62 0m
63 0 Unit
64 0 Unit
65 0 Unit
66 0 Unit
67 0 Tube

*) Upah Angkut/Biaya Transfortasi bahan/material sampai lokasi proyek.


**) Penjelasan detail lihat lampiran [Lampiran, Form: PT.5-20]

yang melakukan survey;


No. Nama Jabatan Tandatangan
1. Ketua

2. Sekretaris

3. Anggota

4. Anggota

5. Anggota
PT.5-04 DAFTAR PERBANDINGAN HARGA BAHAN/ALAT, UPAH
KKM : Jatisari
Desa/Kelurahan : Jatisari
Kecamatan : Karangpawitan
Kabupaten : Garut
Propinsi : Jawa Barat
Tanggal Penetapan : …………………………………….

TOTAL HARGA (RP)


Harga satuan
No. Nama barang/alat/jasa Satuan
ditetapkan (Rp)

A Bahan Bangunan
1 0 m3
2 0 kg
3 0 m3
4 0 m3
5 0 zak
6 0 m3
7 0 m3
8 0 bh
9 0 bh
10 0 kg
11 0 kg
12 0 kg
13 0 kg
14 0 Bh
15 0m
16 0 unit
17 0 unit
18 0 bh
19 0 bh
20 0 Batang
21 0 kg
22 0 lb
23 0 lb
24 0 m2
25 0 kg
26 0 m3
27 0 bh
28 0 bh
29 0 bh
30 0 bh
31 0 bh
32 0 unit
33 0 bh
34 0 bh
35 0 bh
36 0m
37 0 bh
38 0 bh
39 0 bh
40 0m
41 0 Kaleng
42 0 bh
43 0 bh
44 0 bh
45 0 bh
46 0 bh
47 0 bh
48 0 bh
49 0 bh
50 0 bh
51 0 bh
52 0m
53 0 bh
54 0 bh
55 0 bh
56 0 bh
57 0 bh
58 0 kg
59 0 bh
60 0m
61 0 bh
62 0m
63 0 Unit
64 0 Unit
65 0 Unit
66 0 Unit
67 0 Tube
yang menetapkan;

No. Nama Jabatan Tandatangan


1. Ketua

2. Sekretaris

3. Anggota

4. Anggota

5. Anggota

You might also like