You are on page 1of 445

DAFTAR HARGA MATERIAL

SATUAN STANDART HARGA KABUPATEN


NO BAHAN MATERIAL (INDEX 2019)

1 Semen @ 50 Kg Zak 53,000


2 Pasir beton m3 240,000
3 Split 2/3 pecah tangan m3 280,000
4 Batu bata Bh 750
5 Batako Bh 3,500
6 Bata ringan tb 7,5 cm m3 -
7 Genteng Bh 1,250
8 Seng 0,2 x 3 m Lbr -
9 Kayu 6/12 - 3 m Btg -
10 Kayu 6/12 - 4 m Btg 100,000
11 Kayu 8/12 - 4 m Btg 150,000
12 Kayu Usuk 5/7 - 4/6 3 m Btg 27,000
13 Usuk bambu m 5,500
14 Reng Bambu m 1,500
15 Kayu Papan 2/20 2m Lbr -
17 Besi Ø 8 mm Btg 37,500
18 Besi Ø 10 mm Btg 68,000
19 Besi Ø 12 mm Btg 90,000
20 Begel jadi Kg 18,000
21 Bendrat Kg 20,000
22 Kusen lokal Bh -
23 Kusen Pintu 80cm x 200cm lokal Bh 200,000
24 Kusen jendela lokal Bh 150,000
25 Daun pintu lokal Bh 350,000
26 Daun jendela lokal Bh 200,000
27 Kusen dan daun pintu Kamar mandi fiber Set 210,000
28 Seng 2,4 x 0,8 x 0,002 m Lbr 67,000
29 Seng 3 x 0,8 x 0,002 m Lbr 78,000
30 Bubungan lancip genteng Bh 5,000
31 Paku usuk Kg 15,000
32 Paku reng Kg 15,000
33 Paku seng Kg 18,000
34 Benang Rol -
35 Closet JONGKOK Bh 155,000
36 Stop Kran (PVC) 3/4" Bh 25,000
37 Pipa Diameter 3/4" Btg 27,500
38 Pipa Diameter 3" Btg 85,000
39 Pipa diameter 1/2" Btg 21,000
40 Pipa diameter 4 " Btg 130,000
41 Knie PVC 1/2" Bh 10,000
42 Knie PVC 3" Bh 15,000
43 Knie PVC 4" Bh 25,000
44 Knie PVC 3/4" Bh 15,000
45 Galvalum atap / Genteng m -
46 Saklar Bh
47 Kabel Eterna 50 m Rol
48 Pipa listrik Btg
49 Engsel Pintu 4" Psg 35,000
50 Engsel Jendela 3" Psg 21,000
51 Roster Bh 5,000
52 Stop Kontak Broco Bh -
53 Fitting Bh -
54 Semen Bata Ringan 40 kg Sak -
55 Batu pecah M3 215,000
56 Kayu reng - 2 m Btg
57 Batu kapur/gamping Zak 8,000
58 Ember Bh
ART HARGA KABUPATEN
(INDEX 2019)

63,000
280000 240,000
300,000
800
` 3,500
750,000
2,500

22,000 35,000

20,000
37,500
68,000
90,000

20,000

220,000
67,000
78,000
7,500
15,000
15,000
28,000
10,700
215,000
29,000
27,500
85,000
21,000
130,000
10,000
15,000
25,000
15,000
270,000
8,000

35,000
21,000
6000 5,000
27,000
10,260

215,000

15,500
RENCANA ANGGARAN BIAYA (RAB) BSPS

Nomor BNBA :
Nomor KTP :
Nama Penerima Bantuan : MUH SHOLEH
Alamat :
Desa/Kelurahan :
Kecamatan :
Kabupaten/Kota :
Jenis Kegiatan :

SUMBER DANA
HARGA TOTAL HARGA SWADAYA
NO URAIAN PEKERJAAN VOLUME SATUAN (Rp) (Rp) BSPS
Dana Tunai

I Pekerjaan Persiapan
Bongkar Rumah Lama 1.00 ls - - - -
II Pekerjaan Pondasi

1 Galian Tanah Pondasi 7.20 M³ - - - -


2 Urugan Pasir 3.00 M³ 240,000 720,000 - 720,000

3 Pasangan Pondasi 4.68 M³ - -

-Semen @ 50 kg 8.00 Zak 53,000 424,000 424,000 -


-Pasir pasang 2.80 M³ 240,000 672,000 672,000 -
-Batu Kali 6.00 M³ 215,000 1,290,000 - 1,290,000
4 Urugan kembali 2.52 M³ - - - -
III Pekerjaan Sloof
1 Pekerjaan bekisting M² - - - -
2 Cor Beton Sloof, Ukuran 20 x 15 cm - - -
-Besi beton Φ 10 mm SNI 11.00 Btg 68,000 748,000 748,000
-Besi beton Φ 8 mm SNI 10.00 Btg 37,500 375,000 375,000
-Semen @ 50 kg 5.00 Zak 53,000 265,000 265,000 -
-Pasir pasang 0.60 M³ 240,000 144,000 144,000 -
-Batu Pecah 0.80 M³ 280,000 224,000 224,000 -
IV Pekerjaan Kolom
1 Pekerjaan bekisting M² 20,000 - - -
2 Cor Beton Kolom, Ukuran 15 x 15 cm min. T=3m 10.00 Bh

-Besi beton Φ 10 mm SNI 10.00 Btg 68,000 680,000 680,000 -


-Besi beton Φ 8 mm SNI 10.00 Btg 37,500 375,000 375,000 -
-Pasir pasang 0.40 M³ 240,000 96,000 96,000 -
-Semen @ 50 kg 3.00 Zak 53,000 159,000 159,000 -
-Batu pecah 0.60 M³ 280,000 168,000 168,000 -
V Dinding Permanen
1 Tembok - M²

-Pasir Pasang 4.80 M³ 240,000 1,152,000 1,152,000 -


-Semen @ 50 kg 15.00 Zak 53,000 795,000 795,000
-Batu Bata 6,720.00 Bh 750 5,040,000 - 5,040,000
-Batako - Bh 3,500 - - -
2 Pekerjaan Plester
-Pasir Pasang 5.00 M³ 240,000 1,200,000 1,200,000 -
-Semen @ 50 kg 26.00 Zak 53,000 1,378,000 1,378,000 -
3 Papan
-Papan, Ukuran……… - Lbr - - - -
-Kayu, Ukuran………. - Btg - - - -
VI Pekerjaan Pintu dan Jendela
-Kusen Pintu, Ukuran 0,80 X 2,00 M 2.00 Unit 200,000 400,000 400,000 -
-Kusen Jendela - Unit 150,000 - - -
-Kusen Ventilasi, Ukuran…… - Unit - - - -
-Daun Pintu Kayu, Ukuran 2.00 Unit 350,000 700,000 700,000 -
-Daun Jendela Kayu, Ukuran - Unit 200,000 - - -
-Handle Pintu dan Kunci Pintu - Set - - - -
-Handle Jendela dan Kunci Jendela - Set - - - -
-Engsel Pintu - Set 35,000 - - -
-Engsel Jendela - Set 21,000 - - -
VII Ring Balok
1 Pekerjaan bekisting - M² - - - -
2 Pekerjaan Cor Beton
-Besi beton Φ 10 mm SNI 11.00 Btg 68,000 748,000 748,000
-Besi beton Φ 8 mm SNI 11.00 Btg 37,500 412,500 412,500 -
-Semen @ 50 kg 3.00 Zak 53,000 159,000 159,000 -
-Pasir pasang 0.50 M³ 240,000 120,000 120,000 -
-Batu pecah 0.60 M³ 280,000 168,000 168,000 -
VIII Pekerjaan Struktur Atap
-Kayu rangka kuda-kuda, Ukuran 8/12 x 4m 2.00 Btg 150,000 300,000 300,000 -
-Kayu gapit, Ukuran ……. - Btg - - - -
-Kayu usuk, Ukuran 4/6 x 2m - Btg 22,000 - - -
-Kayu Usuk, Ukuran 5/7 x 2m - Btg 27,000 - - -
-Kayu Reng , Ukuran 2/3 x 2m - Btg 1,500 - -
IX Pekerjaan Penutup Atap
1 Penutup Atap 75.60
-Seng gelombang (0,2 cm x 80 cm x 300 cm), atau - Lbr 78,000 - - -
-Genteng 3,000.00 Bh 1,250 3,750,000 3,750,000 -
-Bahan penutup atap lainnya yang diijinkan - Lbr - - - -
2 Bubungan Atap Bh

-Seng Lbr - - -
-Genteng bubungan - Bh 5,000 - - -
-Bahan penutup atap lainnya yang diijinkan Lbr - - -
3 Listplang papan, Ukuran……. M³ - - -
X Pekerjaan Lantai
1 Lantai Rabat Campuran minimal 1:5, T= 5 cm 3.15 M3

-Semen @ 50 kg 1.00 Zak 53,000 53,000 53,000 -


-Pasir pasang 0.10 M³ 240,000 24,000 24,000 -
-Batu pecah 0.20 M³ 280,000 56,000 56,000 -
2 Lantai Papan M²

-Papan, Ukuran……….. - Lbr - - - -


-Kayu, Ukuran……….. - Btg - - - -
XI MCK
-Septic Tank - Unit - - - -
-Closet Jongkok - Unit 155,000 - - -
-Pipa Air Bersih, Ukuran…… - Btg 27,500 - - -
-Pipa Air Kotor, Ukuran…… - Btg 85,000 - - -
-Kran - Bh 25,000 - - -
-Pintu Kamar Mandi 1.00 Set 210,000 210,000 210,000 -
XII Lain-lain/ Instalasi Listrik
Gamping 30.00 Zak 8,000 240,000 240,000 -
Paku 13.87 Kg 15,000 208,100 208,100 -
Bendrat 10.00 Kg 20,000 200,000 200,000 -
Loster 30.00 Bh 5,000 150,000 150,000 -
Papan Bekisting - Lbr - - - -
XIII Upah Kerja
Tukang 60.00 Oh 70,000 4,200,000 2,500,000 1,700,000
Pembantu Tukang 60.00 Oh 60,000 3,600,000 3,600,000

JUMLAH 31,603,600 18,130,600 13,473,000

........................................ ....
Difasilitasi, Ketua KPB Diajukan Oleh,
Tenaga Fasilitator Lapangan Penerima Bantuan

(.........................................) ( ....................................) ( ....................................)

Disahkan oleh, Diverifikasi Oleh,


Tim Teknis Kabupaten Magelang Koordinator Fasilitator

( ...............................................) ( ....................................)
NIP..........................................
FORMAT III-17

PANJANG LEBAR KELL VOL M2


SUMBER DANA dimensi 9 7 32 63 genteng
SWADAYA pekerjaan
Memakai Bahan
Bangunan Lama atap kuda-kuda
penutup atap 75.6 1,890.00
SWADAYA pondasi Galian Tanah 7.2
Urugan Pasir 2.835
SWADAYA Pas. Batu belah 4.68
12 beton sloof 0.96
17 10 kolom 0.675
12 balk 15x15 0.72
17 dinding bata 96
58 batako
SWADAYA Plesteran dinding 192
lantai 5cm 3.15
SWADAYA kayu gording 4 m 35
usuk 2 m 32
reng 2m 157.5
kusen pintu 80*200 cm 1
jendela 1
daun pintu 80*200 cm 1
jendela 1
pintu kmr 1
SWADAYA JUMLAH 1890

dimensi 9 7 32 63 genteng
pekerjaan
atap kuda-kuda 0 -
penutup atap 75.6 3,000.00
pondasi Galian Tanah 7.2 -
Urugan Pasir 2.835 -
Pas. Batu belah 4.68 -
beton sloof 0.96 -
10 kolom 0.675 -
balk 15x15 0.72 -
dinding bata 96 -
batako -
Plesteran dinding 192 -
lantai 5cm 3.15 -
kayu gording 4 m 35 -
usuk 2 m 32 -
reng 2m 157.5 -
kusen pintu 80*200 cm 1 -
jendela 1 -
daun pintu 80*200 cm 1 -
jendela 1 -
pintu kmr 1 -
JUMLAH 3000

SWADAYA
HARGA
MATERIAL VOL SATUAN
SATUAN
Urugan Pasir 240,000 3.00 M³
-Semen @ 50 kg 53,000 61.00 Zak
-Pasir pasang 240,000 14.20 M³
-Batu Kali 215,000 6.00 M³
-Besi beton Φ 10 mm SNI 68,000 32.00 Btg
-Besi beton Φ 8 mm SNI 37,500 31.00 Btg
-Batu pecah 280,000 2.20 M³
-Batu Bata 750 6,720.00 Bh
-Batako 3,500 - Bh
-Kusen Pintu, Ukuran 0,80 X 2,00 M 200,000 2.00 Unit
-Kusen Jendela 150,000 - Unit
-Kusen Ventilasi, Ukuran…… - - Unit
-Daun Pintu Kayu, Ukuran 350,000 2.00 Unit
-Daun Jendela Kayu, Ukuran 200,000 - Unit
-Handle Pintu dan Kunci Pintu - - Set
-Handle Jendela dan Kunci Jendela - - Set
-Engsel Pintu 35,000 - Set
-Engsel Jendela 21,000 - Set
-Kayu rangka kuda-kuda, Ukuran 8/12 x 4m 150,000 2.00 Btg
-Kayu gapit, Ukuran ……. - - Btg
-Kayu usuk, Ukuran 4/6 x 2m 22,000 - Btg
-Kayu Usuk, Ukuran 5/7 x 2m 27,000 - Btg
-Kayu Reng , Ukuran 2/3 x 2m 1,500 - Btg
-Seng gelombang (0,2 cm x 80 cm x 300 cm 78,000 - Lbr
-Genteng 1,250 3,000.00 Bh
-Seng - - Lbr
-Genteng bubungan 5,000 - Bh
-Closet Jongkok 155,000 - Unit
-Pipa Air Bersih, Ukuran…… 27,500 - Btg
-Pipa Air Kotor, Ukuran…… 85,000 - Btg
-Kran 25,000 - Bh
-Pintu Kamar Mandi 210,000 1.00 Set
Gamping 8,000 30.00 Zak
Paku 15,000 13.87 Kg
Bendrat 20,000 10.00 Kg
Loster 5,000 30.00 Bh
Papan Bekisting - - Lbr

15,630,600

(630,600) -840.8
-42.04
........................................ .....2019
Diajukan Oleh,
Penerima Bantuan

( ....................................)

Diverifikasi Oleh,
Koordinator Fasilitator

23,803,600 15,630,600
15,630,600
( ....................................)

(630,600)
4
20.25 1.0888888889 4.549 0.45
24.25 0.0108888889

batu semen pasir spit bes 10 besi 8 bata batako

3.00
6.00 8.00 2.80
5.00 0.60 0.80 11.00 12.00
3.00 0.40 0.60 10.00 10.00
3.00 0.50 0.60 11.00 11.00
15.00 4.80 6,720.00
- - -
19.00 5.00
1.00 0.10 0.20

6 54 17.2 2.2 32 33 6720 0

batu semen pasir spit bes 10 besi 8 bata batako

- - - - - - - -
- - - - - - - -
- - - - - - - -
- 3.00 - - - - -
6.00 8.00 2.80 - - - - -
- 5.00 0.60 0.80 11.00 12.00 - -
- 3.00 0.40 0.60 10.00 10.00 - -
- 3.00 0.50 0.60 11.00 11.00 - -
- 15.00 4.80 - - - 6,720.00 -
- - - - - - - -
- 26.00 5.00 - - - - -
- 1.00 0.10 0.20 - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
6 61 17.2 2.2 32 33 6720 0

REKAP VOL
BIAYA BSPS DANA BSPS
- -
3,233,000.00 61.00
3,408,000.00 14.20
- -
1,428,000.00 21.00
787,500.00 21.00
616,000.00 2.20
- -
- -
400,000.00 2.00
- -
- #DIV/0!
700,000.00 2.00
- -
- #DIV/0!
- #DIV/0!
- -
- -
300,000.00 2.00
- #DIV/0!
- -
- -
- -
- -
3,750,000.00 3,000.00
- #DIV/0!
- -
- -
- -
- -
- -
210,000.00 1.00
240,000.00 30.00
208,100.00 13.87
200,000.00 10.00
150,000.00 30.00
- #DIV/0!
15,630,600.00
DA

Nomor BNBA
Nama Penerima Bantuan
Nomor KTP
Alamat
Desa/Kelurahan
kayu kusen daun Kecamatan
Gording usuk reng pintu jendela pintu jendela pintu KM Kabupaten/Kota
Nomor Rekening Penerim

A. Jumlah Dana yang ditr


No.
1
2
3
4
5
6
7
8
9.00 9
36.00 10
162.00 11
1.00 12
1.00 13
1.00 14
1.00 15
1.00 16
9 36 162 1 1 1 1 1

kayu kusen daun TOTAL HARGA PEMBELIAN


Gording usuk reng pintu jendela pintu jendela pintu KM Terbilang : Enam Juta Dua Ra

- - - - - - - - Disanggupi oleh :
- - - - - - - - Nama Toko/Penyedia Baha
- - - - - - - - Alamat Toko/Penyedia Bah
- - - - - - - - Nomor Rekening Bank Tok
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - - B. Jumlah dana yang dita
2.00 - - - - - - - No
- - - - - - - 1
- - - - - - - TOTAL TARIK TUNAI (B)
- - - 2.00 - - - - Terbilang : Tujuh Juta Lima R
- - - - - - - -
- - - - - 2.00 - - C. Total dana yang ditarik (
- - - - - - - - Dana Yang Ditarik (Rp.)
- - - - - - - 1.00 Terbilang : Tujuh Juta Lima R
2 0 0 2 0 2 0 1

disahkan oleh:
Tim Teknis Kabupaten Ma

( .....................................
NIP.................................

*) coret yang tidak perlu

DA

Nomor BNBA
Nama Penerima Bantuan
Nomor KTP
Alamat
Desa/Kelurahan
Kecamatan
Kabupaten/Kota
Nomor Rekening Penerim

A. Jumlah Dana yang ditr


No.
1
2
3
4
5
6
7
8
9
10
11
12
13
14

TOTAL HARGA PEMBELIAN


Terbilang : Enam Juta Dua Ra

Disanggupi oleh :
Nama Toko/Penyedia Baha
Alamat Toko/Penyedia Bah
Nomor Rekening Bank Tok

B. Jumlah dana yang dita


No
1
TOTAL TARIK TUNAI (B)
Terbilang : Tujuh Juta Lima R

C. Total dana yang ditarik (


Dana Yang Ditarik (Rp.)
Terbilang : Tujuh Juta Lima R
disahkan oleh:
Tim Teknis Kabupaten Ma

( .....................................
NIP.................................

*) coret yang tidak perlu


DAFTAR RENCANA PEMANFAATAN BANTUAN (DRPB) TAHAP 1

Nomor BNBA : 0
Nama Penerima Bantuan : MUH SHOLEH
Nomor KTP : 0
Alamat : 0
Desa/Kelurahan : 0
Kecamatan : 0
Kabupaten/Kota : 0
Nomor Rekening Penerima Bantuan :

A. Jumlah Dana yang ditransfer ke Toko/Penyedia Bahan Bangunan (Tahap I/II *)


Jumlah Harga per Unit
Jenis Bahan Bangunan
(unit) (Rp)
Batu belah 6.00 m3 215,000
Semen 61.00 zak 53,000
Pasir 17.20 m3 240,000
Batu Pecah 2.20 m3 280,000
Besi Ø 10 32.00 btg 68,000
Besi Ø 8 33.00 btg 37,500
Kusen Pintu Ukuran 0,80 x 2,00 m - Bh 200,000
Kusen Jendela - Bh 150,000
Batu Bata 6,720.00 bh 750
Gamping 30.00 zak 8,000
Paku 13.87 Kg 15,000
Bendrat - Kg 22,000
Loster - Bh 7,000
Papan Bekisting - Lbr 20,000
Genteng 3,000.00 Bh 1,250
Genteng bubungan - Bh 5,000

TOTAL HARGA PEMBELIAN


Terbilang : Enam Juta Dua Ratus Lima Puluh Ribu Rupiah

Disanggupi oleh :
Nama Toko/Penyedia Bahan Bangunan :
Alamat Toko/Penyedia Bahan Bangunan :
Nomor Rekening Bank Toko/ Penyedi BB :

Toko/Penyedia Bahan Bangunan


(..................................................)

B. Jumlah dana yang ditarik tunai untuk upah kerja (Tahap I / II *)


Uraian Jumlah harga (Rp)
Upah Kerja PKRS 1,250,000
TOTAL TARIK TUNAI (B) 1,250,000
Terbilang : Tujuh Juta Lima Ratus Ribu Rupiah

C. Total dana yang ditarik ( A + B )


Dana Yang Ditarik (Rp.)
Terbilang : Tujuh Juta Lima Ratus Ribu Rupiah

........................................ .....2019
Diajukan Oleh :
Penerima Bantuan

MUH SHOLEH

disahkan oleh: Diverifikasi oleh: Difasilitasi Oleh :


Tim Teknis Kabupaten Magelang Koordinator Fasilitator Tenaga Fasilitator Lapangan

( ...............................................) ( ....................................) (.........................................)


NIP..........................................

*) coret yang tidak perlu

DAFTAR RENCANA PEMANFAATAN BANTUAN (DRPB) TAHAP 2

Nomor BNBA : 0
Nama Penerima Bantuan : MUH SHOLEH
Nomor KTP : 0
Alamat : 0
Desa/Kelurahan : 0
Kecamatan : 0
Kabupaten/Kota : 0
Nomor Rekening Penerima Bantuan : 0

A. Jumlah Dana yang ditransfer ke Toko/Penyedia Bahan Bangunan (Tahap I/II *)


Jumlah Harga per Unit
Jenis Bahan Bangunan
(unit) (Rp)
Batu belah 0 m3 215,000
Semen 45.00 zak 53,000
Pasir 6 m3 240,000
Batu Pecah 0 m3 280,000
Besi Ø 10 25 btg 68,000
Besi Ø 8 0 btg 37,500
Kusen Pintu Ukuran 0,80 x 2,00 m 0 Bh 200,000
Kusen Jendela 0 Bh 150,000
Batu Bata 700 bh 750
Gamping 0 zak 8,000
Paku 0.0 Kg 15,000
Bendrat 0 Kg 22,000
Loster 0 Bh 7,000
Kayu usuk 10 Btg 19,000

TOTAL HARGA PEMBELIAN


Terbilang : Enam Juta Dua Ratus Lima Puluh Ribu Rupiah

Disanggupi oleh :
Nama Toko/Penyedia Bahan Bangunan : 0
Alamat Toko/Penyedia Bahan Bangunan : 0
Nomor Rekening Bank Toko/ Penyedi BB : 0

Toko/Penyedia Bahan Bangunan

(..................................................)

B. Jumlah dana yang ditarik tunai untuk upah kerja (Tahap I / II *)


Uraian Jumlah harga (Rp)
Upah Kerja PKRS/PBRS *) 1,250,000
TOTAL TARIK TUNAI (B) 1,250,000
Terbilang : Tujuh Juta Lima Ratus Ribu Rupiah

C. Total dana yang ditarik ( A + B )


Dana Yang Ditarik (Rp.)
Terbilang : Tujuh Juta Lima Ratus Ribu Rupiah

........................................ .....2019
Diajukan Oleh :
Penerima Bantuan

MUH SHOLEH
disahkan oleh: Diverifikasi oleh: Difasilitasi Oleh :
Tim Teknis Kabupaten Magelang Koordinator Fasilitator Tenaga Fasilitator Lapangan

( ...............................................) ( ....................................) (.........................................)


NIP..........................................

*) coret yang tidak perlu


Format IV - 2

HAP 1

Jumlah Harga
(Rp)
1,290,000
3,233,000
4,128,000
616,000
2,176,000
1,237,500
-
-
5,040,000
240,000
208,100
-
-
-
3,750,000
-

21,918,600 15,630,600
(6,288,000)

edia Bahan Bangunan


.................................)

Jumlah harga (Rp)


1,250,000
1,250,000

23,168,600

........................... .....2019
Diajukan Oleh :
Penerima Bantuan

MUH SHOLEH

Difasilitasi Oleh :
enaga Fasilitator Lapangan

.......................................)

Format IV - 2

HAP 2
Jumlah Harga
(Rp)
-
2,385,000
1,440,000
-
1,700,000
-
-
-
525,000
-
129,000
-
-
190,000

6,369,000

edia Bahan Bangunan

.................................)

Jumlah harga (Rp)


1,250,000
1,250,000

7,619,000

..................................... .....2019
Diajukan Oleh :
Penerima Bantuan

MUH SHOLEH
Difasilitasi Oleh :
enaga Fasilitator Lapangan

.......................................)
RENCANA ANGGARAN BIAYA (RAB) BSPS

Nomor BNBA :
Nomor KTP :
Nama Penerima Bantuan : MUH SHOLEH
Alamat :
Desa/Kelurahan :
Kecamatan :
Kabupaten/Kota :
Jenis Kegiatan :

SUMBER DANA
HARGA TOTAL HARGA SWADAYA
NO URAIAN PEKERJAAN VOLUME SATUAN (Rp) (Rp) BSPS
Dana Tunai

I Pekerjaan Persiapan
Bongkar Rumah Lama 1.00 ls - - - -
II Pekerjaan Pondasi

1 Galian Tanah Pondasi 6.30 M³ - - - -


2 Urugan Pasir 2.00 M³ 240,000 480,000 - 480,000

3 Pasangan Pondasi 4.10 M³ - -

-Semen @ 50 kg 7.00 Zak 53,000 371,000 371,000 -


-Pasir pasang 2.40 M³ 240,000 576,000 576,000 -
-Batu Kali 5.00 M³ 215,000 1,075,000 - 1,075,000
4 Urugan kembali 2.21 M³ - - - -
III Pekerjaan Sloof
1 Pekerjaan bekisting M² - - - -
2 Cor Beton Sloof, Ukuran 20 x 15 cm - - -
-Besi beton Φ 10 mm SNI 10.00 Btg 68,000 680,000 680,000 -
-Besi beton Φ 8 mm SNI 8.00 Btg 37,500 300,000 300,000 -
-Semen @ 50 kg 4.00 Zak 53,000 212,000 212,000 -
-Pasir pasang 0.50 M³ 240,000 120,000 120,000 -
-Batu Pecah 0.70 M³ 280,000 196,000 196,000 -
IV Pekerjaan Kolom
1 Pekerjaan bekisting M² 20,000 - - -
2 Cor Beton Kolom, Ukuran 15 x 15 cm min. T=3m 8.00 Bh

-Besi beton Φ 10 mm SNI 8.00 Btg 68,000 544,000 544,000 -


-Besi beton Φ 8 mm SNI 8.00 Btg 37,500 300,000 300,000 -
-Pasir pasang 0.40 M³ 240,000 96,000 96,000 -
-Semen @ 50 kg 2.00 Zak 53,000 106,000 106,000 -
-Batu pecah 0.50 M³ 280,000 140,000 140,000 -
V Dinding Permanen
1 Tembok 84.00 M²

-Pasir Pasang 6.10 M³ 240,000 1,464,000 1,464,000 -


-Semen @ 50 kg 19.00 Zak 53,000 1,007,000 1,007,000
-Batu Bata - Bh 750 - - -
-Batako 1,100.00 Bh 3,500 3,850,000 3,850,000 -
2 Pekerjaan Plester
-Pasir Pasang 4.40 M³ 240,000 1,056,000 - 1,056,000
-Semen @ 50 kg 17.00 Zak 53,000 901,000 - 901,000
3 Papan
-Papan, Ukuran……… - Lbr - - - -
-Kayu, Ukuran………. - Btg - - - -
VI Pekerjaan Pintu dan Jendela
-Kusen Pintu, Ukuran 0,80 X 2,00 M 1.00 Unit 200,000 200,000 200,000 -
-Kusen Jendela 2.00 Unit 150,000 300,000 300,000 -
-Kusen Ventilasi, Ukuran…… - Unit - - - -
-Daun Pintu Kayu, Ukuran 1.00 Unit 350,000 350,000 350,000 -
-Daun Jendela Kayu, Ukuran 2.00 Unit 200,000 400,000 400,000 -
-Handle Pintu dan Kunci Pintu - Set - - - -
-Handle Jendela dan Kunci Jendela - Set - - - -
-Engsel Pintu - Set 35,000 - - -
-Engsel Jendela - Set 21,000 - - -
VII Ring Balok
1 Pekerjaan bekisting - M² - - - -
2 Pekerjaan Cor Beton
-Besi beton Φ 10 mm SNI 10.00 Btg 68,000 680,000 680,000
-Besi beton Φ 8 mm SNI 10.00 Btg 37,500 375,000 375,000 -
-Semen @ 50 kg 3.00 Zak 53,000 159,000 159,000 -
-Pasir pasang 0.40 M³ 240,000 96,000 96,000 -
-Batu pecah 0.50 M³ 280,000 140,000 140,000 -
VIII Pekerjaan Struktur Atap
-Kayu rangka kuda-kuda, Ukuran 6/12 x 4m 4.00 Btg 100,000 400,000 400,000 -
-Kayu gapit, Ukuran ……. - Btg - - - -
-Kayu usuk, Ukuran 4/6 x 3 m - Btg 27,000 - - -
-Usuk bambu 200.00 m 5,500 1,100,000 1,100,000 -
-Reng bambu 320.00 m 1,500 480,000 480,000 -
IX Pekerjaan Penutup Atap
1 Penutup Atap 57.60
-Seng gelombang (0,2 cm x 80 cm x 300 cm), atau - Lbr 78,000 - - -
-Genteng - Bh 1,250 - - -
-Bahan penutup atap lainnya yang diijinkan - Lbr - - - -
2 Bubungan Atap Bh

-Seng Lbr - - -
-Genteng bubungan - Bh 5,000 - - -
-Bahan penutup atap lainnya yang diijinkan Lbr - - -
3 Listplang papan, Ukuran……. M³ - - -
X Pekerjaan Lantai
1 Lantai Rabat Campuran minimal 1:5, T= 5 cm 2.40 M3

-Semen @ 50 kg 1.00 Zak 53,000 53,000 - 53,000


-Pasir pasang 0.10 M³ 240,000 24,000 24,000 -
-Batu pecah 0.20 M³ 280,000 56,000 56,000 -
2 Lantai Papan M²

-Papan, Ukuran……….. - Lbr - - - -


-Kayu, Ukuran……….. - Btg - - - -
XI MCK
-Septic Tank - Unit - - - -
-Closet Jongkok - Unit 155,000 - - -
-Pipa Air Bersih, Ukuran…… - Btg 27,500 - - -
-Pipa Air Kotor, Ukuran…… - Btg 85,000 - - -
-Kran - Bh 25,000 - - -
-Pintu Kamar Mandi - Set 210,000 - - -
XII Lain-lain/ Instalasi Listrik
Gamping - Zak 8,000 - - -
Paku 8.53 Kg 15,000 128,000 128,000 -
Bendrat 5.00 Kg 20,000 100,000 100,000 -
Loster 10.00 Bh 5,000 50,000 50,000 -
Papan Bekisting - Lbr - - - -
XIII Upah Kerja
Tukang 60.00 Oh 70,000 4,200,000 2,500,000 1,700,000
Pembantu Tukang 60.00 Oh 60,000 3,600,000 3,600,000

JUMLAH 26,365,000 17,500,000 8,865,000

........................................ .....20
Difasilitasi, Ketua KPB Diajukan Oleh,
Tenaga Fasilitator Lapangan Penerima Bantuan

(.........................................) ( ....................................) ( ....................................)

Disahkan oleh, Diverifikasi Oleh,


Tim Teknis Kabupaten Magelang Koordinator Fasilitator

( ...............................................) ( ....................................)
NIP..........................................
FORMAT III-17

PANJANG LEBAR KELL VOL M2


SUMBER DANA dimensi 6 8 28 48 genteng
SWADAYA pekerjaan
Memakai Bahan
Bangunan Lama atap kuda-kuda
penutup atap 57.6 1,440.00
SWADAYA pondasi Galian Tanah 6.3
Urugan Pasir 2.16
SWADAYA Pas. Batu belah 4.095
12 beton sloof 0.84
17 8 kolom 0.54
12 balk 15x15 0.63
17 dinding bata
58 batako 84
SWADAYA Plesteran dinding 168
lantai 5cm 2.4
SWADAYA kayu gording 4 m 40
usuk 3 m 28
reng 3 m 120
kusen pintu 80*200 cm 1
jendela 1
daun pintu 80*200 cm 1
jendela 1
pintu kmr 1
SWADAYA JUMLAH 1440

dimensi 6 8 28 48 genteng
pekerjaan
atap kuda-kuda 0 -
penutup atap 57.6 -
pondasi Galian Tanah 6.3 -
Urugan Pasir 2.16 -
Pas. Batu belah 4.095 -
beton sloof 0.84 -
8 kolom 0.54 -
balk 15x15 0.63 -
dinding bata 0 -
batako 84 -
Plesteran dinding 168 -
lantai 5cm 2.4 -
kayu gording 4 m 40 -
usuk 3 m 28 -
reng 3 m 120 -
kusen pintu 80*200 cm 1 -
jendela 1 -
daun pintu 80*200 cm 1 -
jendela 1 -
pintu kmr 1 -
JUMLAH 0

SWADAYA
HARGA
MATERIAL VOL SATUAN
SATUAN
Urugan Pasir 240,000 2.00 M³
-Semen @ 50 kg 53,000 53.00 Zak
-Pasir pasang 240,000 14.30 M³
-Batu Kali 215,000 5.00 M³
-Besi beton Φ 10 mm SNI 68,000 28.00 Btg
-Besi beton Φ 8 mm SNI 37,500 26.00 Btg
-Batu pecah 280,000 1.90 M³
-Batu Bata 750 - Bh
-Batako 3,500 1,100.00 Bh
-Kusen Pintu, Ukuran 0,80 X 2,00 M 200,000 1.00 Unit
-Kusen Jendela 150,000 2.00 Unit
-Kusen Ventilasi, Ukuran…… - - Unit
-Daun Pintu Kayu, Ukuran 350,000 1.00 Unit
-Daun Jendela Kayu, Ukuran 200,000 2.00 Unit
-Handle Pintu dan Kunci Pintu - - Set
-Handle Jendela dan Kunci Jendela - - Set
-Engsel Pintu 35,000 - Set
-Engsel Jendela 21,000 - Set
-Kayu rangka kuda-kuda, Ukuran 6/12 x 4m 100,000 4.00 Btg
-Kayu gapit, Ukuran ……. - - Btg
-Kayu usuk, Ukuran 4/6 x 3 m 27,000 - Btg
-Usuk bambu 4m 5,500 200.00 m
-Reng bambu 4m 1,500 320.00 m
-Seng gelombang (0,2 cm x 80 cm x 300 cm 78,000 - Lbr
-Genteng 1,250 - Bh
-Seng - - Lbr
-Genteng bubungan 5,000 - Bh
-Closet Jongkok 155,000 - Unit
-Pipa Air Bersih, Ukuran…… 27,500 - Btg
-Pipa Air Kotor, Ukuran…… 85,000 - Btg
-Kran 25,000 - Bh
-Pintu Kamar Mandi 210,000 - Set
Gamping 8,000 - Zak
Paku 15,000 8.53 Kg
Bendrat 20,000 5.00 Kg
Loster 5,000 10.00 Bh
Papan Bekisting - - Lbr

15,000,000

- 0
0
........................................ .....2019
Diajukan Oleh,
Penerima Bantuan

( ....................................)

Diverifikasi Oleh,
Koordinator Fasilitator

18,565,000 15,000,000
15,000,000
( ....................................)

-
4
20.25 1.0888888889 4.549 0.45
24.25 0.0108888889

batu semen pasir spit bes 10 besi 8 bata batako

2.00
5.00 7.00 2.40
4.00 0.50 0.70 10.00 10.00
2.00 0.40 0.50 8.00 8.00
3.00 0.40 0.50 10.00 10.00
- - -
19.00 6.10 1,050.00
17.00 4.40
1.00 0.10 0.20

5 53 16.3 1.9 28 28 0 1050

batu semen pasir spit bes 10 besi 8 bata batako

- - - - - - - -
- - - - - - - -
- - - - - - - -
- 2.00 - - - - -
5.00 7.00 2.40 - - - - -
- 4.00 0.50 0.70 10.00 10.00 - -
- 2.00 0.40 0.50 8.00 8.00 - -
- 3.00 0.40 0.50 10.00 10.00 - -
- - - - - - - -
- 19.00 6.10 - - - - 1,100.00
- 17.00 4.40 - - - - -
- 1.00 0.10 0.20 - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
5 53 16.3 1.9 28 28 0 1100

REKAP VOL
BIAYA BSPS DANA BSPS
- -
1,855,000.00 35.00
2,376,000.00 9.90
- -
1,904,000.00 28.00
975,000.00 26.00
532,000.00 1.90
- -
3,850,000.00 1,100.00
200,000.00 1.00
300,000.00 2.00
- #DIV/0!
350,000.00 1.00
400,000.00 2.00
- #DIV/0!
- #DIV/0!
- -
- -
400,000.00 4.00
- #DIV/0!
- -
1,100,000.00 200.00
480,000.00 320.00
- -
- -
- #DIV/0!
- -
- -
- -
- -
- -
- -
- -
128,000.00 8.53
100,000.00 5.00
50,000.00 10.00
- #DIV/0!
15,000,000.00
DA

Nomor BNBA
Nama Penerima Bantuan
Nomor KTP
Alamat
Desa/Kelurahan
kayu kusen daun Kecamatan
Gording usuk reng pintu jendela pintu jendela pintu KM Kabupaten/Kota
Nomor Rekening Penerim

A. Jumlah Dana yang ditr


No.
1
2
3
4
5
6
7
8
10.00 9
32.00 10
124.00 11
1.00 12
1.00 13
1.00 14
1.00 15
1.00 16
10 32 124 1 1 1 1 1

kayu kusen daun TOTAL HARGA PEMBELIAN


Gording usuk reng pintu jendela pintu jendela pintu KM Terbilang : Enam Juta Dua Ra

- - - - - - - - Disanggupi oleh :
- - - - - - - - Nama Toko/Penyedia Baha
- - - - - - - - Alamat Toko/Penyedia Bah
- - - - - - - - Nomor Rekening Bank Tok
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - - B. Jumlah dana yang dita
4.00 - - - - - - - No
- 200.00 - - - - - - 1
- - 320.00 - - - - - TOTAL TARIK TUNAI (B)
- - - 1.00 - - - - Terbilang : Tujuh Juta Lima R
- - - - 2.00 - - -
- - - - - 1.00 - - C. Total dana yang ditarik (
- - - - - - 2.00 - Dana Yang Ditarik (Rp.)
- - - - - - - Terbilang : Tujuh Juta Lima R
4 200 320 1 2 1 2 0

disahkan oleh:
Tim Teknis Kabupaten Ma

( .....................................
NIP.................................

*) coret yang tidak perlu

DA

Nomor BNBA
Nama Penerima Bantuan
Nomor KTP
Alamat
Desa/Kelurahan
Kecamatan
Kabupaten/Kota
Nomor Rekening Penerim

A. Jumlah Dana yang ditr


No.
1
2
3
4
5
6
7
8
9
10
11
12
13
14

TOTAL HARGA PEMBELIAN


Terbilang : Enam Juta Dua Ra

Disanggupi oleh :
Nama Toko/Penyedia Baha
Alamat Toko/Penyedia Bah
Nomor Rekening Bank Tok

B. Jumlah dana yang dita


No
1
TOTAL TARIK TUNAI (B)
Terbilang : Tujuh Juta Lima R

C. Total dana yang ditarik (


Dana Yang Ditarik (Rp.)
Terbilang : Tujuh Juta Lima R
disahkan oleh:
Tim Teknis Kabupaten Ma

( .....................................
NIP.................................

*) coret yang tidak perlu


DAFTAR RENCANA PEMANFAATAN BANTUAN (DRPB) TAHAP 1

Nomor BNBA : 0
Nama Penerima Bantuan : MUH SHOLEH
Nomor KTP : 0
Alamat : 0
Desa/Kelurahan : 0
Kecamatan : 0
Kabupaten/Kota : 0
Nomor Rekening Penerima Bantuan :

A. Jumlah Dana yang ditransfer ke Toko/Penyedia Bahan Bangunan (Tahap I/II *)


Jumlah Harga per Unit
Jenis Bahan Bangunan
(unit) (Rp)
Batu belah 5.00 m3 215,000
Semen 53.00 zak 53,000
Pasir 16.30 m3 240,000
Batu Pecah 1.90 m3 280,000
Besi Ø 10 28.00 btg 68,000
Besi Ø 8 28.00 btg 37,500
Kusen Pintu Ukuran 0,80 x 2,00 m - Bh 200,000
Kusen Jendela - Bh 150,000
Batu Bata - bh 750
Gamping - zak 8,000
Paku 8.53 Kg 15,000
Bendrat - Kg 22,000
Loster - Bh 7,000
Papan Bekisting - Lbr 20,000
Genteng - Bh 1,250
Genteng bubungan - Bh 5,000

TOTAL HARGA PEMBELIAN


Terbilang : Enam Juta Dua Ratus Lima Puluh Ribu Rupiah

Disanggupi oleh :
Nama Toko/Penyedia Bahan Bangunan :
Alamat Toko/Penyedia Bahan Bangunan :
Nomor Rekening Bank Toko/ Penyedi BB :

Toko/Penyedia Bahan Bangunan


(..................................................)

B. Jumlah dana yang ditarik tunai untuk upah kerja (Tahap I / II *)


Uraian Jumlah harga (Rp)
Upah Kerja PKRS 1,250,000
TOTAL TARIK TUNAI (B) 1,250,000
Terbilang : Tujuh Juta Lima Ratus Ribu Rupiah

C. Total dana yang ditarik ( A + B )


Dana Yang Ditarik (Rp.)
Terbilang : Tujuh Juta Lima Ratus Ribu Rupiah

........................................ .....2019
Diajukan Oleh :
Penerima Bantuan

MUH SHOLEH

disahkan oleh: Diverifikasi oleh: Difasilitasi Oleh :


Tim Teknis Kabupaten Magelang Koordinator Fasilitator Tenaga Fasilitator Lapangan

( ...............................................) ( ....................................) (.........................................)


NIP..........................................

*) coret yang tidak perlu

DAFTAR RENCANA PEMANFAATAN BANTUAN (DRPB) TAHAP 2

Nomor BNBA : 0
Nama Penerima Bantuan : MUH SHOLEH
Nomor KTP : 0
Alamat : 0
Desa/Kelurahan : 0
Kecamatan : 0
Kabupaten/Kota : 0
Nomor Rekening Penerima Bantuan : 0

A. Jumlah Dana yang ditransfer ke Toko/Penyedia Bahan Bangunan (Tahap I/II *)


Jumlah Harga per Unit
Jenis Bahan Bangunan
(unit) (Rp)
Batu belah 0 m3 215,000
Semen 37.00 zak 53,000
Pasir 6 m3 240,000
Batu Pecah 0 m3 280,000
Besi Ø 10 25 btg 68,000
Besi Ø 8 0 btg 37,500
Kusen Pintu Ukuran 0,80 x 2,00 m 0 Bh 200,000
Kusen Jendela 0 Bh 150,000
Batu Bata 700 bh 750
Gamping 0 zak 8,000
Paku 0.0 Kg 15,000
Bendrat 0 Kg 22,000
Loster 0 Bh 7,000
Kayu usuk 10 Btg 19,000

TOTAL HARGA PEMBELIAN


Terbilang : Enam Juta Dua Ratus Lima Puluh Ribu Rupiah

Disanggupi oleh :
Nama Toko/Penyedia Bahan Bangunan : 0
Alamat Toko/Penyedia Bahan Bangunan : 0
Nomor Rekening Bank Toko/ Penyedi BB : 0

Toko/Penyedia Bahan Bangunan

(..................................................)

B. Jumlah dana yang ditarik tunai untuk upah kerja (Tahap I / II *)


Uraian Jumlah harga (Rp)
Upah Kerja PKRS/PBRS *) 1,250,000
TOTAL TARIK TUNAI (B) 1,250,000
Terbilang : Tujuh Juta Lima Ratus Ribu Rupiah

C. Total dana yang ditarik ( A + B )


Dana Yang Ditarik (Rp.)
Terbilang : Tujuh Juta Lima Ratus Ribu Rupiah

........................................ .....2019
Diajukan Oleh :
Penerima Bantuan

MUH SHOLEH
disahkan oleh: Diverifikasi oleh: Difasilitasi Oleh :
Tim Teknis Kabupaten Magelang Koordinator Fasilitator Tenaga Fasilitator Lapangan

( ...............................................) ( ....................................) (.........................................)


NIP..........................................

*) coret yang tidak perlu


Format IV - 2

HAP 1

Jumlah Harga
(Rp)
1,075,000
2,809,000
3,912,000
532,000
1,904,000
1,050,000
-
-
-
-
128,000
-
-
-
-
-

11,410,000 15,000,000
3,590,000

edia Bahan Bangunan


.................................)

Jumlah harga (Rp)


1,250,000
1,250,000

12,660,000

........................... .....2019
Diajukan Oleh :
Penerima Bantuan

MUH SHOLEH

Difasilitasi Oleh :
enaga Fasilitator Lapangan

.......................................)

Format IV - 2

HAP 2
Jumlah Harga
(Rp)
-
1,961,000
1,440,000
-
1,700,000
-
-
-
525,000
-
129,000
-
-
190,000

5,945,000

edia Bahan Bangunan

.................................)

Jumlah harga (Rp)


1,250,000
1,250,000

7,195,000

..................................... .....2019
Diajukan Oleh :
Penerima Bantuan

MUH SHOLEH
Difasilitasi Oleh :
enaga Fasilitator Lapangan

.......................................)
RENCANA ANGGARAN BIAYA (RAB) BSPS

Nomor BNBA :
Nomor KTP :
Nama Penerima Bantuan : MUH SHOLEH
Alamat :
Desa/Kelurahan :
Kecamatan :
Kabupaten/Kota :
Jenis Kegiatan :

SUMBER DANA
HARGA TOTAL HARGA SWADAYA
NO URAIAN PEKERJAAN VOLUME SATUAN (Rp) (Rp) BSPS
Dana Tunai

I Pekerjaan Persiapan
Bongkar Rumah Lama 1.00 ls - - - -
II Pekerjaan Pondasi

1 Galian Tanah Pondasi 6.30 M³ - - - -


2 Urugan Pasir 2.00 M³ 240,000 480,000 - 480,000

3 Pasangan Pondasi 4.10 M³ - -

-Semen @ 50 kg 7.00 Zak 53,000 371,000 371,000 -


-Pasir pasang 2.40 M³ 240,000 576,000 576,000 -
-Batu Kali 5.00 M³ 215,000 1,075,000 - 1,075,000
4 Urugan kembali 2.21 M³ - - - -
III Pekerjaan Sloof
1 Pekerjaan bekisting M² - - - -
2 Cor Beton Sloof, Ukuran 20 x 15 cm - - -
-Besi beton Φ 10 mm SNI 10.00 Btg 68,000 680,000 680,000 -
-Besi beton Φ 8 mm SNI 8.00 Btg 37,500 300,000 300,000 -
-Semen @ 50 kg 4.00 Zak 53,000 212,000 212,000 -
-Pasir pasang 0.50 M³ 240,000 120,000 120,000 -
-Batu Pecah 0.70 M³ 280,000 196,000 196,000 -
IV Pekerjaan Kolom
1 Pekerjaan bekisting M² 20,000 - - -
2 Cor Beton Kolom, Ukuran 15 x 15 cm min. T=3m 8.00 Bh

-Besi beton Φ 10 mm SNI 8.00 Btg 68,000 544,000 544,000 -


-Besi beton Φ 8 mm SNI 8.00 Btg 37,500 300,000 300,000 -
-Pasir pasang 0.40 M³ 240,000 96,000 96,000 -
-Semen @ 50 kg 2.00 Zak 53,000 106,000 106,000 -
-Batu pecah 0.50 M³ 280,000 140,000 140,000 -
V Dinding Permanen
1 Tembok 84.00 M²

-Pasir Pasang 6.10 M³ 240,000 1,464,000 1,464,000 -


-Semen @ 50 kg 19.00 Zak 53,000 1,007,000 1,007,000
-Batu Bata - Bh 750 - - -
-Batako 1,100.00 Bh 3,500 3,850,000 3,850,000 -
2 Pekerjaan Plester
-Pasir Pasang 4.40 M³ 240,000 1,056,000 1,056,000 -
-Semen @ 50 kg 17.00 Zak 53,000 901,000 901,000 -
3 Papan
-Papan, Ukuran……… - Lbr - - - -
-Kayu, Ukuran………. - Btg - - - -
VI Pekerjaan Pintu dan Jendela
-Kusen Pintu, Ukuran 0,80 X 2,00 M 1.00 Unit 200,000 200,000 200,000 -
-Kusen Jendela 2.00 Unit 150,000 300,000 300,000 -
-Kusen Ventilasi, Ukuran…… - Unit - - - -
-Daun Pintu Kayu, Ukuran 1.00 Unit 350,000 350,000 350,000 -
-Daun Jendela Kayu, Ukuran 2.00 Unit 200,000 400,000 400,000 -
-Handle Pintu dan Kunci Pintu - Set - - - -
-Handle Jendela dan Kunci Jendela - Set - - - -
-Engsel Pintu - Set 35,000 - - -
-Engsel Jendela - Set 21,000 - - -
VII Ring Balok
1 Pekerjaan bekisting - M² - - - -
2 Pekerjaan Cor Beton
-Besi beton Φ 10 mm SNI 10.00 Btg 68,000 680,000 680,000
-Besi beton Φ 8 mm SNI 10.00 Btg 37,500 375,000 375,000 -
-Semen @ 50 kg 3.00 Zak 53,000 159,000 159,000 -
-Pasir pasang 0.40 M³ 240,000 96,000 96,000 -
-Batu pecah 0.50 M³ 280,000 140,000 140,000 -
VIII Pekerjaan Struktur Atap
-Kayu rangka kuda-kuda, Ukuran 8/12 x 4m - Btg 150,000 - - -
-Kayu gapit, Ukuran ……. - Btg - - - -
-Kayu usuk, Ukuran 4/6 x 3 m - Btg 27,000 - - -
-Kayu Usuk, Ukuran 5/7 x 3 m - Btg 27,000 - - -
-Kayu Reng , Ukuran 2/3 x 2m - Btg 1,500 - -
IX Pekerjaan Penutup Atap
1 Penutup Atap 57.60
-Seng gelombang (0,2 cm x 80 cm x 300 cm), atau - Lbr 78,000 - - -
-Genteng - Bh 1,250 - - -
-Bahan penutup atap lainnya yang diijinkan - Lbr - - - -
2 Bubungan Atap Bh

-Seng Lbr - - -
-Genteng bubungan - Bh 5,000 - - -
-Bahan penutup atap lainnya yang diijinkan Lbr - - -
3 Listplang papan, Ukuran……. M³ - - -
X Pekerjaan Lantai
1 Lantai Rabat Campuran minimal 1:5, T= 5 cm 2.40 M3

-Semen @ 50 kg 1.00 Zak 53,000 53,000 - 53,000


-Pasir pasang 0.10 M³ 240,000 24,000 - 24,000
-Batu pecah 0.20 M³ 280,000 56,000 56,000 -
2 Lantai Papan M²

-Papan, Ukuran……….. - Lbr - - - -


-Kayu, Ukuran……….. - Btg - - - -
XI MCK
-Septic Tank - Unit - - - -
-Closet Jongkok - Unit 155,000 - - -
-Pipa Air Bersih, Ukuran…… - Btg 27,500 - - -
-Pipa Air Kotor, Ukuran…… - Btg 85,000 - - -
-Kran - Bh 25,000 - - -
-Pintu Kamar Mandi - Set 210,000 - - -
XII Lain-lain/ Instalasi Listrik
Gamping - Zak 8,000 - - -
Paku 11.67 Kg 15,000 175,000 175,000 -
Bendrat 5.00 Kg 20,000 100,000 100,000 -
Loster 10.00 Bh 5,000 50,000 50,000 -
Papan Bekisting - Lbr - - - -
XIII Upah Kerja
Tukang 60.00 Oh 70,000 4,200,000 2,500,000 1,700,000
Pembantu Tukang 60.00 Oh 60,000 3,600,000 3,600,000

JUMLAH 24,432,000 17,500,000 6,932,000

........................................ .....20
Difasilitasi, Ketua KPB Diajukan Oleh,
Tenaga Fasilitator Lapangan Penerima Bantuan

(.........................................) ( ....................................) ( ....................................)

Disahkan oleh, Diverifikasi Oleh,


Tim Teknis Kabupaten Magelang Koordinator Fasilitator

( ...............................................) ( ....................................)
NIP..........................................
FORMAT III-17

PANJANG LEBAR KELL VOL M2


SUMBER DANA dimensi 6 8 28 48 genteng
SWADAYA pekerjaan
Memakai Bahan
Bangunan Lama atap kuda-kuda
penutup atap 57.6 1,440.00
SWADAYA pondasi Galian Tanah 6.3
Urugan Pasir 2.16
SWADAYA Pas. Batu belah 4.095
12 beton sloof 0.84
17 8 kolom 0.54
12 balk 15x15 0.63
17 dinding bata
58 batako 84
SWADAYA Plesteran dinding 168
lantai 5cm 2.4
SWADAYA kayu gording 4 m 40
usuk 3 m 28
reng 3 m 120
kusen pintu 80*200 cm 1
jendela 1
daun pintu 80*200 cm 1
jendela 1
pintu kmr 1
SWADAYA JUMLAH 1440

dimensi 6 8 28 48 genteng
pekerjaan
atap kuda-kuda 0 -
penutup atap 57.6 -
pondasi Galian Tanah 6.3 -
Urugan Pasir 2.16 -
Pas. Batu belah 4.095 -
beton sloof 0.84 -
8 kolom 0.54 -
balk 15x15 0.63 -
dinding bata 0 -
batako 84 -
Plesteran dinding 168 -
lantai 5cm 2.4 -
kayu gording 4 m 40 -
usuk 3 m 28 -
reng 3 m 120 -
kusen pintu 80*200 cm 1 -
jendela 1 -
daun pintu 80*200 cm 1 -
jendela 1 -
pintu kmr 1 -
JUMLAH 0

SWADAYA
HARGA
MATERIAL VOL SATUAN
SATUAN
Urugan Pasir 240,000 2.00 M³
-Semen @ 50 kg 53,000 53.00 Zak
-Pasir pasang 240,000 14.30 M³
-Batu Kali 215,000 5.00 M³
-Besi beton Φ 10 mm SNI 68,000 28.00 Btg
-Besi beton Φ 8 mm SNI 37,500 26.00 Btg
-Batu pecah 280,000 1.90 M³
-Batu Bata 750 - Bh
-Batako 3,500 1,100.00 Bh
-Kusen Pintu, Ukuran 0,80 X 2,00 M 200,000 1.00 Unit
-Kusen Jendela 150,000 2.00 Unit
-Kusen Ventilasi, Ukuran…… - - Unit
-Daun Pintu Kayu, Ukuran 350,000 1.00 Unit
-Daun Jendela Kayu, Ukuran 200,000 2.00 Unit
-Handle Pintu dan Kunci Pintu - - Set
-Handle Jendela dan Kunci Jendela - - Set
-Engsel Pintu 35,000 - Set
-Engsel Jendela 21,000 - Set
-Kayu rangka kuda-kuda, Ukuran 8/12 x 4m 150,000 - Btg
-Kayu gapit, Ukuran ……. - - Btg
-Kayu usuk, Ukuran 4/6 x 3 m 27,000 - Btg
-Kayu Usuk, Ukuran 5/7 x 3 m 27,000 - Btg
-Kayu Reng , Ukuran 2/3 x 2m 1,500 - Btg
-Seng gelombang (0,2 cm x 80 cm x 300 cm 78,000 - Lbr
-Genteng 1,250 - Bh
-Seng - - Lbr
-Genteng bubungan 5,000 - Bh
-Closet Jongkok 155,000 - Unit
-Pipa Air Bersih, Ukuran…… 27,500 - Btg
-Pipa Air Kotor, Ukuran…… 85,000 - Btg
-Kran 25,000 - Bh
-Pintu Kamar Mandi 210,000 - Set
Gamping 8,000 - Zak
Paku 15,000 11.67 Kg
Bendrat 20,000 5.00 Kg
Loster 5,000 10.00 Bh
Papan Bekisting - - Lbr

15,000,000

- 0
0
........................................ .....2019
Diajukan Oleh,
Penerima Bantuan

( ....................................)

Diverifikasi Oleh,
Koordinator Fasilitator

16,632,000 15,000,000
15,000,000
( ....................................)

-
4
20.25 1.0888888889 4.549 0.45
24.25 0.0108888889

batu semen pasir spit bes 10 besi 8 bata batako

2.00
5.00 7.00 2.40
4.00 0.50 0.70 10.00 10.00
2.00 0.40 0.50 8.00 8.00
3.00 0.40 0.50 10.00 10.00
- - -
19.00 6.10 1,050.00
17.00 4.40
1.00 0.10 0.20

5 53 16.3 1.9 28 28 0 1050

batu semen pasir spit bes 10 besi 8 bata batako

- - - - - - - -
- - - - - - - -
- - - - - - - -
- 2.00 - - - - -
5.00 7.00 2.40 - - - - -
- 4.00 0.50 0.70 10.00 10.00 - -
- 2.00 0.40 0.50 8.00 8.00 - -
- 3.00 0.40 0.50 10.00 10.00 - -
- - - - - - - -
- 19.00 6.10 - - - - 1,100.00
- 17.00 4.40 - - - - -
- 1.00 0.10 0.20 - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
5 53 16.3 1.9 28 28 0 1100

REKAP VOL
BIAYA BSPS DANA BSPS
- -
2,756,000.00 52.00
3,408,000.00 14.20
- -
1,904,000.00 28.00
975,000.00 26.00
532,000.00 1.90
- -
3,850,000.00 1,100.00
200,000.00 1.00
300,000.00 2.00
- #DIV/0!
350,000.00 1.00
400,000.00 2.00
- #DIV/0!
- #DIV/0!
- -
- -
- -
- #DIV/0!
- -
- -
- -
- -
- -
- #DIV/0!
- -
- -
- -
- -
- -
- -
- -
175,000.00 11.67
100,000.00 5.00
50,000.00 10.00
- #DIV/0!
15,000,000.00
DA

Nomor BNBA
Nama Penerima Bantuan
Nomor KTP
Alamat
Desa/Kelurahan
kayu kusen daun Kecamatan
Gording usuk reng pintu jendela pintu jendela pintu KM Kabupaten/Kota
Nomor Rekening Penerim

A. Jumlah Dana yang ditr


No.
1
2
3
4
5
6
7
8
10.00 9
32.00 10
124.00 11
1.00 12
1.00 13
1.00 14
1.00 15
1.00 16
10 32 124 1 1 1 1 1

kayu kusen daun TOTAL HARGA PEMBELIAN


Gording usuk reng pintu jendela pintu jendela pintu KM Terbilang : Enam Juta Dua Ra

- - - - - - - - Disanggupi oleh :
- - - - - - - - Nama Toko/Penyedia Baha
- - - - - - - - Alamat Toko/Penyedia Bah
- - - - - - - - Nomor Rekening Bank Tok
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - - B. Jumlah dana yang dita
- - - - - - - - No
- - - - - - - - 1
- - - - - - - TOTAL TARIK TUNAI (B)
- - - 1.00 - - - - Terbilang : Tujuh Juta Lima R
- - - - 2.00 - - -
- - - - - 1.00 - - C. Total dana yang ditarik (
- - - - - - 2.00 - Dana Yang Ditarik (Rp.)
- - - - - - - Terbilang : Tujuh Juta Lima R
0 0 0 1 2 1 2 0

disahkan oleh:
Tim Teknis Kabupaten Ma

( .....................................
NIP.................................

*) coret yang tidak perlu

DA

Nomor BNBA
Nama Penerima Bantuan
Nomor KTP
Alamat
Desa/Kelurahan
Kecamatan
Kabupaten/Kota
Nomor Rekening Penerim

A. Jumlah Dana yang ditr


No.
1
2
3
4
5
6
7
8
9
10
11
12
13
14

TOTAL HARGA PEMBELIAN


Terbilang : Enam Juta Dua Ra

Disanggupi oleh :
Nama Toko/Penyedia Baha
Alamat Toko/Penyedia Bah
Nomor Rekening Bank Tok

B. Jumlah dana yang dita


No
1
TOTAL TARIK TUNAI (B)
Terbilang : Tujuh Juta Lima R

C. Total dana yang ditarik (


Dana Yang Ditarik (Rp.)
Terbilang : Tujuh Juta Lima R
disahkan oleh:
Tim Teknis Kabupaten Ma

( .....................................
NIP.................................

*) coret yang tidak perlu


DAFTAR RENCANA PEMANFAATAN BANTUAN (DRPB) TAHAP 1

Nomor BNBA : 0
Nama Penerima Bantuan : MUH SHOLEH
Nomor KTP : 0
Alamat : 0
Desa/Kelurahan : 0
Kecamatan : 0
Kabupaten/Kota : 0
Nomor Rekening Penerima Bantuan :

A. Jumlah Dana yang ditransfer ke Toko/Penyedia Bahan Bangunan (Tahap I/II *)


Jumlah Harga per Unit
Jenis Bahan Bangunan
(unit) (Rp)
Batu belah 5.00 m3 215,000
Semen 53.00 zak 53,000
Pasir 16.30 m3 240,000
Batu Pecah 1.90 m3 280,000
Besi Ø 10 28.00 btg 68,000
Besi Ø 8 28.00 btg 37,500
Kusen Pintu Ukuran 0,80 x 2,00 m - Bh 200,000
Kusen Jendela - Bh 150,000
Batu Bata - bh 750
Gamping - zak 8,000
Paku 11.67 Kg 15,000
Bendrat - Kg 22,000
Loster - Bh 7,000
Papan Bekisting - Lbr 20,000
Genteng - Bh 1,250
Genteng bubungan - Bh 5,000

TOTAL HARGA PEMBELIAN


Terbilang : Enam Juta Dua Ratus Lima Puluh Ribu Rupiah

Disanggupi oleh :
Nama Toko/Penyedia Bahan Bangunan :
Alamat Toko/Penyedia Bahan Bangunan :
Nomor Rekening Bank Toko/ Penyedi BB :

Toko/Penyedia Bahan Bangunan


(..................................................)

B. Jumlah dana yang ditarik tunai untuk upah kerja (Tahap I / II *)


Uraian Jumlah harga (Rp)
Upah Kerja PKRS 1,250,000
TOTAL TARIK TUNAI (B) 1,250,000
Terbilang : Tujuh Juta Lima Ratus Ribu Rupiah

C. Total dana yang ditarik ( A + B )


Dana Yang Ditarik (Rp.)
Terbilang : Tujuh Juta Lima Ratus Ribu Rupiah

........................................ .....2019
Diajukan Oleh :
Penerima Bantuan

MUH SHOLEH

disahkan oleh: Diverifikasi oleh: Difasilitasi Oleh :


Tim Teknis Kabupaten Magelang Koordinator Fasilitator Tenaga Fasilitator Lapangan

( ...............................................) ( ....................................) (.........................................)


NIP..........................................

*) coret yang tidak perlu

DAFTAR RENCANA PEMANFAATAN BANTUAN (DRPB) TAHAP 2

Nomor BNBA : 0
Nama Penerima Bantuan : MUH SHOLEH
Nomor KTP : 0
Alamat : 0
Desa/Kelurahan : 0
Kecamatan : 0
Kabupaten/Kota : 0
Nomor Rekening Penerima Bantuan : 0

A. Jumlah Dana yang ditransfer ke Toko/Penyedia Bahan Bangunan (Tahap I/II *)


Jumlah Harga per Unit
Jenis Bahan Bangunan
(unit) (Rp)
Batu belah 0 m3 215,000
Semen 37.00 zak 53,000
Pasir 6 m3 240,000
Batu Pecah 0 m3 280,000
Besi Ø 10 25 btg 68,000
Besi Ø 8 0 btg 37,500
Kusen Pintu Ukuran 0,80 x 2,00 m 0 Bh 200,000
Kusen Jendela 0 Bh 150,000
Batu Bata 700 bh 750
Gamping 0 zak 8,000
Paku 0.0 Kg 15,000
Bendrat 0 Kg 22,000
Loster 0 Bh 7,000
Kayu usuk 10 Btg 19,000

TOTAL HARGA PEMBELIAN


Terbilang : Enam Juta Dua Ratus Lima Puluh Ribu Rupiah

Disanggupi oleh :
Nama Toko/Penyedia Bahan Bangunan : 0
Alamat Toko/Penyedia Bahan Bangunan : 0
Nomor Rekening Bank Toko/ Penyedi BB : 0

Toko/Penyedia Bahan Bangunan

(..................................................)

B. Jumlah dana yang ditarik tunai untuk upah kerja (Tahap I / II *)


Uraian Jumlah harga (Rp)
Upah Kerja PKRS/PBRS *) 1,250,000
TOTAL TARIK TUNAI (B) 1,250,000
Terbilang : Tujuh Juta Lima Ratus Ribu Rupiah

C. Total dana yang ditarik ( A + B )


Dana Yang Ditarik (Rp.)
Terbilang : Tujuh Juta Lima Ratus Ribu Rupiah

........................................ .....2019
Diajukan Oleh :
Penerima Bantuan

MUH SHOLEH
disahkan oleh: Diverifikasi oleh: Difasilitasi Oleh :
Tim Teknis Kabupaten Magelang Koordinator Fasilitator Tenaga Fasilitator Lapangan

( ...............................................) ( ....................................) (.........................................)


NIP..........................................

*) coret yang tidak perlu


Format IV - 2

HAP 1

Jumlah Harga
(Rp)
1,075,000
2,809,000
3,912,000
532,000
1,904,000
1,050,000
-
-
-
-
175,000
-
-
-
-
-

11,457,000 15,000,000
3,543,000

edia Bahan Bangunan


.................................)

Jumlah harga (Rp)


1,250,000
1,250,000

12,707,000

........................... .....2019
Diajukan Oleh :
Penerima Bantuan

MUH SHOLEH

Difasilitasi Oleh :
enaga Fasilitator Lapangan

.......................................)

Format IV - 2

HAP 2
Jumlah Harga
(Rp)
-
1,961,000
1,440,000
-
1,700,000
-
-
-
525,000
-
129,000
-
-
190,000

5,945,000

edia Bahan Bangunan

.................................)

Jumlah harga (Rp)


1,250,000
1,250,000

7,195,000

..................................... .....2019
Diajukan Oleh :
Penerima Bantuan

MUH SHOLEH
Difasilitasi Oleh :
enaga Fasilitator Lapangan

.......................................)
RENCANA ANGGARAN BIAYA (RAB) BSPS

Nomor BNBA :
Nomor KTP :
Nama Penerima Bantuan : MUH SHOLEH
Alamat :
Desa/Kelurahan :
Kecamatan :
Kabupaten/Kota :
Jenis Kegiatan :

SUMBER DANA
HARGA TOTAL HARGA SWADAYA
NO URAIAN PEKERJAAN VOLUME SATUAN (Rp) (Rp) BSPS
Dana Tunai

I Pekerjaan Persiapan
Bongkar Rumah Lama 1.00 ls - - - -
II Pekerjaan Pondasi

1 Galian Tanah Pondasi 5.40 M³ - - - -


2 Urugan Pasir 1.00 M³ 240,000 240,000 - 240,000

3 Pasangan Pondasi 3.51 M³ - -

-Semen @ 50 kg 6.00 Zak 53,000 318,000 - 318,000


-Pasir pasang 2.10 M³ 240,000 504,000 - 504,000
-Batu Kali 4.00 M³ 215,000 860,000 - 860,000
4 Urugan kembali 1.89 M³ - - - -
III Pekerjaan Sloof
1 Pekerjaan bekisting M² - - - -
2 Cor Beton Sloof, Ukuran 20 x 15 cm - - -
-Besi beton Φ 10 mm SNI 8.00 Btg 68,000 544,000 544,000 -
-Besi beton Φ 8 mm SNI 8.00 Btg 37,500 300,000 300,000 -
-Semen @ 50 kg 3.00 Zak 53,000 159,000 159,000 -
-Pasir pasang 0.50 M³ 240,000 120,000 120,000 -
-Batu Pecah 0.60 M³ 280,000 168,000 168,000 -
IV Pekerjaan Kolom
1 Pekerjaan bekisting M² 20,000 - - -
2 Cor Beton Kolom, Ukuran 15 x 15 cm min. T=3m 8.00 Bh

-Besi beton Φ 10 mm SNI 8.00 Btg 68,000 544,000 544,000 -


-Besi beton Φ 8 mm SNI 8.00 Btg 37,500 300,000 300,000 -
-Pasir pasang 0.40 M³ 240,000 96,000 96,000 -
-Semen @ 50 kg 2.00 Zak 53,000 106,000 106,000 -
-Batu pecah 0.50 M³ 280,000 140,000 140,000 -
V Dinding Permanen
1 Tembok 72.00 M²

-Pasir Pasang 5.20 M³ 240,000 1,248,000 1,248,000 -


-Semen @ 50 kg 16.00 Zak 53,000 848,000 848,000
-Batu Bata - Bh 750 - - -
-Batako 1,150.00 Bh 3,500 4,025,000 4,025,000 -
2 Pekerjaan Plester
-Pasir Pasang 3.80 M³ 240,000 912,000 912,000 -
-Semen @ 50 kg 14.00 Zak 53,000 742,000 583,000 159,000
3 Papan
-Papan, Ukuran……… - Lbr - - - -
-Kayu, Ukuran………. - Btg - - - -
VI Pekerjaan Pintu dan Jendela
-Kusen Pintu, Ukuran 0,80 X 2,00 M 1.00 Unit 200,000 200,000 200,000 -
-Kusen Jendela 2.00 Unit 150,000 300,000 300,000 -
-Kusen Ventilasi, Ukuran…… - Unit - - - -
-Daun Pintu Kayu, Ukuran 1.00 Unit 350,000 350,000 350,000 -
-Daun Jendela Kayu, Ukuran 2.00 Unit 200,000 400,000 400,000 -
-Handle Pintu dan Kunci Pintu - Set - - - -
-Handle Jendela dan Kunci Jendela - Set - - - -
-Engsel Pintu - Set 35,000 - - -
-Engsel Jendela - Set 21,000 - - -
VII Ring Balok
1 Pekerjaan bekisting - M² - - - -
2 Pekerjaan Cor Beton
-Besi beton Φ 10 mm SNI 8.00 Btg 68,000 544,000 544,000
-Besi beton Φ 8 mm SNI 8.00 Btg 37,500 300,000 300,000 -
-Semen @ 50 kg 2.00 Zak 53,000 106,000 106,000 -
-Pasir pasang 0.40 M³ 240,000 96,000 96,000 -
-Batu pecah 0.50 M³ 280,000 140,000 140,000 -
VIII Pekerjaan Struktur Atap
-Kayu rangka kuda-kuda, Ukuran 6/12 x 4m 10.00 Btg 100,000 1,000,000 1,000,000 -
-Kayu gapit, Ukuran ……. - Btg - - - -
-Kayu usuk, Ukuran 4/6 x 3 m - Btg 27,000 - - -
-Usuk bambu 100.00 Btg 5,500 550,000 550,000 -
-Reng bambu 360.00 Btg 1,500 540,000 540,000 -
IX Pekerjaan Penutup Atap
1 Penutup Atap 38.40
-Seng gelombang (0,2 cm x 80 cm x 300 cm), atau - Lbr 78,000 - - -
-Genteng - Bh 1,250 - - -
-Bahan penutup atap lainnya yang diijinkan - Lbr - - - -
2 Bubungan Atap Bh

-Seng Lbr - - -
-Genteng bubungan - Bh 5,000 - - -
-Bahan penutup atap lainnya yang diijinkan Lbr - - -
3 Listplang papan, Ukuran……. M³ - - -
X Pekerjaan Lantai
1 Lantai Rabat Campuran minimal 1:5, T= 5 cm 1.60 M3

-Semen @ 50 kg 1.00 Zak 53,000 53,000 53,000 -


-Pasir pasang 0.10 M³ 240,000 24,000 - 24,000
-Batu pecah 0.10 M³ 280,000 28,000 28,000 -
2 Lantai Papan M²

-Papan, Ukuran……….. - Lbr - - - -


-Kayu, Ukuran……….. - Btg - - - -
XI MCK
-Septic Tank - Unit - - - -
-Closet Jongkok - Unit 155,000 - - -
-Pipa Air Bersih, Ukuran…… - Btg 27,500 - - -
-Pipa Air Kotor, Ukuran…… - Btg 85,000 - - -
-Kran - Bh 25,000 - - -
-Pintu Kamar Mandi - Set 210,000 - - -
XII Lain-lain/ Instalasi Listrik
Gamping - Zak 8,000 - - -
Paku 6.67 Kg 15,000 100,000 100,000 -
Bendrat 5.00 Kg 20,000 100,000 100,000 -
Loster 20.00 Bh 5,000 100,000 100,000 -
Papan Bekisting - Lbr - - - -
XIII Upah Kerja
Tukang 60.00 Oh 70,000 4,200,000 2,500,000 1,700,000
Pembantu Tukang 60.00 Oh 60,000 3,600,000 3,600,000

JUMLAH 24,905,000 17,500,000 7,405,000

........................................ .....20
Difasilitasi, Ketua KPB Diajukan Oleh,
Tenaga Fasilitator Lapangan Penerima Bantuan

(.........................................) ( ....................................) ( ....................................)

Disahkan oleh, Diverifikasi Oleh,


Tim Teknis Kabupaten Magelang Koordinator Fasilitator

( ...............................................) ( ....................................)
NIP..........................................
FORMAT III-17

PANJANG LEBAR KELL VOL M2


SUMBER DANA dimensi 4 8 24 32 genteng
SWADAYA pekerjaan
Memakai Bahan
Bangunan Lama atap kuda-kuda
penutup atap 38.4 960.00
SWADAYA pondasi Galian Tanah 5.4
Urugan Pasir 1.44
SWADAYA Pas. Batu belah 3.51
12 beton sloof 0.72
17 8 kolom 0.54
12 balk 15x15 0.54
17 dinding bata
58 batako 72
SWADAYA Plesteran dinding 144
lantai 5cm 1.6
SWADAYA kayu gording 4 m 40
usuk 3 m 24
reng 3 m 80
kusen pintu 80*200 cm 1
jendela 1
daun pintu 80*200 cm 1
jendela 1
pintu kmr 1
SWADAYA JUMLAH 960

dimensi 4 8 24 32 genteng
pekerjaan
atap kuda-kuda 0 -
penutup atap 38.4 -
pondasi Galian Tanah 5.4 -
Urugan Pasir 1.44 -
Pas. Batu belah 3.51 -
beton sloof 0.72 -
8 kolom 0.54 -
balk 15x15 0.54 -
dinding bata 0 -
batako 72 -
Plesteran dinding 144 -
lantai 5cm 1.6 -
kayu gording 4 m 40 -
usuk 3 m 24 -
reng 3 m 80 -
kusen pintu 80*200 cm 1 -
jendela 1 -
daun pintu 80*200 cm 1 -
jendela 1 -
pintu kmr 1 -
JUMLAH 0

SWADAYA
HARGA
MATERIAL VOL SATUAN
SATUAN
Urugan Pasir 240,000 1.00 M³
-Semen @ 50 kg 53,000 44.00 Zak
-Pasir pasang 240,000 12.50 M³
-Batu Kali 215,000 4.00 M³
-Besi beton Φ 10 mm SNI 68,000 24.00 Btg
-Besi beton Φ 8 mm SNI 37,500 24.00 Btg
-Batu pecah 280,000 1.70 M³
-Batu Bata 750 - Bh
-Batako 3,500 1,150.00 Bh
-Kusen Pintu, Ukuran 0,80 X 2,00 M 200,000 1.00 Unit
-Kusen Jendela 150,000 2.00 Unit
-Kusen Ventilasi, Ukuran…… - - Unit
-Daun Pintu Kayu, Ukuran 350,000 1.00 Unit
-Daun Jendela Kayu, Ukuran 200,000 2.00 Unit
-Handle Pintu dan Kunci Pintu - - Set
-Handle Jendela dan Kunci Jendela - - Set
-Engsel Pintu 35,000 - Set
-Engsel Jendela 21,000 - Set
-Kayu rangka kuda-kuda, Ukuran 6/12 x 4m 100,000 10.00 Btg
-Kayu gapit, Ukuran ……. - - Btg
-Kayu usuk, Ukuran 4/6 x 3 m 27,000 - Btg
-Usuk bambu 4m 5,500 100.00 Btg
-Reng bambu 4m 1,500 360.00 Btg
-Seng gelombang (0,2 cm x 80 cm x 300 cm 78,000 - Lbr
-Genteng 1,250 - Bh
-Seng - - Lbr
-Genteng bubungan 5,000 - Bh
-Closet Jongkok 155,000 - Unit
-Pipa Air Bersih, Ukuran…… 27,500 - Btg
-Pipa Air Kotor, Ukuran…… 85,000 - Btg
-Kran 25,000 - Bh
-Pintu Kamar Mandi 210,000 - Set
Gamping 8,000 - Zak
Paku 15,000 6.67 Kg
Bendrat 20,000 5.00 Kg
Loster 5,000 20.00 Bh
Papan Bekisting - - Lbr

15,000,000

- 0
0
........................................ .....2019
Diajukan Oleh,
Penerima Bantuan

( ....................................)

Diverifikasi Oleh,
Koordinator Fasilitator

17,105,000 15,000,000
15,000,000
( ....................................)

-
4
20.25 1.0888888889 4.549 0.45
24.25 0.0108888889

batu semen pasir spit bes 10 besi 8 bata batako

1.00
4.00 6.00 2.10
3.00 0.50 0.60 8.00 9.00
2.00 0.40 0.50 8.00 8.00
2.00 0.40 0.50 8.00 8.00
- - -
16.00 5.20 900.00
14.00 3.80
1.00 0.10 0.10

4 44 13.5 1.7 24 25 0 900

batu semen pasir spit bes 10 besi 8 bata batako

- - - - - - - -
- - - - - - - -
- - - - - - - -
- 1.00 - - - - -
4.00 6.00 2.10 - - - - -
- 3.00 0.50 0.60 8.00 9.00 - -
- 2.00 0.40 0.50 8.00 8.00 - -
- 2.00 0.40 0.50 8.00 8.00 - -
- - - - - - - -
- 16.00 5.20 - - - - 1,150.00
- 14.00 3.80 - - - - -
- 1.00 0.10 0.10 - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
4 44 13.5 1.7 24 25 0 1150

REKAP VOL
BIAYA BSPS DANA BSPS
- -
1,855,000.00 35.00
2,472,000.00 10.30
- -
1,632,000.00 24.00
900,000.00 24.00
476,000.00 1.70
- -
4,025,000.00 1,150.00
200,000.00 1.00
300,000.00 2.00
- #DIV/0!
350,000.00 1.00
400,000.00 2.00
- #DIV/0!
- #DIV/0!
- -
- -
1,000,000.00 10.00
- #DIV/0!
- -
550,000.00 100.00
540,000.00 360.00
- -
- -
- #DIV/0!
- -
- -
- -
- -
- -
- -
- -
100,000.00 6.67
100,000.00 5.00
100,000.00 20.00
- #DIV/0!
15,000,000.00
DA

Nomor BNBA
Nama Penerima Bantuan
Nomor KTP
Alamat
Desa/Kelurahan
kayu kusen daun Kecamatan
Gording usuk reng pintu jendela pintu jendela pintu KM Kabupaten/Kota
Nomor Rekening Penerim

A. Jumlah Dana yang ditr


No.
1
2
3
4
5
6
7
8
10.00 9
28.00 10
84.00 11
1.00 12
1.00 13
1.00 14
1.00 15
1.00 16
10 28 84 1 1 1 1 1

kayu kusen daun TOTAL HARGA PEMBELIAN


Gording usuk reng pintu jendela pintu jendela pintu KM Terbilang : Enam Juta Dua Ra

- - - - - - - - Disanggupi oleh :
- - - - - - - - Nama Toko/Penyedia Baha
- - - - - - - - Alamat Toko/Penyedia Bah
- - - - - - - - Nomor Rekening Bank Tok
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - - B. Jumlah dana yang dita
10.00 - - - - - - - No
- 100.00 - - - - - - 1
- - 360.00 - - - - - TOTAL TARIK TUNAI (B)
- - - 1.00 - - - - Terbilang : Tujuh Juta Lima R
- - - - 2.00 - - -
- - - - - 1.00 - - C. Total dana yang ditarik (
- - - - - - 2.00 - Dana Yang Ditarik (Rp.)
- - - - - - - Terbilang : Tujuh Juta Lima R
10 100 360 1 2 1 2 0

disahkan oleh:
Tim Teknis Kabupaten Ma

( .....................................
NIP.................................

*) coret yang tidak perlu

DA

Nomor BNBA
Nama Penerima Bantuan
Nomor KTP
Alamat
Desa/Kelurahan
Kecamatan
Kabupaten/Kota
Nomor Rekening Penerim

A. Jumlah Dana yang ditr


No.
1
2
3
4
5
6
7
8
9
10
11
12
13
14

TOTAL HARGA PEMBELIAN


Terbilang : Enam Juta Dua Ra

Disanggupi oleh :
Nama Toko/Penyedia Baha
Alamat Toko/Penyedia Bah
Nomor Rekening Bank Tok

B. Jumlah dana yang dita


No
1
TOTAL TARIK TUNAI (B)
Terbilang : Tujuh Juta Lima R

C. Total dana yang ditarik (


Dana Yang Ditarik (Rp.)
Terbilang : Tujuh Juta Lima R
disahkan oleh:
Tim Teknis Kabupaten Ma

( .....................................
NIP.................................

*) coret yang tidak perlu


DAFTAR RENCANA PEMANFAATAN BANTUAN (DRPB) TAHAP 1

Nomor BNBA : 0
Nama Penerima Bantuan : MUH SHOLEH
Nomor KTP : 0
Alamat : 0
Desa/Kelurahan : 0
Kecamatan : 0
Kabupaten/Kota : 0
Nomor Rekening Penerima Bantuan :

A. Jumlah Dana yang ditransfer ke Toko/Penyedia Bahan Bangunan (Tahap I/II *)


Jumlah Harga per Unit
Jenis Bahan Bangunan
(unit) (Rp)
Batu belah 4.00 m3 215,000
Semen 44.00 zak 53,000
Pasir 13.50 m3 240,000
Batu Pecah 1.70 m3 280,000
Besi Ø 10 24.00 btg 68,000
Besi Ø 8 25.00 btg 37,500
Kusen Pintu Ukuran 0,80 x 2,00 m - Bh 200,000
Kusen Jendela - Bh 150,000
Batu Bata - bh 750
Gamping - zak 8,000
Paku 6.67 Kg 15,000
Bendrat - Kg 22,000
Loster - Bh 7,000
Papan Bekisting - Lbr 20,000
Genteng - Bh 1,250
Genteng bubungan - Bh 5,000

TOTAL HARGA PEMBELIAN


Terbilang : Enam Juta Dua Ratus Lima Puluh Ribu Rupiah

Disanggupi oleh :
Nama Toko/Penyedia Bahan Bangunan :
Alamat Toko/Penyedia Bahan Bangunan :
Nomor Rekening Bank Toko/ Penyedi BB :

Toko/Penyedia Bahan Bangunan


(..................................................)

B. Jumlah dana yang ditarik tunai untuk upah kerja (Tahap I / II *)


Uraian Jumlah harga (Rp)
Upah Kerja PKRS 1,250,000
TOTAL TARIK TUNAI (B) 1,250,000
Terbilang : Tujuh Juta Lima Ratus Ribu Rupiah

C. Total dana yang ditarik ( A + B )


Dana Yang Ditarik (Rp.)
Terbilang : Tujuh Juta Lima Ratus Ribu Rupiah

........................................ .....2019
Diajukan Oleh :
Penerima Bantuan

MUH SHOLEH

disahkan oleh: Diverifikasi oleh: Difasilitasi Oleh :


Tim Teknis Kabupaten Magelang Koordinator Fasilitator Tenaga Fasilitator Lapangan

( ...............................................) ( ....................................) (.........................................)


NIP..........................................

*) coret yang tidak perlu

DAFTAR RENCANA PEMANFAATAN BANTUAN (DRPB) TAHAP 2

Nomor BNBA : 0
Nama Penerima Bantuan : MUH SHOLEH
Nomor KTP : 0
Alamat : 0
Desa/Kelurahan : 0
Kecamatan : 0
Kabupaten/Kota : 0
Nomor Rekening Penerima Bantuan : 0

A. Jumlah Dana yang ditransfer ke Toko/Penyedia Bahan Bangunan (Tahap I/II *)


Jumlah Harga per Unit
Jenis Bahan Bangunan
(unit) (Rp)
Batu belah 0 m3 215,000
Semen 28.00 zak 53,000
Pasir 6 m3 240,000
Batu Pecah 0 m3 280,000
Besi Ø 10 25 btg 68,000
Besi Ø 8 0 btg 37,500
Kusen Pintu Ukuran 0,80 x 2,00 m 0 Bh 200,000
Kusen Jendela 0 Bh 150,000
Batu Bata 700 bh 750
Gamping 0 zak 8,000
Paku 0.0 Kg 15,000
Bendrat 0 Kg 22,000
Loster 0 Bh 7,000
Kayu usuk 10 Btg 19,000

TOTAL HARGA PEMBELIAN


Terbilang : Enam Juta Dua Ratus Lima Puluh Ribu Rupiah

Disanggupi oleh :
Nama Toko/Penyedia Bahan Bangunan : 0
Alamat Toko/Penyedia Bahan Bangunan : 0
Nomor Rekening Bank Toko/ Penyedi BB : 0

Toko/Penyedia Bahan Bangunan

(..................................................)

B. Jumlah dana yang ditarik tunai untuk upah kerja (Tahap I / II *)


Uraian Jumlah harga (Rp)
Upah Kerja PKRS/PBRS *) 1,250,000
TOTAL TARIK TUNAI (B) 1,250,000
Terbilang : Tujuh Juta Lima Ratus Ribu Rupiah

C. Total dana yang ditarik ( A + B )


Dana Yang Ditarik (Rp.)
Terbilang : Tujuh Juta Lima Ratus Ribu Rupiah

........................................ .....2019
Diajukan Oleh :
Penerima Bantuan

MUH SHOLEH
disahkan oleh: Diverifikasi oleh: Difasilitasi Oleh :
Tim Teknis Kabupaten Magelang Koordinator Fasilitator Tenaga Fasilitator Lapangan

( ...............................................) ( ....................................) (.........................................)


NIP..........................................

*) coret yang tidak perlu


Format IV - 2

HAP 1

Jumlah Harga
(Rp)
860,000
2,332,000
3,240,000
476,000
1,632,000
937,500
-
-
-
-
100,000
-
-
-
-
-

9,577,500 15,000,000
5,422,500

edia Bahan Bangunan


.................................)

Jumlah harga (Rp)


1,250,000
1,250,000

10,827,500

........................... .....2019
Diajukan Oleh :
Penerima Bantuan

MUH SHOLEH

Difasilitasi Oleh :
enaga Fasilitator Lapangan

.......................................)

Format IV - 2

HAP 2
Jumlah Harga
(Rp)
-
1,484,000
1,440,000
-
1,700,000
-
-
-
525,000
-
129,000
-
-
190,000

5,468,000

edia Bahan Bangunan

.................................)

Jumlah harga (Rp)


1,250,000
1,250,000

6,718,000

..................................... .....2019
Diajukan Oleh :
Penerima Bantuan

MUH SHOLEH
Difasilitasi Oleh :
enaga Fasilitator Lapangan

.......................................)
RENCANA ANGGARAN BIAYA (RAB) BSPS

Nomor BNBA :
Nomor KTP :
Nama Penerima Bantuan : MUH SHOLEH
Alamat :
Desa/Kelurahan :
Kecamatan :
Kabupaten/Kota :
Jenis Kegiatan :

SUMBER DANA
HARGA TOTAL HARGA SWADAYA
NO URAIAN PEKERJAAN VOLUME SATUAN (Rp) (Rp) BSPS
Dana Tunai

I Pekerjaan Persiapan
Bongkar Rumah Lama 1.00 ls - - - -
II Pekerjaan Pondasi

1 Galian Tanah Pondasi 7.65 M³ - - - -


2 Urugan Pasir 3.00 M³ 240,000 720,000 - 720,000

3 Pasangan Pondasi 4.97 M³ - -

-Semen @ 50 kg 9.00 Zak 53,000 477,000 - 477,000


-Pasir pasang 3.00 M³ 240,000 720,000 - 720,000
-Batu Kali 6.00 M³ 215,000 1,290,000 - 1,290,000
4 Urugan kembali 2.68 M³ - - - -
III Pekerjaan Sloof
1 Pekerjaan bekisting M² - - - -
2 Cor Beton Sloof, Ukuran 20 x 15 cm - - -
-Besi beton Φ 10 mm SNI 12.00 Btg 68,000 816,000 816,000 -
-Besi beton Φ 8 mm SNI 8.00 Btg 37,500 300,000 300,000 -
-Semen @ 50 kg 5.00 Zak 53,000 265,000 265,000 -
-Pasir pasang 0.70 M³ 240,000 168,000 168,000 -
-Batu Pecah 0.80 M³ 280,000 224,000 224,000 -
IV Pekerjaan Kolom
1 Pekerjaan bekisting M² 20,000 - - -
2 Cor Beton Kolom, Ukuran 15 x 15 cm min. T=3m 10.00 Bh

-Besi beton Φ 10 mm SNI 8.00 Btg 68,000 544,000 544,000 -


-Besi beton Φ 8 mm SNI 8.00 Btg 37,500 300,000 300,000 -
-Pasir pasang 0.40 M³ 240,000 96,000 96,000 -
-Semen @ 50 kg 2.00 Zak 53,000 106,000 106,000 -
-Batu pecah 0.50 M³ 280,000 140,000 140,000 -
V Dinding Permanen
1 Tembok 102.00 M²

-Pasir Pasang 7.40 M³ 240,000 1,776,000 1,776,000 -


-Semen @ 50 kg 23.00 Zak 53,000 1,219,000 1,219,000
-Batu Bata - Bh 750 - - -
-Batako 1,100.00 Bh 3,500 3,850,000 3,850,000 -
2 Pekerjaan Plester
-Pasir Pasang 5.40 M³ 240,000 1,296,000 - 1,296,000
-Semen @ 50 kg 21.00 Zak 53,000 1,113,000 - 1,113,000
3 Papan
-Papan, Ukuran……… - Lbr - - - -
-Kayu, Ukuran………. - Btg - - - -
VI Pekerjaan Pintu dan Jendela
-Kusen Pintu, Ukuran 0,80 X 2,00 M 1.00 Unit 200,000 200,000 200,000 -
-Kusen Jendela 2.00 Unit 150,000 300,000 300,000 -
-Kusen Ventilasi, Ukuran…… - Unit - - - -
-Daun Pintu Kayu, Ukuran 1.00 Unit 350,000 350,000 350,000 -
-Daun Jendela Kayu, Ukuran 2.00 Unit 200,000 400,000 400,000 -
-Handle Pintu dan Kunci Pintu - Set - - - -
-Handle Jendela dan Kunci Jendela - Set - - - -
-Engsel Pintu - Set 35,000 - - -
-Engsel Jendela - Set 21,000 - - -
VII Ring Balok
1 Pekerjaan bekisting - M² - - - -
2 Pekerjaan Cor Beton
-Besi beton Φ 10 mm SNI 12.00 Btg 68,000 816,000 816,000
-Besi beton Φ 8 mm SNI 11.00 Btg 37,500 412,500 412,500 -
-Semen @ 50 kg 4.00 Zak 53,000 212,000 212,000 -
-Pasir pasang 0.50 M³ 240,000 120,000 120,000 -
-Batu pecah 0.60 M³ 280,000 168,000 168,000 -
VIII Pekerjaan Struktur Atap
-Kayu rangka kuda-kuda, Ukuran 6/12 x 4m - Btg 100,000 - - -
-Kayu gapit, Ukuran ……. - Btg - - - -
-Kayu usuk, Ukuran 4/6 x 3 m - Btg 27,000 - - -
-Usuk Bambu 240.00 m 5,500 1,320,000 1,320,000 -
-Reng Bambu 360.00 m 1,500 540,000 540,000 -
IX Pekerjaan Penutup Atap
1 Penutup Atap 86.40
-Seng gelombang (0,2 cm x 80 cm x 300 cm), atau - Lbr 78,000 - - -
-Genteng - Bh 1,250 - - -
-Bahan penutup atap lainnya yang diijinkan - Lbr - - - -
2 Bubungan Atap Bh

-Seng Lbr - - -
-Genteng bubungan - Bh 5,000 - - -
-Bahan penutup atap lainnya yang diijinkan Lbr - - -
3 Listplang papan, Ukuran……. M³ - - -
X Pekerjaan Lantai
1 Lantai Rabat Campuran minimal 1:5, T= 5 cm 3.60 M3

-Semen @ 50 kg 1.00 Zak 53,000 53,000 53,000 -


-Pasir pasang 0.10 M³ 240,000 24,000 24,000 -
-Batu pecah 0.20 M³ 280,000 56,000 56,000 -
2 Lantai Papan M²

-Papan, Ukuran……….. - Lbr - - - -


-Kayu, Ukuran……….. - Btg - - - -
XI MCK
-Septic Tank - Unit - - - -
-Closet Jongkok - Unit 155,000 - - -
-Pipa Air Bersih, Ukuran…… - Btg 27,500 - - -
-Pipa Air Kotor, Ukuran…… - Btg 85,000 - - -
-Kran - Bh 25,000 - - -
-Pintu Kamar Mandi - Set 210,000 - - -
XII Lain-lain/ Instalasi Listrik
Gamping - Zak 8,000 - - -
Paku 4.97 Kg 15,000 74,500 74,500 -
Bendrat 5.00 Kg 20,000 100,000 100,000 -
Loster 10.00 Bh 5,000 50,000 50,000 -
Papan Bekisting - Lbr - - - -
XIII Upah Kerja
Tukang 60.00 Oh 70,000 4,200,000 2,500,000 1,700,000
Pembantu Tukang 60.00 Oh 60,000 3,600,000 3,600,000

JUMLAH 28,416,000 17,500,000 10,916,000

........................................ .....20
Difasilitasi, Ketua KPB Diajukan Oleh,
Tenaga Fasilitator Lapangan Penerima Bantuan

(.........................................) ( ....................................) ( ....................................)

Disahkan oleh, Diverifikasi Oleh,


Tim Teknis Kabupaten Magelang Koordinator Fasilitator

( ...............................................) ( ....................................)
NIP..........................................
FORMAT III-17

PANJANG LEBAR KELL VOL M2


SUMBER DANA dimensi 8 9 34 72 genteng
SWADAYA pekerjaan
Memakai Bahan
Bangunan Lama atap kuda-kuda
penutup atap 86.4 2,160.00
SWADAYA pondasi Galian Tanah 7.65
Urugan Pasir 3.24
SWADAYA Pas. Batu belah 4.9725
12 beton sloof 1.02
17 8 kolom 0.54
12 balk 15x15 0.765
17 dinding bata
58 batako 102
SWADAYA Plesteran dinding 204
lantai 5cm 3.6
SWADAYA kayu gording 4 m 45
usuk 3 m 34
reng 3 m 180
kusen pintu 80*200 cm 1
jendela 1
daun pintu 80*200 cm 1
jendela 1
pintu kmr 1
SWADAYA JUMLAH 2160

dimensi 8 9 34 72 genteng
pekerjaan
atap kuda-kuda 0 -
penutup atap 86.4 -
pondasi Galian Tanah 7.65 -
Urugan Pasir 3.24 -
Pas. Batu belah 4.9725 -
beton sloof 1.02 -
10 kolom 0.54 -
balk 15x15 0.765 -
dinding bata 0 -
batako 102 -
Plesteran dinding 204 -
lantai 5cm 3.6 -
kayu gording 4 m 45 -
usuk 3 m 34 -
reng 3 m 180 -
kusen pintu 80*200 cm 1 -
jendela 1 -
daun pintu 80*200 cm 1 -
jendela 1 -
pintu kmr 1 -
JUMLAH 0

SWADAYA
HARGA
MATERIAL VOL SATUAN
SATUAN
Urugan Pasir 240,000 3.00 M³
-Semen @ 50 kg 53,000 65.00 Zak
-Pasir pasang 240,000 17.50 M³
-Batu Kali 215,000 6.00 M³
-Besi beton Φ 10 mm SNI 68,000 32.00 Btg
-Besi beton Φ 8 mm SNI 37,500 27.00 Btg
-Batu pecah 280,000 2.10 M³
-Batu Bata 750 - Bh
-Batako 3,500 1,100.00 Bh
-Kusen Pintu, Ukuran 0,80 X 2,00 M 200,000 1.00 Unit
-Kusen Jendela 150,000 2.00 Unit
-Kusen Ventilasi, Ukuran…… - - Unit
-Daun Pintu Kayu, Ukuran 350,000 1.00 Unit
-Daun Jendela Kayu, Ukuran 200,000 2.00 Unit
-Handle Pintu dan Kunci Pintu - - Set
-Handle Jendela dan Kunci Jendela - - Set
-Engsel Pintu 35,000 - Set
-Engsel Jendela 21,000 - Set
-Kayu rangka kuda-kuda, Ukuran 6/12 x 4m 100,000 - Btg
-Kayu gapit, Ukuran ……. - - Btg
-Kayu usuk, Ukuran 4/6 x 3 m 27,000 - Btg
-Usuk Bambu 4m 5,500 240.00 m
-Reng Bambu 4m 1,500 360.00 m
-Seng gelombang (0,2 cm x 80 cm x 300 cm 78,000 - Lbr
-Genteng 1,250 - Bh
-Seng - - Lbr
-Genteng bubungan 5,000 - Bh
-Closet Jongkok 155,000 - Unit
-Pipa Air Bersih, Ukuran…… 27,500 - Btg
-Pipa Air Kotor, Ukuran…… 85,000 - Btg
-Kran 25,000 - Bh
-Pintu Kamar Mandi 210,000 - Set
Gamping 8,000 - Zak
Paku 15,000 4.97 Kg
Bendrat 20,000 5.00 Kg
Loster 5,000 10.00 Bh
Papan Bekisting - - Lbr

15,000,000

- 0
0
........................................ .....2019
Diajukan Oleh,
Penerima Bantuan

( ....................................)

Diverifikasi Oleh,
Koordinator Fasilitator

20,616,000 15,000,000
15,000,000
( ....................................)

-
4
20.25 1.0888888889 4.549 0.45
24.25 0.0108888889

batu semen pasir spit bes 10 besi 8 bata batako

3.00
6.00 9.00 3.00
5.00 0.70 0.80 12.00 12.00
2.00 0.40 0.50 8.00 8.00
4.00 0.50 0.60 12.00 11.00
- - -
23.00 7.40 1,275.00
21.00 5.40
1.00 0.10 0.20

6 65 20.5 2.1 32 31 0 1275

batu semen pasir spit bes 10 besi 8 bata batako

- - - - - - - -
- - - - - - - -
- - - - - - - -
- 3.00 - - - - -
6.00 9.00 3.00 - - - - -
- 5.00 0.70 0.80 12.00 12.00 - -
- 2.00 0.40 0.50 8.00 8.00 - -
- 4.00 0.50 0.60 12.00 11.00 - -
- - - - - - - -
- 23.00 7.40 - - - - 1,100.00
- 21.00 5.40 - - - - -
- 1.00 0.10 0.20 - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
6 65 20.5 2.1 32 31 0 1100

REKAP VOL
BIAYA BSPS DANA BSPS
- -
1,855,000.00 35.00
2,184,000.00 9.10
- -
2,176,000.00 32.00
1,012,500.00 27.00
588,000.00 2.10
- -
3,850,000.00 1,100.00
200,000.00 1.00
300,000.00 2.00
- #DIV/0!
350,000.00 1.00
400,000.00 2.00
- #DIV/0!
- #DIV/0!
- -
- -
- -
- #DIV/0!
- -
1,320,000.00 240.00
540,000.00 360.00
- -
- -
- #DIV/0!
- -
- -
- -
- -
- -
- -
- -
74,500.00 4.97
100,000.00 5.00
50,000.00 10.00
- #DIV/0!
15,000,000.00
DA

Nomor BNBA
Nama Penerima Bantuan
Nomor KTP
Alamat
Desa/Kelurahan
kayu kusen daun Kecamatan
Gording usuk reng pintu jendela pintu jendela pintu KM Kabupaten/Kota
Nomor Rekening Penerim

A. Jumlah Dana yang ditr


No.
1
2
3
4
5
6
7
8
12.00 9
38.00 10
184.00 11
1.00 12
1.00 13
1.00 14
1.00 15
1.00 16
12 38 184 1 1 1 1 1

kayu kusen daun TOTAL HARGA PEMBELIAN


Gording usuk reng pintu jendela pintu jendela pintu KM Terbilang : Enam Juta Dua Ra

- - - - - - - - Disanggupi oleh :
- - - - - - - - Nama Toko/Penyedia Baha
- - - - - - - - Alamat Toko/Penyedia Bah
- - - - - - - - Nomor Rekening Bank Tok
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - - B. Jumlah dana yang dita
- - - - - - - - No
- 240.00 - - - - - - 1
- - 360.00 - - - - - TOTAL TARIK TUNAI (B)
- - - 1.00 - - - - Terbilang : Tujuh Juta Lima R
- - - - 2.00 - - -
- - - - - 1.00 - - C. Total dana yang ditarik (
- - - - - - 2.00 - Dana Yang Ditarik (Rp.)
- - - - - - - Terbilang : Tujuh Juta Lima R
0 240 360 1 2 1 2 0

disahkan oleh:
Tim Teknis Kabupaten Ma

( .....................................
NIP.................................

*) coret yang tidak perlu

DA

Nomor BNBA
Nama Penerima Bantuan
Nomor KTP
Alamat
Desa/Kelurahan
Kecamatan
Kabupaten/Kota
Nomor Rekening Penerim

A. Jumlah Dana yang ditr


No.
1
2
3
4
5
6
7
8
9
10
11
12
13
14

TOTAL HARGA PEMBELIAN


Terbilang : Enam Juta Dua Ra

Disanggupi oleh :
Nama Toko/Penyedia Baha
Alamat Toko/Penyedia Bah
Nomor Rekening Bank Tok

B. Jumlah dana yang dita


No
1
TOTAL TARIK TUNAI (B)
Terbilang : Tujuh Juta Lima R

C. Total dana yang ditarik (


Dana Yang Ditarik (Rp.)
Terbilang : Tujuh Juta Lima R
disahkan oleh:
Tim Teknis Kabupaten Ma

( .....................................
NIP.................................

*) coret yang tidak perlu


DAFTAR RENCANA PEMANFAATAN BANTUAN (DRPB) TAHAP 1

Nomor BNBA : 0
Nama Penerima Bantuan : MUH SHOLEH
Nomor KTP : 0
Alamat : 0
Desa/Kelurahan : 0
Kecamatan : 0
Kabupaten/Kota : 0
Nomor Rekening Penerima Bantuan :

A. Jumlah Dana yang ditransfer ke Toko/Penyedia Bahan Bangunan (Tahap I/II *)


Jumlah Harga per Unit
Jenis Bahan Bangunan
(unit) (Rp)
Batu belah 6.00 m3 215,000
Semen 65.00 zak 53,000
Pasir 20.50 m3 240,000
Batu Pecah 2.10 m3 280,000
Besi Ø 10 32.00 btg 68,000
Besi Ø 8 31.00 btg 37,500
Kusen Pintu Ukuran 0,80 x 2,00 m - Bh 200,000
Kusen Jendela - Bh 150,000
Batu Bata - bh 750
Gamping - zak 8,000
Paku 4.97 Kg 15,000
Bendrat - Kg 22,000
Loster - Bh 7,000
Papan Bekisting - Lbr 20,000
Genteng - Bh 1,250
Genteng bubungan - Bh 5,000

TOTAL HARGA PEMBELIAN


Terbilang : Enam Juta Dua Ratus Lima Puluh Ribu Rupiah

Disanggupi oleh :
Nama Toko/Penyedia Bahan Bangunan :
Alamat Toko/Penyedia Bahan Bangunan :
Nomor Rekening Bank Toko/ Penyedi BB :

Toko/Penyedia Bahan Bangunan


(..................................................)

B. Jumlah dana yang ditarik tunai untuk upah kerja (Tahap I / II *)


Uraian Jumlah harga (Rp)
Upah Kerja PKRS 1,250,000
TOTAL TARIK TUNAI (B) 1,250,000
Terbilang : Tujuh Juta Lima Ratus Ribu Rupiah

C. Total dana yang ditarik ( A + B )


Dana Yang Ditarik (Rp.)
Terbilang : Tujuh Juta Lima Ratus Ribu Rupiah

........................................ .....2019
Diajukan Oleh :
Penerima Bantuan

MUH SHOLEH

disahkan oleh: Diverifikasi oleh: Difasilitasi Oleh :


Tim Teknis Kabupaten Magelang Koordinator Fasilitator Tenaga Fasilitator Lapangan

( ...............................................) ( ....................................) (.........................................)


NIP..........................................

*) coret yang tidak perlu

DAFTAR RENCANA PEMANFAATAN BANTUAN (DRPB) TAHAP 2

Nomor BNBA : 0
Nama Penerima Bantuan : MUH SHOLEH
Nomor KTP : 0
Alamat : 0
Desa/Kelurahan : 0
Kecamatan : 0
Kabupaten/Kota : 0
Nomor Rekening Penerima Bantuan : 0

A. Jumlah Dana yang ditransfer ke Toko/Penyedia Bahan Bangunan (Tahap I/II *)


Jumlah Harga per Unit
Jenis Bahan Bangunan
(unit) (Rp)
Batu belah 0 m3 215,000
Semen 49.00 zak 53,000
Pasir 6 m3 240,000
Batu Pecah 0 m3 280,000
Besi Ø 10 25 btg 68,000
Besi Ø 8 0 btg 37,500
Kusen Pintu Ukuran 0,80 x 2,00 m 0 Bh 200,000
Kusen Jendela 0 Bh 150,000
Batu Bata 700 bh 750
Gamping 0 zak 8,000
Paku 0.0 Kg 15,000
Bendrat 0 Kg 22,000
Loster 0 Bh 7,000
Kayu usuk 10 Btg 19,000

TOTAL HARGA PEMBELIAN


Terbilang : Enam Juta Dua Ratus Lima Puluh Ribu Rupiah

Disanggupi oleh :
Nama Toko/Penyedia Bahan Bangunan : 0
Alamat Toko/Penyedia Bahan Bangunan : 0
Nomor Rekening Bank Toko/ Penyedi BB : 0

Toko/Penyedia Bahan Bangunan

(..................................................)

B. Jumlah dana yang ditarik tunai untuk upah kerja (Tahap I / II *)


Uraian Jumlah harga (Rp)
Upah Kerja PKRS/PBRS *) 1,250,000
TOTAL TARIK TUNAI (B) 1,250,000
Terbilang : Tujuh Juta Lima Ratus Ribu Rupiah

C. Total dana yang ditarik ( A + B )


Dana Yang Ditarik (Rp.)
Terbilang : Tujuh Juta Lima Ratus Ribu Rupiah

........................................ .....2019
Diajukan Oleh :
Penerima Bantuan

MUH SHOLEH
disahkan oleh: Diverifikasi oleh: Difasilitasi Oleh :
Tim Teknis Kabupaten Magelang Koordinator Fasilitator Tenaga Fasilitator Lapangan

( ...............................................) ( ....................................) (.........................................)


NIP..........................................

*) coret yang tidak perlu


Format IV - 2

HAP 1

Jumlah Harga
(Rp)
1,290,000
3,445,000
4,920,000
588,000
2,176,000
1,162,500
-
-
-
-
74,500
-
-
-
-
-

13,656,000 15,000,000
1,344,000

edia Bahan Bangunan


.................................)

Jumlah harga (Rp)


1,250,000
1,250,000

14,906,000

........................... .....2019
Diajukan Oleh :
Penerima Bantuan

MUH SHOLEH

Difasilitasi Oleh :
enaga Fasilitator Lapangan

.......................................)

Format IV - 2

HAP 2
Jumlah Harga
(Rp)
-
2,597,000
1,440,000
-
1,700,000
-
-
-
525,000
-
129,000
-
-
190,000

6,581,000

edia Bahan Bangunan

.................................)

Jumlah harga (Rp)


1,250,000
1,250,000

7,831,000

..................................... .....2019
Diajukan Oleh :
Penerima Bantuan

MUH SHOLEH
Difasilitasi Oleh :
enaga Fasilitator Lapangan

.......................................)
RENCANA ANGGARAN BIAYA (RAB) BSPS

Nomor BNBA :
Nomor KTP :
Nama Penerima Bantuan : MUH SHOLEH
Alamat :
Desa/Kelurahan :
Kecamatan :
Kabupaten/Kota :
Jenis Kegiatan :

SUMBER DANA
HARGA TOTAL HARGA SWADAYA
NO URAIAN PEKERJAAN VOLUME SATUAN (Rp) (Rp) BSPS
Dana Tunai

I Pekerjaan Persiapan
Bongkar Rumah Lama 1.00 ls - - - -
II Pekerjaan Pondasi

1 Galian Tanah Pondasi 7.20 M³ - - - -


2 Urugan Pasir 2.00 M³ 240,000 480,000 - 480,000

3 Pasangan Pondasi 4.68 M³ - -

-Semen @ 50 kg 8.00 Zak 53,000 424,000 - 424,000


-Pasir pasang 2.80 M³ 240,000 672,000 - 672,000
-Batu Kali 6.00 M³ 215,000 1,290,000 - 1,290,000
4 Urugan kembali 2.52 M³ - - - -
III Pekerjaan Sloof
1 Pekerjaan bekisting M² - - - -
2 Cor Beton Sloof, Ukuran 20 x 15 cm - - -
-Besi beton Φ 10 mm SNI 5.00 Btg 68,000 340,000 340,000 -
-Besi beton Φ 8 mm SNI 5.00 Btg 37,500 187,500 187,500 -
-Semen @ 50 kg 5.00 Zak 53,000 265,000 265,000 -
-Pasir pasang 0.60 M³ 240,000 144,000 144,000 -
-Batu Pecah 0.80 M³ 280,000 224,000 224,000 -
IV Pekerjaan Kolom
1 Pekerjaan bekisting M² 20,000 - - -
2 Cor Beton Kolom, Ukuran 15 x 15 cm min. T=3m 5.00 Bh

-Besi beton Φ 10 mm SNI 5.00 Btg 68,000 340,000 340,000 -


-Besi beton Φ 8 mm SNI 5.00 Btg 37,500 187,500 187,500 -
-Pasir pasang 0.20 M³ 240,000 48,000 48,000 -
-Semen @ 50 kg 1.00 Zak 53,000 53,000 53,000 -
-Batu pecah 0.30 M³ 280,000 84,000 84,000 -
V Dinding Permanen
1 Tembok 96.00 M²

-Pasir Pasang 7.00 M³ 240,000 1,680,000 1,680,000 -


-Semen @ 50 kg 12.00 Zak 53,000 636,000 636,000
-Batu Bata - Bh 750 - - -
-Batako 750.00 Bh 3,500 2,625,000 2,625,000 -
2 Pekerjaan Plester
-Pasir Pasang 5.00 M³ 240,000 1,200,000 - 1,200,000
-Semen @ 50 kg 19.00 Zak 53,000 1,007,000 424,000 583,000
3 Papan
-Papan, Ukuran……… - Lbr - - - -
-Kayu, Ukuran………. - Btg - - - -
VI Pekerjaan Pintu dan Jendela
-Kusen Pintu, Ukuran 0,80 X 2,00 M 2.00 Unit 200,000 400,000 400,000 -
-Kusen Jendela 2.00 Unit 150,000 300,000 300,000 -
-Kusen Ventilasi, Ukuran…… - Unit - - - -
-Daun Pintu Kayu, Ukuran 2.00 Unit 350,000 700,000 700,000 -
-Daun Jendela Kayu, Ukuran 2.00 Unit 200,000 400,000 400,000 -
-Handle Pintu dan Kunci Pintu - Set - - - -
-Handle Jendela dan Kunci Jendela - Set - - - -
-Engsel Pintu - Set 35,000 - - -
-Engsel Jendela - Set 21,000 - - -
VII Ring Balok
1 Pekerjaan bekisting - M² - - - -
2 Pekerjaan Cor Beton
-Besi beton Φ 10 mm SNI 11.00 Btg 68,000 748,000 748,000
-Besi beton Φ 8 mm SNI 11.00 Btg 37,500 412,500 412,500 -
-Semen @ 50 kg 3.00 Zak 53,000 159,000 159,000 -
-Pasir pasang 0.50 M³ 240,000 120,000 120,000 -
-Batu pecah 0.60 M³ 280,000 168,000 168,000 -
VIII Pekerjaan Struktur Atap
-Kayu rangka kuda-kuda, Ukuran 6/12 x 4m 5.00 Btg 100,000 500,000 500,000 -
-Kayu gapit, Ukuran ……. - Btg - - - -
-Kayu usuk, Ukuran 4/6 x 2m - Btg 27,000 - - -
-Usuk bambu 120.00 Btg 5,500 660,000 660,000 -
-Reng Bambu 280.00 Btg 1,500 420,000 420,000 -
IX Pekerjaan Penutup Atap
1 Penutup Atap 57.60
-Seng gelombang (0,2 cm x 80 cm x 300 cm), atau - Lbr 78,000 - - -
-Genteng 1,500.00 Bh 1,250 1,875,000 1,875,000 -
-Bahan penutup atap lainnya yang diijinkan - Lbr - - - -
2 Bubungan Atap Bh

-Seng Lbr - - -
-Genteng bubungan 30.00 Bh 5,000 150,000 150,000 -
-Bahan penutup atap lainnya yang diijinkan Lbr - - -
3 Listplang papan, Ukuran……. M³ - - -
X Pekerjaan Lantai
1 Lantai Rabat Campuran minimal 1:5, T= 5 cm 2.40 M3

-Semen @ 50 kg 1.00 Zak 53,000 53,000 53,000 -


-Pasir pasang 0.10 M³ 240,000 24,000 24,000 -
-Batu pecah 0.20 M³ 280,000 56,000 56,000 -
2 Lantai Papan M²

-Papan, Ukuran……….. - Lbr - - - -


-Kayu, Ukuran……….. - Btg - - - -
XI MCK
-Septic Tank - Unit - - - -
-Closet Jongkok 1.00 Unit 155,000 155,000 155,000 -
-Pipa Air Bersih, Ukuran…… - Btg 27,500 - - -
-Pipa Air Kotor, Ukuran…… - Btg 85,000 - - -
-Kran - Bh 25,000 - - -
-Pintu Kamar Mandi 1.00 Set 210,000 210,000 210,000 -
XII Lain-lain/ Instalasi Listrik
Gamping - Zak 8,000 - - -
Paku 8.10 Kg 15,000 121,500 121,500 -
Bendrat 5.00 Kg 20,000 100,000 100,000 -
Loster 6.00 Bh 5,000 30,000 30,000 -
Papan Bekisting - Lbr - - - -
XIII Upah Kerja
Tukang 60.00 Oh 70,000 4,200,000 2,500,000 1,700,000
Pembantu Tukang 60.00 Oh 60,000 3,600,000 3,600,000

JUMLAH 27,449,000 17,500,000 9,949,000

........................................ .....20
Difasilitasi, Ketua KPB Diajukan Oleh,
Tenaga Fasilitator Lapangan Penerima Bantuan

(.........................................) ( ....................................) ( ....................................)

Disahkan oleh, Diverifikasi Oleh,


Tim Teknis Kabupaten Magelang Koordinator Fasilitator

( ...............................................) ( ....................................)
NIP..........................................
FORMAT III-17

PANJANG LEBAR KELL VOL M2


SUMBER DANA dimensi 12 4 32 48 genteng
SWADAYA pekerjaan
Memakai Bahan
Bangunan Lama atap kuda-kuda
penutup atap 57.6 1,440.00
SWADAYA pondasi Galian Tanah 7.2
Urugan Pasir 2.16
SWADAYA Pas. Batu belah 4.68
12 beton sloof 0.96
17 5 kolom 0.3375
12 balk 15x15 0.72
17 dinding bata
58 batako 96
SWADAYA Plesteran dinding 192
lantai 5cm 2.4
SWADAYA kayu gording 4 m 20
usuk 2 m 32
reng 2m 120
kusen pintu 80*200 cm 1
jendela 1
daun pintu 80*200 cm 1
jendela 1
pintu kmr 1
SWADAYA JUMLAH 1440

dimensi 12 4 32 48 genteng
pekerjaan
atap kuda-kuda 0 -
penutup atap 57.6 1,500.00
pondasi Galian Tanah 7.2 -
Urugan Pasir 2.16 -
Pas. Batu belah 4.68 -
beton sloof 0.96 -
5 kolom 0.3375 -
balk 15x15 0.72 -
dinding bata 0 -
batako 96 -
Plesteran dinding 192 -
lantai 5cm 2.4 -
kayu gording 4 m 20 -
usuk 2 m 32 -
reng 2m 120 -
kusen pintu 80*200 cm 1 -
jendela 1 -
daun pintu 80*200 cm 1 -
jendela 1 -
pintu kmr 1 -
JUMLAH 1500

SWADAYA
HARGA
MATERIAL VOL SATUAN
SATUAN
Urugan Pasir 240,000 2.00 M³
-Semen @ 50 kg 53,000 49.00 Zak
-Pasir pasang 240,000 16.20 M³
-Batu Kali 215,000 6.00 M³
-Besi beton Φ 10 mm SNI 68,000 21.00 Btg
-Besi beton Φ 8 mm SNI 37,500 21.00 Btg
-Batu pecah 280,000 1.90 M³
-Batu Bata 750 - Bh
-Batako 3,500 750.00 Bh
-Kusen Pintu, Ukuran 0,80 X 2,00 M 200,000 2.00 Unit
-Kusen Jendela 150,000 2.00 Unit
-Kusen Ventilasi, Ukuran…… - - Unit
-Daun Pintu Kayu, Ukuran 350,000 2.00 Unit
-Daun Jendela Kayu, Ukuran 200,000 2.00 Unit
-Handle Pintu dan Kunci Pintu - - Set
-Handle Jendela dan Kunci Jendela - - Set
-Engsel Pintu 35,000 - Set
-Engsel Jendela 21,000 - Set
-Kayu rangka kuda-kuda, Ukuran 6/12 x 4m 100,000 5.00 Btg
-Kayu gapit, Ukuran ……. - - Btg
-Kayu usuk, Ukuran 4/6 x 2m 27,000 - Btg
-Usuk bambu 4m 5,500 120.00 Btg
-Reng Bambu 4m 1,500 280.00 Btg
-Seng gelombang (0,2 cm x 80 cm x 300 cm 78,000 - Lbr
-Genteng 1,250 1,500.00 Bh
-Seng - - Lbr
-Genteng bubungan 5,000 30.00 Bh
-Closet Jongkok 155,000 1.00 Unit
-Pipa Air Bersih, Ukuran…… 27,500 - Btg
-Pipa Air Kotor, Ukuran…… 85,000 - Btg
-Kran 25,000 - Bh
-Pintu Kamar Mandi 210,000 1.00 Set
Gamping 8,000 - Zak
Paku 15,000 8.10 Kg
Bendrat 20,000 5.00 Kg
Loster 5,000 6.00 Bh
Papan Bekisting - - Lbr

15,000,000

- 0
0
........................................ .....2019
Diajukan Oleh,
Penerima Bantuan

( ....................................)

Diverifikasi Oleh,
Koordinator Fasilitator

19,649,000 15,000,000
15,000,000
( ....................................)

-
4
20.25 1.0888888889 4.549 0.45
24.25 0.0108888889

batu semen pasir spit bes 10 besi 8 bata batako

2.00
6.00 8.00 2.80
5.00 0.60 0.80 11.00 12.00
1.00 0.20 0.30 5.00 5.00
3.00 0.50 0.60 11.00 11.00
- - -
22.00 7.00 1,200.00
19.00 5.00
1.00 0.10 0.20

6 59 18.2 1.9 27 28 0 1200

batu semen pasir spit bes 10 besi 8 bata batako

- - - - - - - -
- - - - - - - -
- - - - - - - -
- 2.00 - - - - -
6.00 8.00 2.80 - - - - -
- 5.00 0.60 0.80 5.00 4.00 - -
- 1.00 0.20 0.30 5.00 5.00 - -
- 3.00 0.50 0.60 11.00 11.00 - -
- - - - - - - -
- 12.00 7.00 - - - - 750.00
- 19.00 5.00 - - - - -
- 1.00 0.10 0.20 - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
6 49 18.2 1.9 21 20 0 750

REKAP VOL
BIAYA BSPS DANA BSPS
- -
1,590,000.00 30.00
2,016,000.00 8.40
- -
1,428,000.00 21.00
787,500.00 21.00
532,000.00 1.90
- -
2,625,000.00 750.00
400,000.00 2.00
300,000.00 2.00
- #DIV/0!
700,000.00 2.00
400,000.00 2.00
- #DIV/0!
- #DIV/0!
- -
- -
500,000.00 5.00
- #DIV/0!
- -
660,000.00 120.00
420,000.00 280.00
- -
1,875,000.00 1,500.00
- #DIV/0!
150,000.00 30.00
155,000.00 1.00
- -
- -
- -
210,000.00 1.00
- -
121,500.00 8.10
100,000.00 5.00
30,000.00 6.00
- #DIV/0!
15,000,000.00
DA

Nomor BNBA
Nama Penerima Bantuan
Nomor KTP
Alamat
Desa/Kelurahan
kayu kusen daun Kecamatan
Gording usuk reng pintu jendela pintu jendela pintu KM Kabupaten/Kota
Nomor Rekening Penerim

A. Jumlah Dana yang ditr


No.
1
2
3
4
5
6
7
8
5.00 9
36.00 10
124.00 11
1.00 12
1.00 13
1.00 14
1.00 15
1.00 16
5 36 124 1 1 1 1 1

kayu kusen daun TOTAL HARGA PEMBELIAN


Gording usuk reng pintu jendela pintu jendela pintu KM Terbilang : Enam Juta Dua Ra

- - - - - - - - Disanggupi oleh :
- - - - - - - - Nama Toko/Penyedia Baha
- - - - - - - - Alamat Toko/Penyedia Bah
- - - - - - - - Nomor Rekening Bank Tok
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - - B. Jumlah dana yang dita
5.00 - - - - - - - No
- 120.00 - - - - - - 1
- - 280.00 - - - - - TOTAL TARIK TUNAI (B)
- - - 2.00 - - - - Terbilang : Tujuh Juta Lima R
- - - - 2.00 - - -
- - - - - 2.00 - - C. Total dana yang ditarik (
- - - - - - 2.00 - Dana Yang Ditarik (Rp.)
- - - - - - - 1.00 Terbilang : Tujuh Juta Lima R
5 120 280 2 2 2 2 1

disahkan oleh:
Tim Teknis Kabupaten Ma

( .....................................
NIP.................................

*) coret yang tidak perlu

DA

Nomor BNBA
Nama Penerima Bantuan
Nomor KTP
Alamat
Desa/Kelurahan
Kecamatan
Kabupaten/Kota
Nomor Rekening Penerim

A. Jumlah Dana yang ditr


No.
1
2
3
4
5
6
7
8
9
10
11
12
13
14

TOTAL HARGA PEMBELIAN


Terbilang : Enam Juta Dua Ra

Disanggupi oleh :
Nama Toko/Penyedia Baha
Alamat Toko/Penyedia Bah
Nomor Rekening Bank Tok

B. Jumlah dana yang dita


No
1
TOTAL TARIK TUNAI (B)
Terbilang : Tujuh Juta Lima R

C. Total dana yang ditarik (


Dana Yang Ditarik (Rp.)
Terbilang : Tujuh Juta Lima R
disahkan oleh:
Tim Teknis Kabupaten Ma

( .....................................
NIP.................................

*) coret yang tidak perlu


DAFTAR RENCANA PEMANFAATAN BANTUAN (DRPB) TAHAP 1

Nomor BNBA : 0
Nama Penerima Bantuan : MUH SHOLEH
Nomor KTP : 0
Alamat : 0
Desa/Kelurahan : 0
Kecamatan : 0
Kabupaten/Kota : 0
Nomor Rekening Penerima Bantuan :

A. Jumlah Dana yang ditransfer ke Toko/Penyedia Bahan Bangunan (Tahap I/II *)


Jumlah Harga per Unit
Jenis Bahan Bangunan
(unit) (Rp)
Batu belah 6.00 m3 215,000
Semen 49.00 zak 53,000
Pasir 18.20 m3 240,000
Batu Pecah 1.90 m3 280,000
Besi Ø 10 21.00 btg 68,000
Besi Ø 8 20.00 btg 37,500
Kusen Pintu Ukuran 0,80 x 2,00 m - Bh 200,000
Kusen Jendela - Bh 150,000
Batu Bata - bh 750
Gamping - zak 8,000
Paku 8.10 Kg 15,000
Bendrat - Kg 22,000
Loster - Bh 7,000
Papan Bekisting - Lbr 20,000
Genteng 1,500.00 Bh 1,250
Genteng bubungan 30.00 Bh 5,000

TOTAL HARGA PEMBELIAN


Terbilang : Enam Juta Dua Ratus Lima Puluh Ribu Rupiah

Disanggupi oleh :
Nama Toko/Penyedia Bahan Bangunan :
Alamat Toko/Penyedia Bahan Bangunan :
Nomor Rekening Bank Toko/ Penyedi BB :

Toko/Penyedia Bahan Bangunan


(..................................................)

B. Jumlah dana yang ditarik tunai untuk upah kerja (Tahap I / II *)


Uraian Jumlah harga (Rp)
Upah Kerja PKRS 1,250,000
TOTAL TARIK TUNAI (B) 1,250,000
Terbilang : Tujuh Juta Lima Ratus Ribu Rupiah

C. Total dana yang ditarik ( A + B )


Dana Yang Ditarik (Rp.)
Terbilang : Tujuh Juta Lima Ratus Ribu Rupiah

........................................ .....2019
Diajukan Oleh :
Penerima Bantuan

MUH SHOLEH

disahkan oleh: Diverifikasi oleh: Difasilitasi Oleh :


Tim Teknis Kabupaten Magelang Koordinator Fasilitator Tenaga Fasilitator Lapangan

( ...............................................) ( ....................................) (.........................................)


NIP..........................................

*) coret yang tidak perlu

DAFTAR RENCANA PEMANFAATAN BANTUAN (DRPB) TAHAP 2

Nomor BNBA : 0
Nama Penerima Bantuan : MUH SHOLEH
Nomor KTP : 0
Alamat : 0
Desa/Kelurahan : 0
Kecamatan : 0
Kabupaten/Kota : 0
Nomor Rekening Penerima Bantuan : 0

A. Jumlah Dana yang ditransfer ke Toko/Penyedia Bahan Bangunan (Tahap I/II *)


Jumlah Harga per Unit
Jenis Bahan Bangunan
(unit) (Rp)
Batu belah 0 m3 215,000
Semen 33.00 zak 53,000
Pasir 6 m3 240,000
Batu Pecah 0 m3 280,000
Besi Ø 10 25 btg 68,000
Besi Ø 8 0 btg 37,500
Kusen Pintu Ukuran 0,80 x 2,00 m 0 Bh 200,000
Kusen Jendela 0 Bh 150,000
Batu Bata 700 bh 750
Gamping 0 zak 8,000
Paku 0.0 Kg 15,000
Bendrat 0 Kg 22,000
Loster 0 Bh 7,000
Kayu usuk 10 Btg 19,000

TOTAL HARGA PEMBELIAN


Terbilang : Enam Juta Dua Ratus Lima Puluh Ribu Rupiah

Disanggupi oleh :
Nama Toko/Penyedia Bahan Bangunan : 0
Alamat Toko/Penyedia Bahan Bangunan : 0
Nomor Rekening Bank Toko/ Penyedi BB : 0

Toko/Penyedia Bahan Bangunan

(..................................................)

B. Jumlah dana yang ditarik tunai untuk upah kerja (Tahap I / II *)


Uraian Jumlah harga (Rp)
Upah Kerja PKRS/PBRS *) 1,250,000
TOTAL TARIK TUNAI (B) 1,250,000
Terbilang : Tujuh Juta Lima Ratus Ribu Rupiah

C. Total dana yang ditarik ( A + B )


Dana Yang Ditarik (Rp.)
Terbilang : Tujuh Juta Lima Ratus Ribu Rupiah

........................................ .....2019
Diajukan Oleh :
Penerima Bantuan

MUH SHOLEH
disahkan oleh: Diverifikasi oleh: Difasilitasi Oleh :
Tim Teknis Kabupaten Magelang Koordinator Fasilitator Tenaga Fasilitator Lapangan

( ...............................................) ( ....................................) (.........................................)


NIP..........................................

*) coret yang tidak perlu


Format IV - 2

HAP 1

Jumlah Harga
(Rp)
1,290,000
2,597,000
4,368,000
532,000
1,428,000
750,000
-
-
-
-
121,500
-
-
-
1,875,000
150,000

13,111,500 15,000,000
1,888,500

edia Bahan Bangunan


.................................)

Jumlah harga (Rp)


1,250,000
1,250,000

14,361,500

........................... .....2019
Diajukan Oleh :
Penerima Bantuan

MUH SHOLEH

Difasilitasi Oleh :
enaga Fasilitator Lapangan

.......................................)

Format IV - 2

HAP 2
Jumlah Harga
(Rp)
-
1,749,000
1,440,000
-
1,700,000
-
-
-
525,000
-
129,000
-
-
190,000

5,733,000

edia Bahan Bangunan

.................................)

Jumlah harga (Rp)


1,250,000
1,250,000

6,983,000

..................................... .....2019
Diajukan Oleh :
Penerima Bantuan

MUH SHOLEH
Difasilitasi Oleh :
enaga Fasilitator Lapangan

.......................................)
RENCANA ANGGARAN BIAYA (RAB) BSPS

Nomor BNBA :
Nomor KTP :
Nama Penerima Bantuan : MUH SHOLEH
Alamat :
Desa/Kelurahan :
Kecamatan :
Kabupaten/Kota :
Jenis Kegiatan :

SUMBER DANA
HARGA TOTAL HARGA SWADAYA
NO URAIAN PEKERJAAN VOLUME SATUAN (Rp) (Rp) BSPS
Dana Tunai

I Pekerjaan Persiapan
Bongkar Rumah Lama 1.00 ls - - - -
II Pekerjaan Pondasi

1 Galian Tanah Pondasi 7.20 M³ - - - -


2 Urugan Pasir 3.00 M³ 240,000 720,000 - 720,000

3 Pasangan Pondasi 4.68 M³ - -

-Semen @ 50 kg 8.00 Zak 53,000 424,000 - 424,000


-Pasir pasang 2.80 M³ 240,000 672,000 - 672,000
-Batu Kali 6.00 M³ 215,000 1,290,000 - 1,290,000
4 Urugan kembali 2.52 M³ - - - -
III Pekerjaan Sloof
1 Pekerjaan bekisting M² - - - -
2 Cor Beton Sloof, Ukuran 20 x 15 cm - - -
-Besi beton Φ 10 mm SNI 5.00 Btg 68,000 340,000 340,000 -
-Besi beton Φ 8 mm SNI 5.00 Btg 37,500 187,500 187,500 -
-Semen @ 50 kg 5.00 Zak 53,000 265,000 265,000 -
-Pasir pasang 0.60 M³ 240,000 144,000 144,000 -
-Batu Pecah 0.80 M³ 280,000 224,000 224,000 -
IV Pekerjaan Kolom
1 Pekerjaan bekisting M² 20,000 - - -
2 Cor Beton Kolom, Ukuran 15 x 15 cm min. T=3m 6.00 Bh

-Besi beton Φ 10 mm SNI 5.00 Btg 68,000 340,000 340,000 -


-Besi beton Φ 8 mm SNI 5.00 Btg 37,500 187,500 187,500 -
-Pasir pasang 0.40 M³ 240,000 96,000 96,000 -
-Semen @ 50 kg 3.00 Zak 53,000 159,000 159,000 -
-Batu pecah 0.60 M³ 280,000 168,000 168,000 -
V Dinding Permanen
1 Tembok 96.00 M²

-Pasir Pasang 4.80 M³ 240,000 1,152,000 1,152,000 -


-Semen @ 50 kg 15.00 Zak 53,000 795,000 795,000
-Batu Bata 2,000.00 Bh 750 1,500,000 1,500,000 -
-Batako - Bh 3,500 - - -
2 Pekerjaan Plester
-Pasir Pasang 5.00 M³ 240,000 1,200,000 - 1,200,000
-Semen @ 50 kg 19.00 Zak 53,000 1,007,000 1,007,000
3 Papan
-Papan, Ukuran……… - Lbr - - - -
-Kayu, Ukuran………. - Btg - - - -
VI Pekerjaan Pintu dan Jendela
-Kusen Pintu, Ukuran 0,80 X 2,00 M 1.00 Unit 200,000 200,000 200,000 -
-Kusen Jendela 2.00 Unit 150,000 300,000 300,000 -
-Kusen Ventilasi, Ukuran…… - Unit - - - -
-Daun Pintu Kayu, Ukuran 1.00 Unit 350,000 350,000 350,000 -
-Daun Jendela Kayu, Ukuran 2.00 Unit 200,000 400,000 400,000 -
-Handle Pintu dan Kunci Pintu - Set - - - -
-Handle Jendela dan Kunci Jendela - Set - - - -
-Engsel Pintu - Set 35,000 - - -
-Engsel Jendela - Set 21,000 - - -
VII Ring Balok
1 Pekerjaan bekisting - M² - - - -
2 Pekerjaan Cor Beton
-Besi beton Φ 10 mm SNI 11.00 Btg 68,000 748,000 748,000
-Besi beton Φ 8 mm SNI 11.00 Btg 37,500 412,500 412,500 -
-Semen @ 50 kg 3.00 Zak 53,000 159,000 159,000 -
-Pasir pasang 0.50 M³ 240,000 120,000 120,000 -
-Batu pecah 0.60 M³ 280,000 168,000 168,000 -
VIII Pekerjaan Struktur Atap
-Kayu rangka kuda-kuda, Ukuran 6/12 x 4m 10.00 Btg 100,000 1,000,000 1,000,000 -
-Kayu gapit, Ukuran ……. - Btg - - - -
-Kayu usuk, Ukuran 4/6 x 3m - Btg 27,000 - - -
-Usuk Bambu - m - - - -
-Reng bambu - m 1,500 - -
IX Pekerjaan Penutup Atap
1 Penutup Atap 75.60
-Seng gelombang (0,2 cm x 80 cm x 300 cm), atau - Lbr 78,000 - - -
-Genteng - Bh 1,250 - - -
-Bahan penutup atap lainnya yang diijinkan - Lbr - - - -
2 Bubungan Atap Bh

-Seng Lbr - - -
-Genteng bubungan - Bh 5,000 - - -
-Bahan penutup atap lainnya yang diijinkan Lbr - - -
3 Listplang papan, Ukuran……. M³ - - -
X Pekerjaan Lantai
1 Lantai Rabat Campuran minimal 1:5, T= 5 cm 3.15 M3

-Semen @ 50 kg 1.00 Zak 53,000 53,000 53,000 -


-Pasir pasang 0.10 M³ 240,000 24,000 24,000 -
-Batu pecah 0.20 M³ 280,000 56,000 56,000 -
2 Lantai Papan M²

-Papan, Ukuran……….. - Lbr - - - -


-Kayu, Ukuran……….. - Btg - - - -
XI MCK
-Septic Tank - Unit - - - -
-Closet Jongkok - Unit 155,000 - - -
-Pipa Air Bersih, Ukuran…… - Btg 27,500 - - -
-Pipa Air Kotor, Ukuran…… - Btg 85,000 - - -
-Kran - Bh 25,000 - - -
-Pintu Kamar Mandi - Set 210,000 - - -
XII Lain-lain/ Instalasi Listrik
Gamping 20.00 Zak 8,000 160,000 160,000 -
Paku - Kg 15,000 - - -
Bendrat 4.00 Kg 20,000 80,000 80,000 -
Loster 10.00 Bh 5,000 50,000 50,000 -
Papan Bekisting - Lbr - - - -
XIII Upah Kerja
Tukang 60.00 Oh 70,000 4,200,000 2,500,000 1,700,000
Pembantu Tukang 60.00 Oh 60,000 3,600,000 3,600,000

JUMLAH 22,951,500 12,338,500 10,613,000

........................................ .....20
Difasilitasi, Ketua KPB Diajukan Oleh,
Tenaga Fasilitator Lapangan Penerima Bantuan

(.........................................) ( ....................................) ( ....................................)

Disahkan oleh, Diverifikasi Oleh,


Tim Teknis Kabupaten Magelang Koordinator Fasilitator

( ...............................................) ( ....................................)
NIP..........................................
FORMAT III-17

PANJANG LEBAR KELL VOL M2


SUMBER DANA dimensi 7 9 32 63 genteng
SWADAYA pekerjaan
Memakai Bahan
Bangunan Lama atap kuda-kuda
penutup atap 75.6 1,890.00
SWADAYA pondasi Galian Tanah 7.2
Urugan Pasir 2.835
SWADAYA Pas. Batu belah 4.68
12 beton sloof 0.96
17 10 kolom 0.675
12 balk 15x15 0.72
17 dinding bata 96
58 batako
SWADAYA Plesteran dinding 192
lantai 5cm 3.15
SWADAYA kayu gording 4 m 45
usuk 2 m 32
reng 2m 157.5
kusen pintu 80*200 cm 1
jendela 1
daun pintu 80*200 cm 1
jendela 1
pintu kmr 1
SWADAYA JUMLAH 1890

dimensi 7 9 32 63 genteng
pekerjaan
atap kuda-kuda 0 -
penutup atap 75.6 -
pondasi Galian Tanah 7.2 -
Urugan Pasir 2.835 -
Pas. Batu belah 4.68 -
beton sloof 0.96 -
6 kolom 0.675 -
balk 15x15 0.72 -
dinding bata 96 -
batako 0 -
Plesteran dinding 192 -
lantai 5cm 3.15 -
kayu gording 4 m 45 -
usuk 2 m 32 -
reng 2m 157.5 -
kusen pintu 80*200 cm 1 -
jendela 1 -
daun pintu 80*200 cm 1 -
jendela 1 -
pintu kmr 1 -
JUMLAH 0

SWADAYA
HARGA
MATERIAL VOL SATUAN
SATUAN
Urugan Pasir 240,000 3.00 M³
-Semen @ 50 kg 53,000 54.00 Zak
-Pasir pasang 240,000 14.20 M³
-Batu Kali 215,000 6.00 M³
-Besi beton Φ 10 mm SNI 68,000 21.00 Btg
-Besi beton Φ 8 mm SNI 37,500 21.00 Btg
-Batu pecah 280,000 2.20 M³
-Batu Bata 750 2,000.00 Bh
-Batako 3,500 - Bh
-Kusen Pintu, Ukuran 0,80 X 2,00 M 200,000 1.00 Unit
-Kusen Jendela 150,000 2.00 Unit
-Kusen Ventilasi, Ukuran…… - - Unit
-Daun Pintu Kayu, Ukuran 350,000 1.00 Unit
-Daun Jendela Kayu, Ukuran 200,000 2.00 Unit
-Handle Pintu dan Kunci Pintu - - Set
-Handle Jendela dan Kunci Jendela - - Set
-Engsel Pintu 35,000 - Set
-Engsel Jendela 21,000 - Set
-Kayu rangka kuda-kuda, Ukuran 6/12 x 4m 100,000 10.00 Btg
-Kayu gapit, Ukuran ……. - - Btg
-Kayu usuk, Ukuran 4/6 x 3m 27,000 - Btg
-Usuk Bambu - - m
-Reng bambu 1,500 - m
-Seng gelombang (0,2 cm x 80 cm x 300 cm 78,000 - Lbr
-Genteng 1,250 - Bh
-Seng - - Lbr
-Genteng bubungan 5,000 - Bh
-Closet Jongkok 155,000 - Unit
-Pipa Air Bersih, Ukuran…… 27,500 - Btg
-Pipa Air Kotor, Ukuran…… 85,000 - Btg
-Kran 25,000 - Bh
-Pintu Kamar Mandi 210,000 - Set
Gamping 8,000 20.00 Zak
Paku 15,000 - Kg
Bendrat 20,000 4.00 Kg
Loster 5,000 10.00 Bh
Papan Bekisting - - Lbr

9,838,500

5,161,500 6882
344.1
........................................ .....2019
Diajukan Oleh,
Penerima Bantuan

( ....................................)

Diverifikasi Oleh,
Koordinator Fasilitator

15,151,500 9,838,500
9,838,500
( ....................................)

5,161,500
4
20.25 1.0888888889 4.549 0.45
24.25 0.0108888889

batu semen pasir spit bes 10 besi 8 bata batako

3.00
6.00 8.00 2.80
5.00 0.60 0.80 11.00 12.00
3.00 0.40 0.60 10.00 10.00
3.00 0.50 0.60 11.00 11.00
15.00 4.80 6,720.00
- - -
19.00 5.00
1.00 0.10 0.20

6 54 17.2 2.2 32 33 6720 0

batu semen pasir spit bes 10 besi 8 bata batako

- - - - - - - -
- - - - - - - -
- - - - - - - -
- 3.00 - - - - -
6.00 8.00 2.80 - - - - -
- 5.00 0.60 0.80 5.00 6.00 - -
- 3.00 0.40 0.60 5.00 5.00 - -
- 3.00 0.50 0.60 11.00 11.00 - -
- 15.00 4.80 - - - 2,000.00 -
- - - - - - -
- 19.00 5.00 - - - - -
- 1.00 0.10 0.20 - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
6 54 17.2 2.2 21 22 2000 0

REKAP VOL
BIAYA BSPS DANA BSPS
- -
1,431,000.00 27.00
1,536,000.00 6.40
- -
1,428,000.00 21.00
787,500.00 21.00
616,000.00 2.20
1,500,000.00 2,000.00
- -
200,000.00 1.00
300,000.00 2.00
- #DIV/0!
350,000.00 1.00
400,000.00 2.00
- #DIV/0!
- #DIV/0!
- -
- -
1,000,000.00 10.00
- #DIV/0!
- -
- #DIV/0!
- -
- -
- -
- #DIV/0!
- -
- -
- -
- -
- -
- -
160,000.00 20.00
- -
80,000.00 4.00
50,000.00 10.00
- #DIV/0!
9,838,500.00
DA

Nomor BNBA
Nama Penerima Bantuan
Nomor KTP
Alamat
Desa/Kelurahan
kayu kusen daun Kecamatan
Gording usuk reng pintu jendela pintu jendela pintu KM Kabupaten/Kota
Nomor Rekening Penerim

A. Jumlah Dana yang ditr


No.
1
2
3
4
5
6
7
8
12.00 9
36.00 10
162.00 11
1.00 12
1.00 13
1.00 14
1.00 15
1.00 16
12 36 162 1 1 1 1 1

kayu kusen daun TOTAL HARGA PEMBELIAN


Gording usuk reng pintu jendela pintu jendela pintu KM Terbilang : Enam Juta Dua Ra

- - - - - - - - Disanggupi oleh :
- - - - - - - - Nama Toko/Penyedia Baha
- - - - - - - - Alamat Toko/Penyedia Bah
- - - - - - - - Nomor Rekening Bank Tok
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - - B. Jumlah dana yang dita
10.00 - - - - - - - No
- - - - - - - 1
- - - - - - - TOTAL TARIK TUNAI (B)
- - - 1.00 - - - - Terbilang : Tujuh Juta Lima R
- - - - 2.00 - - -
- - - - - 1.00 - - C. Total dana yang ditarik (
- - - - - - 2.00 - Dana Yang Ditarik (Rp.)
- - - - - - - Terbilang : Tujuh Juta Lima R
10 0 0 1 2 1 2 0

disahkan oleh:
Tim Teknis Kabupaten Ma

( .....................................
NIP.................................

*) coret yang tidak perlu

DA

Nomor BNBA
Nama Penerima Bantuan
Nomor KTP
Alamat
Desa/Kelurahan
Kecamatan
Kabupaten/Kota
Nomor Rekening Penerim

A. Jumlah Dana yang ditr


No.
1
2
3
4
5
6
7
8
9
10
11
12
13
14

TOTAL HARGA PEMBELIAN


Terbilang : Enam Juta Dua Ra

Disanggupi oleh :
Nama Toko/Penyedia Baha
Alamat Toko/Penyedia Bah
Nomor Rekening Bank Tok

B. Jumlah dana yang dita


No
1
TOTAL TARIK TUNAI (B)
Terbilang : Tujuh Juta Lima R

C. Total dana yang ditarik (


Dana Yang Ditarik (Rp.)
Terbilang : Tujuh Juta Lima R
disahkan oleh:
Tim Teknis Kabupaten Ma

( .....................................
NIP.................................

*) coret yang tidak perlu


DAFTAR RENCANA PEMANFAATAN BANTUAN (DRPB) TAHAP 1

Nomor BNBA : 0
Nama Penerima Bantuan : MUH SHOLEH
Nomor KTP : 0
Alamat : 0
Desa/Kelurahan : 0
Kecamatan : 0
Kabupaten/Kota : 0
Nomor Rekening Penerima Bantuan :

A. Jumlah Dana yang ditransfer ke Toko/Penyedia Bahan Bangunan (Tahap I/II *)


Jumlah Harga per Unit
Jenis Bahan Bangunan
(unit) (Rp)
Batu belah 6.00 m3 215,000
Semen 54.00 zak 53,000
Pasir 17.20 m3 240,000
Batu Pecah 2.20 m3 280,000
Besi Ø 10 21.00 btg 68,000
Besi Ø 8 22.00 btg 37,500
Kusen Pintu Ukuran 0,80 x 2,00 m - Bh 200,000
Kusen Jendela - Bh 150,000
Batu Bata 2,000.00 bh 750
Gamping 20.00 zak 8,000
Paku - Kg 15,000
Bendrat - Kg 22,000
Loster - Bh 7,000
Papan Bekisting - Lbr 20,000
Genteng - Bh 1,250
Genteng bubungan - Bh 5,000

TOTAL HARGA PEMBELIAN


Terbilang : Enam Juta Dua Ratus Lima Puluh Ribu Rupiah

Disanggupi oleh :
Nama Toko/Penyedia Bahan Bangunan :
Alamat Toko/Penyedia Bahan Bangunan :
Nomor Rekening Bank Toko/ Penyedi BB :

Toko/Penyedia Bahan Bangunan


(..................................................)

B. Jumlah dana yang ditarik tunai untuk upah kerja (Tahap I / II *)


Uraian Jumlah harga (Rp)
Upah Kerja PKRS 1,250,000
TOTAL TARIK TUNAI (B) 1,250,000
Terbilang : Tujuh Juta Lima Ratus Ribu Rupiah

C. Total dana yang ditarik ( A + B )


Dana Yang Ditarik (Rp.)
Terbilang : Tujuh Juta Lima Ratus Ribu Rupiah

........................................ .....2019
Diajukan Oleh :
Penerima Bantuan

MUH SHOLEH

disahkan oleh: Diverifikasi oleh: Difasilitasi Oleh :


Tim Teknis Kabupaten Magelang Koordinator Fasilitator Tenaga Fasilitator Lapangan

( ...............................................) ( ....................................) (.........................................)


NIP..........................................

*) coret yang tidak perlu

DAFTAR RENCANA PEMANFAATAN BANTUAN (DRPB) TAHAP 2

Nomor BNBA : 0
Nama Penerima Bantuan : MUH SHOLEH
Nomor KTP : 0
Alamat : 0
Desa/Kelurahan : 0
Kecamatan : 0
Kabupaten/Kota : 0
Nomor Rekening Penerima Bantuan : 0

A. Jumlah Dana yang ditransfer ke Toko/Penyedia Bahan Bangunan (Tahap I/II *)


Jumlah Harga per Unit
Jenis Bahan Bangunan
(unit) (Rp)
Batu belah 0 m3 215,000
Semen 38.00 zak 53,000
Pasir 6 m3 240,000
Batu Pecah 0 m3 280,000
Besi Ø 10 25 btg 68,000
Besi Ø 8 0 btg 37,500
Kusen Pintu Ukuran 0,80 x 2,00 m 0 Bh 200,000
Kusen Jendela 0 Bh 150,000
Batu Bata 700 bh 750
Gamping 0 zak 8,000
Paku 0.0 Kg 15,000
Bendrat 0 Kg 22,000
Loster 0 Bh 7,000
Kayu usuk 10 Btg 19,000

TOTAL HARGA PEMBELIAN


Terbilang : Enam Juta Dua Ratus Lima Puluh Ribu Rupiah

Disanggupi oleh :
Nama Toko/Penyedia Bahan Bangunan : 0
Alamat Toko/Penyedia Bahan Bangunan : 0
Nomor Rekening Bank Toko/ Penyedi BB : 0

Toko/Penyedia Bahan Bangunan

(..................................................)

B. Jumlah dana yang ditarik tunai untuk upah kerja (Tahap I / II *)


Uraian Jumlah harga (Rp)
Upah Kerja PKRS/PBRS *) 1,250,000
TOTAL TARIK TUNAI (B) 1,250,000
Terbilang : Tujuh Juta Lima Ratus Ribu Rupiah

C. Total dana yang ditarik ( A + B )


Dana Yang Ditarik (Rp.)
Terbilang : Tujuh Juta Lima Ratus Ribu Rupiah

........................................ .....2019
Diajukan Oleh :
Penerima Bantuan

MUH SHOLEH
disahkan oleh: Diverifikasi oleh: Difasilitasi Oleh :
Tim Teknis Kabupaten Magelang Koordinator Fasilitator Tenaga Fasilitator Lapangan

( ...............................................) ( ....................................) (.........................................)


NIP..........................................

*) coret yang tidak perlu


Format IV - 2

HAP 1

Jumlah Harga
(Rp)
1,290,000
2,862,000
4,128,000
616,000
1,428,000
825,000
-
-
1,500,000
160,000
-
-
-
-
-
-

12,809,000 9,838,500
(2,970,500)

edia Bahan Bangunan


.................................)

Jumlah harga (Rp)


1,250,000
1,250,000

14,059,000

........................... .....2019
Diajukan Oleh :
Penerima Bantuan

MUH SHOLEH

Difasilitasi Oleh :
enaga Fasilitator Lapangan

.......................................)

Format IV - 2

HAP 2
Jumlah Harga
(Rp)
-
2,014,000
1,440,000
-
1,700,000
-
-
-
525,000
-
129,000
-
-
190,000

5,998,000

edia Bahan Bangunan

.................................)

Jumlah harga (Rp)


1,250,000
1,250,000

7,248,000

..................................... .....2019
Diajukan Oleh :
Penerima Bantuan

MUH SHOLEH
Difasilitasi Oleh :
enaga Fasilitator Lapangan

.......................................)
RENCANA ANGGARAN BIAYA (RAB) BSPS

Nomor BNBA :
Nomor KTP :
Nama Penerima Bantuan : MUH SHOLEH
Alamat :
Desa/Kelurahan :
Kecamatan :
Kabupaten/Kota :
Jenis Kegiatan :

SUMBER DANA
HARGA TOTAL HARGA SWADAYA
NO URAIAN PEKERJAAN VOLUME SATUAN (Rp) (Rp) BSPS
Dana Tunai

I Pekerjaan Persiapan
Bongkar Rumah Lama 1.00 ls - - - -
II Pekerjaan Pondasi

1 Galian Tanah Pondasi 7.20 M³ - - - -


2 Urugan Pasir 2.00 M³ 240,000 480,000 - 480,000

3 Pasangan Pondasi 4.68 M³ - -

-Semen @ 50 kg 8.00 Zak 53,000 424,000 - 424,000


-Pasir pasang 2.80 M³ 240,000 672,000 - 672,000
-Batu Kali 6.00 M³ 215,000 1,290,000 - 1,290,000
4 Urugan kembali 2.52 M³ - - - -
III Pekerjaan Sloof
1 Pekerjaan bekisting M² - - - -
2 Cor Beton Sloof, Ukuran 20 x 15 cm - - -
-Besi beton Φ 10 mm SNI 10.00 Btg 68,000 680,000 680,000 -
-Besi beton Φ 8 mm SNI 10.00 Btg 37,500 375,000 - 375,000
-Semen @ 50 kg 5.00 Zak 53,000 265,000 265,000 -
-Pasir pasang 0.60 M³ 240,000 144,000 144,000 -
-Batu Pecah 0.80 M³ 280,000 224,000 224,000 -
IV Pekerjaan Kolom
1 Pekerjaan bekisting M² 20,000 - - -
2 Cor Beton Kolom, Ukuran 15 x 15 cm min. T=3m 10.00 Bh

-Besi beton Φ 10 mm SNI 10.00 Btg 68,000 680,000 680,000 -


-Besi beton Φ 8 mm SNI 10.00 Btg 37,500 375,000 - 375,000
-Pasir pasang 0.40 M³ 240,000 96,000 96,000 -
-Semen @ 50 kg 3.00 Zak 53,000 159,000 159,000 -
-Batu pecah 0.60 M³ 280,000 168,000 168,000 -
V Dinding Permanen
1 Tembok 96.00 M²

-Pasir Pasang 7.00 M³ 240,000 1,680,000 1,680,000 -


-Semen @ 50 kg 22.00 Zak 53,000 1,166,000 1,166,000
-Batu Bata - Bh 750 - - -
-Batako 1,350.00 Bh 3,500 4,725,000 4,725,000 -
2 Pekerjaan Plester
-Pasir Pasang 5.00 M³ 240,000 1,200,000 - 1,200,000
-Semen @ 50 kg 19.00 Zak 53,000 1,007,000 53,000 954,000
3 Papan
-Papan, Ukuran……… - Lbr - - - -
-Kayu, Ukuran………. - Btg - - - -
VI Pekerjaan Pintu dan Jendela
-Kusen Pintu, Ukuran 0,80 X 2,00 M 1.00 Unit 200,000 200,000 200,000 -
-Kusen Jendela 2.00 Unit 150,000 300,000 300,000 -
-Kusen Ventilasi, Ukuran…… - Unit - - - -
-Daun Pintu Kayu, Ukuran 1.00 Unit 350,000 350,000 350,000 -
-Daun Jendela Kayu, Ukuran 2.00 Unit 200,000 400,000 400,000 -
-Handle Pintu dan Kunci Pintu - Set - - - -
-Handle Jendela dan Kunci Jendela - Set - - - -
-Engsel Pintu - Set 35,000 - - -
-Engsel Jendela - Set 21,000 - - -
VII Ring Balok
1 Pekerjaan bekisting - M² - - - -
2 Pekerjaan Cor Beton
-Besi beton Φ 10 mm SNI 11.00 Btg 68,000 748,000 748,000 -
-Besi beton Φ 8 mm SNI 11.00 Btg 37,500 412,500 - 412,500
-Semen @ 50 kg 3.00 Zak 53,000 159,000 159,000 -
-Pasir pasang 0.50 M³ 240,000 120,000 120,000 -
-Batu pecah 0.60 M³ 280,000 168,000 168,000 -
VIII Pekerjaan Struktur Atap
-Kayu rangka kuda-kuda, Ukuran 6/12 x 4m - Btg 100,000 - - -
-Kayu gapit, Ukuran ……. - Btg - - - -
-Kayu usuk, Ukuran 4/6 x 3m - Btg 27,000 - - -
-Usuk bambu - Btg - - - -
Reng bambu - Btg 1,500 - -
IX Pekerjaan Penutup Atap
1 Penutup Atap 72.00
-Seng gelombang (0,2 cm x 80 cm x 300 cm), atau - Lbr 78,000 - - -
-Genteng 1,800.00 Bh 1,250 2,250,000 2,250,000 -
-Bahan penutup atap lainnya yang diijinkan - Lbr - - - -
2 Bubungan Atap Bh

-Seng Lbr - - -
-Genteng bubungan - Bh 5,000 - - -
-Bahan penutup atap lainnya yang diijinkan Lbr - - -
3 Listplang papan, Ukuran……. M³ - - -
X Pekerjaan Lantai
1 Lantai Rabat Campuran minimal 1:5, T= 5 cm 3.00 M3

-Semen @ 50 kg 1.00 Zak 53,000 53,000 53,000 -


-Pasir pasang 0.10 M³ 240,000 24,000 24,000 -
-Batu pecah 0.20 M³ 280,000 56,000 56,000 -
2 Lantai Papan M²

-Papan, Ukuran……….. - Lbr - - - -


-Kayu, Ukuran……….. - Btg - - - -
XI MCK
-Septic Tank - Unit - - - -
-Closet Jongkok - Unit 155,000 - - -
-Pipa Air Bersih, Ukuran…… - Btg 27,500 - - -
-Pipa Air Kotor, Ukuran…… - Btg 85,000 - - -
-Kran - Bh 25,000 - - -
-Pintu Kamar Mandi - Set 210,000 - - -
XII Lain-lain/ Instalasi Listrik
Gamping - Zak 8,000 - - -
Paku 2.80 Kg 15,000 42,000 42,000 -
Bendrat 2.00 Kg 20,000 40,000 40,000 -
Loster 10.00 Bh 5,000 50,000 50,000 -
Papan Bekisting - Lbr - - - -
XIII Upah Kerja
Tukang 60.00 Oh 70,000 4,200,000 2,500,000 1,700,000
Pembantu Tukang 60.00 Oh 60,000 3,600,000 3,600,000

JUMLAH 28,982,500 17,500,000 11,482,500

........................................ .....20
Difasilitasi, Ketua KPB Diajukan Oleh,
Tenaga Fasilitator Lapangan Penerima Bantuan

(.........................................) ( ....................................) ( ....................................)

Disahkan oleh, Diverifikasi Oleh,


Tim Teknis Kabupaten Magelang Koordinator Fasilitator

( ...............................................) ( ....................................)
NIP..........................................
FORMAT III-17

PANJANG LEBAR KELL VOL M2


SUMBER DANA dimensi 6 10 32 60 genteng
SWADAYA pekerjaan
Memakai Bahan
Bangunan Lama atap kuda-kuda
penutup atap 72 1,800.00
SWADAYA pondasi Galian Tanah 7.2
Urugan Pasir 2.7
SWADAYA Pas. Batu belah 4.68
12 beton sloof 0.96
17 10 kolom 0.675
12 balk 15x15 0.72
17 dinding bata
58 batako 96
SWADAYA Plesteran dinding 192
lantai 5cm 3
SWADAYA kayu gording 4 m 50
usuk 2 m 32
reng 2m 150
kusen pintu 80*200 cm 1
jendela 1
daun pintu 80*200 cm 1
jendela 1
pintu kmr 1
SWADAYA JUMLAH 1800

dimensi 6 10 32 60 genteng
pekerjaan
atap kuda-kuda 0 -
penutup atap 72 1,800.00
pondasi Galian Tanah 7.2 -
Urugan Pasir 2.7 -
Pas. Batu belah 4.68 -
beton sloof 0.96 -
10 kolom 0.675 -
balk 15x15 0.72 -
dinding bata 0 -
batako 96 -
Plesteran dinding 192 -
lantai 5cm 3 -
kayu gording 4 m 50 -
usuk 2 m 32 -
reng 2m 150 -
kusen pintu 80*200 cm 1 -
jendela 1 -
daun pintu 80*200 cm 1 -
jendela 1 -
pintu kmr 1 -
JUMLAH 1800

SWADAYA
HARGA
MATERIAL VOL SATUAN
SATUAN
Urugan Pasir 240,000 2.00 M³
-Semen @ 50 kg 53,000 61.00 Zak
-Pasir pasang 240,000 16.40 M³
-Batu Kali 215,000 6.00 M³
-Besi beton Φ 10 mm SNI 68,000 31.00 Btg
-Besi beton Φ 8 mm SNI 37,500 31.00 Btg
-Batu pecah 280,000 2.20 M³
-Batu Bata 750 - Bh
-Batako 3,500 1,350.00 Bh
-Kusen Pintu, Ukuran 0,80 X 2,00 M 200,000 1.00 Unit
-Kusen Jendela 150,000 2.00 Unit
-Kusen Ventilasi, Ukuran…… - - Unit
-Daun Pintu Kayu, Ukuran 350,000 1.00 Unit
-Daun Jendela Kayu, Ukuran 200,000 2.00 Unit
-Handle Pintu dan Kunci Pintu - - Set
-Handle Jendela dan Kunci Jendela - - Set
-Engsel Pintu 35,000 - Set
-Engsel Jendela 21,000 - Set
-Kayu rangka kuda-kuda, Ukuran 6/12 x 4m 100,000 - Btg
-Kayu gapit, Ukuran ……. - - Btg
-Kayu usuk, Ukuran 4/6 x 3m 27,000 - Btg
-Usuk bambu - - Btg
Reng bambu 1,500 - Btg
-Seng gelombang (0,2 cm x 80 cm x 300 cm 78,000 - Lbr
-Genteng 1,250 1,800.00 Bh
-Seng - - Lbr
-Genteng bubungan 5,000 - Bh
-Closet Jongkok 155,000 - Unit
-Pipa Air Bersih, Ukuran…… 27,500 - Btg
-Pipa Air Kotor, Ukuran…… 85,000 - Btg
-Kran 25,000 - Bh
-Pintu Kamar Mandi 210,000 - Set
Gamping 8,000 - Zak
Paku 15,000 2.80 Kg
Bendrat 20,000 2.00 Kg
Loster 5,000 10.00 Bh
Papan Bekisting - - Lbr

15,000,000

- 0
0
........................................ .....2019
Diajukan Oleh,
Penerima Bantuan

( ....................................)

Diverifikasi Oleh,
Koordinator Fasilitator

21,182,500 15,000,000
15,000,000
( ....................................)

-
4
20.25 1.0888888889 4.549 0.45
24.25 0.0108888889

batu semen pasir spit bes 10 besi 8 bata batako

2.00
6.00 8.00 2.80
5.00 0.60 0.80 10.00 12.00
3.00 0.40 0.60 10.00 10.00
3.00 0.50 0.60 11.00 11.00
- - -
22.00 7.00 1,200.00
19.00 5.00
1.00 0.10 0.20

6 61 18.4 2.2 31 33 0 1200

batu semen pasir spit bes 10 besi 8 bata batako

- - - - - - - -
- - - - - - - -
- - - - - - - -
- 2.00 - - - - -
6.00 8.00 2.80 - - - - -
- 5.00 0.60 0.80 10.00 12.00 - -
- 3.00 0.40 0.60 10.00 10.00 - -
- 3.00 0.50 0.60 11.00 11.00 - -
- - - - - - - -
- 22.00 7.00 - - - - 1,350.00
- 19.00 5.00 - - - - -
- 1.00 0.10 0.20 - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
6 61 18.4 2.2 31 33 0 1350

REKAP VOL
BIAYA BSPS DANA BSPS
- -
1,855,000.00 35.00
2,064,000.00 8.60
- -
2,108,000.00 31.00
- -
616,000.00 2.20
- -
4,725,000.00 1,350.00
200,000.00 1.00
300,000.00 2.00
- #DIV/0!
350,000.00 1.00
400,000.00 2.00
- #DIV/0!
- #DIV/0!
- -
- -
- -
- #DIV/0!
- -
- #DIV/0!
- -
- -
2,250,000.00 1,800.00
- #DIV/0!
- -
- -
- -
- -
- -
- -
- -
42,000.00 2.80
40,000.00 2.00
50,000.00 10.00
- #DIV/0!
15,000,000.00
DA

Nomor BNBA
Nama Penerima Bantuan
Nomor KTP
Alamat
Desa/Kelurahan
kayu kusen daun Kecamatan
Gording usuk reng pintu jendela pintu jendela pintu KM Kabupaten/Kota
Nomor Rekening Penerim

A. Jumlah Dana yang ditr


No.
1
2
3
4
5
6
7
8
13.00 9
36.00 10
154.00 11
1.00 12
1.00 13
1.00 14
1.00 15
1.00 16
13 36 154 1 1 1 1 1

kayu kusen daun TOTAL HARGA PEMBELIAN


Gording usuk reng pintu jendela pintu jendela pintu KM Terbilang : Enam Juta Dua Ra

- - - - - - - - Disanggupi oleh :
- - - - - - - - Nama Toko/Penyedia Baha
- - - - - - - - Alamat Toko/Penyedia Bah
- - - - - - - - Nomor Rekening Bank Tok
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - - B. Jumlah dana yang dita
- - - - - - - - No
- - - - - - - 1
- - - - - - - TOTAL TARIK TUNAI (B)
- - - 1.00 - - - - Terbilang : Tujuh Juta Lima R
- - - - 2.00 - - -
- - - - - 1.00 - - C. Total dana yang ditarik (
- - - - - - 2.00 - Dana Yang Ditarik (Rp.)
- - - - - - - Terbilang : Tujuh Juta Lima R
0 0 0 1 2 1 2 0

disahkan oleh:
Tim Teknis Kabupaten Ma

( .....................................
NIP.................................

*) coret yang tidak perlu

DA

Nomor BNBA
Nama Penerima Bantuan
Nomor KTP
Alamat
Desa/Kelurahan
Kecamatan
Kabupaten/Kota
Nomor Rekening Penerim

A. Jumlah Dana yang ditr


No.
1
2
3
4
5
6
7
8
9
10
11
12
13
14

TOTAL HARGA PEMBELIAN


Terbilang : Enam Juta Dua Ra

Disanggupi oleh :
Nama Toko/Penyedia Baha
Alamat Toko/Penyedia Bah
Nomor Rekening Bank Tok

B. Jumlah dana yang dita


No
1
TOTAL TARIK TUNAI (B)
Terbilang : Tujuh Juta Lima R

C. Total dana yang ditarik (


Dana Yang Ditarik (Rp.)
Terbilang : Tujuh Juta Lima R
disahkan oleh:
Tim Teknis Kabupaten Ma

( .....................................
NIP.................................

*) coret yang tidak perlu


DAFTAR RENCANA PEMANFAATAN BANTUAN (DRPB) TAHAP 1

Nomor BNBA : 0
Nama Penerima Bantuan : MUH SHOLEH
Nomor KTP : 0
Alamat : 0
Desa/Kelurahan : 0
Kecamatan : 0
Kabupaten/Kota : 0
Nomor Rekening Penerima Bantuan :

A. Jumlah Dana yang ditransfer ke Toko/Penyedia Bahan Bangunan (Tahap I/II *)


Jumlah Harga per Unit
Jenis Bahan Bangunan
(unit) (Rp)
Batu belah 6.00 m3 215,000
Semen 61.00 zak 53,000
Pasir 18.40 m3 240,000
Batu Pecah 2.20 m3 280,000
Besi Ø 10 31.00 btg 68,000
Besi Ø 8 33.00 btg 37,500
Kusen Pintu Ukuran 0,80 x 2,00 m - Bh 200,000
Kusen Jendela - Bh 150,000
Batu Bata - bh 750
Gamping - zak 8,000
Paku 2.80 Kg 15,000
Bendrat - Kg 22,000
Loster - Bh 7,000
Papan Bekisting - Lbr 20,000
Genteng 1,800.00 Bh 1,250
Genteng bubungan - Bh 5,000

TOTAL HARGA PEMBELIAN


Terbilang : Enam Juta Dua Ratus Lima Puluh Ribu Rupiah

Disanggupi oleh :
Nama Toko/Penyedia Bahan Bangunan :
Alamat Toko/Penyedia Bahan Bangunan :
Nomor Rekening Bank Toko/ Penyedi BB :

Toko/Penyedia Bahan Bangunan


(..................................................)

B. Jumlah dana yang ditarik tunai untuk upah kerja (Tahap I / II *)


Uraian Jumlah harga (Rp)
Upah Kerja PKRS 1,250,000
TOTAL TARIK TUNAI (B) 1,250,000
Terbilang : Tujuh Juta Lima Ratus Ribu Rupiah

C. Total dana yang ditarik ( A + B )


Dana Yang Ditarik (Rp.)
Terbilang : Tujuh Juta Lima Ratus Ribu Rupiah

........................................ .....2019
Diajukan Oleh :
Penerima Bantuan

MUH SHOLEH

disahkan oleh: Diverifikasi oleh: Difasilitasi Oleh :


Tim Teknis Kabupaten Magelang Koordinator Fasilitator Tenaga Fasilitator Lapangan

( ...............................................) ( ....................................) (.........................................)


NIP..........................................

*) coret yang tidak perlu

DAFTAR RENCANA PEMANFAATAN BANTUAN (DRPB) TAHAP 2

Nomor BNBA : 0
Nama Penerima Bantuan : MUH SHOLEH
Nomor KTP : 0
Alamat : 0
Desa/Kelurahan : 0
Kecamatan : 0
Kabupaten/Kota : 0
Nomor Rekening Penerima Bantuan : 0

A. Jumlah Dana yang ditransfer ke Toko/Penyedia Bahan Bangunan (Tahap I/II *)


Jumlah Harga per Unit
Jenis Bahan Bangunan
(unit) (Rp)
Batu belah 0 m3 215,000
Semen 45.00 zak 53,000
Pasir 6 m3 240,000
Batu Pecah 0 m3 280,000
Besi Ø 10 25 btg 68,000
Besi Ø 8 0 btg 37,500
Kusen Pintu Ukuran 0,80 x 2,00 m 0 Bh 200,000
Kusen Jendela 0 Bh 150,000
Batu Bata 700 bh 750
Gamping 0 zak 8,000
Paku 0.0 Kg 15,000
Bendrat 0 Kg 22,000
Loster 0 Bh 7,000
Kayu usuk 10 Btg 19,000

TOTAL HARGA PEMBELIAN


Terbilang : Enam Juta Dua Ratus Lima Puluh Ribu Rupiah

Disanggupi oleh :
Nama Toko/Penyedia Bahan Bangunan : 0
Alamat Toko/Penyedia Bahan Bangunan : 0
Nomor Rekening Bank Toko/ Penyedi BB : 0

Toko/Penyedia Bahan Bangunan

(..................................................)

B. Jumlah dana yang ditarik tunai untuk upah kerja (Tahap I / II *)


Uraian Jumlah harga (Rp)
Upah Kerja PKRS/PBRS *) 1,250,000
TOTAL TARIK TUNAI (B) 1,250,000
Terbilang : Tujuh Juta Lima Ratus Ribu Rupiah

C. Total dana yang ditarik ( A + B )


Dana Yang Ditarik (Rp.)
Terbilang : Tujuh Juta Lima Ratus Ribu Rupiah

........................................ .....2019
Diajukan Oleh :
Penerima Bantuan

MUH SHOLEH
disahkan oleh: Diverifikasi oleh: Difasilitasi Oleh :
Tim Teknis Kabupaten Magelang Koordinator Fasilitator Tenaga Fasilitator Lapangan

( ...............................................) ( ....................................) (.........................................)


NIP..........................................

*) coret yang tidak perlu


Format IV - 2

HAP 1

Jumlah Harga
(Rp)
1,290,000
3,233,000
4,416,000
616,000
2,108,000
1,237,500
-
-
-
-
42,000
-
-
-
2,250,000
-

15,192,500 15,000,000
(192,500)

edia Bahan Bangunan


.................................)

Jumlah harga (Rp)


1,250,000
1,250,000

16,442,500

........................... .....2019
Diajukan Oleh :
Penerima Bantuan

MUH SHOLEH

Difasilitasi Oleh :
enaga Fasilitator Lapangan

.......................................)

Format IV - 2

HAP 2
Jumlah Harga
(Rp)
-
2,385,000
1,440,000
-
1,700,000
-
-
-
525,000
-
129,000
-
-
190,000

6,369,000

edia Bahan Bangunan

.................................)

Jumlah harga (Rp)


1,250,000
1,250,000

7,619,000

..................................... .....2019
Diajukan Oleh :
Penerima Bantuan

MUH SHOLEH
Difasilitasi Oleh :
enaga Fasilitator Lapangan

.......................................)
RENCANA ANGGARAN BIAYA (RAB) BSPS

Nomor BNBA :
Nomor KTP :
Nama Penerima Bantuan : MUH SHOLEH
Alamat :
Desa/Kelurahan :
Kecamatan :
Kabupaten/Kota :
Jenis Kegiatan :

SUMBER DANA
HARGA TOTAL HARGA SWADAYA
NO URAIAN PEKERJAAN VOLUME SATUAN (Rp) (Rp) BSPS
Dana Tunai

I Pekerjaan Persiapan
Bongkar Rumah Lama 1.00 ls - - - -
II Pekerjaan Pondasi

1 Galian Tanah Pondasi 7.65 M³ - - - -


2 Urugan Pasir 3.00 M³ 240,000 720,000 - 720,000

3 Pasangan Pondasi 4.97 M³ - -

-Semen @ 50 kg 9.00 Zak 53,000 477,000 - 477,000


-Pasir pasang 3.00 M³ 240,000 720,000 - 720,000
-Batu Kali 6.00 M³ 215,000 1,290,000 - 1,290,000
4 Urugan kembali 2.68 M³ - - - -
III Pekerjaan Sloof
1 Pekerjaan bekisting M² - - - -
2 Cor Beton Sloof, Ukuran 20 x 15 cm - - -
-Besi beton Φ 10 mm SNI 12.00 Btg 68,000 816,000 816,000 -
-Besi beton Φ 8 mm SNI 12.00 Btg 37,500 450,000 450,000 -
-Semen @ 50 kg 5.00 Zak 53,000 265,000 265,000 -
-Pasir pasang 0.70 M³ 240,000 168,000 168,000 -
-Batu Pecah 0.80 M³ 280,000 224,000 224,000 -
IV Pekerjaan Kolom
1 Pekerjaan bekisting M² 20,000 - - -
2 Cor Beton Kolom, Ukuran 15 x 15 cm min. T=3m 12.00 Bh

-Besi beton Φ 10 mm SNI 12.00 Btg 68,000 816,000 816,000 -


-Besi beton Φ 8 mm SNI 12.00 Btg 37,500 450,000 450,000 -
-Pasir pasang 0.50 M³ 240,000 120,000 120,000 -
-Semen @ 50 kg 4.00 Zak 53,000 212,000 212,000 -
-Batu pecah 0.70 M³ 280,000 196,000 196,000 -
V Dinding Permanen
1 Tembok 102.00 M²

-Pasir Pasang 7.40 M³ 240,000 1,776,000 1,776,000 -


-Semen @ 50 kg 23.00 Zak 53,000 1,219,000 1,219,000
-Batu Bata - Bh 750 - - -
-Batako 1,450.00 Bh 3,500 5,075,000 5,075,000 -
2 Pekerjaan Plester
-Pasir Pasang 5.40 M³ 240,000 1,296,000 - 1,296,000
-Semen @ 50 kg 21.00 Zak 53,000 1,113,000 689,000 424,000
3 Papan
-Papan, Ukuran……… - Lbr - - - -
-Kayu, Ukuran………. - Btg - - - -
VI Pekerjaan Pintu dan Jendela
-Kusen Pintu, Ukuran 0,80 X 2,00 M - Unit 200,000 - - -
-Kusen Jendela - Unit 150,000 - - -
-Kusen Ventilasi, Ukuran…… - Unit - - - -
-Daun Pintu Kayu, Ukuran - Unit 350,000 - - -
-Daun Jendela Kayu, Ukuran - Unit 200,000 - - -
-Handle Pintu dan Kunci Pintu - Set - - - -
-Handle Jendela dan Kunci Jendela - Set - - - -
-Engsel Pintu - Set 35,000 - - -
-Engsel Jendela - Set 21,000 - - -
VII Ring Balok
1 Pekerjaan bekisting - M² - - - -
2 Pekerjaan Cor Beton
-Besi beton Φ 10 mm SNI 12.00 Btg 68,000 816,000 816,000
-Besi beton Φ 8 mm SNI 11.00 Btg 37,500 412,500 412,500 -
-Semen @ 50 kg 4.00 Zak 53,000 212,000 212,000 -
-Pasir pasang 0.50 M³ 240,000 120,000 120,000 -
-Batu pecah 0.60 M³ 280,000 168,000 168,000 -
VIII Pekerjaan Struktur Atap
-Kayu rangka kuda-kuda, Ukuran 6/12 x 4m 4.00 Btg 100,000 400,000 400,000 -
-Kayu gapit, Ukuran ……. - Btg - - - -
-Kayu usuk, Ukuran 4/6 x 3m - Btg 27,000 - - -
-Kayu Usuk, Ukuran 5/7 x 3m - Btg - - - -
-Kayu Reng , Ukuran 2/3 x 3m - Btg 1,500 - -
IX Pekerjaan Penutup Atap
1 Penutup Atap 86.40
-Seng gelombang (0,2 cm x 80 cm x 300 cm), atau - Lbr 78,000 - - -
-Genteng - Bh 1,250 - - -
-Bahan penutup atap lainnya yang diijinkan - Lbr - - - -
2 Bubungan Atap Bh

-Seng Lbr - - -
-Genteng bubungan - Bh 5,000 - - -
-Bahan penutup atap lainnya yang diijinkan Lbr - - -
3 Listplang papan, Ukuran……. M³ - - -
X Pekerjaan Lantai
1 Lantai Rabat Campuran minimal 1:5, T= 5 cm 3.60 M3

-Semen @ 50 kg 1.00 Zak 53,000 53,000 53,000 -


-Pasir pasang 0.10 M³ 240,000 24,000 24,000 -
-Batu pecah 0.20 M³ 280,000 56,000 56,000 -
2 Lantai Papan M²

-Papan, Ukuran……….. - Lbr - - - -


-Kayu, Ukuran……….. - Btg - - - -
XI MCK
-Septic Tank - Unit - - - -
-Closet Jongkok - Unit 155,000 - - -
-Pipa Air Bersih, Ukuran…… - Btg 27,500 - - -
-Pipa Air Kotor, Ukuran…… - Btg 85,000 - - -
-Kran - Bh 25,000 - - -
-Pintu Kamar Mandi - Set 210,000 - - -
XII Lain-lain/ Instalasi Listrik
Gamping - Zak 8,000 - - -
Paku 4.83 Kg 15,000 72,500 72,500 -
Bendrat 7.00 Kg 20,000 140,000 140,000 -
Loster 10.00 Bh 5,000 50,000 50,000 -
Papan Bekisting - Lbr - - - -
XIII Upah Kerja
Tukang 60.00 Oh 70,000 4,200,000 2,500,000 1,700,000
Pembantu Tukang 60.00 Oh 60,000 3,600,000 3,600,000

JUMLAH 27,727,000 17,500,000 10,227,000

........................................ .....20
Difasilitasi, Ketua KPB Diajukan Oleh,
Tenaga Fasilitator Lapangan Penerima Bantuan

(.........................................) ( ....................................) ( ....................................)

Disahkan oleh, Diverifikasi Oleh,


Tim Teknis Kabupaten Magelang Koordinator Fasilitator

( ...............................................) ( ....................................)
NIP..........................................
FORMAT III-17

PANJANG LEBAR KELL VOL M2


SUMBER DANA dimensi 8 9 34 72 genteng
SWADAYA pekerjaan
Memakai Bahan
Bangunan Lama atap kuda-kuda
penutup atap 86.4 2,160.00
SWADAYA pondasi Galian Tanah 7.65
Urugan Pasir 3.24
SWADAYA Pas. Batu belah 4.9725
12 beton sloof 1.02
17 12 kolom 0.81
12 balk 15x15 0.765
17 dinding bata
58 batako 102
SWADAYA Plesteran dinding 204
lantai 5cm 3.6
SWADAYA kayu gording 4 m 45
usuk 2 m 34
reng 2m 180
kusen pintu 80*200 cm 1
jendela 1
daun pintu 80*200 cm 1
jendela 1
pintu kmr 1
SWADAYA JUMLAH 2160

dimensi 8 9 34 72 genteng
pekerjaan
atap kuda-kuda 0 -
penutup atap 86.4 -
pondasi Galian Tanah 7.65 -
Urugan Pasir 3.24 -
Pas. Batu belah 4.9725 -
beton sloof 1.02 -
12 kolom 0.81 -
balk 15x15 0.765 -
dinding bata 0 -
batako 102 -
Plesteran dinding 204 -
lantai 5cm 3.6 -
kayu gording 4 m 45 -
usuk 2 m 34 -
reng 2m 180 -
kusen pintu 80*200 cm 1 -
jendela 1 -
daun pintu 80*200 cm 1 -
jendela 1 -
pintu kmr 1 -
JUMLAH 0

SWADAYA
HARGA
MATERIAL VOL SATUAN
SATUAN
Urugan Pasir 240,000 3.00 M³
-Semen @ 50 kg 53,000 67.00 Zak
-Pasir pasang 240,000 17.60 M³
-Batu Kali 215,000 6.00 M³
-Besi beton Φ 10 mm SNI 68,000 36.00 Btg
-Besi beton Φ 8 mm SNI 37,500 35.00 Btg
-Batu pecah 280,000 2.30 M³
-Batu Bata 750 - Bh
-Batako 3,500 1,450.00 Bh
-Kusen Pintu, Ukuran 0,80 X 2,00 M 200,000 - Unit
-Kusen Jendela 150,000 - Unit
-Kusen Ventilasi, Ukuran…… - - Unit
-Daun Pintu Kayu, Ukuran 350,000 - Unit
-Daun Jendela Kayu, Ukuran 200,000 - Unit
-Handle Pintu dan Kunci Pintu - - Set
-Handle Jendela dan Kunci Jendela - - Set
-Engsel Pintu 35,000 - Set
-Engsel Jendela 21,000 - Set
-Kayu rangka kuda-kuda, Ukuran 6/12 x 4m 100,000 4.00 Btg
-Kayu gapit, Ukuran ……. - - Btg
-Kayu usuk, Ukuran 4/6 x 3m 27,000 - Btg
-Kayu Usuk, Ukuran 5/7 x 3m - - Btg
-Kayu Reng , Ukuran 2/3 x 3m 1,500 - Btg
-Seng gelombang (0,2 cm x 80 cm x 300 cm 78,000 - Lbr
-Genteng 1,250 - Bh
-Seng - - Lbr
-Genteng bubungan 5,000 - Bh
-Closet Jongkok 155,000 - Unit
-Pipa Air Bersih, Ukuran…… 27,500 - Btg
-Pipa Air Kotor, Ukuran…… 85,000 - Btg
-Kran 25,000 - Bh
-Pintu Kamar Mandi 210,000 - Set
Gamping 8,000 - Zak
Paku 15,000 4.83 Kg
Bendrat 20,000 7.00 Kg
Loster 5,000 10.00 Bh
Papan Bekisting - - Lbr

15,000,000

- 0
0
........................................ .....2019
Diajukan Oleh,
Penerima Bantuan

( ....................................)

Diverifikasi Oleh,
Koordinator Fasilitator

19,927,000 15,000,000
15,000,000
( ....................................)

-
4
20.25 1.0888888889 4.549 0.45
24.25 0.0108888889

batu semen pasir spit bes 10 besi 8 bata batako

3.00
6.00 9.00 3.00
5.00 0.70 0.80 12.00 12.00
4.00 0.50 0.70 12.00 12.00
4.00 0.50 0.60 12.00 11.00
- - -
23.00 7.40 1,275.00
21.00 5.40
1.00 0.10 0.20

6 67 20.6 2.3 36 35 0 1275

batu semen pasir spit bes 10 besi 8 bata batako

- - - - - - - -
- - - - - - - -
- - - - - - - -
- 3.00 - - - - -
6.00 9.00 3.00 - - - - -
- 5.00 0.70 0.80 12.00 12.00 - -
- 4.00 0.50 0.70 12.00 12.00 - -
- 4.00 0.50 0.60 12.00 11.00 - -
- - - - - - - -
- 23.00 7.40 - - - - 1,450.00
- 21.00 5.40 - - - - -
- 1.00 0.10 0.20 - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
6 67 20.6 2.3 36 35 0 1450

REKAP VOL
BIAYA BSPS DANA BSPS
- -
2,650,000.00 50.00
2,208,000.00 9.20
- -
2,448,000.00 36.00
1,312,500.00 35.00
644,000.00 2.30
- -
5,075,000.00 1,450.00
- -
- -
- #DIV/0!
- -
- -
- #DIV/0!
- #DIV/0!
- -
- -
400,000.00 4.00
- #DIV/0!
- -
- #DIV/0!
- -
- -
- -
- #DIV/0!
- -
- -
- -
- -
- -
- -
- -
72,500.00 4.83
140,000.00 7.00
50,000.00 10.00
- #DIV/0!
15,000,000.00
DA

Nomor BNBA
Nama Penerima Bantuan
Nomor KTP
Alamat
Desa/Kelurahan
kayu kusen daun Kecamatan
Gording usuk reng pintu jendela pintu jendela pintu KM Kabupaten/Kota
Nomor Rekening Penerim

A. Jumlah Dana yang ditr


No.
1
2
3
4
5
6
7
8
12.00 9
38.00 10
184.00 11
1.00 12
1.00 13
1.00 14
1.00 15
1.00 16
12 38 184 1 1 1 1 1

kayu kusen daun TOTAL HARGA PEMBELIAN


Gording usuk reng pintu jendela pintu jendela pintu KM Terbilang : Enam Juta Dua Ra

- - - - - - - - Disanggupi oleh :
- - - - - - - - Nama Toko/Penyedia Baha
- - - - - - - - Alamat Toko/Penyedia Bah
- - - - - - - - Nomor Rekening Bank Tok
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - - B. Jumlah dana yang dita
4.00 - - - - - - - No
- - - - - - - 1
- - - - - - - TOTAL TARIK TUNAI (B)
- - - - - - - - Terbilang : Tujuh Juta Lima R
- - - - - - - -
- - - - - - - - C. Total dana yang ditarik (
- - - - - - - - Dana Yang Ditarik (Rp.)
- - - - - - - Terbilang : Tujuh Juta Lima R
4 0 0 0 0 0 0 0

disahkan oleh:
Tim Teknis Kabupaten Ma

( .....................................
NIP.................................

*) coret yang tidak perlu

DA

Nomor BNBA
Nama Penerima Bantuan
Nomor KTP
Alamat
Desa/Kelurahan
Kecamatan
Kabupaten/Kota
Nomor Rekening Penerim

A. Jumlah Dana yang ditr


No.
1
2
3
4
5
6
7
8
9
10
11
12
13
14

TOTAL HARGA PEMBELIAN


Terbilang : Enam Juta Dua Ra

Disanggupi oleh :
Nama Toko/Penyedia Baha
Alamat Toko/Penyedia Bah
Nomor Rekening Bank Tok

B. Jumlah dana yang dita


No
1
TOTAL TARIK TUNAI (B)
Terbilang : Tujuh Juta Lima R

C. Total dana yang ditarik (


Dana Yang Ditarik (Rp.)
Terbilang : Tujuh Juta Lima R
disahkan oleh:
Tim Teknis Kabupaten Ma

( .....................................
NIP.................................

*) coret yang tidak perlu


DAFTAR RENCANA PEMANFAATAN BANTUAN (DRPB) TAHAP 1

Nomor BNBA : 0
Nama Penerima Bantuan : MUH SHOLEH
Nomor KTP : 0
Alamat : 0
Desa/Kelurahan : 0
Kecamatan : 0
Kabupaten/Kota : 0
Nomor Rekening Penerima Bantuan :

A. Jumlah Dana yang ditransfer ke Toko/Penyedia Bahan Bangunan (Tahap I/II *)


Jumlah Harga per Unit
Jenis Bahan Bangunan
(unit) (Rp)
Batu belah 6.00 m3 215,000
Semen 67.00 zak 53,000
Pasir 20.60 m3 240,000
Batu Pecah 2.30 m3 280,000
Besi Ø 10 36.00 btg 68,000
Besi Ø 8 35.00 btg 37,500
Kusen Pintu Ukuran 0,80 x 2,00 m - Bh 200,000
Kusen Jendela - Bh 150,000
Batu Bata - bh 750
Gamping - zak 8,000
Paku 4.83 Kg 15,000
Bendrat - Kg 22,000
Loster - Bh 7,000
Papan Bekisting - Lbr 20,000
Genteng - Bh 1,250
Genteng bubungan - Bh 5,000

TOTAL HARGA PEMBELIAN


Terbilang : Enam Juta Dua Ratus Lima Puluh Ribu Rupiah

Disanggupi oleh :
Nama Toko/Penyedia Bahan Bangunan :
Alamat Toko/Penyedia Bahan Bangunan :
Nomor Rekening Bank Toko/ Penyedi BB :

Toko/Penyedia Bahan Bangunan


(..................................................)

B. Jumlah dana yang ditarik tunai untuk upah kerja (Tahap I / II *)


Uraian Jumlah harga (Rp)
Upah Kerja PKRS 1,250,000
TOTAL TARIK TUNAI (B) 1,250,000
Terbilang : Tujuh Juta Lima Ratus Ribu Rupiah

C. Total dana yang ditarik ( A + B )


Dana Yang Ditarik (Rp.)
Terbilang : Tujuh Juta Lima Ratus Ribu Rupiah

........................................ .....2019
Diajukan Oleh :
Penerima Bantuan

MUH SHOLEH

disahkan oleh: Diverifikasi oleh: Difasilitasi Oleh :


Tim Teknis Kabupaten Magelang Koordinator Fasilitator Tenaga Fasilitator Lapangan

( ...............................................) ( ....................................) (.........................................)


NIP..........................................

*) coret yang tidak perlu

DAFTAR RENCANA PEMANFAATAN BANTUAN (DRPB) TAHAP 2

Nomor BNBA : 0
Nama Penerima Bantuan : MUH SHOLEH
Nomor KTP : 0
Alamat : 0
Desa/Kelurahan : 0
Kecamatan : 0
Kabupaten/Kota : 0
Nomor Rekening Penerima Bantuan : 0

A. Jumlah Dana yang ditransfer ke Toko/Penyedia Bahan Bangunan (Tahap I/II *)


Jumlah Harga per Unit
Jenis Bahan Bangunan
(unit) (Rp)
Batu belah 0 m3 215,000
Semen 51.00 zak 53,000
Pasir 6 m3 240,000
Batu Pecah 0 m3 280,000
Besi Ø 10 25 btg 68,000
Besi Ø 8 0 btg 37,500
Kusen Pintu Ukuran 0,80 x 2,00 m 0 Bh 200,000
Kusen Jendela 0 Bh 150,000
Batu Bata 700 bh 750
Gamping 0 zak 8,000
Paku 0.0 Kg 15,000
Bendrat 0 Kg 22,000
Loster 0 Bh 7,000
Kayu usuk 10 Btg 19,000

TOTAL HARGA PEMBELIAN


Terbilang : Enam Juta Dua Ratus Lima Puluh Ribu Rupiah

Disanggupi oleh :
Nama Toko/Penyedia Bahan Bangunan : 0
Alamat Toko/Penyedia Bahan Bangunan : 0
Nomor Rekening Bank Toko/ Penyedi BB : 0

Toko/Penyedia Bahan Bangunan

(..................................................)

B. Jumlah dana yang ditarik tunai untuk upah kerja (Tahap I / II *)


Uraian Jumlah harga (Rp)
Upah Kerja PKRS/PBRS *) 1,250,000
TOTAL TARIK TUNAI (B) 1,250,000
Terbilang : Tujuh Juta Lima Ratus Ribu Rupiah

C. Total dana yang ditarik ( A + B )


Dana Yang Ditarik (Rp.)
Terbilang : Tujuh Juta Lima Ratus Ribu Rupiah

........................................ .....2019
Diajukan Oleh :
Penerima Bantuan

MUH SHOLEH
disahkan oleh: Diverifikasi oleh: Difasilitasi Oleh :
Tim Teknis Kabupaten Magelang Koordinator Fasilitator Tenaga Fasilitator Lapangan

( ...............................................) ( ....................................) (.........................................)


NIP..........................................

*) coret yang tidak perlu


Format IV - 2

HAP 1

Jumlah Harga
(Rp)
1,290,000
3,551,000
4,944,000
644,000
2,448,000
1,312,500
-
-
-
-
72,500
-
-
-
-
-

14,262,000 15,000,000
738,000

edia Bahan Bangunan


.................................)

Jumlah harga (Rp)


1,250,000
1,250,000

15,512,000

........................... .....2019
Diajukan Oleh :
Penerima Bantuan

MUH SHOLEH

Difasilitasi Oleh :
enaga Fasilitator Lapangan

.......................................)

Format IV - 2

HAP 2
Jumlah Harga
(Rp)
-
2,703,000
1,440,000
-
1,700,000
-
-
-
525,000
-
129,000
-
-
190,000

6,687,000

edia Bahan Bangunan

.................................)

Jumlah harga (Rp)


1,250,000
1,250,000

7,937,000

..................................... .....2019
Diajukan Oleh :
Penerima Bantuan

MUH SHOLEH
Difasilitasi Oleh :
enaga Fasilitator Lapangan

.......................................)
RENCANA ANGGARAN BIAYA (RAB) BSPS

Nomor BNBA :
Nomor KTP :
Nama Penerima Bantuan : MUH SHOLEH
Alamat :
Desa/Kelurahan :
Kecamatan :
Kabupaten/Kota :
Jenis Kegiatan :

SUMBER DANA
HARGA TOTAL HARGA SWADAYA
NO URAIAN PEKERJAAN VOLUME SATUAN (Rp) (Rp) BSPS
Dana Tunai

I Pekerjaan Persiapan
Bongkar Rumah Lama 1.00 ls - - - -
II Pekerjaan Pondasi

1 Galian Tanah Pondasi 5.85 M³ - - - -


2 Urugan Pasir 1.00 M³ 240,000 240,000 - 240,000

3 Pasangan Pondasi 3.80 M³ - -

-Semen @ 50 kg 6.00 Zak 53,000 318,000 - 318,000


-Pasir pasang 2.30 M³ 240,000 552,000 - 552,000
-Batu Kali 5.00 M³ 215,000 1,075,000 - 1,075,000
4 Urugan kembali 2.05 M³ - - - -
III Pekerjaan Sloof
1 Pekerjaan bekisting M² - - - -
2 Cor Beton Sloof, Ukuran 20 x 15 cm - - -
-Besi beton Φ 10 mm SNI 9.00 Btg 68,000 612,000 612,000 -
-Besi beton Φ 8 mm SNI 8.00 Btg 37,500 300,000 300,000 -
-Semen @ 50 kg 4.00 Zak 53,000 212,000 212,000 -
-Pasir pasang 0.50 M³ 240,000 120,000 120,000 -
-Batu Pecah 0.60 M³ 280,000 168,000 168,000 -
IV Pekerjaan Kolom
1 Pekerjaan bekisting M² 20,000 - - -
2 Cor Beton Kolom, Ukuran 15 x 15 cm min. T=3m 8.00 Bh

-Besi beton Φ 10 mm SNI 8.00 Btg 68,000 544,000 544,000 -


-Besi beton Φ 8 mm SNI 8.00 Btg 37,500 300,000 300,000 -
-Pasir pasang 0.40 M³ 240,000 96,000 96,000 -
-Semen @ 50 kg 2.00 Zak 53,000 106,000 106,000 -
-Batu pecah 0.50 M³ 280,000 140,000 140,000 -
V Dinding Permanen
1 Tembok 78.00 M²

-Pasir Pasang 5.70 M³ 240,000 1,368,000 1,368,000 -


-Semen @ 50 kg 17.00 Zak 53,000 901,000 901,000
-Batu Bata - Bh 750 - - -
-Batako 500.00 Bh 3,500 1,750,000 1,750,000 -
2 Pekerjaan Plester
-Pasir Pasang 4.10 M³ 240,000 984,000 984,000 -
-Semen @ 50 kg 16.00 Zak 53,000 848,000 848,000 -
3 Papan
-Papan, Ukuran……… - Lbr - - - -
-Kayu, Ukuran………. - Btg - - - -
VI Pekerjaan Pintu dan Jendela
-Kusen Pintu, Ukuran 0,80 X 2,00 M 2.00 Unit 200,000 400,000 400,000 -
-Kusen Jendela 2.00 Unit 150,000 300,000 300,000 -
-Kusen Ventilasi, Ukuran…… - Unit - - - -
-Daun Pintu Kayu, Ukuran 2.00 Unit 350,000 700,000 700,000 -
-Daun Jendela Kayu, Ukuran 2.00 Unit 200,000 400,000 400,000 -
-Handle Pintu dan Kunci Pintu - Set - - - -
-Handle Jendela dan Kunci Jendela - Set - - - -
-Engsel Pintu - Set 35,000 - - -
-Engsel Jendela - Set 21,000 - - -
VII Ring Balok
1 Pekerjaan bekisting - M² - - - -
2 Pekerjaan Cor Beton
-Besi beton Φ 10 mm SNI 9.00 Btg 68,000 612,000 612,000
-Besi beton Φ 8 mm SNI 9.00 Btg 37,500 337,500 337,500 -
-Semen @ 50 kg 3.00 Zak 53,000 159,000 159,000 -
-Pasir pasang 0.40 M³ 240,000 96,000 96,000 -
-Batu pecah 0.50 M³ 280,000 140,000 140,000 -
VIII Pekerjaan Struktur Atap
-Kayu rangka kuda-kuda, Ukuran 6/12 x 4m 10.00 Btg 100,000 1,000,000 1,000,000 -
-Kayu gapit, Ukuran ……. - Btg - - - -
-Kayu usuk, Ukuran 4/6 x 3m - Btg 27,000 - - -
-Kayu Usuk, Ukuran 5/7 x 3m - Btg - - - -
-Kayu Reng , Ukuran 2/3 x 3m - Btg 1,500 - -
IX Pekerjaan Penutup Atap
1 Penutup Atap 48.00
-Seng gelombang (0,2 cm x 80 cm x 300 cm), atau - Lbr 78,000 - - -
-Genteng 1,400.00 Bh 1,250 1,750,000 1,750,000 -
-Bahan penutup atap lainnya yang diijinkan - Lbr - - - -
2 Bubungan Atap Bh

-Seng Lbr - - -
-Genteng bubungan - Bh 5,000 - - -
-Bahan penutup atap lainnya yang diijinkan Lbr - - -
3 Listplang papan, Ukuran……. M³ - - -
X Pekerjaan Lantai
1 Lantai Rabat Campuran minimal 1:5, T= 5 cm 2.00 M3

-Semen @ 50 kg 1.00 Zak 53,000 53,000 53,000 -


-Pasir pasang 0.10 M³ 240,000 24,000 24,000 -
-Batu pecah 0.10 M³ 280,000 28,000 28,000 -
2 Lantai Papan M²

-Papan, Ukuran……….. - Lbr - - - -


-Kayu, Ukuran……….. - Btg - - - -
XI MCK
-Septic Tank - Unit - - - -
-Closet Jongkok - Unit 155,000 - - -
-Pipa Air Bersih, Ukuran…… - Btg 27,500 - - -
-Pipa Air Kotor, Ukuran…… - Btg 85,000 - - -
-Kran - Bh 25,000 - - -
-Pintu Kamar Mandi - Set 210,000 - - -
XII Lain-lain/ Instalasi Listrik
Gamping 35.00 Zak 8,000 280,000 280,000 -
Paku 8.10 Kg 15,000 121,500 121,500 -
Bendrat 5.00 Kg 20,000 100,000 100,000 -
Loster 10.00 Bh 5,000 50,000 50,000 -
Papan Bekisting - Lbr - - - -
XIII Upah Kerja
Tukang 60.00 Oh 70,000 4,200,000 2,500,000 1,700,000
Pembantu Tukang 60.00 Oh 60,000 3,600,000 3,600,000

JUMLAH 24,985,000 17,500,000 7,485,000

........................................ .....20
Difasilitasi, Ketua KPB Diajukan Oleh,
Tenaga Fasilitator Lapangan Penerima Bantuan

(.........................................) ( ....................................) ( ....................................)

Disahkan oleh, Diverifikasi Oleh,


Tim Teknis Kabupaten Magelang Koordinator Fasilitator

( ...............................................) ( ....................................)
NIP..........................................
FORMAT III-17

PANJANG LEBAR KELL VOL M2


SUMBER DANA dimensi 5 8 26 40 genteng
SWADAYA pekerjaan
Memakai Bahan
Bangunan Lama atap kuda-kuda
penutup atap 48 1,200.00
SWADAYA pondasi Galian Tanah 5.85
Urugan Pasir 1.8
SWADAYA Pas. Batu belah 3.8025
12 beton sloof 0.78
17 8 kolom 0.54
12 balk 15x15 0.585
17 dinding bata
58 batako 78
SWADAYA Plesteran dinding 156
lantai 5cm 2
SWADAYA kayu gording 4 m 40
usuk 2 m 26
reng 2m 100
kusen pintu 80*200 cm 1
jendela 1
daun pintu 80*200 cm 1
jendela 1
pintu kmr 1
SWADAYA JUMLAH 1200

dimensi 5 8 26 40 genteng
pekerjaan
atap kuda-kuda 0 -
penutup atap 48 1,400.00
pondasi Galian Tanah 5.85 -
Urugan Pasir 1.8 -
Pas. Batu belah 3.8025 -
beton sloof 0.78 -
8 kolom 0.54 -
balk 15x15 0.585 -
dinding bata 0 -
batako 78 -
Plesteran dinding 156 -
lantai 5cm 2 -
kayu gording 4 m 40 -
usuk 2 m 26 -
reng 2m 100 -
kusen pintu 80*200 cm 1 -
jendela 1 -
daun pintu 80*200 cm 1 -
jendela 1 -
pintu kmr 1 -
JUMLAH 1400

SWADAYA
HARGA
MATERIAL VOL SATUAN
SATUAN
Urugan Pasir 240,000 1.00 M³
-Semen @ 50 kg 53,000 49.00 Zak
-Pasir pasang 240,000 13.50 M³
-Batu Kali 215,000 5.00 M³
-Besi beton Φ 10 mm SNI 68,000 26.00 Btg
-Besi beton Φ 8 mm SNI 37,500 25.00 Btg
-Batu pecah 280,000 1.70 M³
-Batu Bata 750 - Bh
-Batako 3,500 500.00 Bh
-Kusen Pintu, Ukuran 0,80 X 2,00 M 200,000 2.00 Unit
-Kusen Jendela 150,000 2.00 Unit
-Kusen Ventilasi, Ukuran…… - - Unit
-Daun Pintu Kayu, Ukuran 350,000 2.00 Unit
-Daun Jendela Kayu, Ukuran 200,000 2.00 Unit
-Handle Pintu dan Kunci Pintu - - Set
-Handle Jendela dan Kunci Jendela - - Set
-Engsel Pintu 35,000 - Set
-Engsel Jendela 21,000 - Set
-Kayu rangka kuda-kuda, Ukuran 6/12 x 4m 100,000 10.00 Btg
-Kayu gapit, Ukuran ……. - - Btg
-Kayu usuk, Ukuran 4/6 x 3m 27,000 - Btg
-Kayu Usuk, Ukuran 5/7 x 3m - - Btg
-Kayu Reng , Ukuran 2/3 x 3m 1,500 - Btg
-Seng gelombang (0,2 cm x 80 cm x 300 cm 78,000 - Lbr
-Genteng 1,250 1,400.00 Bh
-Seng - - Lbr
-Genteng bubungan 5,000 - Bh
-Closet Jongkok 155,000 - Unit
-Pipa Air Bersih, Ukuran…… 27,500 - Btg
-Pipa Air Kotor, Ukuran…… 85,000 - Btg
-Kran 25,000 - Bh
-Pintu Kamar Mandi 210,000 - Set
Gamping 8,000 35.00 Zak
Paku 15,000 8.10 Kg
Bendrat 20,000 5.00 Kg
Loster 5,000 10.00 Bh
Papan Bekisting - - Lbr

15,000,000

- 0
0
........................................ .....2019
Diajukan Oleh,
Penerima Bantuan

( ....................................)

Diverifikasi Oleh,
Koordinator Fasilitator

17,185,000 15,000,000
15,000,000
( ....................................)

-
4
20.25 1.0888888889 4.549 0.45
24.25 0.0108888889

batu semen pasir spit bes 10 besi 8 bata batako

1.00
5.00 6.00 2.30
4.00 0.50 0.60 9.00 10.00
2.00 0.40 0.50 8.00 8.00
3.00 0.40 0.50 9.00 9.00
- - -
17.00 5.70 975.00
16.00 4.10
1.00 0.10 0.10

5 49 14.5 1.7 26 27 0 975

batu semen pasir spit bes 10 besi 8 bata batako

- - - - - - - -
- - - - - - - -
- - - - - - - -
- 1.00 - - - - -
5.00 6.00 2.30 - - - - -
- 4.00 0.50 0.60 9.00 10.00 - -
- 2.00 0.40 0.50 8.00 8.00 - -
- 3.00 0.40 0.50 9.00 9.00 - -
- - - - - - - -
- 17.00 5.70 - - - - 500.00
- 16.00 4.10 - - - - -
- 1.00 0.10 0.10 - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
5 49 14.5 1.7 26 27 0 500

REKAP VOL
BIAYA BSPS DANA BSPS
- -
2,279,000.00 43.00
2,688,000.00 11.20
- -
1,768,000.00 26.00
937,500.00 25.00
476,000.00 1.70
- -
1,750,000.00 500.00
400,000.00 2.00
300,000.00 2.00
- #DIV/0!
700,000.00 2.00
400,000.00 2.00
- #DIV/0!
- #DIV/0!
- -
- -
1,000,000.00 10.00
- #DIV/0!
- -
- #DIV/0!
- -
- -
1,750,000.00 1,400.00
- #DIV/0!
- -
- -
- -
- -
- -
- -
280,000.00 35.00
121,500.00 8.10
100,000.00 5.00
50,000.00 10.00
- #DIV/0!
15,000,000.00
DA

Nomor BNBA
Nama Penerima Bantuan
Nomor KTP
Alamat
Desa/Kelurahan
kayu kusen daun Kecamatan
Gording usuk reng pintu jendela pintu jendela pintu KM Kabupaten/Kota
Nomor Rekening Penerim

A. Jumlah Dana yang ditr


No.
1
2
3
4
5
6
7
8
10.00 9
30.00 10
104.00 11
1.00 12
1.00 13
1.00 14
1.00 15
1.00 16
10 30 104 1 1 1 1 1

kayu kusen daun TOTAL HARGA PEMBELIAN


Gording usuk reng pintu jendela pintu jendela pintu KM Terbilang : Enam Juta Dua Ra

- - - - - - - - Disanggupi oleh :
- - - - - - - - Nama Toko/Penyedia Baha
- - - - - - - - Alamat Toko/Penyedia Bah
- - - - - - - - Nomor Rekening Bank Tok
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - - B. Jumlah dana yang dita
10.00 - - - - - - - No
- - - - - - - 1
- - - - - - - TOTAL TARIK TUNAI (B)
- - - 2.00 - - - - Terbilang : Tujuh Juta Lima R
- - - - 2.00 - - -
- - - - - 2.00 - - C. Total dana yang ditarik (
- - - - - - 2.00 - Dana Yang Ditarik (Rp.)
- - - - - - - Terbilang : Tujuh Juta Lima R
10 0 0 2 2 2 2 0

disahkan oleh:
Tim Teknis Kabupaten Ma

( .....................................
NIP.................................

*) coret yang tidak perlu

DA

Nomor BNBA
Nama Penerima Bantuan
Nomor KTP
Alamat
Desa/Kelurahan
Kecamatan
Kabupaten/Kota
Nomor Rekening Penerim

A. Jumlah Dana yang ditr


No.
1
2
3
4
5
6
7
8
9
10
11
12
13
14

TOTAL HARGA PEMBELIAN


Terbilang : Enam Juta Dua Ra

Disanggupi oleh :
Nama Toko/Penyedia Baha
Alamat Toko/Penyedia Bah
Nomor Rekening Bank Tok

B. Jumlah dana yang dita


No
1
TOTAL TARIK TUNAI (B)
Terbilang : Tujuh Juta Lima R

C. Total dana yang ditarik (


Dana Yang Ditarik (Rp.)
Terbilang : Tujuh Juta Lima R
disahkan oleh:
Tim Teknis Kabupaten Ma

( .....................................
NIP.................................

*) coret yang tidak perlu


DAFTAR RENCANA PEMANFAATAN BANTUAN (DRPB) TAHAP 1

Nomor BNBA : 0
Nama Penerima Bantuan : MUH SHOLEH
Nomor KTP : 0
Alamat : 0
Desa/Kelurahan : 0
Kecamatan : 0
Kabupaten/Kota : 0
Nomor Rekening Penerima Bantuan :

A. Jumlah Dana yang ditransfer ke Toko/Penyedia Bahan Bangunan (Tahap I/II *)


Jumlah Harga per Unit
Jenis Bahan Bangunan
(unit) (Rp)
Batu belah 5.00 m3 215,000
Semen 49.00 zak 53,000
Pasir 14.50 m3 240,000
Batu Pecah 1.70 m3 280,000
Besi Ø 10 26.00 btg 68,000
Besi Ø 8 27.00 btg 37,500
Kusen Pintu Ukuran 0,80 x 2,00 m - Bh 200,000
Kusen Jendela - Bh 150,000
Batu Bata - bh 750
Gamping 35.00 zak 8,000
Paku 8.10 Kg 15,000
Bendrat - Kg 22,000
Loster - Bh 7,000
Papan Bekisting - Lbr 20,000
Genteng 1,400.00 Bh 1,250
Genteng bubungan - Bh 5,000

TOTAL HARGA PEMBELIAN


Terbilang : Enam Juta Dua Ratus Lima Puluh Ribu Rupiah

Disanggupi oleh :
Nama Toko/Penyedia Bahan Bangunan :
Alamat Toko/Penyedia Bahan Bangunan :
Nomor Rekening Bank Toko/ Penyedi BB :

Toko/Penyedia Bahan Bangunan


(..................................................)

B. Jumlah dana yang ditarik tunai untuk upah kerja (Tahap I / II *)


Uraian Jumlah harga (Rp)
Upah Kerja PKRS 1,250,000
TOTAL TARIK TUNAI (B) 1,250,000
Terbilang : Tujuh Juta Lima Ratus Ribu Rupiah

C. Total dana yang ditarik ( A + B )


Dana Yang Ditarik (Rp.)
Terbilang : Tujuh Juta Lima Ratus Ribu Rupiah

........................................ .....2019
Diajukan Oleh :
Penerima Bantuan

MUH SHOLEH

disahkan oleh: Diverifikasi oleh: Difasilitasi Oleh :


Tim Teknis Kabupaten Magelang Koordinator Fasilitator Tenaga Fasilitator Lapangan

( ...............................................) ( ....................................) (.........................................)


NIP..........................................

*) coret yang tidak perlu

DAFTAR RENCANA PEMANFAATAN BANTUAN (DRPB) TAHAP 2

Nomor BNBA : 0
Nama Penerima Bantuan : MUH SHOLEH
Nomor KTP : 0
Alamat : 0
Desa/Kelurahan : 0
Kecamatan : 0
Kabupaten/Kota : 0
Nomor Rekening Penerima Bantuan : 0

A. Jumlah Dana yang ditransfer ke Toko/Penyedia Bahan Bangunan (Tahap I/II *)


Jumlah Harga per Unit
Jenis Bahan Bangunan
(unit) (Rp)
Batu belah 0 m3 215,000
Semen 33.00 zak 53,000
Pasir 6 m3 240,000
Batu Pecah 0 m3 280,000
Besi Ø 10 25 btg 68,000
Besi Ø 8 0 btg 37,500
Kusen Pintu Ukuran 0,80 x 2,00 m 0 Bh 200,000
Kusen Jendela 0 Bh 150,000
Batu Bata 700 bh 750
Gamping 0 zak 8,000
Paku 0.0 Kg 15,000
Bendrat 0 Kg 22,000
Loster 0 Bh 7,000
Kayu usuk 10 Btg 19,000

TOTAL HARGA PEMBELIAN


Terbilang : Enam Juta Dua Ratus Lima Puluh Ribu Rupiah

Disanggupi oleh :
Nama Toko/Penyedia Bahan Bangunan : 0
Alamat Toko/Penyedia Bahan Bangunan : 0
Nomor Rekening Bank Toko/ Penyedi BB : 0

Toko/Penyedia Bahan Bangunan

(..................................................)

B. Jumlah dana yang ditarik tunai untuk upah kerja (Tahap I / II *)


Uraian Jumlah harga (Rp)
Upah Kerja PKRS/PBRS *) 1,250,000
TOTAL TARIK TUNAI (B) 1,250,000
Terbilang : Tujuh Juta Lima Ratus Ribu Rupiah

C. Total dana yang ditarik ( A + B )


Dana Yang Ditarik (Rp.)
Terbilang : Tujuh Juta Lima Ratus Ribu Rupiah

........................................ .....2019
Diajukan Oleh :
Penerima Bantuan

MUH SHOLEH
disahkan oleh: Diverifikasi oleh: Difasilitasi Oleh :
Tim Teknis Kabupaten Magelang Koordinator Fasilitator Tenaga Fasilitator Lapangan

( ...............................................) ( ....................................) (.........................................)


NIP..........................................

*) coret yang tidak perlu


Format IV - 2

HAP 1

Jumlah Harga
(Rp)
1,075,000
2,597,000
3,480,000
476,000
1,768,000
1,012,500
-
-
-
280,000
121,500
-
-
-
1,750,000
-

12,560,000 15,000,000
2,440,000

edia Bahan Bangunan


.................................)

Jumlah harga (Rp)


1,250,000
1,250,000

13,810,000

........................... .....2019
Diajukan Oleh :
Penerima Bantuan

MUH SHOLEH

Difasilitasi Oleh :
enaga Fasilitator Lapangan

.......................................)

Format IV - 2

HAP 2
Jumlah Harga
(Rp)
-
1,749,000
1,440,000
-
1,700,000
-
-
-
525,000
-
129,000
-
-
190,000

5,733,000

edia Bahan Bangunan

.................................)

Jumlah harga (Rp)


1,250,000
1,250,000

6,983,000

..................................... .....2019
Diajukan Oleh :
Penerima Bantuan

MUH SHOLEH
Difasilitasi Oleh :
enaga Fasilitator Lapangan

.......................................)
RENCANA ANGGARAN BIAYA (RAB) BSPS

Nomor BNBA :
Nomor KTP :
Nama Penerima Bantuan : MUH SHOLEH
Alamat :
Desa/Kelurahan :
Kecamatan :
Kabupaten/Kota :
Jenis Kegiatan :

SUMBER DANA
HARGA TOTAL HARGA SWADAYA
NO URAIAN PEKERJAAN VOLUME SATUAN (Rp) (Rp) BSPS
Dana Tunai

I Pekerjaan Persiapan
Bongkar Rumah Lama 1.00 ls - - - -
II Pekerjaan Pondasi

1 Galian Tanah Pondasi 6.75 M³ - - - -


2 Urugan Pasir 2.00 M³ 240,000 480,000 - 480,000

3 Pasangan Pondasi 4.39 M³ - -

-Semen @ 50 kg 7.00 Zak 53,000 371,000 - 371,000


-Pasir pasang 2.60 M³ 240,000 624,000 - 624,000
-Batu Kali 5.00 M³ 215,000 1,075,000 - 1,075,000
4 Urugan kembali 2.36 M³ - - - -
III Pekerjaan Sloof
1 Pekerjaan bekisting M² - - - -
2 Cor Beton Sloof, Ukuran 20 x 15 cm - - -
-Besi beton Φ 10 mm SNI 10.00 Btg 68,000 680,000 680,000 -
-Besi beton Φ 8 mm SNI 10.00 Btg 37,500 375,000 375,000
-Semen @ 50 kg 4.00 Zak 53,000 212,000 212,000 -
-Pasir pasang 0.60 M³ 240,000 144,000 144,000 -
-Batu Pecah 0.70 M³ 280,000 196,000 196,000 -
IV Pekerjaan Kolom
1 Pekerjaan bekisting M² 20,000 - - -
2 Cor Beton Kolom, Ukuran 15 x 15 cm min. T=3m 10.00 Bh

-Besi beton Φ 10 mm SNI 10.00 Btg 68,000 680,000 680,000 -


-Besi beton Φ 8 mm SNI 10.00 Btg 37,500 375,000 375,000 -
-Pasir pasang 0.40 M³ 240,000 96,000 96,000 -
-Semen @ 50 kg 3.00 Zak 53,000 159,000 159,000 -
-Batu pecah 0.60 M³ 280,000 168,000 168,000 -
V Dinding Permanen
1 Tembok - M²

-Pasir Pasang 4.50 M³ 240,000 1,080,000 1,080,000 -


-Semen @ 50 kg 14.00 Zak 53,000 742,000 742,000
-Batu Bata 5,000.00 Bh 750 3,750,000 3,750,000 -
-Batako - Bh 3,500 - - -
2 Pekerjaan Plester
-Pasir Pasang 4.70 M³ 240,000 1,128,000 240,000 888,000
-Semen @ 50 kg 25.00 Zak 53,000 1,325,000 530,000 795,000
3 Papan
-Papan, Ukuran……… - Lbr - - - -
-Kayu, Ukuran………. - Btg - - - -
VI Pekerjaan Pintu dan Jendela
-Kusen Pintu, Ukuran 0,80 X 2,00 M 1.00 Unit 200,000 200,000 200,000 -
-Kusen Jendela - Unit 150,000 - - -
-Kusen Ventilasi, Ukuran…… - Unit - - - -
-Daun Pintu Kayu, Ukuran 1.00 Unit 350,000 350,000 350,000 -
-Daun Jendela Kayu, Ukuran 10.00 Unit 200,000 2,000,000 2,000,000 -
-Handle Pintu dan Kunci Pintu - Set - - - -
-Handle Jendela dan Kunci Jendela - Set - - - -
-Engsel Pintu - Set 35,000 - - -
-Engsel Jendela - Set 21,000 - - -
VII Ring Balok
1 Pekerjaan bekisting - M² - - - -
2 Pekerjaan Cor Beton
-Besi beton Φ 10 mm SNI 10.00 Btg 68,000 680,000 680,000
-Besi beton Φ 8 mm SNI 10.00 Btg 37,500 375,000 375,000 -
-Semen @ 50 kg 3.00 Zak 53,000 159,000 159,000 -
-Pasir pasang 0.40 M³ 240,000 96,000 96,000 -
-Batu pecah 0.60 M³ 280,000 168,000 168,000 -
VIII Pekerjaan Struktur Atap
-Kayu rangka kuda-kuda, Ukuran 8/12 x 4m 2.00 Btg 150,000 300,000 300,000 -
-Kayu gapit, Ukuran ……. - Btg - - - -
-Kayu usuk, Ukuran 4/6 x 2m - Btg 22,000 - - -
-Kayu Usuk, Ukuran 5/7 x 2m - Btg 27,000 - - -
-Kayu Reng , Ukuran 2/3 x 2m - Btg 1,500 - -
IX Pekerjaan Penutup Atap
1 Penutup Atap 64.80
-Seng gelombang (0,2 cm x 80 cm x 300 cm), atau - Lbr 78,000 - - -
-Genteng 1,000.00 Bh 1,250 1,250,000 1,250,000 -
-Bahan penutup atap lainnya yang diijinkan - Lbr - - - -
2 Bubungan Atap Bh

-Seng Lbr - - -
-Genteng bubungan - Bh 5,000 - - -
-Bahan penutup atap lainnya yang diijinkan Lbr - - -
3 Listplang papan, Ukuran……. M³ - - -
X Pekerjaan Lantai
1 Lantai Rabat Campuran minimal 1:5, T= 5 cm 2.70 M3

-Semen @ 50 kg 1.00 Zak 53,000 53,000 53,000 -


-Pasir pasang 0.10 M³ 240,000 24,000 24,000 -
-Batu pecah 0.20 M³ 280,000 56,000 56,000 -
2 Lantai Papan M²

-Papan, Ukuran……….. - Lbr - - - -


-Kayu, Ukuran……….. - Btg - - - -
XI MCK
-Septic Tank - Unit - - - -
-Closet Jongkok - Unit 155,000 - - -
-Pipa Air Bersih, Ukuran…… - Btg 27,500 - - -
-Pipa Air Kotor, Ukuran…… - Btg 85,000 - - -
-Kran - Bh 25,000 - - -
-Pintu Kamar Mandi - Set 210,000 - - -
XII Lain-lain/ Instalasi Listrik
Gamping - Zak 8,000 - - -
Paku 5.80 Kg 15,000 87,000 87,000 -
Bendrat 5.00 Kg 20,000 100,000 100,000 -
Loster 10.00 Bh 5,000 50,000 50,000 -
Papan Bekisting - Lbr - - - -
XIII Upah Kerja
Tukang 60.00 Oh 70,000 4,200,000 2,500,000 1,700,000
Pembantu Tukang 60.00 Oh 60,000 3,600,000 3,600,000

JUMLAH 27,408,000 17,500,000 9,908,000

........................................ ....
Difasilitasi, Ketua KPB Diajukan Oleh,
Tenaga Fasilitator Lapangan Penerima Bantuan

(.........................................) ( ....................................) ( ....................................)

Disahkan oleh, Diverifikasi Oleh,


Tim Teknis Kabupaten Magelang Koordinator Fasilitator

( ...............................................) ( ....................................)
NIP..........................................
FORMAT III-17

PANJANG LEBAR KELL VOL M2


SUMBER DANA dimensi 6 9 30 54 genteng
SWADAYA pekerjaan
Memakai Bahan
Bangunan Lama atap kuda-kuda
penutup atap 64.8 1,620.00
SWADAYA pondasi Galian Tanah 6.75
Urugan Pasir 2.43
SWADAYA Pas. Batu belah 4.3875
12 beton sloof 0.9
17 10 kolom 0.675
12 balk 15x15 0.675
17 dinding bata 90
58 batako
SWADAYA Plesteran dinding 180
lantai 5cm 2.7
SWADAYA kayu gording 4 m 45
usuk 2 m 30
reng 2m 135
kusen pintu 80*200 cm 1
jendela 1
daun pintu 80*200 cm 1
jendela 1
pintu kmr 1
SWADAYA JUMLAH 1620

dimensi 6 9 30 54 genteng
pekerjaan
atap kuda-kuda 0 -
penutup atap 64.8 1,000.00
pondasi Galian Tanah 6.75 -
Urugan Pasir 2.43 -
Pas. Batu belah 4.3875 -
beton sloof 0.9 -
10 kolom 0.675 -
balk 15x15 0.675 -
dinding bata 90 -
batako -
Plesteran dinding 180 -
lantai 5cm 2.7 -
kayu gording 4 m 45 -
usuk 2 m 30 -
reng 2m 135 -
kusen pintu 80*200 cm 1 -
jendela 1 -
daun pintu 80*200 cm 1 -
jendela 1 -
pintu kmr 1 -
JUMLAH 1000

SWADAYA
HARGA
MATERIAL VOL SATUAN
SATUAN
Urugan Pasir 240,000 2.00 M³
-Semen @ 50 kg 53,000 57.00 Zak
-Pasir pasang 240,000 13.30 M³
-Batu Kali 215,000 5.00 M³
-Besi beton Φ 10 mm SNI 68,000 30.00 Btg
-Besi beton Φ 8 mm SNI 37,500 30.00 Btg
-Batu pecah 280,000 2.10 M³
-Batu Bata 750 5,000.00 Bh
-Batako 3,500 - Bh
-Kusen Pintu, Ukuran 0,80 X 2,00 M 200,000 1.00 Unit
-Kusen Jendela 150,000 - Unit
-Kusen Ventilasi, Ukuran…… - - Unit
-Daun Pintu Kayu, Ukuran 350,000 1.00 Unit
-Daun Jendela Kayu, Ukuran 200,000 10.00 Unit
-Handle Pintu dan Kunci Pintu - - Set
-Handle Jendela dan Kunci Jendela - - Set
-Engsel Pintu 35,000 - Set
-Engsel Jendela 21,000 - Set
-Kayu rangka kuda-kuda, Ukuran 8/12 x 4m 150,000 2.00 Btg
-Kayu gapit, Ukuran ……. - - Btg
-Kayu usuk, Ukuran 4/6 x 2m 22,000 - Btg
-Kayu Usuk, Ukuran 5/7 x 2m 27,000 - Btg
-Kayu Reng , Ukuran 2/3 x 2m 1,500 - Btg
-Seng gelombang (0,2 cm x 80 cm x 300 cm 78,000 - Lbr
-Genteng 1,250 1,000.00 Bh
-Seng - - Lbr
-Genteng bubungan 5,000 - Bh
-Closet Jongkok 155,000 - Unit
-Pipa Air Bersih, Ukuran…… 27,500 - Btg
-Pipa Air Kotor, Ukuran…… 85,000 - Btg
-Kran 25,000 - Bh
-Pintu Kamar Mandi 210,000 - Set
Gamping 8,000 - Zak
Paku 15,000 5.80 Kg
Bendrat 20,000 5.00 Kg
Loster 5,000 10.00 Bh
Papan Bekisting - - Lbr

15,000,000

- 0
0
........................................ .....2019
Diajukan Oleh,
Penerima Bantuan

( ....................................)

Diverifikasi Oleh,
Koordinator Fasilitator

19,608,000 15,000,000
15,000,000
( ....................................)

-
4
20.25 1.0888888889 4.549 0.45
24.25 0.0108888889

batu semen pasir spit bes 10 besi 8 bata batako

2.00
5.00 7.00 2.60
4.00 0.60 0.70 10.00 11.00
3.00 0.40 0.60 10.00 10.00
3.00 0.40 0.60 10.00 10.00
14.00 4.50 6,300.00
- - -
18.00 4.70
1.00 0.10 0.20

5 50 15.3 2.1 30 31 6300 0

batu semen pasir spit bes 10 besi 8 bata batako

- - - - - - - -
- - - - - - - -
- - - - - - - -
- 2.00 - - - - -
5.00 7.00 2.60 - - - - -
- 4.00 0.60 0.70 10.00 11.00 - -
- 3.00 0.40 0.60 10.00 10.00 - -
- 3.00 0.40 0.60 10.00 10.00 - -
- 14.00 4.50 - - - 5,000.00 -
- - - - - - - -
- 25.00 4.70 - - - - -
- 1.00 0.10 0.20 - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
5 57 15.3 2.1 30 31 5000 0

REKAP VOL
BIAYA BSPS DANA BSPS
- -
1,855,000.00 35.00
1,680,000.00 7.00
- -
2,040,000.00 30.00
750,000.00 20.00
588,000.00 2.10
3,750,000.00 5,000.00
- -
200,000.00 1.00
- -
- #DIV/0!
350,000.00 1.00
2,000,000.00 10.00
- #DIV/0!
- #DIV/0!
- -
- -
300,000.00 2.00
- #DIV/0!
- -
- -
- -
- -
1,250,000.00 1,000.00
- #DIV/0!
- -
- -
- -
- -
- -
- -
- -
87,000.00 5.80
100,000.00 5.00
50,000.00 10.00
- #DIV/0!
15,000,000.00
DA

Nomor BNBA
Nama Penerima Bantuan
Nomor KTP
Alamat
Desa/Kelurahan
kayu kusen daun Kecamatan
Gording usuk reng pintu jendela pintu jendela pintu KM Kabupaten/Kota
Nomor Rekening Penerim

A. Jumlah Dana yang ditr


No.
1
2
3
4
5
6
7
8
12.00 9
34.00 10
140.00 11
1.00 12
1.00 13
1.00 14
1.00 15
1.00 16
12 34 140 1 1 1 1 1

kayu kusen daun TOTAL HARGA PEMBELIAN


Gording usuk reng pintu jendela pintu jendela pintu KM Terbilang : Enam Juta Dua Ra

- - - - - - - - Disanggupi oleh :
- - - - - - - - Nama Toko/Penyedia Baha
- - - - - - - - Alamat Toko/Penyedia Bah
- - - - - - - - Nomor Rekening Bank Tok
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - - B. Jumlah dana yang dita
2.00 - - - - - - - No
- - - - - - - 1
- - - - - - - TOTAL TARIK TUNAI (B)
- - - 1.00 - - - - Terbilang : Tujuh Juta Lima R
- - - - - - - -
- - - - - 1.00 - - C. Total dana yang ditarik (
- - - - - - 10.00 - Dana Yang Ditarik (Rp.)
- - - - - - - - Terbilang : Tujuh Juta Lima R
2 0 0 1 0 1 10 0

disahkan oleh:
Tim Teknis Kabupaten Ma

( .....................................
NIP.................................

*) coret yang tidak perlu

DA

Nomor BNBA
Nama Penerima Bantuan
Nomor KTP
Alamat
Desa/Kelurahan
Kecamatan
Kabupaten/Kota
Nomor Rekening Penerim

A. Jumlah Dana yang ditr


No.
1
2
3
4
5
6
7
8
9
10
11
12
13
14

TOTAL HARGA PEMBELIAN


Terbilang : Enam Juta Dua Ra

Disanggupi oleh :
Nama Toko/Penyedia Baha
Alamat Toko/Penyedia Bah
Nomor Rekening Bank Tok

B. Jumlah dana yang dita


No
1
TOTAL TARIK TUNAI (B)
Terbilang : Tujuh Juta Lima R

C. Total dana yang ditarik (


Dana Yang Ditarik (Rp.)
Terbilang : Tujuh Juta Lima R
disahkan oleh:
Tim Teknis Kabupaten Ma

( .....................................
NIP.................................

*) coret yang tidak perlu


DAFTAR RENCANA PEMANFAATAN BANTUAN (DRPB) TAHAP 1

Nomor BNBA : 0
Nama Penerima Bantuan : MUH SHOLEH
Nomor KTP : 0
Alamat : 0
Desa/Kelurahan : 0
Kecamatan : 0
Kabupaten/Kota : 0
Nomor Rekening Penerima Bantuan :

A. Jumlah Dana yang ditransfer ke Toko/Penyedia Bahan Bangunan (Tahap I/II *)


Jumlah Harga per Unit
Jenis Bahan Bangunan
(unit) (Rp)
Batu belah 5.00 m3 215,000
Semen 57.00 zak 53,000
Pasir 15.30 m3 240,000
Batu Pecah 2.10 m3 280,000
Besi Ø 10 30.00 btg 68,000
Besi Ø 8 31.00 btg 37,500
Kusen Pintu Ukuran 0,80 x 2,00 m - Bh 200,000
Kusen Jendela - Bh 150,000
Batu Bata 5,000.00 bh 750
Gamping - zak 8,000
Paku 5.80 Kg 15,000
Bendrat - Kg 22,000
Loster - Bh 7,000
Papan Bekisting - Lbr 20,000
Genteng 1,000.00 Bh 1,250
Genteng bubungan - Bh 5,000

TOTAL HARGA PEMBELIAN


Terbilang : Enam Juta Dua Ratus Lima Puluh Ribu Rupiah

Disanggupi oleh :
Nama Toko/Penyedia Bahan Bangunan :
Alamat Toko/Penyedia Bahan Bangunan :
Nomor Rekening Bank Toko/ Penyedi BB :

Toko/Penyedia Bahan Bangunan


(..................................................)

B. Jumlah dana yang ditarik tunai untuk upah kerja (Tahap I / II *)


Uraian Jumlah harga (Rp)
Upah Kerja PKRS 1,250,000
TOTAL TARIK TUNAI (B) 1,250,000
Terbilang : Tujuh Juta Lima Ratus Ribu Rupiah

C. Total dana yang ditarik ( A + B )


Dana Yang Ditarik (Rp.)
Terbilang : Tujuh Juta Lima Ratus Ribu Rupiah

........................................ .....2019
Diajukan Oleh :
Penerima Bantuan

MUH SHOLEH

disahkan oleh: Diverifikasi oleh: Difasilitasi Oleh :


Tim Teknis Kabupaten Magelang Koordinator Fasilitator Tenaga Fasilitator Lapangan

( ...............................................) ( ....................................) (.........................................)


NIP..........................................

*) coret yang tidak perlu

DAFTAR RENCANA PEMANFAATAN BANTUAN (DRPB) TAHAP 2

Nomor BNBA : 0
Nama Penerima Bantuan : MUH SHOLEH
Nomor KTP : 0
Alamat : 0
Desa/Kelurahan : 0
Kecamatan : 0
Kabupaten/Kota : 0
Nomor Rekening Penerima Bantuan : 0

A. Jumlah Dana yang ditransfer ke Toko/Penyedia Bahan Bangunan (Tahap I/II *)


Jumlah Harga per Unit
Jenis Bahan Bangunan
(unit) (Rp)
Batu belah 0 m3 215,000
Semen 41.00 zak 53,000
Pasir 6 m3 240,000
Batu Pecah 0 m3 280,000
Besi Ø 10 25 btg 68,000
Besi Ø 8 0 btg 37,500
Kusen Pintu Ukuran 0,80 x 2,00 m 0 Bh 200,000
Kusen Jendela 0 Bh 150,000
Batu Bata 700 bh 750
Gamping 0 zak 8,000
Paku 0.0 Kg 15,000
Bendrat 0 Kg 22,000
Loster 0 Bh 7,000
Kayu usuk 10 Btg 19,000

TOTAL HARGA PEMBELIAN


Terbilang : Enam Juta Dua Ratus Lima Puluh Ribu Rupiah

Disanggupi oleh :
Nama Toko/Penyedia Bahan Bangunan : 0
Alamat Toko/Penyedia Bahan Bangunan : 0
Nomor Rekening Bank Toko/ Penyedi BB : 0

Toko/Penyedia Bahan Bangunan

(..................................................)

B. Jumlah dana yang ditarik tunai untuk upah kerja (Tahap I / II *)


Uraian Jumlah harga (Rp)
Upah Kerja PKRS/PBRS *) 1,250,000
TOTAL TARIK TUNAI (B) 1,250,000
Terbilang : Tujuh Juta Lima Ratus Ribu Rupiah

C. Total dana yang ditarik ( A + B )


Dana Yang Ditarik (Rp.)
Terbilang : Tujuh Juta Lima Ratus Ribu Rupiah

........................................ .....2019
Diajukan Oleh :
Penerima Bantuan

MUH SHOLEH
disahkan oleh: Diverifikasi oleh: Difasilitasi Oleh :
Tim Teknis Kabupaten Magelang Koordinator Fasilitator Tenaga Fasilitator Lapangan

( ...............................................) ( ....................................) (.........................................)


NIP..........................................

*) coret yang tidak perlu


Format IV - 2

HAP 1

Jumlah Harga
(Rp)
1,075,000
3,021,000
3,672,000
588,000
2,040,000
1,162,500
-
-
3,750,000
-
87,000
-
-
-
1,250,000
-

16,645,500 15,000,000
(1,645,500)

edia Bahan Bangunan


.................................)

Jumlah harga (Rp)


1,250,000
1,250,000

17,895,500

........................... .....2019
Diajukan Oleh :
Penerima Bantuan

MUH SHOLEH

Difasilitasi Oleh :
enaga Fasilitator Lapangan

.......................................)

Format IV - 2

HAP 2
Jumlah Harga
(Rp)
-
2,173,000
1,440,000
-
1,700,000
-
-
-
525,000
-
129,000
-
-
190,000

6,157,000

edia Bahan Bangunan

.................................)

Jumlah harga (Rp)


1,250,000
1,250,000

7,407,000

..................................... .....2019
Diajukan Oleh :
Penerima Bantuan

MUH SHOLEH
Difasilitasi Oleh :
enaga Fasilitator Lapangan

.......................................)
RENCANA ANGGARAN BIAYA (RAB) BSPS

Nomor BNBA :
Nomor KTP :
Nama Penerima Bantuan : MUH SHOLEH
Alamat :
Desa/Kelurahan :
Kecamatan :
Kabupaten/Kota :
Jenis Kegiatan :

SUMBER DANA
HARGA TOTAL HARGA SWADAYA
NO URAIAN PEKERJAAN VOLUME SATUAN (Rp) (Rp) BSPS
Dana Tunai

I Pekerjaan Persiapan
Bongkar Rumah Lama 1.00 ls - - - -
II Pekerjaan Pondasi

1 Galian Tanah Pondasi 6.75 M³ - - - -


2 Urugan Pasir 2.00 M³ 240,000 480,000 - 480,000

3 Pasangan Pondasi 4.39 M³ - -

-Semen @ 50 kg 7.00 Zak 53,000 371,000 371,000 -


-Pasir pasang 2.60 M³ 240,000 624,000 624,000 -
-Batu Kali 5.00 M³ 215,000 1,075,000 - 1,075,000
4 Urugan kembali 2.36 M³ - - - -
III Pekerjaan Sloof
1 Pekerjaan bekisting M² - - - -
2 Cor Beton Sloof, Ukuran 20 x 15 cm - - -
-Besi beton Φ 10 mm SNI 10.00 Btg 68,000 680,000 680,000 -
-Besi beton Φ 8 mm SNI 10.00 Btg 37,500 375,000 375,000 -
-Semen @ 50 kg 4.00 Zak 53,000 212,000 212,000 -
-Pasir pasang 0.60 M³ 240,000 144,000 144,000 -
-Batu Pecah 0.70 M³ 280,000 196,000 196,000 -
IV Pekerjaan Kolom
1 Pekerjaan bekisting M² 20,000 - - -
2 Cor Beton Kolom, Ukuran 15 x 15 cm min. T=3m 10.00 Bh

-Besi beton Φ 10 mm SNI 10.00 Btg 68,000 680,000 680,000 -


-Besi beton Φ 8 mm SNI 10.00 Btg 37,500 375,000 375,000 -
-Pasir pasang 0.40 M³ 240,000 96,000 96,000 -
-Semen @ 50 kg 3.00 Zak 53,000 159,000 159,000 -
-Batu pecah 0.60 M³ 280,000 168,000 168,000 -
V Dinding Permanen
1 Tembok - M²

-Pasir Pasang 4.50 M³ 240,000 1,080,000 1,080,000 -


-Semen @ 50 kg 14.00 Zak 53,000 742,000 742,000
-Batu Bata 5,000.00 Bh 750 3,750,000 3,750,000 -
-Batako - Bh 3,500 - - -
2 Pekerjaan Plester
-Pasir Pasang 4.70 M³ 240,000 1,128,000 1,128,000 -
-Semen @ 50 kg 25.00 Zak 53,000 1,325,000 - 1,325,000
3 Papan
-Papan, Ukuran……… - Lbr - - - -
-Kayu, Ukuran………. - Btg - - - -
VI Pekerjaan Pintu dan Jendela
-Kusen Pintu, Ukuran 0,80 X 2,00 M 2.00 Unit 200,000 400,000 400,000 -
-Kusen Jendela 3.00 Unit 150,000 450,000 450,000 -
-Kusen Ventilasi, Ukuran…… - Unit - - - -
-Daun Pintu Kayu, Ukuran 2.00 Unit 350,000 700,000 700,000 -
-Daun Jendela Kayu, Ukuran 3.00 Unit 200,000 600,000 600,000 -
-Handle Pintu dan Kunci Pintu - Set - - - -
-Handle Jendela dan Kunci Jendela - Set - - - -
-Engsel Pintu - Set 35,000 - - -
-Engsel Jendela - Set 21,000 - - -
VII Ring Balok
1 Pekerjaan bekisting - M² - - - -
2 Pekerjaan Cor Beton
-Besi beton Φ 10 mm SNI 10.00 Btg 68,000 680,000 680,000
-Besi beton Φ 8 mm SNI 10.00 Btg 37,500 375,000 375,000 -
-Semen @ 50 kg 3.00 Zak 53,000 159,000 159,000 -
-Pasir pasang 0.40 M³ 240,000 96,000 96,000 -
-Batu pecah 0.60 M³ 280,000 168,000 168,000 -
VIII Pekerjaan Struktur Atap
-Kayu rangka kuda-kuda, Ukuran 8/12 x 4m - Btg 150,000 - - -
-Kayu gapit, Ukuran ……. - Btg - - - -
-Kayu usuk, Ukuran 4/6 x 2m - Btg 22,000 - - -
-Kayu Usuk, Ukuran 5/7 x 2m - Btg 27,000 - - -
-Kayu Reng , Ukuran 2/3 x 2m - Btg 1,500 - -
IX Pekerjaan Penutup Atap
1 Penutup Atap 64.80
-Seng gelombang (0,2 cm x 80 cm x 300 cm), atau - Lbr 78,000 - - -
-Genteng - Bh 1,250 - - -
-Bahan penutup atap lainnya yang diijinkan - Lbr - - - -
2 Bubungan Atap Bh

-Seng Lbr - - -
-Genteng bubungan - Bh 5,000 - - -
-Bahan penutup atap lainnya yang diijinkan Lbr - - -
3 Listplang papan, Ukuran……. M³ - - -
X Pekerjaan Lantai
1 Lantai Rabat Campuran minimal 1:5, T= 5 cm 2.70 M3

-Semen @ 50 kg 1.00 Zak 53,000 53,000 53,000 -


-Pasir pasang 0.10 M³ 240,000 24,000 24,000 -
-Batu pecah 0.20 M³ 280,000 56,000 56,000 -
2 Lantai Papan M²

-Papan, Ukuran……….. - Lbr - - - -


-Kayu, Ukuran……….. - Btg - - - -
XI MCK
-Septic Tank - Unit - - - -
-Closet Jongkok - Unit 155,000 - - -
-Pipa Air Bersih, Ukuran…… - Btg 27,500 - - -
-Pipa Air Kotor, Ukuran…… - Btg 85,000 - - -
-Kran - Bh 25,000 - - -
-Pintu Kamar Mandi - Set 210,000 - - -
XII Lain-lain/ Instalasi Listrik
Gamping 30.00 Zak 8,000 240,000 240,000 -
Paku 5.93 Kg 15,000 89,000 89,000 -
Bendrat 4.00 Kg 20,000 80,000 80,000 -
Loster 10.00 Bh 5,000 50,000 50,000 -
Papan Bekisting - Lbr - - - -
XIII Upah Kerja
Tukang 60.00 Oh 70,000 4,200,000 2,500,000 1,700,000
Pembantu Tukang 60.00 Oh 60,000 3,600,000 3,600,000

JUMLAH 25,680,000 17,500,000 8,180,000

........................................ ....
Difasilitasi, Ketua KPB Diajukan Oleh,
Tenaga Fasilitator Lapangan Penerima Bantuan

(.........................................) ( ....................................) ( ....................................)

Disahkan oleh, Diverifikasi Oleh,


Tim Teknis Kabupaten Magelang Koordinator Fasilitator

( ...............................................) ( ....................................)
NIP..........................................
FORMAT III-17

PANJANG LEBAR KELL VOL M2


SUMBER DANA dimensi 6 9 30 54 genteng
SWADAYA pekerjaan
Memakai Bahan
Bangunan Lama atap kuda-kuda
penutup atap 64.8 1,620.00
SWADAYA pondasi Galian Tanah 6.75
Urugan Pasir 2.43
SWADAYA Pas. Batu belah 4.3875
12 beton sloof 0.9
17 10 kolom 0.675
12 balk 15x15 0.675
17 dinding bata 90
58 batako
SWADAYA Plesteran dinding 180
lantai 5cm 2.7
SWADAYA kayu gording 4 m 45
usuk 2 m 30
reng 2m 135
kusen pintu 80*200 cm 1
jendela 1
daun pintu 80*200 cm 1
jendela 1
pintu kmr 1
SWADAYA JUMLAH 1620

dimensi 6 9 30 54 genteng
pekerjaan
atap kuda-kuda 0 -
penutup atap 64.8 -
pondasi Galian Tanah 6.75 -
Urugan Pasir 2.43 -
Pas. Batu belah 4.3875 -
beton sloof 0.9 -
10 kolom 0.675 -
balk 15x15 0.675 -
dinding bata 90 -
batako -
Plesteran dinding 180 -
lantai 5cm 2.7 -
kayu gording 4 m 45 -
usuk 2 m 30 -
reng 2m 135 -
kusen pintu 80*200 cm 1 -
jendela 1 -
daun pintu 80*200 cm 1 -
jendela 1 -
pintu kmr 1 -
JUMLAH 0

SWADAYA
HARGA
MATERIAL VOL SATUAN
SATUAN
Urugan Pasir 240,000 2.00 M³
-Semen @ 50 kg 53,000 57.00 Zak
-Pasir pasang 240,000 13.30 M³
-Batu Kali 215,000 5.00 M³
-Besi beton Φ 10 mm SNI 68,000 30.00 Btg
-Besi beton Φ 8 mm SNI 37,500 30.00 Btg
-Batu pecah 280,000 2.10 M³
-Batu Bata 750 5,000.00 Bh
-Batako 3,500 - Bh
-Kusen Pintu, Ukuran 0,80 X 2,00 M 200,000 2.00 Unit
-Kusen Jendela 150,000 3.00 Unit
-Kusen Ventilasi, Ukuran…… - - Unit
-Daun Pintu Kayu, Ukuran 350,000 2.00 Unit
-Daun Jendela Kayu, Ukuran 200,000 3.00 Unit
-Handle Pintu dan Kunci Pintu - - Set
-Handle Jendela dan Kunci Jendela - - Set
-Engsel Pintu 35,000 - Set
-Engsel Jendela 21,000 - Set
-Kayu rangka kuda-kuda, Ukuran 8/12 x 4m 150,000 - Btg
-Kayu gapit, Ukuran ……. - - Btg
-Kayu usuk, Ukuran 4/6 x 2m 22,000 - Btg
-Kayu Usuk, Ukuran 5/7 x 2m 27,000 - Btg
-Kayu Reng , Ukuran 2/3 x 2m 1,500 - Btg
-Seng gelombang (0,2 cm x 80 cm x 300 cm 78,000 - Lbr
-Genteng 1,250 - Bh
-Seng - - Lbr
-Genteng bubungan 5,000 - Bh
-Closet Jongkok 155,000 - Unit
-Pipa Air Bersih, Ukuran…… 27,500 - Btg
-Pipa Air Kotor, Ukuran…… 85,000 - Btg
-Kran 25,000 - Bh
-Pintu Kamar Mandi 210,000 - Set
Gamping 8,000 30.00 Zak
Paku 15,000 5.93 Kg
Bendrat 20,000 4.00 Kg
Loster 5,000 10.00 Bh
Papan Bekisting - - Lbr

15,000,000

- 0
0
........................................ .....2019
Diajukan Oleh,
Penerima Bantuan

( ....................................)

Diverifikasi Oleh,
Koordinator Fasilitator

17,880,000 15,000,000
15,000,000
( ....................................)

-
4
20.25 1.0888888889 4.549 0.45
24.25 0.0108888889

batu semen pasir spit bes 10 besi 8 bata batako

2.00
5.00 7.00 2.60
4.00 0.60 0.70 10.00 11.00
3.00 0.40 0.60 10.00 10.00
3.00 0.40 0.60 10.00 10.00
14.00 4.50 6,300.00
- - -
18.00 4.70
1.00 0.10 0.20

5 50 15.3 2.1 30 31 6300 0

batu semen pasir spit bes 10 besi 8 bata batako

- - - - - - - -
- - - - - - - -
- - - - - - - -
- 2.00 - - - - -
5.00 7.00 2.60 - - - - -
- 4.00 0.60 0.70 10.00 11.00 - -
- 3.00 0.40 0.60 10.00 10.00 - -
- 3.00 0.40 0.60 10.00 10.00 - -
- 14.00 4.50 - - - 5,000.00 -
- - - - - - - -
- 25.00 4.70 - - - - -
- 1.00 0.10 0.20 - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
5 57 15.3 2.1 30 31 5000 0

REKAP VOL
BIAYA BSPS DANA BSPS
- -
1,696,000.00 32.00
3,192,000.00 13.30
- -
2,040,000.00 30.00
1,125,000.00 30.00
588,000.00 2.10
3,750,000.00 5,000.00
- -
400,000.00 2.00
450,000.00 3.00
- #DIV/0!
700,000.00 2.00
600,000.00 3.00
- #DIV/0!
- #DIV/0!
- -
- -
- -
- #DIV/0!
- -
- -
- -
- -
- -
- #DIV/0!
- -
- -
- -
- -
- -
- -
240,000.00 30.00
89,000.00 5.93
80,000.00 4.00
50,000.00 10.00
- #DIV/0!
15,000,000.00
DA

Nomor BNBA
Nama Penerima Bantuan
Nomor KTP
Alamat
Desa/Kelurahan
kayu kusen daun Kecamatan
Gording usuk reng pintu jendela pintu jendela pintu KM Kabupaten/Kota
Nomor Rekening Penerim

A. Jumlah Dana yang ditr


No.
1
2
3
4
5
6
7
8
12.00 9
34.00 10
140.00 11
1.00 12
1.00 13
1.00 14
1.00 15
1.00 16
12 34 140 1 1 1 1 1

kayu kusen daun TOTAL HARGA PEMBELIAN


Gording usuk reng pintu jendela pintu jendela pintu KM Terbilang : Enam Juta Dua Ra

- - - - - - - - Disanggupi oleh :
- - - - - - - - Nama Toko/Penyedia Baha
- - - - - - - - Alamat Toko/Penyedia Bah
- - - - - - - - Nomor Rekening Bank Tok
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - - B. Jumlah dana yang dita
- - - - - - - - No
- - - - - - - 1
- - - - - - - TOTAL TARIK TUNAI (B)
- - - 2.00 - - - - Terbilang : Tujuh Juta Lima R
- - - - 3.00 - - -
- - - - - 2.00 - - C. Total dana yang ditarik (
- - - - - - 3.00 - Dana Yang Ditarik (Rp.)
- - - - - - - - Terbilang : Tujuh Juta Lima R
0 0 0 2 3 2 3 0

disahkan oleh:
Tim Teknis Kabupaten Ma

( .....................................
NIP.................................

*) coret yang tidak perlu

DA

Nomor BNBA
Nama Penerima Bantuan
Nomor KTP
Alamat
Desa/Kelurahan
Kecamatan
Kabupaten/Kota
Nomor Rekening Penerim

A. Jumlah Dana yang ditr


No.
1
2
3
4
5
6
7
8
9
10
11
12
13
14

TOTAL HARGA PEMBELIAN


Terbilang : Enam Juta Dua Ra

Disanggupi oleh :
Nama Toko/Penyedia Baha
Alamat Toko/Penyedia Bah
Nomor Rekening Bank Tok

B. Jumlah dana yang dita


No
1
TOTAL TARIK TUNAI (B)
Terbilang : Tujuh Juta Lima R

C. Total dana yang ditarik (


Dana Yang Ditarik (Rp.)
Terbilang : Tujuh Juta Lima R
disahkan oleh:
Tim Teknis Kabupaten Ma

( .....................................
NIP.................................

*) coret yang tidak perlu


DAFTAR RENCANA PEMANFAATAN BANTUAN (DRPB) TAHAP 1

Nomor BNBA : 0
Nama Penerima Bantuan : MUH SHOLEH
Nomor KTP : 0
Alamat : 0
Desa/Kelurahan : 0
Kecamatan : 0
Kabupaten/Kota : 0
Nomor Rekening Penerima Bantuan :

A. Jumlah Dana yang ditransfer ke Toko/Penyedia Bahan Bangunan (Tahap I/II *)


Jumlah Harga per Unit
Jenis Bahan Bangunan
(unit) (Rp)
Batu belah 5.00 m3 215,000
Semen 57.00 zak 53,000
Pasir 15.30 m3 240,000
Batu Pecah 2.10 m3 280,000
Besi Ø 10 30.00 btg 68,000
Besi Ø 8 31.00 btg 37,500
Kusen Pintu Ukuran 0,80 x 2,00 m - Bh 200,000
Kusen Jendela - Bh 150,000
Batu Bata 5,000.00 bh 750
Gamping 30.00 zak 8,000
Paku 5.93 Kg 15,000
Bendrat - Kg 22,000
Loster - Bh 7,000
Papan Bekisting - Lbr 20,000
Genteng - Bh 1,250
Genteng bubungan - Bh 5,000

TOTAL HARGA PEMBELIAN


Terbilang : Enam Juta Dua Ratus Lima Puluh Ribu Rupiah

Disanggupi oleh :
Nama Toko/Penyedia Bahan Bangunan :
Alamat Toko/Penyedia Bahan Bangunan :
Nomor Rekening Bank Toko/ Penyedi BB :

Toko/Penyedia Bahan Bangunan


(..................................................)

B. Jumlah dana yang ditarik tunai untuk upah kerja (Tahap I / II *)


Uraian Jumlah harga (Rp)
Upah Kerja PKRS 1,250,000
TOTAL TARIK TUNAI (B) 1,250,000
Terbilang : Tujuh Juta Lima Ratus Ribu Rupiah

C. Total dana yang ditarik ( A + B )


Dana Yang Ditarik (Rp.)
Terbilang : Tujuh Juta Lima Ratus Ribu Rupiah

........................................ .....2019
Diajukan Oleh :
Penerima Bantuan

MUH SHOLEH

disahkan oleh: Diverifikasi oleh: Difasilitasi Oleh :


Tim Teknis Kabupaten Magelang Koordinator Fasilitator Tenaga Fasilitator Lapangan

( ...............................................) ( ....................................) (.........................................)


NIP..........................................

*) coret yang tidak perlu

DAFTAR RENCANA PEMANFAATAN BANTUAN (DRPB) TAHAP 2

Nomor BNBA : 0
Nama Penerima Bantuan : MUH SHOLEH
Nomor KTP : 0
Alamat : 0
Desa/Kelurahan : 0
Kecamatan : 0
Kabupaten/Kota : 0
Nomor Rekening Penerima Bantuan : 0

A. Jumlah Dana yang ditransfer ke Toko/Penyedia Bahan Bangunan (Tahap I/II *)


Jumlah Harga per Unit
Jenis Bahan Bangunan
(unit) (Rp)
Batu belah 0 m3 215,000
Semen 41.00 zak 53,000
Pasir 6 m3 240,000
Batu Pecah 0 m3 280,000
Besi Ø 10 25 btg 68,000
Besi Ø 8 0 btg 37,500
Kusen Pintu Ukuran 0,80 x 2,00 m 0 Bh 200,000
Kusen Jendela 0 Bh 150,000
Batu Bata 700 bh 750
Gamping 0 zak 8,000
Paku 0.0 Kg 15,000
Bendrat 0 Kg 22,000
Loster 0 Bh 7,000
Kayu usuk 10 Btg 19,000

TOTAL HARGA PEMBELIAN


Terbilang : Enam Juta Dua Ratus Lima Puluh Ribu Rupiah

Disanggupi oleh :
Nama Toko/Penyedia Bahan Bangunan : 0
Alamat Toko/Penyedia Bahan Bangunan : 0
Nomor Rekening Bank Toko/ Penyedi BB : 0

Toko/Penyedia Bahan Bangunan

(..................................................)

B. Jumlah dana yang ditarik tunai untuk upah kerja (Tahap I / II *)


Uraian Jumlah harga (Rp)
Upah Kerja PKRS/PBRS *) 1,250,000
TOTAL TARIK TUNAI (B) 1,250,000
Terbilang : Tujuh Juta Lima Ratus Ribu Rupiah

C. Total dana yang ditarik ( A + B )


Dana Yang Ditarik (Rp.)
Terbilang : Tujuh Juta Lima Ratus Ribu Rupiah

........................................ .....2019
Diajukan Oleh :
Penerima Bantuan

MUH SHOLEH
disahkan oleh: Diverifikasi oleh: Difasilitasi Oleh :
Tim Teknis Kabupaten Magelang Koordinator Fasilitator Tenaga Fasilitator Lapangan

( ...............................................) ( ....................................) (.........................................)


NIP..........................................

*) coret yang tidak perlu


Format IV - 2

HAP 1

Jumlah Harga
(Rp)
1,075,000
3,021,000
3,672,000
588,000
2,040,000
1,162,500
-
-
3,750,000
240,000
89,000
-
-
-
-
-

15,637,500 15,000,000
(637,500)

edia Bahan Bangunan


.................................)

Jumlah harga (Rp)


1,250,000
1,250,000

16,887,500

........................... .....2019
Diajukan Oleh :
Penerima Bantuan

MUH SHOLEH

Difasilitasi Oleh :
enaga Fasilitator Lapangan

.......................................)

Format IV - 2

HAP 2
Jumlah Harga
(Rp)
-
2,173,000
1,440,000
-
1,700,000
-
-
-
525,000
-
129,000
-
-
190,000

6,157,000

edia Bahan Bangunan

.................................)

Jumlah harga (Rp)


1,250,000
1,250,000

7,407,000

..................................... .....2019
Diajukan Oleh :
Penerima Bantuan

MUH SHOLEH
Difasilitasi Oleh :
enaga Fasilitator Lapangan

.......................................)
RENCANA ANGGARAN BIAYA (RAB) BSPS

Nomor BNBA :
Nomor KTP :
Nama Penerima Bantuan : MUH SHOLEH
Alamat :
Desa/Kelurahan :
Kecamatan :
Kabupaten/Kota :
Jenis Kegiatan :

SUMBER DANA
HARGA TOTAL HARGA SWADAYA
NO URAIAN PEKERJAAN VOLUME SATUAN (Rp) (Rp) BSPS
Dana Tunai

I Pekerjaan Persiapan
Bongkar Rumah Lama 1.00 ls - - - -
II Pekerjaan Pondasi

1 Galian Tanah Pondasi 5.85 M³ - - - -


2 Urugan Pasir 2.00 M³ 240,000 480,000 - 480,000

3 Pasangan Pondasi 3.80 M³ - -

-Semen @ 50 kg 6.00 Zak 53,000 318,000 159,000 159,000


-Pasir pasang 2.30 M³ 240,000 552,000 552,000 -
-Batu Kali 5.00 M³ 215,000 1,075,000 - 1,075,000
4 Urugan kembali 2.05 M³ - - - -
III Pekerjaan Sloof
1 Pekerjaan bekisting M² - - - -
2 Cor Beton Sloof, Ukuran 20 x 15 cm - - -
-Besi beton Φ 10 mm SNI 9.00 Btg 68,000 612,000 612,000 -
-Besi beton Φ 8 mm SNI 8.00 Btg 37,500 300,000 300,000 -
-Semen @ 50 kg 4.00 Zak 53,000 212,000 212,000 -
-Pasir pasang 0.50 M³ 240,000 120,000 120,000 -
-Batu Pecah 0.60 M³ 280,000 168,000 168,000 -
IV Pekerjaan Kolom
1 Pekerjaan bekisting M² 20,000 - - -
2 Cor Beton Kolom, Ukuran 15 x 15 cm min. T=3m 8.00 Bh

-Besi beton Φ 10 mm SNI 8.00 Btg 68,000 544,000 544,000 -


-Besi beton Φ 8 mm SNI 8.00 Btg 37,500 300,000 300,000 -
-Pasir pasang 0.40 M³ 240,000 96,000 96,000 -
-Semen @ 50 kg 2.00 Zak 53,000 106,000 106,000 -
-Batu pecah 0.50 M³ 280,000 140,000 140,000 -
V Dinding Permanen
1 Tembok 78.00 M²

-Pasir Pasang 5.70 M³ 240,000 1,368,000 1,368,000 -


-Semen @ 50 kg 17.00 Zak 53,000 901,000 901,000
-Batu Bata - Bh 750 - - -
-Batako 1,400.00 Bh 3,500 4,900,000 4,900,000 -
2 Pekerjaan Plester
-Pasir Pasang 4.10 M³ 240,000 984,000 984,000 -
-Semen @ 50 kg 16.00 Zak 53,000 848,000 - 848,000
3 Papan
-Papan, Ukuran……… - Lbr - - - -
-Kayu, Ukuran………. - Btg - - - -
VI Pekerjaan Pintu dan Jendela
-Kusen Pintu, Ukuran 0,80 X 2,00 M 2.00 Unit 200,000 400,000 400,000 -
-Kusen Jendela 2.00 Unit 150,000 300,000 300,000 -
-Kusen Ventilasi, Ukuran…… - Unit - - - -
-Daun Pintu Kayu, Ukuran 2.00 Unit 350,000 700,000 700,000 -
-Daun Jendela Kayu, Ukuran 2.00 Unit 200,000 400,000 400,000 -
-Handle Pintu dan Kunci Pintu - Set - - - -
-Handle Jendela dan Kunci Jendela - Set - - - -
-Engsel Pintu - Set 35,000 - - -
-Engsel Jendela - Set 21,000 - - -
VII Ring Balok
1 Pekerjaan bekisting - M² - - - -
2 Pekerjaan Cor Beton
-Besi beton Φ 10 mm SNI 9.00 Btg 68,000 612,000 612,000
-Besi beton Φ 8 mm SNI 9.00 Btg 37,500 337,500 337,500 -
-Semen @ 50 kg 3.00 Zak 53,000 159,000 159,000 -
-Pasir pasang 0.40 M³ 240,000 96,000 96,000 -
-Batu pecah 0.50 M³ 280,000 140,000 140,000 -
VIII Pekerjaan Struktur Atap
-Kayu rangka kuda-kuda, Ukuran 6/12 x 4m - Btg 100,000 - - -
-Kayu gapit, Ukuran ……. - Btg - - - -
-Kayu usuk, Ukuran 4/6 x 3 m - Btg 27,000 - - -
-Usuk bambu - Btg 5,500 - - -
-Reng bambu - Btg 1,500 - -
IX Pekerjaan Penutup Atap
1 Penutup Atap 50.40
-Seng gelombang (0,2 cm x 80 cm x 300 cm), atau - Lbr 78,000 - - -
-Genteng - Bh 1,250 - - -
-Bahan penutup atap lainnya yang diijinkan - Lbr - - - -
2 Bubungan Atap Bh

-Seng Lbr - - -
-Genteng bubungan - Bh 5,000 - - -
-Bahan penutup atap lainnya yang diijinkan Lbr - - -
3 Listplang papan, Ukuran……. M³ - - -
X Pekerjaan Lantai
1 Lantai Rabat Campuran minimal 1:5, T= 5 cm 2.10 M3

-Semen @ 50 kg 1.00 Zak 53,000 53,000 53,000 -


-Pasir pasang 0.10 M³ 240,000 24,000 24,000 -
-Batu pecah 0.10 M³ 280,000 28,000 28,000 -
2 Lantai Papan M²

-Papan, Ukuran……….. - Lbr - - - -


-Kayu, Ukuran……….. - Btg - - - -
XI MCK
-Septic Tank - Unit - - - -
-Closet Jongkok - Unit 155,000 - - -
-Pipa Air Bersih, Ukuran…… - Btg 27,500 - - -
-Pipa Air Kotor, Ukuran…… - Btg 85,000 - - -
-Kran - Bh 25,000 - - -
-Pintu Kamar Mandi - Set 210,000 - - -
XII Lain-lain/ Instalasi Listrik
Gamping - Zak 8,000 - - -
Paku 9.23 Kg 15,000 138,500 138,500 -
Bendrat 5.00 Kg 20,000 100,000 100,000 -
Loster 10.00 Bh 5,000 50,000 50,000 -
Papan Bekisting - Lbr - - - -
XIII Upah Kerja
Tukang 60.00 Oh 70,000 4,200,000 2,500,000 1,700,000
Pembantu Tukang 60.00 Oh 60,000 3,600,000 3,600,000

JUMLAH 25,362,000 17,500,000 7,862,000

........................................ .....20
Difasilitasi, Ketua KPB Diajukan Oleh,
Tenaga Fasilitator Lapangan Penerima Bantuan

(.........................................) ( ....................................) ( ....................................)

Disahkan oleh, Diverifikasi Oleh,


Tim Teknis Kabupaten Magelang Koordinator Fasilitator

( ...............................................) ( ....................................)
NIP..........................................
FORMAT III-17

PANJANG LEBAR KELL VOL M2


SUMBER DANA dimensi 6 7 26 42 genteng
SWADAYA pekerjaan
Memakai Bahan
Bangunan Lama atap kuda-kuda
penutup atap 50.4 1,260.00
SWADAYA pondasi Galian Tanah 5.85
Urugan Pasir 1.89
SWADAYA Pas. Batu belah 3.8025
12 beton sloof 0.78
17 8 kolom 0.54
12 balk 15x15 0.585
17 dinding bata
58 batako 78
SWADAYA Plesteran dinding 156
lantai 5cm 2.1
SWADAYA kayu gording 4 m 35
usuk 3 m 26
reng 3 m 105
kusen pintu 80*200 cm 1
jendela 1
daun pintu 80*200 cm 1
jendela 1
pintu kmr 1
SWADAYA JUMLAH 1260

dimensi 6 7 26 42 genteng
pekerjaan
atap kuda-kuda 0 -
penutup atap 50.4 -
pondasi Galian Tanah 5.85 -
Urugan Pasir 1.89 -
Pas. Batu belah 3.8025 -
beton sloof 0.78 -
8 kolom 0.54 -
balk 15x15 0.585 -
dinding bata 0 -
batako 78 -
Plesteran dinding 156 -
lantai 5cm 2.1 -
kayu gording 4 m 35 -
usuk 3 m 26 -
reng 3 m 105 -
kusen pintu 80*200 cm 1 -
jendela 1 -
daun pintu 80*200 cm 1 -
jendela 1 -
pintu kmr 1 -
JUMLAH 0

SWADAYA
HARGA
MATERIAL VOL SATUAN
SATUAN
Urugan Pasir 240,000 2.00 M³
-Semen @ 50 kg 53,000 49.00 Zak
-Pasir pasang 240,000 13.50 M³
-Batu Kali 215,000 5.00 M³
-Besi beton Φ 10 mm SNI 68,000 26.00 Btg
-Besi beton Φ 8 mm SNI 37,500 25.00 Btg
-Batu pecah 280,000 1.70 M³
-Batu Bata 750 - Bh
-Batako 3,500 1,400.00 Bh
-Kusen Pintu, Ukuran 0,80 X 2,00 M 200,000 2.00 Unit
-Kusen Jendela 150,000 2.00 Unit
-Kusen Ventilasi, Ukuran…… - - Unit
-Daun Pintu Kayu, Ukuran 350,000 2.00 Unit
-Daun Jendela Kayu, Ukuran 200,000 2.00 Unit
-Handle Pintu dan Kunci Pintu - - Set
-Handle Jendela dan Kunci Jendela - - Set
-Engsel Pintu 35,000 - Set
-Engsel Jendela 21,000 - Set
-Kayu rangka kuda-kuda, Ukuran 6/12 x 4m 100,000 - Btg
-Kayu gapit, Ukuran ……. - - Btg
-Kayu usuk, Ukuran 4/6 x 3 m 27,000 - Btg
-Usuk bambu 5,500 - Btg
-Reng bambu 1,500 - Btg
-Seng gelombang (0,2 cm x 80 cm x 300 cm 78,000 - Lbr
-Genteng 1,250 - Bh
-Seng - - Lbr
-Genteng bubungan 5,000 - Bh
-Closet Jongkok 155,000 - Unit
-Pipa Air Bersih, Ukuran…… 27,500 - Btg
-Pipa Air Kotor, Ukuran…… 85,000 - Btg
-Kran 25,000 - Bh
-Pintu Kamar Mandi 210,000 - Set
Gamping 8,000 - Zak
Paku 15,000 9.23 Kg
Bendrat 20,000 5.00 Kg
Loster 5,000 10.00 Bh
Papan Bekisting - - Lbr

15,000,000

- 0
0
........................................ .....2019
Diajukan Oleh,
Penerima Bantuan

( ....................................)

Diverifikasi Oleh,
Koordinator Fasilitator

17,562,000 15,000,000
15,000,000
( ....................................)

-
4
20.25 1.0888888889 4.549 0.45
24.25 0.0108888889

batu semen pasir spit bes 10 besi 8 bata batako

2.00
5.00 6.00 2.30
4.00 0.50 0.60 9.00 10.00
2.00 0.40 0.50 8.00 8.00
3.00 0.40 0.50 9.00 9.00
- - -
17.00 5.70 975.00
16.00 4.10
1.00 0.10 0.10

5 49 15.5 1.7 26 27 0 975

batu semen pasir spit bes 10 besi 8 bata batako

- - - - - - - -
- - - - - - - -
- - - - - - - -
- 2.00 - - - - -
5.00 6.00 2.30 - - - - -
- 4.00 0.50 0.60 9.00 10.00 - -
- 2.00 0.40 0.50 8.00 8.00 - -
- 3.00 0.40 0.50 9.00 9.00 - -
- - - - - - - -
- 17.00 5.70 - - - - 1,400.00
- 16.00 4.10 - - - - -
- 1.00 0.10 0.10 - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
5 49 15.5 1.7 26 27 0 1400

REKAP VOL
BIAYA BSPS DANA BSPS
- -
1,590,000.00 30.00
3,240,000.00 13.50
- -
1,768,000.00 26.00
937,500.00 25.00
476,000.00 1.70
- -
4,900,000.00 1,400.00
400,000.00 2.00
300,000.00 2.00
- #DIV/0!
700,000.00 2.00
400,000.00 2.00
- #DIV/0!
- #DIV/0!
- -
- -
- -
- #DIV/0!
- -
- -
- -
- -
- -
- #DIV/0!
- -
- -
- -
- -
- -
- -
- -
138,500.00 9.23
100,000.00 5.00
50,000.00 10.00
- #DIV/0!
15,000,000.00
DA

Nomor BNBA
Nama Penerima Bantuan
Nomor KTP
Alamat
Desa/Kelurahan
kayu kusen daun Kecamatan
Gording usuk reng pintu jendela pintu jendela pintu KM Kabupaten/Kota
Nomor Rekening Penerim

A. Jumlah Dana yang ditr


No.
1
2
3
4
5
6
7
8
9.00 9
30.00 10
110.00 11
1.00 12
1.00 13
1.00 14
1.00 15
1.00 16
9 30 110 1 1 1 1 1

kayu kusen daun TOTAL HARGA PEMBELIAN


Gording usuk reng pintu jendela pintu jendela pintu KM Terbilang : Enam Juta Dua Ra

- - - - - - - - Disanggupi oleh :
- - - - - - - - Nama Toko/Penyedia Baha
- - - - - - - - Alamat Toko/Penyedia Bah
- - - - - - - - Nomor Rekening Bank Tok
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - - B. Jumlah dana yang dita
- - - - - - - - No
- - - - - - - - 1
- - - - - - - TOTAL TARIK TUNAI (B)
- - - 2.00 - - - - Terbilang : Tujuh Juta Lima R
- - - - 2.00 - - -
- - - - - 2.00 - - C. Total dana yang ditarik (
- - - - - - 2.00 - Dana Yang Ditarik (Rp.)
- - - - - - - Terbilang : Tujuh Juta Lima R
0 0 0 2 2 2 2 0

disahkan oleh:
Tim Teknis Kabupaten Ma

( .....................................
NIP.................................

*) coret yang tidak perlu

DA

Nomor BNBA
Nama Penerima Bantuan
Nomor KTP
Alamat
Desa/Kelurahan
Kecamatan
Kabupaten/Kota
Nomor Rekening Penerim

A. Jumlah Dana yang ditr


No.
1
2
3
4
5
6
7
8
9
10
11
12
13
14

TOTAL HARGA PEMBELIAN


Terbilang : Enam Juta Dua Ra

Disanggupi oleh :
Nama Toko/Penyedia Baha
Alamat Toko/Penyedia Bah
Nomor Rekening Bank Tok

B. Jumlah dana yang dita


No
1
TOTAL TARIK TUNAI (B)
Terbilang : Tujuh Juta Lima R

C. Total dana yang ditarik (


Dana Yang Ditarik (Rp.)
Terbilang : Tujuh Juta Lima R
disahkan oleh:
Tim Teknis Kabupaten Ma

( .....................................
NIP.................................

*) coret yang tidak perlu


DAFTAR RENCANA PEMANFAATAN BANTUAN (DRPB) TAHAP 1

Nomor BNBA : 0
Nama Penerima Bantuan : MUH SHOLEH
Nomor KTP : 0
Alamat : 0
Desa/Kelurahan : 0
Kecamatan : 0
Kabupaten/Kota : 0
Nomor Rekening Penerima Bantuan :

A. Jumlah Dana yang ditransfer ke Toko/Penyedia Bahan Bangunan (Tahap I/II *)


Jumlah Harga per Unit
Jenis Bahan Bangunan
(unit) (Rp)
Batu belah 5.00 m3 215,000
Semen 49.00 zak 53,000
Pasir 15.50 m3 240,000
Batu Pecah 1.70 m3 280,000
Besi Ø 10 26.00 btg 68,000
Besi Ø 8 27.00 btg 37,500
Kusen Pintu Ukuran 0,80 x 2,00 m - Bh 200,000
Kusen Jendela - Bh 150,000
Batu Bata - bh 750
Gamping - zak 8,000
Paku 9.23 Kg 15,000
Bendrat - Kg 22,000
Loster - Bh 7,000
Papan Bekisting - Lbr 20,000
Genteng - Bh 1,250
Genteng bubungan - Bh 5,000

TOTAL HARGA PEMBELIAN


Terbilang : Enam Juta Dua Ratus Lima Puluh Ribu Rupiah

Disanggupi oleh :
Nama Toko/Penyedia Bahan Bangunan :
Alamat Toko/Penyedia Bahan Bangunan :
Nomor Rekening Bank Toko/ Penyedi BB :

Toko/Penyedia Bahan Bangunan


(..................................................)

B. Jumlah dana yang ditarik tunai untuk upah kerja (Tahap I / II *)


Uraian Jumlah harga (Rp)
Upah Kerja PKRS 1,250,000
TOTAL TARIK TUNAI (B) 1,250,000
Terbilang : Tujuh Juta Lima Ratus Ribu Rupiah

C. Total dana yang ditarik ( A + B )


Dana Yang Ditarik (Rp.)
Terbilang : Tujuh Juta Lima Ratus Ribu Rupiah

........................................ .....2019
Diajukan Oleh :
Penerima Bantuan

MUH SHOLEH

disahkan oleh: Diverifikasi oleh: Difasilitasi Oleh :


Tim Teknis Kabupaten Magelang Koordinator Fasilitator Tenaga Fasilitator Lapangan

( ...............................................) ( ....................................) (.........................................)


NIP..........................................

*) coret yang tidak perlu

DAFTAR RENCANA PEMANFAATAN BANTUAN (DRPB) TAHAP 2

Nomor BNBA : 0
Nama Penerima Bantuan : MUH SHOLEH
Nomor KTP : 0
Alamat : 0
Desa/Kelurahan : 0
Kecamatan : 0
Kabupaten/Kota : 0
Nomor Rekening Penerima Bantuan : 0

A. Jumlah Dana yang ditransfer ke Toko/Penyedia Bahan Bangunan (Tahap I/II *)


Jumlah Harga per Unit
Jenis Bahan Bangunan
(unit) (Rp)
Batu belah 0 m3 215,000
Semen 33.00 zak 53,000
Pasir 6 m3 240,000
Batu Pecah 0 m3 280,000
Besi Ø 10 25 btg 68,000
Besi Ø 8 0 btg 37,500
Kusen Pintu Ukuran 0,80 x 2,00 m 0 Bh 200,000
Kusen Jendela 0 Bh 150,000
Batu Bata 700 bh 750
Gamping 0 zak 8,000
Paku 0.0 Kg 15,000
Bendrat 0 Kg 22,000
Loster 0 Bh 7,000
Kayu usuk 10 Btg 19,000

TOTAL HARGA PEMBELIAN


Terbilang : Enam Juta Dua Ratus Lima Puluh Ribu Rupiah

Disanggupi oleh :
Nama Toko/Penyedia Bahan Bangunan : 0
Alamat Toko/Penyedia Bahan Bangunan : 0
Nomor Rekening Bank Toko/ Penyedi BB : 0

Toko/Penyedia Bahan Bangunan

(..................................................)

B. Jumlah dana yang ditarik tunai untuk upah kerja (Tahap I / II *)


Uraian Jumlah harga (Rp)
Upah Kerja PKRS/PBRS *) 1,250,000
TOTAL TARIK TUNAI (B) 1,250,000
Terbilang : Tujuh Juta Lima Ratus Ribu Rupiah

C. Total dana yang ditarik ( A + B )


Dana Yang Ditarik (Rp.)
Terbilang : Tujuh Juta Lima Ratus Ribu Rupiah

........................................ .....2019
Diajukan Oleh :
Penerima Bantuan

MUH SHOLEH
disahkan oleh: Diverifikasi oleh: Difasilitasi Oleh :
Tim Teknis Kabupaten Magelang Koordinator Fasilitator Tenaga Fasilitator Lapangan

( ...............................................) ( ....................................) (.........................................)


NIP..........................................

*) coret yang tidak perlu


Format IV - 2

HAP 1

Jumlah Harga
(Rp)
1,075,000
2,597,000
3,720,000
476,000
1,768,000
1,012,500
-
-
-
-
138,500
-
-
-
-
-

10,787,000 15,000,000
4,213,000

edia Bahan Bangunan


.................................)

Jumlah harga (Rp)


1,250,000
1,250,000

12,037,000

........................... .....2019
Diajukan Oleh :
Penerima Bantuan

MUH SHOLEH

Difasilitasi Oleh :
enaga Fasilitator Lapangan

.......................................)

Format IV - 2

HAP 2
Jumlah Harga
(Rp)
-
1,749,000
1,440,000
-
1,700,000
-
-
-
525,000
-
129,000
-
-
190,000

5,733,000

edia Bahan Bangunan

.................................)

Jumlah harga (Rp)


1,250,000
1,250,000

6,983,000

..................................... .....2019
Diajukan Oleh :
Penerima Bantuan

MUH SHOLEH
Difasilitasi Oleh :
enaga Fasilitator Lapangan

.......................................)
RENCANA ANGGARAN BIAYA (RAB) BSPS

Nomor BNBA :
Nomor KTP :
Nama Penerima Bantuan : MUH SHOLEH
Alamat :
Desa/Kelurahan :
Kecamatan :
Kabupaten/Kota :
Jenis Kegiatan :

SUMBER DANA
HARGA TOTAL HARGA SWADAYA
NO URAIAN PEKERJAAN VOLUME SATUAN (Rp) (Rp) BSPS
Dana Tunai

I Pekerjaan Persiapan
Bongkar Rumah Lama 1.00 ls - - - -
II Pekerjaan Pondasi

1 Galian Tanah Pondasi 6.75 M³ - - - -


2 Urugan Pasir 2.00 M³ 240,000 480,000 - 480,000

3 Pasangan Pondasi 4.39 M³ - -

-Semen @ 50 kg 7.00 Zak 53,000 371,000 - 371,000


-Pasir pasang 2.60 M³ 240,000 624,000 - 624,000
-Batu Kali 5.00 M³ 215,000 1,075,000 - 1,075,000
4 Urugan kembali 2.36 M³ - - - -
III Pekerjaan Sloof
1 Pekerjaan bekisting M² - - - -
2 Cor Beton Sloof, Ukuran 20 x 15 cm - - -
-Besi beton Φ 10 mm SNI 10.00 Btg 68,000 680,000 680,000 -
-Besi beton Φ 8 mm SNI 10.00 Btg 37,500 375,000 375,000 -
-Semen @ 50 kg 4.00 Zak 53,000 212,000 212,000 -
-Pasir pasang 0.60 M³ 240,000 144,000 144,000 -
-Batu Pecah 0.70 M³ 280,000 196,000 196,000 -
IV Pekerjaan Kolom
1 Pekerjaan bekisting M² 20,000 - - -
2 Cor Beton Kolom, Ukuran 15 x 15 cm min. T=3m 10.00 Bh

-Besi beton Φ 10 mm SNI 10.00 Btg 68,000 680,000 680,000 -


-Besi beton Φ 8 mm SNI 10.00 Btg 37,500 375,000 375,000 -
-Pasir pasang 0.40 M³ 240,000 96,000 96,000 -
-Semen @ 50 kg 3.00 Zak 53,000 159,000 159,000 -
-Batu pecah 0.60 M³ 280,000 168,000 168,000 -
V Dinding Permanen
1 Tembok 90.00 M²

-Pasir Pasang 6.50 M³ 240,000 1,560,000 1,560,000 -


-Semen @ 50 kg 20.00 Zak 53,000 1,060,000 1,060,000
-Batu Bata - Bh 750 - - -
-Batako 1,250.00 Bh 3,500 4,375,000 4,375,000 -
2 Pekerjaan Plester
-Pasir Pasang 4.70 M³ 240,000 1,128,000 1,128,000 -
-Semen @ 50 kg 18.00 Zak 53,000 954,000 795,000 159,000
3 Papan
-Papan, Ukuran……… - Lbr - - - -
-Kayu, Ukuran………. - Btg - - - -
VI Pekerjaan Pintu dan Jendela
-Kusen Pintu, Ukuran 0,80 X 2,00 M 2.00 Unit 200,000 400,000 400,000 -
-Kusen Jendela - Unit 150,000 - - -
-Kusen Ventilasi, Ukuran…… - Unit - - - -
-Daun Pintu Kayu, Ukuran 2.00 Unit 350,000 700,000 700,000 -
-Daun Jendela Kayu, Ukuran - Unit 200,000 - - -
-Handle Pintu dan Kunci Pintu - Set - - - -
-Handle Jendela dan Kunci Jendela - Set - - - -
-Engsel Pintu - Set 35,000 - - -
-Engsel Jendela - Set 21,000 - - -
VII Ring Balok
1 Pekerjaan bekisting - M² - - - -
2 Pekerjaan Cor Beton
-Besi beton Φ 10 mm SNI 10.00 Btg 68,000 680,000 680,000
-Besi beton Φ 8 mm SNI 10.00 Btg 37,500 375,000 375,000 -
-Semen @ 50 kg 3.00 Zak 53,000 159,000 159,000 -
-Pasir pasang 0.40 M³ 240,000 96,000 96,000 -
-Batu pecah 0.60 M³ 280,000 168,000 168,000 -
VIII Pekerjaan Struktur Atap
-Kayu rangka kuda-kuda, Ukuran 6/12 x 4m - Btg 100,000 - - -
-Kayu gapit, Ukuran ……. - Btg - - - -
-Kayu usuk, Ukuran 4/6 x 3 m - Btg 27,000 - - -
-Usuk bambu - m 5,500 - - -
-Reng bambu - m 1,500 - - -
IX Pekerjaan Penutup Atap
1 Penutup Atap 64.80
-Seng gelombang (0,2 cm x 80 cm x 300 cm), atau - Lbr 78,000 - - -
-Genteng - Bh 1,250 - - -
-Bahan penutup atap lainnya yang diijinkan - Lbr - - - -
2 Bubungan Atap Bh

-Seng Lbr - - -
-Genteng bubungan - Bh 5,000 - - -
-Bahan penutup atap lainnya yang diijinkan Lbr - - -
3 Listplang papan, Ukuran……. M³ - - -
X Pekerjaan Lantai
1 Lantai Rabat Campuran minimal 1:5, T= 5 cm 2.70 M3

-Semen @ 50 kg 1.00 Zak 53,000 53,000 53,000 -


-Pasir pasang 0.10 M³ 240,000 24,000 24,000 -
-Batu pecah 0.20 M³ 280,000 56,000 56,000 -
2 Lantai Papan M²

-Papan, Ukuran……….. - Lbr - - - -


-Kayu, Ukuran……….. - Btg - - - -
XI MCK
-Septic Tank - Unit - - - -
-Closet Jongkok - Unit 155,000 - - -
-Pipa Air Bersih, Ukuran…… - Btg 27,500 - - -
-Pipa Air Kotor, Ukuran…… - Btg 85,000 - - -
-Kran - Bh 25,000 - - -
-Pintu Kamar Mandi - Set 210,000 - - -
XII Lain-lain/ Instalasi Listrik
Gamping - Zak 8,000 - - -
Paku 5.00 Kg 15,000 75,000 75,000 -
Bendrat 8.05 Kg 20,000 161,000 161,000 -
Loster 10.00 Bh 5,000 50,000 50,000 -
Papan Bekisting - Lbr - - - -
XIII Upah Kerja
Tukang 60.00 Oh 70,000 4,200,000 2,500,000 1,700,000
Pembantu Tukang 60.00 Oh 60,000 3,600,000 3,600,000

JUMLAH 25,509,000 17,500,000 8,009,000

........................................ .....20
Difasilitasi, Ketua KPB Diajukan Oleh,
Tenaga Fasilitator Lapangan Penerima Bantuan

(.........................................) ( ....................................) ( ....................................)

Disahkan oleh, Diverifikasi Oleh,


Tim Teknis Kabupaten Magelang Koordinator Fasilitator

( ...............................................) ( ....................................)
NIP..........................................
FORMAT III-17

PANJANG LEBAR KELL VOL M2


SUMBER DANA dimensi 9 6 30 54 genteng
SWADAYA pekerjaan
Memakai Bahan
Bangunan Lama atap kuda-kuda
penutup atap 64.8 1,620.00
SWADAYA pondasi Galian Tanah 6.75
Urugan Pasir 2.43
SWADAYA Pas. Batu belah 4.3875
12 beton sloof 0.9
17 10 kolom 0.675
12 balk 15x15 0.675
17 dinding bata
58 batako 90
SWADAYA Plesteran dinding 180
lantai 5cm 2.7
SWADAYA kayu gording 4 m 30
usuk 3 m 30
reng 3 m 135
kusen pintu 80*200 cm 1
jendela 1
daun pintu 80*200 cm 1
jendela 1
pintu kmr 1
SWADAYA JUMLAH 1620

dimensi 9 6 30 54 genteng
pekerjaan
atap kuda-kuda 0 -
penutup atap 64.8 -
pondasi Galian Tanah 6.75 -
Urugan Pasir 2.43 -
Pas. Batu belah 4.3875 -
beton sloof 0.9 -
10 kolom 0.675 -
balk 15x15 0.675 -
dinding bata 0 -
batako 90 -
Plesteran dinding 180 -
lantai 5cm 2.7 -
kayu gording 4 m 30 -
usuk 3 m 30 -
reng 3 m 135 -
kusen pintu 80*200 cm 1 -
jendela 1 -
daun pintu 80*200 cm 1 -
jendela 1 -
pintu kmr 1 -
JUMLAH 0

SWADAYA
HARGA
MATERIAL VOL SATUAN
SATUAN
Urugan Pasir 240,000 2.00 M³
-Semen @ 50 kg 53,000 56.00 Zak
-Pasir pasang 240,000 15.30 M³
-Batu Kali 215,000 5.00 M³
-Besi beton Φ 10 mm SNI 68,000 30.00 Btg
-Besi beton Φ 8 mm SNI 37,500 30.00 Btg
-Batu pecah 280,000 2.10 M³
-Batu Bata 750 - Bh
-Batako 3,500 1,250.00 Bh
-Kusen Pintu, Ukuran 0,80 X 2,00 M 200,000 2.00 Unit
-Kusen Jendela 150,000 - Unit
-Kusen Ventilasi, Ukuran…… - - Unit
-Daun Pintu Kayu, Ukuran 350,000 2.00 Unit
-Daun Jendela Kayu, Ukuran 200,000 - Unit
-Handle Pintu dan Kunci Pintu - - Set
-Handle Jendela dan Kunci Jendela - - Set
-Engsel Pintu 35,000 - Set
-Engsel Jendela 21,000 - Set
-Kayu rangka kuda-kuda, Ukuran 6/12 x 4m 100,000 - Btg
-Kayu gapit, Ukuran ……. - - Btg
-Kayu usuk, Ukuran 4/6 x 3 m 27,000 - Btg
-Usuk bambu 4m 5,500 - m
-Reng bambu 4m 1,500 - m
-Seng gelombang (0,2 cm x 80 cm x 300 cm 78,000 - Lbr
-Genteng 1,250 - Bh
-Seng - - Lbr
-Genteng bubungan 5,000 - Bh
-Closet Jongkok 155,000 - Unit
-Pipa Air Bersih, Ukuran…… 27,500 - Btg
-Pipa Air Kotor, Ukuran…… 85,000 - Btg
-Kran 25,000 - Bh
-Pintu Kamar Mandi 210,000 - Set
Gamping 8,000 - Zak
Paku 15,000 5.00 Kg
Bendrat 20,000 8.05 Kg
Loster 5,000 10.00 Bh
Papan Bekisting - - Lbr

15,000,000

- 0
0
........................................ .....2019 0
Diajukan Oleh,
Penerima Bantuan

( ....................................)

Diverifikasi Oleh,
Koordinator Fasilitator

17,709,000 15,000,000
15,000,000
( ....................................)

-
4
20.25 1.0888888889 4.549 0.45
24.25 0.0108888889

batu semen pasir spit bes 10 besi 8 bata batako

2.00
5.00 7.00 2.60
4.00 0.60 0.70 10.00 11.00
3.00 0.40 0.60 10.00 10.00
3.00 0.40 0.60 10.00 10.00
- - -
20.00 6.50 1,125.00
18.00 4.70
1.00 0.10 0.20

5 56 17.3 2.1 30 31 0 1125

batu semen pasir spit bes 10 besi 8 bata batako

- - - - - - - -
- - - - - - - -
- - - - - - - -
- 2.00 - - - - -
5.00 7.00 2.60 - - - - -
- 4.00 0.60 0.70 10.00 11.00 - -
- 3.00 0.40 0.60 10.00 10.00 - -
- 3.00 0.40 0.60 10.00 10.00 - -
- - - - - - - -
- 20.00 6.50 - - - - 1,250.00
- 18.00 4.70 - - - - -
- 1.00 0.10 0.20 - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
5 56 17.3 2.1 30 31 0 1250

REKAP VOL
BIAYA BSPS DANA BSPS
- -
2,438,000.00 46.00
3,048,000.00 12.70
- -
2,040,000.00 30.00
1,125,000.00 30.00
588,000.00 2.10
- -
4,375,000.00 1,250.00
400,000.00 2.00
- -
- #DIV/0!
700,000.00 2.00
- -
- #DIV/0!
- #DIV/0!
- -
- -
- -
- #DIV/0!
- -
- -
- -
- -
- -
- #DIV/0!
- -
- -
- -
- -
- -
- -
- -
75,000.00 5.00
161,000.00 8.05
50,000.00 10.00
- #DIV/0!
15,000,000.00
DA

Nomor BNBA
Nama Penerima Bantuan
Nomor KTP
Alamat
Desa/Kelurahan
kayu kusen daun Kecamatan
Gording usuk reng pintu jendela pintu jendela pintu KM Kabupaten/Kota
Nomor Rekening Penerim

A. Jumlah Dana yang ditr


No.
1
2
3
4
5
6
7
8
8.00 9
34.00 10
140.00 11
1.00 12
1.00 13
1.00 14
1.00 15
1.00 16
8 34 140 1 1 1 1 1

kayu kusen daun TOTAL HARGA PEMBELIAN


Gording usuk reng pintu jendela pintu jendela pintu KM Terbilang : Enam Juta Dua Ra

- - - - - - - - Disanggupi oleh :
- - - - - - - - Nama Toko/Penyedia Baha
- - - - - - - - Alamat Toko/Penyedia Bah
- - - - - - - - Nomor Rekening Bank Tok
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - - B. Jumlah dana yang dita
- - - - - - - - No
- - - - - - - - 1
- - - - - - - - TOTAL TARIK TUNAI (B)
- - - 2.00 - - - - Terbilang : Tujuh Juta Lima R
- - - - - - - -
- - - - - 2.00 - - C. Total dana yang ditarik (
- - - - - - - - Dana Yang Ditarik (Rp.)
- - - - - - - Terbilang : Tujuh Juta Lima R
0 0 0 2 0 2 0 0

disahkan oleh:
Tim Teknis Kabupaten Ma

( .....................................
NIP.................................

*) coret yang tidak perlu

DA

Nomor BNBA
Nama Penerima Bantuan
Nomor KTP
Alamat
Desa/Kelurahan
Kecamatan
Kabupaten/Kota
Nomor Rekening Penerim

A. Jumlah Dana yang ditr


No.
1
2
3
4
5
6
7
8
9
10
11
12
13
14

TOTAL HARGA PEMBELIAN


Terbilang : Enam Juta Dua Ra

Disanggupi oleh :
Nama Toko/Penyedia Baha
Alamat Toko/Penyedia Bah
Nomor Rekening Bank Tok

B. Jumlah dana yang dita


No
1
TOTAL TARIK TUNAI (B)
Terbilang : Tujuh Juta Lima R

C. Total dana yang ditarik (


Dana Yang Ditarik (Rp.)
Terbilang : Tujuh Juta Lima R
disahkan oleh:
Tim Teknis Kabupaten Ma

( .....................................
NIP.................................

*) coret yang tidak perlu


DAFTAR RENCANA PEMANFAATAN BANTUAN (DRPB) TAHAP 1

Nomor BNBA : 0
Nama Penerima Bantuan : MUH SHOLEH
Nomor KTP : 0
Alamat : 0
Desa/Kelurahan : 0
Kecamatan : 0
Kabupaten/Kota : 0
Nomor Rekening Penerima Bantuan :

A. Jumlah Dana yang ditransfer ke Toko/Penyedia Bahan Bangunan (Tahap I/II *)


Jumlah Harga per Unit
Jenis Bahan Bangunan
(unit) (Rp)
Batu belah 5.00 m3 215,000
Semen 56.00 zak 53,000
Pasir 17.30 m3 240,000
Batu Pecah 2.10 m3 280,000
Besi Ø 10 30.00 btg 68,000
Besi Ø 8 31.00 btg 37,500
Kusen Pintu Ukuran 0,80 x 2,00 m - Bh 200,000
Kusen Jendela - Bh 150,000
Batu Bata - bh 750
Gamping - zak 8,000
Paku 5.00 Kg 15,000
Bendrat - Kg 22,000
Loster - Bh 7,000
Papan Bekisting - Lbr 20,000
Genteng - Bh 1,250
Genteng bubungan - Bh 5,000

TOTAL HARGA PEMBELIAN


Terbilang : Enam Juta Dua Ratus Lima Puluh Ribu Rupiah

Disanggupi oleh :
Nama Toko/Penyedia Bahan Bangunan :
Alamat Toko/Penyedia Bahan Bangunan :
Nomor Rekening Bank Toko/ Penyedi BB :

Toko/Penyedia Bahan Bangunan


(..................................................)

B. Jumlah dana yang ditarik tunai untuk upah kerja (Tahap I / II *)


Uraian Jumlah harga (Rp)
Upah Kerja PKRS 1,250,000
TOTAL TARIK TUNAI (B) 1,250,000
Terbilang : Tujuh Juta Lima Ratus Ribu Rupiah

C. Total dana yang ditarik ( A + B )


Dana Yang Ditarik (Rp.)
Terbilang : Tujuh Juta Lima Ratus Ribu Rupiah

........................................ .....2019
Diajukan Oleh :
Penerima Bantuan

MUH SHOLEH

disahkan oleh: Diverifikasi oleh: Difasilitasi Oleh :


Tim Teknis Kabupaten Magelang Koordinator Fasilitator Tenaga Fasilitator Lapangan

( ...............................................) ( ....................................) (.........................................)


NIP..........................................

*) coret yang tidak perlu

DAFTAR RENCANA PEMANFAATAN BANTUAN (DRPB) TAHAP 2

Nomor BNBA : 0
Nama Penerima Bantuan : MUH SHOLEH
Nomor KTP : 0
Alamat : 0
Desa/Kelurahan : 0
Kecamatan : 0
Kabupaten/Kota : 0
Nomor Rekening Penerima Bantuan : 0

A. Jumlah Dana yang ditransfer ke Toko/Penyedia Bahan Bangunan (Tahap I/II *)


Jumlah Harga per Unit
Jenis Bahan Bangunan
(unit) (Rp)
Batu belah 0 m3 215,000
Semen 40.00 zak 53,000
Pasir 6 m3 240,000
Batu Pecah 0 m3 280,000
Besi Ø 10 25 btg 68,000
Besi Ø 8 0 btg 37,500
Kusen Pintu Ukuran 0,80 x 2,00 m 0 Bh 200,000
Kusen Jendela 0 Bh 150,000
Batu Bata 700 bh 750
Gamping 0 zak 8,000
Paku 0.0 Kg 15,000
Bendrat 0 Kg 22,000
Loster 0 Bh 7,000
Kayu usuk 10 Btg 19,000

TOTAL HARGA PEMBELIAN


Terbilang : Enam Juta Dua Ratus Lima Puluh Ribu Rupiah

Disanggupi oleh :
Nama Toko/Penyedia Bahan Bangunan : 0
Alamat Toko/Penyedia Bahan Bangunan : 0
Nomor Rekening Bank Toko/ Penyedi BB : 0

Toko/Penyedia Bahan Bangunan

(..................................................)

B. Jumlah dana yang ditarik tunai untuk upah kerja (Tahap I / II *)


Uraian Jumlah harga (Rp)
Upah Kerja PKRS/PBRS *) 1,250,000
TOTAL TARIK TUNAI (B) 1,250,000
Terbilang : Tujuh Juta Lima Ratus Ribu Rupiah

C. Total dana yang ditarik ( A + B )


Dana Yang Ditarik (Rp.)
Terbilang : Tujuh Juta Lima Ratus Ribu Rupiah

........................................ .....2019
Diajukan Oleh :
Penerima Bantuan

MUH SHOLEH
disahkan oleh: Diverifikasi oleh: Difasilitasi Oleh :
Tim Teknis Kabupaten Magelang Koordinator Fasilitator Tenaga Fasilitator Lapangan

( ...............................................) ( ....................................) (.........................................)


NIP..........................................

*) coret yang tidak perlu


Format IV - 2

HAP 1

Jumlah Harga
(Rp)
1,075,000
2,968,000
4,152,000
588,000
2,040,000
1,162,500
-
-
-
-
75,000
-
-
-
-
-

12,060,500 15,000,000
2,939,500

edia Bahan Bangunan


.................................)

Jumlah harga (Rp)


1,250,000
1,250,000

13,310,500

........................... .....2019
Diajukan Oleh :
Penerima Bantuan

MUH SHOLEH

Difasilitasi Oleh :
enaga Fasilitator Lapangan

.......................................)

Format IV - 2

HAP 2
Jumlah Harga
(Rp)
-
2,120,000
1,440,000
-
1,700,000
-
-
-
525,000
-
129,000
-
-
190,000

6,104,000

edia Bahan Bangunan

.................................)

Jumlah harga (Rp)


1,250,000
1,250,000

7,354,000

..................................... .....2019
Diajukan Oleh :
Penerima Bantuan

MUH SHOLEH
Difasilitasi Oleh :
enaga Fasilitator Lapangan

.......................................)
RENCANA ANGGARAN BIAYA (RAB) BSPS

Nomor BNBA :
Nomor KTP :
Nama Penerima Bantuan : MUH SHOLEH
Alamat :
Desa/Kelurahan :
Kecamatan :
Kabupaten/Kota :
Jenis Kegiatan :

SUMBER DANA
HARGA TOTAL HARGA SWADAYA
NO URAIAN PEKERJAAN VOLUME SATUAN (Rp) (Rp) BSPS
Dana Tunai

I Pekerjaan Persiapan
Bongkar Rumah Lama 1.00 ls - - - -
II Pekerjaan Pondasi

1 Galian Tanah Pondasi 6.75 M³ - - - -


2 Urugan Pasir 2.00 M³ 240,000 480,000 - 480,000

3 Pasangan Pondasi 4.39 M³ - -

-Semen @ 50 kg 7.00 Zak 53,000 371,000 - 371,000


-Pasir pasang 2.60 M³ 240,000 624,000 - 624,000
-Batu Kali 5.00 M³ 215,000 1,075,000 - 1,075,000
4 Urugan kembali 2.36 M³ - - - -
III Pekerjaan Sloof
1 Pekerjaan bekisting M² - - - -
2 Cor Beton Sloof, Ukuran 20 x 15 cm - - -
-Besi beton Φ 10 mm SNI 10.00 Btg 68,000 680,000 680,000 -
-Besi beton Φ 8 mm SNI 10.00 Btg 37,500 375,000 375,000 -
-Semen @ 50 kg 4.00 Zak 53,000 212,000 212,000 -
-Pasir pasang 0.60 M³ 240,000 144,000 144,000 -
-Batu Pecah 0.70 M³ 280,000 196,000 196,000 -
IV Pekerjaan Kolom
1 Pekerjaan bekisting M² 20,000 - - -
2 Cor Beton Kolom, Ukuran 15 x 15 cm min. T=3m 10.00 Bh

-Besi beton Φ 10 mm SNI 10.00 Btg 68,000 680,000 680,000 -


-Besi beton Φ 8 mm SNI 10.00 Btg 37,500 375,000 375,000 -
-Pasir pasang 0.40 M³ 240,000 96,000 96,000 -
-Semen @ 50 kg 3.00 Zak 53,000 159,000 159,000 -
-Batu pecah 0.60 M³ 280,000 168,000 168,000 -
V Dinding Permanen
1 Tembok 90.00 M²

-Pasir Pasang 6.50 M³ 240,000 1,560,000 1,560,000 -


-Semen @ 50 kg 20.00 Zak 53,000 1,060,000 477,000 583,000
-Batu Bata - Bh 750 - - -
-Batako 1,000.00 Bh 3,500 3,500,000 3,500,000 -
2 Pekerjaan Plester
-Pasir Pasang 4.70 M³ 240,000 1,128,000 - 1,128,000
-Semen @ 50 kg 18.00 Zak 53,000 954,000 - 954,000
3 Papan
-Papan, Ukuran……… - Lbr - - - -
-Kayu, Ukuran………. - Btg - - - -
VI Pekerjaan Pintu dan Jendela
-Kusen Pintu, Ukuran 0,80 X 2,00 M 2.00 Unit 200,000 400,000 400,000 -
-Kusen Jendela 2.00 Unit 150,000 300,000 300,000 -
-Kusen Ventilasi, Ukuran…… - Unit - - - -
-Daun Pintu Kayu, Ukuran 2.00 Unit 350,000 700,000 700,000 -
-Daun Jendela Kayu, Ukuran 2.00 Unit 200,000 400,000 400,000 -
-Handle Pintu dan Kunci Pintu - Set - - - -
-Handle Jendela dan Kunci Jendela - Set - - - -
-Engsel Pintu - Set 35,000 - - -
-Engsel Jendela - Set 21,000 - - -
VII Ring Balok
1 Pekerjaan bekisting - M² - - - -
2 Pekerjaan Cor Beton
-Besi beton Φ 10 mm SNI 10.00 Btg 68,000 680,000 680,000
-Besi beton Φ 8 mm SNI 10.00 Btg 37,500 375,000 375,000 -
-Semen @ 50 kg 3.00 Zak 53,000 159,000 159,000 -
-Pasir pasang 0.40 M³ 240,000 96,000 96,000 -
-Batu pecah 0.60 M³ 280,000 168,000 168,000 -
VIII Pekerjaan Struktur Atap
-Kayu rangka kuda-kuda, Ukuran 6/12 x 4m 6.00 Btg 100,000 600,000 600,000 -
-Kayu gapit, Ukuran ……. - Btg - - - -
-Kayu usuk, Ukuran 4/6 x 3 m 10.00 Btg 27,000 270,000 270,000 -
-Usuk bambu - m 5,500 - - -
-Reng bambu - m 1,500 - - -
IX Pekerjaan Penutup Atap
1 Penutup Atap 64.80
-Seng gelombang (0,2 cm x 80 cm x 300 cm), atau - Lbr 78,000 - - -
-Genteng 1,500.00 Bh 1,250 1,875,000 1,875,000 -
-Bahan penutup atap lainnya yang diijinkan - Lbr - - - -
2 Bubungan Atap Bh

-Seng Lbr - - -
-Genteng bubungan - Bh 5,000 - - -
-Bahan penutup atap lainnya yang diijinkan Lbr - - -
3 Listplang papan, Ukuran……. M³ - - -
X Pekerjaan Lantai
1 Lantai Rabat Campuran minimal 1:5, T= 5 cm 2.70 M3

-Semen @ 50 kg 1.00 Zak 53,000 53,000 53,000 -


-Pasir pasang 0.10 M³ 240,000 24,000 24,000 -
-Batu pecah 0.20 M³ 280,000 56,000 56,000 -
2 Lantai Papan M²

-Papan, Ukuran……….. - Lbr - - - -


-Kayu, Ukuran……….. - Btg - - - -
XI MCK
-Septic Tank - Unit - - - -
-Closet Jongkok - Unit 155,000 - - -
-Pipa Air Bersih, Ukuran…… - Btg 27,500 - - -
-Pipa Air Kotor, Ukuran…… - Btg 85,000 - - -
-Kran - Bh 25,000 - - -
-Pintu Kamar Mandi - Set 210,000 - - -
XII Lain-lain/ Instalasi Listrik
Gamping - Zak 8,000 - - -
Paku 6.13 Kg 15,000 92,000 92,000 -
Bendrat 5.00 Kg 20,000 100,000 100,000 -
Loster 6.00 Bh 5,000 30,000 30,000 -
Papan Bekisting - Lbr - - - -
XIII Upah Kerja
Tukang 60.00 Oh 70,000 4,200,000 2,500,000 1,700,000
Pembantu Tukang 60.00 Oh 60,000 3,600,000 3,600,000

JUMLAH 28,015,000 17,500,000 10,515,000

........................................ .....20
Difasilitasi, Ketua KPB Diajukan Oleh,
Tenaga Fasilitator Lapangan Penerima Bantuan

(.........................................) ( ....................................) ( ....................................)

Disahkan oleh, Diverifikasi Oleh,


Tim Teknis Kabupaten Magelang Koordinator Fasilitator

( ...............................................) ( ....................................)
NIP..........................................
FORMAT III-17

PANJANG LEBAR KELL VOL M2


SUMBER DANA dimensi 6 9 30 54 genteng
SWADAYA pekerjaan
Memakai Bahan
Bangunan Lama atap kuda-kuda
penutup atap 64.8 1,620.00
SWADAYA pondasi Galian Tanah 6.75
Urugan Pasir 2.43
SWADAYA Pas. Batu belah 4.3875
12 beton sloof 0.9
17 10 kolom 0.675
12 balk 15x15 0.675
17 dinding bata
58 batako 90
SWADAYA Plesteran dinding 180
lantai 5cm 2.7
SWADAYA kayu gording 4 m 45
usuk 3 m 30
reng 3 m 135
kusen pintu 80*200 cm 1
jendela 1
daun pintu 80*200 cm 1
jendela 1
pintu kmr 1
SWADAYA JUMLAH 1620

dimensi 6 9 30 54 genteng
pekerjaan
atap kuda-kuda 0 -
penutup atap 64.8 1,500.00
pondasi Galian Tanah 6.75 -
Urugan Pasir 2.43 -
Pas. Batu belah 4.3875 -
beton sloof 0.9 -
10 kolom 0.675 -
balk 15x15 0.675 -
dinding bata 0 -
batako 90 -
Plesteran dinding 180 -
lantai 5cm 2.7 -
kayu gording 4 m 45 -
usuk 3 m 30 -
reng 3 m 135 -
kusen pintu 80*200 cm 1 -
jendela 1 -
daun pintu 80*200 cm 1 -
jendela 1 -
pintu kmr 1 -
JUMLAH 1500

SWADAYA
HARGA
MATERIAL VOL SATUAN
SATUAN
Urugan Pasir 240,000 2.00 M³
-Semen @ 50 kg 53,000 56.00 Zak
-Pasir pasang 240,000 15.30 M³
-Batu Kali 215,000 5.00 M³
-Besi beton Φ 10 mm SNI 68,000 30.00 Btg
-Besi beton Φ 8 mm SNI 37,500 30.00 Btg
-Batu pecah 280,000 2.10 M³
-Batu Bata 750 - Bh
-Batako 3,500 1,000.00 Bh
-Kusen Pintu, Ukuran 0,80 X 2,00 M 200,000 2.00 Unit
-Kusen Jendela 150,000 2.00 Unit
-Kusen Ventilasi, Ukuran…… - - Unit
-Daun Pintu Kayu, Ukuran 350,000 2.00 Unit
-Daun Jendela Kayu, Ukuran 200,000 2.00 Unit
-Handle Pintu dan Kunci Pintu - - Set
-Handle Jendela dan Kunci Jendela - - Set
-Engsel Pintu 35,000 - Set
-Engsel Jendela 21,000 - Set
-Kayu rangka kuda-kuda, Ukuran 6/12 x 4m 100,000 6.00 Btg
-Kayu gapit, Ukuran ……. - - Btg
-Kayu usuk, Ukuran 4/6 x 3 m 27,000 10.00 Btg
-Usuk bambu 4m 5,500 - m
-Reng bambu 4m 1,500 - m
-Seng gelombang (0,2 cm x 80 cm x 300 cm 78,000 - Lbr
-Genteng 1,250 1,500.00 Bh
-Seng - - Lbr
-Genteng bubungan 5,000 - Bh
-Closet Jongkok 155,000 - Unit
-Pipa Air Bersih, Ukuran…… 27,500 - Btg
-Pipa Air Kotor, Ukuran…… 85,000 - Btg
-Kran 25,000 - Bh
-Pintu Kamar Mandi 210,000 - Set
Gamping 8,000 - Zak
Paku 15,000 6.13 Kg
Bendrat 20,000 5.00 Kg
Loster 5,000 6.00 Bh
Papan Bekisting - - Lbr

15,000,000

- 0
0
........................................ .....2019 0
Diajukan Oleh,
Penerima Bantuan

( ....................................)

Diverifikasi Oleh,
Koordinator Fasilitator

20,215,000 15,000,000
15,000,000
( ....................................)

-
4
20.25 1.0888888889 4.549 0.45
24.25 0.0108888889

batu semen pasir spit bes 10 besi 8 bata batako

2.00
5.00 7.00 2.60
4.00 0.60 0.70 10.00 11.00
3.00 0.40 0.60 10.00 10.00
3.00 0.40 0.60 10.00 10.00
- - -
20.00 6.50 1,125.00
18.00 4.70
1.00 0.10 0.20

5 56 17.3 2.1 30 31 0 1125

batu semen pasir spit bes 10 besi 8 bata batako

- - - - - - - -
- - - - - - - -
- - - - - - - -
- 2.00 - - - - -
5.00 7.00 2.60 - - - - -
- 4.00 0.60 0.70 10.00 11.00 - -
- 3.00 0.40 0.60 10.00 10.00 - -
- 3.00 0.40 0.60 10.00 10.00 - -
- - - - - - - -
- 20.00 6.50 - - - - 1,000.00
- 18.00 4.70 - - - - -
- 1.00 0.10 0.20 - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
5 56 17.3 2.1 30 31 0 1000

REKAP VOL
BIAYA BSPS DANA BSPS
- -
1,060,000.00 20.00
1,920,000.00 8.00
- -
2,040,000.00 30.00
1,125,000.00 30.00
588,000.00 2.10
- -
3,500,000.00 1,000.00
400,000.00 2.00
300,000.00 2.00
- #DIV/0!
700,000.00 2.00
400,000.00 2.00
- #DIV/0!
- #DIV/0!
- -
- -
600,000.00 6.00
- #DIV/0!
270,000.00 10.00
- -
- -
- -
1,875,000.00 1,500.00
- #DIV/0!
- -
- -
- -
- -
- -
- -
- -
92,000.00 6.13
100,000.00 5.00
30,000.00 6.00
- #DIV/0!
15,000,000.00
DA

Nomor BNBA
Nama Penerima Bantuan
Nomor KTP
Alamat
Desa/Kelurahan
kayu kusen daun Kecamatan
Gording usuk reng pintu jendela pintu jendela pintu KM Kabupaten/Kota
Nomor Rekening Penerim

A. Jumlah Dana yang ditr


No.
1
2
3
4
5
6
7
8
12.00 9
34.00 10
140.00 11
1.00 12
1.00 13
1.00 14
1.00 15
1.00 16
12 34 140 1 1 1 1 1

kayu kusen daun TOTAL HARGA PEMBELIAN


Gording usuk reng pintu jendela pintu jendela pintu KM Terbilang : Enam Juta Dua Ra

- - - - - - - - Disanggupi oleh :
- - - - - - - - Nama Toko/Penyedia Baha
- - - - - - - - Alamat Toko/Penyedia Bah
- - - - - - - - Nomor Rekening Bank Tok
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - - B. Jumlah dana yang dita
6.00 - - - - - - - No
- - - - - - - - 1
- - - - - - - - TOTAL TARIK TUNAI (B)
- - - 2.00 - - - - Terbilang : Tujuh Juta Lima R
- - - - 2.00 - - -
- - - - - 2.00 - - C. Total dana yang ditarik (
- - - - - - 2.00 - Dana Yang Ditarik (Rp.)
- - - - - - - Terbilang : Tujuh Juta Lima R
6 0 0 2 2 2 2 0

disahkan oleh:
Tim Teknis Kabupaten Ma

( .....................................
NIP.................................

*) coret yang tidak perlu

DA

Nomor BNBA
Nama Penerima Bantuan
Nomor KTP
Alamat
Desa/Kelurahan
Kecamatan
Kabupaten/Kota
Nomor Rekening Penerim

A. Jumlah Dana yang ditr


No.
1
2
3
4
5
6
7
8
9
10
11
12
13
14

TOTAL HARGA PEMBELIAN


Terbilang : Enam Juta Dua Ra

Disanggupi oleh :
Nama Toko/Penyedia Baha
Alamat Toko/Penyedia Bah
Nomor Rekening Bank Tok

B. Jumlah dana yang dita


No
1
TOTAL TARIK TUNAI (B)
Terbilang : Tujuh Juta Lima R

C. Total dana yang ditarik (


Dana Yang Ditarik (Rp.)
Terbilang : Tujuh Juta Lima R
disahkan oleh:
Tim Teknis Kabupaten Ma

( .....................................
NIP.................................

*) coret yang tidak perlu


DAFTAR RENCANA PEMANFAATAN BANTUAN (DRPB) TAHAP 1

Nomor BNBA : 0
Nama Penerima Bantuan : MUH SHOLEH
Nomor KTP : 0
Alamat : 0
Desa/Kelurahan : 0
Kecamatan : 0
Kabupaten/Kota : 0
Nomor Rekening Penerima Bantuan :

A. Jumlah Dana yang ditransfer ke Toko/Penyedia Bahan Bangunan (Tahap I/II *)


Jumlah Harga per Unit
Jenis Bahan Bangunan
(unit) (Rp)
Batu belah 5.00 m3 215,000
Semen 56.00 zak 53,000
Pasir 17.30 m3 240,000
Batu Pecah 2.10 m3 280,000
Besi Ø 10 30.00 btg 68,000
Besi Ø 8 31.00 btg 37,500
Kusen Pintu Ukuran 0,80 x 2,00 m - Bh 200,000
Kusen Jendela - Bh 150,000
Batu Bata - bh 750
Gamping - zak 8,000
Paku 6.13 Kg 15,000
Bendrat - Kg 22,000
Loster - Bh 7,000
Papan Bekisting - Lbr 20,000
Genteng 1,500.00 Bh 1,250
Genteng bubungan - Bh 5,000

TOTAL HARGA PEMBELIAN


Terbilang : Enam Juta Dua Ratus Lima Puluh Ribu Rupiah

Disanggupi oleh :
Nama Toko/Penyedia Bahan Bangunan :
Alamat Toko/Penyedia Bahan Bangunan :
Nomor Rekening Bank Toko/ Penyedi BB :

Toko/Penyedia Bahan Bangunan


(..................................................)

B. Jumlah dana yang ditarik tunai untuk upah kerja (Tahap I / II *)


Uraian Jumlah harga (Rp)
Upah Kerja PKRS 1,250,000
TOTAL TARIK TUNAI (B) 1,250,000
Terbilang : Tujuh Juta Lima Ratus Ribu Rupiah

C. Total dana yang ditarik ( A + B )


Dana Yang Ditarik (Rp.)
Terbilang : Tujuh Juta Lima Ratus Ribu Rupiah

........................................ .....2019
Diajukan Oleh :
Penerima Bantuan

MUH SHOLEH

disahkan oleh: Diverifikasi oleh: Difasilitasi Oleh :


Tim Teknis Kabupaten Magelang Koordinator Fasilitator Tenaga Fasilitator Lapangan

( ...............................................) ( ....................................) (.........................................)


NIP..........................................

*) coret yang tidak perlu

DAFTAR RENCANA PEMANFAATAN BANTUAN (DRPB) TAHAP 2

Nomor BNBA : 0
Nama Penerima Bantuan : MUH SHOLEH
Nomor KTP : 0
Alamat : 0
Desa/Kelurahan : 0
Kecamatan : 0
Kabupaten/Kota : 0
Nomor Rekening Penerima Bantuan : 0

A. Jumlah Dana yang ditransfer ke Toko/Penyedia Bahan Bangunan (Tahap I/II *)


Jumlah Harga per Unit
Jenis Bahan Bangunan
(unit) (Rp)
Batu belah 0 m3 215,000
Semen 40.00 zak 53,000
Pasir 6 m3 240,000
Batu Pecah 0 m3 280,000
Besi Ø 10 25 btg 68,000
Besi Ø 8 0 btg 37,500
Kusen Pintu Ukuran 0,80 x 2,00 m 0 Bh 200,000
Kusen Jendela 0 Bh 150,000
Batu Bata 700 bh 750
Gamping 0 zak 8,000
Paku 0.0 Kg 15,000
Bendrat 0 Kg 22,000
Loster 0 Bh 7,000
Kayu usuk 10 Btg 19,000

TOTAL HARGA PEMBELIAN


Terbilang : Enam Juta Dua Ratus Lima Puluh Ribu Rupiah

Disanggupi oleh :
Nama Toko/Penyedia Bahan Bangunan : 0
Alamat Toko/Penyedia Bahan Bangunan : 0
Nomor Rekening Bank Toko/ Penyedi BB : 0

Toko/Penyedia Bahan Bangunan

(..................................................)

B. Jumlah dana yang ditarik tunai untuk upah kerja (Tahap I / II *)


Uraian Jumlah harga (Rp)
Upah Kerja PKRS/PBRS *) 1,250,000
TOTAL TARIK TUNAI (B) 1,250,000
Terbilang : Tujuh Juta Lima Ratus Ribu Rupiah

C. Total dana yang ditarik ( A + B )


Dana Yang Ditarik (Rp.)
Terbilang : Tujuh Juta Lima Ratus Ribu Rupiah

........................................ .....2019
Diajukan Oleh :
Penerima Bantuan

MUH SHOLEH
disahkan oleh: Diverifikasi oleh: Difasilitasi Oleh :
Tim Teknis Kabupaten Magelang Koordinator Fasilitator Tenaga Fasilitator Lapangan

( ...............................................) ( ....................................) (.........................................)


NIP..........................................

*) coret yang tidak perlu


Format IV - 2

HAP 1

Jumlah Harga
(Rp)
1,075,000
2,968,000
4,152,000
588,000
2,040,000
1,162,500
-
-
-
-
92,000
-
-
-
1,875,000
-

13,952,500 15,000,000
1,047,500

edia Bahan Bangunan


.................................)

Jumlah harga (Rp)


1,250,000
1,250,000

15,202,500

........................... .....2019
Diajukan Oleh :
Penerima Bantuan

MUH SHOLEH

Difasilitasi Oleh :
enaga Fasilitator Lapangan

.......................................)

Format IV - 2

HAP 2
Jumlah Harga
(Rp)
-
2,120,000
1,440,000
-
1,700,000
-
-
-
525,000
-
129,000
-
-
190,000

6,104,000

edia Bahan Bangunan

.................................)

Jumlah harga (Rp)


1,250,000
1,250,000

7,354,000

..................................... .....2019
Diajukan Oleh :
Penerima Bantuan

MUH SHOLEH
Difasilitasi Oleh :
enaga Fasilitator Lapangan

.......................................)
RENCANA ANGGARAN BIAYA (RAB) BSPS

Nomor BNBA :
Nomor KTP :
Nama Penerima Bantuan : MUH SHOLEH
Alamat :
Desa/Kelurahan :
Kecamatan :
Kabupaten/Kota :
Jenis Kegiatan :

SUMBER DANA
HARGA TOTAL HARGA SWADAYA
NO URAIAN PEKERJAAN VOLUME SATUAN (Rp) (Rp) BSPS
Dana Tunai

I Pekerjaan Persiapan
Bongkar Rumah Lama 1.00 ls - - - -
II Pekerjaan Pondasi

1 Galian Tanah Pondasi 6.75 M³ - - - -


2 Urugan Pasir 2.00 M³ 240,000 480,000 - 480,000

3 Pasangan Pondasi 4.39 M³ - -

-Semen @ 50 kg 7.00 Zak 53,000 371,000 - 371,000


-Pasir pasang 2.60 M³ 240,000 624,000 - 624,000
-Batu Kali 5.00 M³ 215,000 1,075,000 - 1,075,000
4 Urugan kembali 2.36 M³ - - - -
III Pekerjaan Sloof
1 Pekerjaan bekisting M² - - - -
2 Cor Beton Sloof, Ukuran 20 x 15 cm - - -
-Besi beton Φ 10 mm SNI 10.00 Btg 68,000 680,000 680,000 -
-Besi beton Φ 8 mm SNI 10.00 Btg 37,500 375,000 375,000 -
-Semen @ 50 kg 4.00 Zak 53,000 212,000 212,000 -
-Pasir pasang 0.60 M³ 240,000 144,000 144,000 -
-Batu Pecah 0.70 M³ 280,000 196,000 196,000 -
IV Pekerjaan Kolom
1 Pekerjaan bekisting M² 20,000 - - -
2 Cor Beton Kolom, Ukuran 15 x 15 cm min. T=3m 10.00 Bh

-Besi beton Φ 10 mm SNI 10.00 Btg 68,000 680,000 680,000 -


-Besi beton Φ 8 mm SNI 10.00 Btg 37,500 375,000 375,000 -
-Pasir pasang 0.40 M³ 240,000 96,000 96,000 -
-Semen @ 50 kg 3.00 Zak 53,000 159,000 159,000 -
-Batu pecah 0.60 M³ 280,000 168,000 168,000 -
V Dinding Permanen
1 Tembok 90.00 M²

-Pasir Pasang 6.50 M³ 240,000 1,560,000 1,560,000 -


-Semen @ 50 kg 20.00 Zak 53,000 1,060,000 1,060,000 -
-Batu Bata - Bh 750 - - -
-Batako 1,600.00 Bh 3,500 5,600,000 5,600,000 -
2 Pekerjaan Plester
-Pasir Pasang 4.70 M³ 240,000 1,128,000 1,128,000 -
-Semen @ 50 kg 18.00 Zak 53,000 954,000 583,000 371,000
3 Papan
-Papan, Ukuran……… - Lbr - - - -
-Kayu, Ukuran………. - Btg - - - -
VI Pekerjaan Pintu dan Jendela
-Kusen Pintu, Ukuran 0,80 X 2,00 M - Unit 200,000 - - -
-Kusen Jendela - Unit 150,000 - - -
-Kusen Ventilasi, Ukuran…… - Unit - - - -
-Daun Pintu Kayu, Ukuran - Unit 350,000 - - -
-Daun Jendela Kayu, Ukuran - Unit 200,000 - - -
-Handle Pintu dan Kunci Pintu - Set - - - -
-Handle Jendela dan Kunci Jendela - Set - - - -
-Engsel Pintu - Set 35,000 - - -
-Engsel Jendela - Set 21,000 - - -
VII Ring Balok
1 Pekerjaan bekisting - M² - - - -
2 Pekerjaan Cor Beton
-Besi beton Φ 10 mm SNI 10.00 Btg 68,000 680,000 680,000
-Besi beton Φ 8 mm SNI 10.00 Btg 37,500 375,000 375,000 -
-Semen @ 50 kg 3.00 Zak 53,000 159,000 159,000 -
-Pasir pasang 0.40 M³ 240,000 96,000 96,000 -
-Batu pecah 0.60 M³ 280,000 168,000 168,000 -
VIII Pekerjaan Struktur Atap
-Kayu rangka kuda-kuda, Ukuran 6/12 x 4m - Btg 100,000 - - -
-Kayu gapit, Ukuran ……. - Btg - - - -
-Kayu usuk, Ukuran 4/6 x 3 m - Btg 27,000 - - -
-Usuk bambu - m 5,500 - - -
-Reng bambu - m 1,500 - - -
IX Pekerjaan Penutup Atap
1 Penutup Atap 64.80
-Seng gelombang (0,2 cm x 80 cm x 300 cm), atau - Lbr 78,000 - - -
-Genteng - Bh 1,250 - - -
-Bahan penutup atap lainnya yang diijinkan - Lbr - - - -
2 Bubungan Atap Bh

-Seng Lbr - - -
-Genteng bubungan - Bh 5,000 - - -
-Bahan penutup atap lainnya yang diijinkan Lbr - - -
3 Listplang papan, Ukuran……. M³ - - -
X Pekerjaan Lantai
1 Lantai Rabat Campuran minimal 1:5, T= 5 cm 2.70 M3

-Semen @ 50 kg 1.00 Zak 53,000 53,000 53,000 -


-Pasir pasang 0.10 M³ 240,000 24,000 24,000 -
-Batu pecah 0.20 M³ 280,000 56,000 56,000 -
2 Lantai Papan M²

-Papan, Ukuran……….. - Lbr - - - -


-Kayu, Ukuran……….. - Btg - - - -
XI MCK
-Septic Tank - Unit - - - -
-Closet Jongkok - Unit 155,000 - - -
-Pipa Air Bersih, Ukuran…… - Btg 27,500 - - -
-Pipa Air Kotor, Ukuran…… - Btg 85,000 - - -
-Kran - Bh 25,000 - - -
-Pintu Kamar Mandi - Set 210,000 - - -
XII Lain-lain/ Instalasi Listrik
Gamping - Zak 8,000 - - -
Paku 8.20 Kg 15,000 123,000 123,000 -
Bendrat 10.00 Kg 20,000 200,000 200,000 -
Loster 10.00 Bh 5,000 50,000 50,000 -
Papan Bekisting - Lbr - - - -
XIII Upah Kerja
Tukang 60.00 Oh 70,000 4,200,000 2,500,000 1,700,000
Pembantu Tukang 60.00 Oh 60,000 3,600,000 3,600,000

JUMLAH 25,721,000 17,500,000 8,221,000

........................................ .....20
Difasilitasi, Ketua KPB Diajukan Oleh,
Tenaga Fasilitator Lapangan Penerima Bantuan

(.........................................) ( ....................................) ( ....................................)

Disahkan oleh, Diverifikasi Oleh,


Tim Teknis Kabupaten Magelang Koordinator Fasilitator

( ...............................................) ( ....................................)
NIP..........................................
FORMAT III-17

PANJANG LEBAR KELL VOL M2


SUMBER DANA dimensi 6 9 30 54 genteng
SWADAYA pekerjaan
Memakai Bahan
Bangunan Lama atap kuda-kuda
penutup atap 64.8 1,620.00
SWADAYA pondasi Galian Tanah 6.75
Urugan Pasir 2.43
SWADAYA Pas. Batu belah 4.3875
12 beton sloof 0.9
17 10 kolom 0.675
12 balk 15x15 0.675
17 dinding bata
58 batako 90
SWADAYA Plesteran dinding 180
lantai 5cm 2.7
SWADAYA kayu gording 4 m 45
usuk 3 m 30
reng 3 m 135
kusen pintu 80*200 cm 1
jendela 1
daun pintu 80*200 cm 1
jendela 1
pintu kmr 1
SWADAYA JUMLAH 1620

dimensi 6 9 30 54 genteng
pekerjaan
atap kuda-kuda 0 -
penutup atap 64.8 -
pondasi Galian Tanah 6.75 -
Urugan Pasir 2.43 -
Pas. Batu belah 4.3875 -
beton sloof 0.9 -
10 kolom 0.675 -
balk 15x15 0.675 -
dinding bata 0 -
batako 90 -
Plesteran dinding 180 -
lantai 5cm 2.7 -
kayu gording 4 m 45 -
usuk 3 m 30 -
reng 3 m 135 -
kusen pintu 80*200 cm 1 -
jendela 1 -
daun pintu 80*200 cm 1 -
jendela 1 -
pintu kmr 1 -
JUMLAH 0

SWADAYA
HARGA
MATERIAL VOL SATUAN
SATUAN
Urugan Pasir 240,000 2.00 M³
-Semen @ 50 kg 53,000 56.00 Zak
-Pasir pasang 240,000 15.30 M³
-Batu Kali 215,000 5.00 M³
-Besi beton Φ 10 mm SNI 68,000 30.00 Btg
-Besi beton Φ 8 mm SNI 37,500 30.00 Btg
-Batu pecah 280,000 2.10 M³
-Batu Bata 750 - Bh
-Batako 3,500 1,600.00 Bh
-Kusen Pintu, Ukuran 0,80 X 2,00 M 200,000 - Unit
-Kusen Jendela 150,000 - Unit
-Kusen Ventilasi, Ukuran…… - - Unit
-Daun Pintu Kayu, Ukuran 350,000 - Unit
-Daun Jendela Kayu, Ukuran 200,000 - Unit
-Handle Pintu dan Kunci Pintu - - Set
-Handle Jendela dan Kunci Jendela - - Set
-Engsel Pintu 35,000 - Set
-Engsel Jendela 21,000 - Set
-Kayu rangka kuda-kuda, Ukuran 6/12 x 4m 100,000 - Btg
-Kayu gapit, Ukuran ……. - - Btg
-Kayu usuk, Ukuran 4/6 x 3 m 27,000 - Btg
-Usuk bambu 4m 5,500 - m
-Reng bambu 4m 1,500 - m
-Seng gelombang (0,2 cm x 80 cm x 300 cm 78,000 - Lbr
-Genteng 1,250 - Bh
-Seng - - Lbr
-Genteng bubungan 5,000 - Bh
-Closet Jongkok 155,000 - Unit
-Pipa Air Bersih, Ukuran…… 27,500 - Btg
-Pipa Air Kotor, Ukuran…… 85,000 - Btg
-Kran 25,000 - Bh
-Pintu Kamar Mandi 210,000 - Set
Gamping 8,000 - Zak
Paku 15,000 8.20 Kg
Bendrat 20,000 10.00 Kg
Loster 5,000 10.00 Bh
Papan Bekisting - - Lbr

15,000,000

- 0
0
........................................ .....2019 0
Diajukan Oleh,
Penerima Bantuan

( ....................................)

Diverifikasi Oleh,
Koordinator Fasilitator

17,921,000 15,000,000
15,000,000
( ....................................)

-
4
20.25 1.0888888889 4.549 0.45
24.25 0.0108888889

batu semen pasir spit bes 10 besi 8 bata batako

2.00
5.00 7.00 2.60
4.00 0.60 0.70 10.00 11.00
3.00 0.40 0.60 10.00 10.00
3.00 0.40 0.60 10.00 10.00
- - -
20.00 6.50 1,125.00
18.00 4.70
1.00 0.10 0.20

5 56 17.3 2.1 30 31 0 1125

batu semen pasir spit bes 10 besi 8 bata batako

- - - - - - - -
- - - - - - - -
- - - - - - - -
- 2.00 - - - - -
5.00 7.00 2.60 - - - - -
- 4.00 0.60 0.70 10.00 11.00 - -
- 3.00 0.40 0.60 10.00 10.00 - -
- 3.00 0.40 0.60 10.00 10.00 - -
- - - - - - - -
- 20.00 6.50 - - - - 1,600.00
- 18.00 4.70 - - - - -
- 1.00 0.10 0.20 - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
5 56 17.3 2.1 30 31 0 1600

REKAP VOL
BIAYA BSPS DANA BSPS
- -
2,226,000.00 42.00
3,048,000.00 12.70
- -
2,040,000.00 30.00
1,125,000.00 30.00
588,000.00 2.10
- -
5,600,000.00 1,600.00
- -
- -
- #DIV/0!
- -
- -
- #DIV/0!
- #DIV/0!
- -
- -
- -
- #DIV/0!
- -
- -
- -
- -
- -
- #DIV/0!
- -
- -
- -
- -
- -
- -
- -
123,000.00 8.20
200,000.00 10.00
50,000.00 10.00
- #DIV/0!
15,000,000.00
DA

Nomor BNBA
Nama Penerima Bantuan
Nomor KTP
Alamat
Desa/Kelurahan
kayu kusen daun Kecamatan
Gording usuk reng pintu jendela pintu jendela pintu KM Kabupaten/Kota
Nomor Rekening Penerim

A. Jumlah Dana yang ditr


No.
1
2
3
4
5
6
7
8
12.00 9
34.00 10
140.00 11
1.00 12
1.00 13
1.00 14
1.00 15
1.00 16
12 34 140 1 1 1 1 1

kayu kusen daun TOTAL HARGA PEMBELIAN


Gording usuk reng pintu jendela pintu jendela pintu KM Terbilang : Enam Juta Dua Ra

- - - - - - - - Disanggupi oleh :
- - - - - - - - Nama Toko/Penyedia Baha
- - - - - - - - Alamat Toko/Penyedia Bah
- - - - - - - - Nomor Rekening Bank Tok
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - - B. Jumlah dana yang dita
- - - - - - - - No
- - - - - - - - 1
- - - - - - - - TOTAL TARIK TUNAI (B)
- - - - - - - - Terbilang : Tujuh Juta Lima R
- - - - - - - -
- - - - - - - - C. Total dana yang ditarik (
- - - - - - - - Dana Yang Ditarik (Rp.)
- - - - - - - Terbilang : Tujuh Juta Lima R
0 0 0 0 0 0 0 0

disahkan oleh:
Tim Teknis Kabupaten Ma

( .....................................
NIP.................................

*) coret yang tidak perlu

DA

Nomor BNBA
Nama Penerima Bantuan
Nomor KTP
Alamat
Desa/Kelurahan
Kecamatan
Kabupaten/Kota
Nomor Rekening Penerim

A. Jumlah Dana yang ditr


No.
1
2
3
4
5
6
7
8
9
10
11
12
13
14

TOTAL HARGA PEMBELIAN


Terbilang : Enam Juta Dua Ra

Disanggupi oleh :
Nama Toko/Penyedia Baha
Alamat Toko/Penyedia Bah
Nomor Rekening Bank Tok

B. Jumlah dana yang dita


No
1
TOTAL TARIK TUNAI (B)
Terbilang : Tujuh Juta Lima R

C. Total dana yang ditarik (


Dana Yang Ditarik (Rp.)
Terbilang : Tujuh Juta Lima R
disahkan oleh:
Tim Teknis Kabupaten Ma

( .....................................
NIP.................................

*) coret yang tidak perlu


DAFTAR RENCANA PEMANFAATAN BANTUAN (DRPB) TAHAP 1

Nomor BNBA : 0
Nama Penerima Bantuan : MUH SHOLEH
Nomor KTP : 0
Alamat : 0
Desa/Kelurahan : 0
Kecamatan : 0
Kabupaten/Kota : 0
Nomor Rekening Penerima Bantuan :

A. Jumlah Dana yang ditransfer ke Toko/Penyedia Bahan Bangunan (Tahap I/II *)


Jumlah Harga per Unit
Jenis Bahan Bangunan
(unit) (Rp)
Batu belah 5.00 m3 215,000
Semen 56.00 zak 53,000
Pasir 17.30 m3 240,000
Batu Pecah 2.10 m3 280,000
Besi Ø 10 30.00 btg 68,000
Besi Ø 8 31.00 btg 37,500
Kusen Pintu Ukuran 0,80 x 2,00 m - Bh 200,000
Kusen Jendela - Bh 150,000
Batu Bata - bh 750
Gamping - zak 8,000
Paku 8.20 Kg 15,000
Bendrat - Kg 22,000
Loster - Bh 7,000
Papan Bekisting - Lbr 20,000
Genteng - Bh 1,250
Genteng bubungan - Bh 5,000

TOTAL HARGA PEMBELIAN


Terbilang : Enam Juta Dua Ratus Lima Puluh Ribu Rupiah

Disanggupi oleh :
Nama Toko/Penyedia Bahan Bangunan :
Alamat Toko/Penyedia Bahan Bangunan :
Nomor Rekening Bank Toko/ Penyedi BB :

Toko/Penyedia Bahan Bangunan


(..................................................)

B. Jumlah dana yang ditarik tunai untuk upah kerja (Tahap I / II *)


Uraian Jumlah harga (Rp)
Upah Kerja PKRS 1,250,000
TOTAL TARIK TUNAI (B) 1,250,000
Terbilang : Tujuh Juta Lima Ratus Ribu Rupiah

C. Total dana yang ditarik ( A + B )


Dana Yang Ditarik (Rp.)
Terbilang : Tujuh Juta Lima Ratus Ribu Rupiah

........................................ .....2019
Diajukan Oleh :
Penerima Bantuan

MUH SHOLEH

disahkan oleh: Diverifikasi oleh: Difasilitasi Oleh :


Tim Teknis Kabupaten Magelang Koordinator Fasilitator Tenaga Fasilitator Lapangan

( ...............................................) ( ....................................) (.........................................)


NIP..........................................

*) coret yang tidak perlu

DAFTAR RENCANA PEMANFAATAN BANTUAN (DRPB) TAHAP 2

Nomor BNBA : 0
Nama Penerima Bantuan : MUH SHOLEH
Nomor KTP : 0
Alamat : 0
Desa/Kelurahan : 0
Kecamatan : 0
Kabupaten/Kota : 0
Nomor Rekening Penerima Bantuan : 0

A. Jumlah Dana yang ditransfer ke Toko/Penyedia Bahan Bangunan (Tahap I/II *)


Jumlah Harga per Unit
Jenis Bahan Bangunan
(unit) (Rp)
Batu belah 0 m3 215,000
Semen 40.00 zak 53,000
Pasir 6 m3 240,000
Batu Pecah 0 m3 280,000
Besi Ø 10 25 btg 68,000
Besi Ø 8 0 btg 37,500
Kusen Pintu Ukuran 0,80 x 2,00 m 0 Bh 200,000
Kusen Jendela 0 Bh 150,000
Batu Bata 700 bh 750
Gamping 0 zak 8,000
Paku 0.0 Kg 15,000
Bendrat 0 Kg 22,000
Loster 0 Bh 7,000
Kayu usuk 10 Btg 19,000

TOTAL HARGA PEMBELIAN


Terbilang : Enam Juta Dua Ratus Lima Puluh Ribu Rupiah

Disanggupi oleh :
Nama Toko/Penyedia Bahan Bangunan : 0
Alamat Toko/Penyedia Bahan Bangunan : 0
Nomor Rekening Bank Toko/ Penyedi BB : 0

Toko/Penyedia Bahan Bangunan

(..................................................)

B. Jumlah dana yang ditarik tunai untuk upah kerja (Tahap I / II *)


Uraian Jumlah harga (Rp)
Upah Kerja PKRS/PBRS *) 1,250,000
TOTAL TARIK TUNAI (B) 1,250,000
Terbilang : Tujuh Juta Lima Ratus Ribu Rupiah

C. Total dana yang ditarik ( A + B )


Dana Yang Ditarik (Rp.)
Terbilang : Tujuh Juta Lima Ratus Ribu Rupiah

........................................ .....2019
Diajukan Oleh :
Penerima Bantuan

MUH SHOLEH
disahkan oleh: Diverifikasi oleh: Difasilitasi Oleh :
Tim Teknis Kabupaten Magelang Koordinator Fasilitator Tenaga Fasilitator Lapangan

( ...............................................) ( ....................................) (.........................................)


NIP..........................................

*) coret yang tidak perlu


Format IV - 2

HAP 1

Jumlah Harga
(Rp)
1,075,000
2,968,000
4,152,000
588,000
2,040,000
1,162,500
-
-
-
-
123,000
-
-
-
-
-

12,108,500 15,000,000
2,891,500

edia Bahan Bangunan


.................................)

Jumlah harga (Rp)


1,250,000
1,250,000

13,358,500

........................... .....2019
Diajukan Oleh :
Penerima Bantuan

MUH SHOLEH

Difasilitasi Oleh :
enaga Fasilitator Lapangan

.......................................)

Format IV - 2

HAP 2
Jumlah Harga
(Rp)
-
2,120,000
1,440,000
-
1,700,000
-
-
-
525,000
-
129,000
-
-
190,000

6,104,000

edia Bahan Bangunan

.................................)

Jumlah harga (Rp)


1,250,000
1,250,000

7,354,000

..................................... .....2019
Diajukan Oleh :
Penerima Bantuan

MUH SHOLEH
Difasilitasi Oleh :
enaga Fasilitator Lapangan

.......................................)
RENCANA ANGGARAN BIAYA (RAB) BSPS

Nomor BNBA :
Nomor KTP :
Nama Penerima Bantuan : MUH SHOLEH
Alamat :
Desa/Kelurahan :
Kecamatan :
Kabupaten/Kota :
Jenis Kegiatan :

SUMBER DANA
HARGA TOTAL HARGA SWADAYA
NO URAIAN PEKERJAAN VOLUME SATUAN (Rp) (Rp) BSPS
Dana Tunai

I Pekerjaan Persiapan
Bongkar Rumah Lama 1.00 ls - - - -
II Pekerjaan Pondasi

1 Galian Tanah Pondasi 6.75 M³ - - - -


2 Urugan Pasir 2.00 M³ 240,000 480,000 - 480,000

3 Pasangan Pondasi 4.39 M³ - -

-Semen @ 50 kg 7.00 Zak 53,000 371,000 - 371,000


-Pasir pasang 2.60 M³ 240,000 624,000 - 624,000
-Batu Kali 5.00 M³ 215,000 1,075,000 - 1,075,000
4 Urugan kembali 2.36 M³ - - - -
III Pekerjaan Sloof
1 Pekerjaan bekisting M² - - - -
2 Cor Beton Sloof, Ukuran 20 x 15 cm - - -
-Besi beton Φ 10 mm SNI 10.00 Btg 68,000 680,000 680,000 -
-Besi beton Φ 8 mm SNI 10.00 Btg 37,500 375,000 375,000 -
-Semen @ 50 kg 4.00 Zak 53,000 212,000 212,000 -
-Pasir pasang 0.60 M³ 240,000 144,000 144,000 -
-Batu Pecah 0.70 M³ 280,000 196,000 196,000 -
IV Pekerjaan Kolom
1 Pekerjaan bekisting M² 20,000 - - -
2 Cor Beton Kolom, Ukuran 15 x 15 cm min. T=3m 10.00 Bh

-Besi beton Φ 10 mm SNI 10.00 Btg 68,000 680,000 680,000 -


-Besi beton Φ 8 mm SNI 10.00 Btg 37,500 375,000 375,000 -
-Pasir pasang 0.40 M³ 240,000 96,000 96,000 -
-Semen @ 50 kg 3.00 Zak 53,000 159,000 159,000 -
-Batu pecah 0.60 M³ 280,000 168,000 168,000 -
V Dinding Permanen
1 Tembok 90.00 M²

-Pasir Pasang 6.50 M³ 240,000 1,560,000 1,560,000 -


-Semen @ 50 kg 20.00 Zak 53,000 1,060,000 1,060,000 -
-Batu Bata - Bh 750 - - -
-Batako 1,250.00 Bh 3,500 4,375,000 4,375,000 -
2 Pekerjaan Plester
-Pasir Pasang 4.70 M³ 240,000 1,128,000 480,000 648,000
-Semen @ 50 kg 18.00 Zak 53,000 954,000 106,000 848,000
3 Papan
-Papan, Ukuran……… - Lbr - - - -
-Kayu, Ukuran………. - Btg - - - -
VI Pekerjaan Pintu dan Jendela
-Kusen Pintu, Ukuran 0,80 X 2,00 M 2.00 Unit 200,000 400,000 400,000 -
-Kusen Jendela 2.00 Unit 150,000 300,000 300,000 -
-Kusen Ventilasi, Ukuran…… - Unit - - - -
-Daun Pintu Kayu, Ukuran 2.00 Unit 350,000 700,000 700,000 -
-Daun Jendela Kayu, Ukuran 2.00 Unit 200,000 400,000 400,000 -
-Handle Pintu dan Kunci Pintu - Set - - - -
-Handle Jendela dan Kunci Jendela - Set - - - -
-Engsel Pintu - Set 35,000 - - -
-Engsel Jendela - Set 21,000 - - -
VII Ring Balok
1 Pekerjaan bekisting - M² - - - -
2 Pekerjaan Cor Beton
-Besi beton Φ 10 mm SNI 10.00 Btg 68,000 680,000 680,000
-Besi beton Φ 8 mm SNI 10.00 Btg 37,500 375,000 375,000 -
-Semen @ 50 kg 3.00 Zak 53,000 159,000 159,000 -
-Pasir pasang 0.40 M³ 240,000 96,000 96,000 -
-Batu pecah 0.60 M³ 280,000 168,000 168,000 -
VIII Pekerjaan Struktur Atap
-Kayu rangka kuda-kuda, Ukuran 6/12 x 4m 5.00 Btg 100,000 500,000 500,000 -
-Kayu gapit, Ukuran ……. - Btg - - - -
-Kayu usuk, Ukuran 4/6 x 3 m 10.00 Btg 27,000 270,000 270,000 -
-Usuk bambu - m 5,500 - - -
-Reng bambu - m 1,500 - - -
IX Pekerjaan Penutup Atap
1 Penutup Atap 64.80
-Seng gelombang (0,2 cm x 80 cm x 300 cm), atau - Lbr 78,000 - - -
-Genteng - Bh 1,250 - - -
-Bahan penutup atap lainnya yang diijinkan - Lbr - - - -
2 Bubungan Atap Bh

-Seng Lbr - - -
-Genteng bubungan - Bh 5,000 - - -
-Bahan penutup atap lainnya yang diijinkan Lbr - - -
3 Listplang papan, Ukuran……. M³ - - -
X Pekerjaan Lantai
1 Lantai Rabat Campuran minimal 1:5, T= 5 cm 2.70 M3

-Semen @ 50 kg 1.00 Zak 53,000 53,000 - 53,000


-Pasir pasang 0.10 M³ 240,000 24,000 24,000 -
-Batu pecah 0.20 M³ 280,000 56,000 56,000 -
2 Lantai Papan M²

-Papan, Ukuran……….. - Lbr - - - -


-Kayu, Ukuran……….. - Btg - - - -
XI MCK
-Septic Tank - Unit - - - -
-Closet Jongkok - Unit 155,000 - - -
-Pipa Air Bersih, Ukuran…… - Btg 27,500 - - -
-Pipa Air Kotor, Ukuran…… - Btg 85,000 - - -
-Kran - Bh 25,000 - - -
-Pintu Kamar Mandi - Set 210,000 - - -
XII Lain-lain/ Instalasi Listrik
Gamping - Zak 8,000 - - -
Paku 5.07 Kg 15,000 76,000 76,000 -
Bendrat 5.00 Kg 20,000 100,000 100,000 -
Loster 6.00 Bh 5,000 30,000 30,000 -
Papan Bekisting - Lbr - - - -
XIII Upah Kerja
Tukang 60.00 Oh 70,000 4,200,000 2,500,000 1,700,000
Pembantu Tukang 60.00 Oh 60,000 3,600,000 3,600,000

JUMLAH 26,899,000 17,500,000 9,399,000

........................................ .....20
Difasilitasi, Ketua KPB Diajukan Oleh,
Tenaga Fasilitator Lapangan Penerima Bantuan

(.........................................) ( ....................................) ( ....................................)

Disahkan oleh, Diverifikasi Oleh,


Tim Teknis Kabupaten Magelang Koordinator Fasilitator

( ...............................................) ( ....................................)
NIP..........................................
FORMAT III-17

PANJANG LEBAR KELL VOL M2


SUMBER DANA dimensi 6 9 30 54 genteng
SWADAYA pekerjaan
Memakai Bahan
Bangunan Lama atap kuda-kuda
penutup atap 64.8 1,620.00
SWADAYA pondasi Galian Tanah 6.75
Urugan Pasir 2.43
SWADAYA Pas. Batu belah 4.3875
12 beton sloof 0.9
17 10 kolom 0.675
12 balk 15x15 0.675
17 dinding bata
58 batako 90
SWADAYA Plesteran dinding 180
lantai 5cm 2.7
SWADAYA kayu gording 4 m 45
usuk 3 m 30
reng 3 m 135
kusen pintu 80*200 cm 1
jendela 1
daun pintu 80*200 cm 1
jendela 1
pintu kmr 1
SWADAYA JUMLAH 1620

dimensi 6 9 30 54 genteng
pekerjaan
atap kuda-kuda 0 -
penutup atap 64.8 -
pondasi Galian Tanah 6.75 -
Urugan Pasir 2.43 -
Pas. Batu belah 4.3875 -
beton sloof 0.9 -
10 kolom 0.675 -
balk 15x15 0.675 -
dinding bata 0 -
batako 90 -
Plesteran dinding 180 -
lantai 5cm 2.7 -
kayu gording 4 m 45 -
usuk 3 m 30 -
reng 3 m 135 -
kusen pintu 80*200 cm 1 -
jendela 1 -
daun pintu 80*200 cm 1 -
jendela 1 -
pintu kmr 1 -
JUMLAH 0

SWADAYA
HARGA
MATERIAL VOL SATUAN
SATUAN
Urugan Pasir 240,000 2.00 M³
-Semen @ 50 kg 53,000 56.00 Zak
-Pasir pasang 240,000 15.30 M³
-Batu Kali 215,000 5.00 M³
-Besi beton Φ 10 mm SNI 68,000 30.00 Btg
-Besi beton Φ 8 mm SNI 37,500 30.00 Btg
-Batu pecah 280,000 2.10 M³
-Batu Bata 750 - Bh
-Batako 3,500 1,250.00 Bh
-Kusen Pintu, Ukuran 0,80 X 2,00 M 200,000 2.00 Unit
-Kusen Jendela 150,000 2.00 Unit
-Kusen Ventilasi, Ukuran…… - - Unit
-Daun Pintu Kayu, Ukuran 350,000 2.00 Unit
-Daun Jendela Kayu, Ukuran 200,000 2.00 Unit
-Handle Pintu dan Kunci Pintu - - Set
-Handle Jendela dan Kunci Jendela - - Set
-Engsel Pintu 35,000 - Set
-Engsel Jendela 21,000 - Set
-Kayu rangka kuda-kuda, Ukuran 6/12 x 4m 100,000 5.00 Btg
-Kayu gapit, Ukuran ……. - - Btg
-Kayu usuk, Ukuran 4/6 x 3 m 27,000 10.00 Btg
-Usuk bambu 4m 5,500 - m
-Reng bambu 4m 1,500 - m
-Seng gelombang (0,2 cm x 80 cm x 300 cm 78,000 - Lbr
-Genteng 1,250 - Bh
-Seng - - Lbr
-Genteng bubungan 5,000 - Bh
-Closet Jongkok 155,000 - Unit
-Pipa Air Bersih, Ukuran…… 27,500 - Btg
-Pipa Air Kotor, Ukuran…… 85,000 - Btg
-Kran 25,000 - Bh
-Pintu Kamar Mandi 210,000 - Set
Gamping 8,000 - Zak
Paku 15,000 5.07 Kg
Bendrat 20,000 5.00 Kg
Loster 5,000 6.00 Bh
Papan Bekisting - - Lbr

15,000,000

- 0
0
........................................ .....2019 0
Diajukan Oleh,
Penerima Bantuan

( ....................................)

Diverifikasi Oleh,
Koordinator Fasilitator

19,099,000 15,000,000
15,000,000
( ....................................)

-
4
20.25 1.0888888889 4.549 0.45
24.25 0.0108888889

batu semen pasir spit bes 10 besi 8 bata batako

2.00
5.00 7.00 2.60
4.00 0.60 0.70 10.00 11.00
3.00 0.40 0.60 10.00 10.00
3.00 0.40 0.60 10.00 10.00
- - -
20.00 6.50 1,125.00
18.00 4.70
1.00 0.10 0.20

5 56 17.3 2.1 30 31 0 1125

batu semen pasir spit bes 10 besi 8 bata batako

- - - - - - - -
- - - - - - - -
- - - - - - - -
- 2.00 - - - - -
5.00 7.00 2.60 - - - - -
- 4.00 0.60 0.70 10.00 11.00 - -
- 3.00 0.40 0.60 10.00 10.00 - -
- 3.00 0.40 0.60 10.00 10.00 - -
- - - - - - - -
- 20.00 6.50 - - - - 1,250.00
- 18.00 4.70 - - - - -
- 1.00 0.10 0.20 - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
5 56 17.3 2.1 30 31 0 1250

REKAP VOL
BIAYA BSPS DANA BSPS
- -
1,696,000.00 32.00
2,400,000.00 10.00
- -
2,040,000.00 30.00
1,125,000.00 30.00
588,000.00 2.10
- -
4,375,000.00 1,250.00
400,000.00 2.00
300,000.00 2.00
- #DIV/0!
700,000.00 2.00
400,000.00 2.00
- #DIV/0!
- #DIV/0!
- -
- -
500,000.00 5.00
- #DIV/0!
270,000.00 10.00
- -
- -
- -
- -
- #DIV/0!
- -
- -
- -
- -
- -
- -
- -
76,000.00 5.07
100,000.00 5.00
30,000.00 6.00
- #DIV/0!
15,000,000.00
DA

Nomor BNBA
Nama Penerima Bantuan
Nomor KTP
Alamat
Desa/Kelurahan
kayu kusen daun Kecamatan
Gording usuk reng pintu jendela pintu jendela pintu KM Kabupaten/Kota
Nomor Rekening Penerim

A. Jumlah Dana yang ditr


No.
1
2
3
4
5
6
7
8
12.00 9
34.00 10
140.00 11
1.00 12
1.00 13
1.00 14
1.00 15
1.00 16
12 34 140 1 1 1 1 1

kayu kusen daun TOTAL HARGA PEMBELIAN


Gording usuk reng pintu jendela pintu jendela pintu KM Terbilang : Enam Juta Dua Ra

- - - - - - - - Disanggupi oleh :
- - - - - - - - Nama Toko/Penyedia Baha
- - - - - - - - Alamat Toko/Penyedia Bah
- - - - - - - - Nomor Rekening Bank Tok
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - - B. Jumlah dana yang dita
5.00 - - - - - - - No
- - - - - - - - 1
- - - - - - - - TOTAL TARIK TUNAI (B)
- - - 2.00 - - - - Terbilang : Tujuh Juta Lima R
- - - - 2.00 - - -
- - - - - 2.00 - - C. Total dana yang ditarik (
- - - - - - 2.00 - Dana Yang Ditarik (Rp.)
- - - - - - - Terbilang : Tujuh Juta Lima R
5 0 0 2 2 2 2 0

disahkan oleh:
Tim Teknis Kabupaten Ma

( .....................................
NIP.................................

*) coret yang tidak perlu

DA

Nomor BNBA
Nama Penerima Bantuan
Nomor KTP
Alamat
Desa/Kelurahan
Kecamatan
Kabupaten/Kota
Nomor Rekening Penerim

A. Jumlah Dana yang ditr


No.
1
2
3
4
5
6
7
8
9
10
11
12
13
14

TOTAL HARGA PEMBELIAN


Terbilang : Enam Juta Dua Ra

Disanggupi oleh :
Nama Toko/Penyedia Baha
Alamat Toko/Penyedia Bah
Nomor Rekening Bank Tok

B. Jumlah dana yang dita


No
1
TOTAL TARIK TUNAI (B)
Terbilang : Tujuh Juta Lima R

C. Total dana yang ditarik (


Dana Yang Ditarik (Rp.)
Terbilang : Tujuh Juta Lima R
disahkan oleh:
Tim Teknis Kabupaten Ma

( .....................................
NIP.................................

*) coret yang tidak perlu


DAFTAR RENCANA PEMANFAATAN BANTUAN (DRPB) TAHAP 1

Nomor BNBA : 0
Nama Penerima Bantuan : MUH SHOLEH
Nomor KTP : 0
Alamat : 0
Desa/Kelurahan : 0
Kecamatan : 0
Kabupaten/Kota : 0
Nomor Rekening Penerima Bantuan :

A. Jumlah Dana yang ditransfer ke Toko/Penyedia Bahan Bangunan (Tahap I/II *)


Jumlah Harga per Unit
Jenis Bahan Bangunan
(unit) (Rp)
Batu belah 5.00 m3 215,000
Semen 56.00 zak 53,000
Pasir 17.30 m3 240,000
Batu Pecah 2.10 m3 280,000
Besi Ø 10 30.00 btg 68,000
Besi Ø 8 31.00 btg 37,500
Kusen Pintu Ukuran 0,80 x 2,00 m - Bh 200,000
Kusen Jendela - Bh 150,000
Batu Bata - bh 750
Gamping - zak 8,000
Paku 5.07 Kg 15,000
Bendrat - Kg 22,000
Loster - Bh 7,000
Papan Bekisting - Lbr 20,000
Genteng - Bh 1,250
Genteng bubungan - Bh 5,000

TOTAL HARGA PEMBELIAN


Terbilang : Enam Juta Dua Ratus Lima Puluh Ribu Rupiah

Disanggupi oleh :
Nama Toko/Penyedia Bahan Bangunan :
Alamat Toko/Penyedia Bahan Bangunan :
Nomor Rekening Bank Toko/ Penyedi BB :

Toko/Penyedia Bahan Bangunan


(..................................................)

B. Jumlah dana yang ditarik tunai untuk upah kerja (Tahap I / II *)


Uraian Jumlah harga (Rp)
Upah Kerja PKRS 1,250,000
TOTAL TARIK TUNAI (B) 1,250,000
Terbilang : Tujuh Juta Lima Ratus Ribu Rupiah

C. Total dana yang ditarik ( A + B )


Dana Yang Ditarik (Rp.)
Terbilang : Tujuh Juta Lima Ratus Ribu Rupiah

........................................ .....2019
Diajukan Oleh :
Penerima Bantuan

MUH SHOLEH

disahkan oleh: Diverifikasi oleh: Difasilitasi Oleh :


Tim Teknis Kabupaten Magelang Koordinator Fasilitator Tenaga Fasilitator Lapangan

( ...............................................) ( ....................................) (.........................................)


NIP..........................................

*) coret yang tidak perlu

DAFTAR RENCANA PEMANFAATAN BANTUAN (DRPB) TAHAP 2

Nomor BNBA : 0
Nama Penerima Bantuan : MUH SHOLEH
Nomor KTP : 0
Alamat : 0
Desa/Kelurahan : 0
Kecamatan : 0
Kabupaten/Kota : 0
Nomor Rekening Penerima Bantuan : 0

A. Jumlah Dana yang ditransfer ke Toko/Penyedia Bahan Bangunan (Tahap I/II *)


Jumlah Harga per Unit
Jenis Bahan Bangunan
(unit) (Rp)
Batu belah 0 m3 215,000
Semen 40.00 zak 53,000
Pasir 6 m3 240,000
Batu Pecah 0 m3 280,000
Besi Ø 10 25 btg 68,000
Besi Ø 8 0 btg 37,500
Kusen Pintu Ukuran 0,80 x 2,00 m 0 Bh 200,000
Kusen Jendela 0 Bh 150,000
Batu Bata 700 bh 750
Gamping 0 zak 8,000
Paku 0.0 Kg 15,000
Bendrat 0 Kg 22,000
Loster 0 Bh 7,000
Kayu usuk 10 Btg 19,000

TOTAL HARGA PEMBELIAN


Terbilang : Enam Juta Dua Ratus Lima Puluh Ribu Rupiah

Disanggupi oleh :
Nama Toko/Penyedia Bahan Bangunan : 0
Alamat Toko/Penyedia Bahan Bangunan : 0
Nomor Rekening Bank Toko/ Penyedi BB : 0

Toko/Penyedia Bahan Bangunan

(..................................................)

B. Jumlah dana yang ditarik tunai untuk upah kerja (Tahap I / II *)


Uraian Jumlah harga (Rp)
Upah Kerja PKRS/PBRS *) 1,250,000
TOTAL TARIK TUNAI (B) 1,250,000
Terbilang : Tujuh Juta Lima Ratus Ribu Rupiah

C. Total dana yang ditarik ( A + B )


Dana Yang Ditarik (Rp.)
Terbilang : Tujuh Juta Lima Ratus Ribu Rupiah

........................................ .....2019
Diajukan Oleh :
Penerima Bantuan

MUH SHOLEH
disahkan oleh: Diverifikasi oleh: Difasilitasi Oleh :
Tim Teknis Kabupaten Magelang Koordinator Fasilitator Tenaga Fasilitator Lapangan

( ...............................................) ( ....................................) (.........................................)


NIP..........................................

*) coret yang tidak perlu


Format IV - 2

HAP 1

Jumlah Harga
(Rp)
1,075,000
2,968,000
4,152,000
588,000
2,040,000
1,162,500
-
-
-
-
76,000
-
-
-
-
-

12,061,500 15,000,000
2,938,500

edia Bahan Bangunan


.................................)

Jumlah harga (Rp)


1,250,000
1,250,000

13,311,500

........................... .....2019
Diajukan Oleh :
Penerima Bantuan

MUH SHOLEH

Difasilitasi Oleh :
enaga Fasilitator Lapangan

.......................................)

Format IV - 2

HAP 2
Jumlah Harga
(Rp)
-
2,120,000
1,440,000
-
1,700,000
-
-
-
525,000
-
129,000
-
-
190,000

6,104,000

edia Bahan Bangunan

.................................)

Jumlah harga (Rp)


1,250,000
1,250,000

7,354,000

..................................... .....2019
Diajukan Oleh :
Penerima Bantuan

MUH SHOLEH
Difasilitasi Oleh :
enaga Fasilitator Lapangan

.......................................)
RENCANA ANGGARAN BIAYA (RAB) BSPS

Nomor BNBA :
Nomor KTP :
Nama Penerima Bantuan : MUH SHOLEH
Alamat :
Desa/Kelurahan :
Kecamatan :
Kabupaten/Kota :
Jenis Kegiatan :

SUMBER DANA
HARGA TOTAL HARGA SWADAYA
NO URAIAN PEKERJAAN VOLUME SATUAN (Rp) (Rp) BSPS
Dana Tunai

I Pekerjaan Persiapan
Bongkar Rumah Lama 1.00 ls - - - -
II Pekerjaan Pondasi

1 Galian Tanah Pondasi 6.75 M³ - - - -


2 Urugan Pasir 2.00 M³ 240,000 480,000 - 480,000

3 Pasangan Pondasi 4.39 M³ - -

-Semen @ 50 kg 7.00 Zak 53,000 371,000 371,000 -


-Pasir pasang 2.60 M³ 240,000 624,000 624,000 -
-Batu Kali 5.00 M³ 215,000 1,075,000 - 1,075,000
4 Urugan kembali 2.36 M³ - - - -
III Pekerjaan Sloof
1 Pekerjaan bekisting M² - - - -
2 Cor Beton Sloof, Ukuran 20 x 15 cm - - -
-Besi beton Φ 10 mm SNI 10.00 Btg 68,000 680,000 680,000 -
-Besi beton Φ 8 mm SNI 10.00 Btg 37,500 375,000 - 375,000
-Semen @ 50 kg 4.00 Zak 53,000 212,000 212,000 -
-Pasir pasang 0.60 M³ 240,000 144,000 144,000 -
-Batu Pecah 0.70 M³ 280,000 196,000 196,000 -
IV Pekerjaan Kolom
1 Pekerjaan bekisting M² 20,000 - - -
2 Cor Beton Kolom, Ukuran 15 x 15 cm min. T=3m 10.00 Bh

-Besi beton Φ 10 mm SNI 10.00 Btg 68,000 680,000 680,000 -


-Besi beton Φ 8 mm SNI 10.00 Btg 37,500 375,000 375,000 -
-Pasir pasang 0.40 M³ 240,000 96,000 96,000 -
-Semen @ 50 kg 3.00 Zak 53,000 159,000 159,000 -
-Batu pecah 0.60 M³ 280,000 168,000 168,000 -
V Dinding Permanen
1 Tembok - M²

-Pasir Pasang 4.50 M³ 240,000 1,080,000 1,080,000 -


-Semen @ 50 kg 14.00 Zak 53,000 742,000 742,000
-Batu Bata 4,000.00 Bh 750 3,000,000 3,000,000 -
-Batako - Bh 3,500 - - -
2 Pekerjaan Plester
-Pasir Pasang 4.70 M³ 240,000 1,128,000 480,000 648,000
-Semen @ 50 kg 25.00 Zak 53,000 1,325,000 424,000 901,000
3 Papan
-Papan, Ukuran……… - Lbr - - - -
-Kayu, Ukuran………. - Btg - - - -
VI Pekerjaan Pintu dan Jendela
-Kusen Pintu, Ukuran 0,80 X 2,00 M 2.00 Unit 200,000 400,000 400,000 -
-Kusen Jendela 2.00 Unit 150,000 300,000 300,000 -
-Kusen Ventilasi, Ukuran…… - Unit - - - -
-Daun Pintu Kayu, Ukuran 2.00 Unit 350,000 700,000 700,000 -
-Daun Jendela Kayu, Ukuran 2.00 Unit 200,000 400,000 400,000 -
-Handle Pintu dan Kunci Pintu - Set - - - -
-Handle Jendela dan Kunci Jendela - Set - - - -
-Engsel Pintu - Set 35,000 - - -
-Engsel Jendela - Set 21,000 - - -
VII Ring Balok
1 Pekerjaan bekisting - M² - - - -
2 Pekerjaan Cor Beton
-Besi beton Φ 10 mm SNI 10.00 Btg 68,000 680,000 680,000
-Besi beton Φ 8 mm SNI 10.00 Btg 37,500 375,000 375,000 -
-Semen @ 50 kg 3.00 Zak 53,000 159,000 159,000 -
-Pasir pasang 0.40 M³ 240,000 96,000 96,000 -
-Batu pecah 0.60 M³ 280,000 168,000 168,000 -
VIII Pekerjaan Struktur Atap
-Kayu rangka kuda-kuda, Ukuran 8/12 x 4m - Btg 150,000 - - -
-Kayu gapit, Ukuran ……. - Btg - - - -
-Kayu usuk, Ukuran 4/6 x 2m - Btg 22,000 - - -
-Kayu Usuk, Ukuran 5/7 x 2m - Btg 27,000 - - -
-Kayu Reng , Ukuran 2/3 x 2m - Btg 1,500 - -
IX Pekerjaan Penutup Atap
1 Penutup Atap 64.80
-Seng gelombang (0,2 cm x 80 cm x 300 cm), atau - Lbr 78,000 - - -
-Genteng 1,600.00 Bh 1,250 2,000,000 2,000,000 -
-Bahan penutup atap lainnya yang diijinkan - Lbr - - - -
2 Bubungan Atap Bh

-Seng Lbr - - -
-Genteng bubungan - Bh 5,000 - - -
-Bahan penutup atap lainnya yang diijinkan Lbr - - -
3 Listplang papan, Ukuran……. M³ - - -
X Pekerjaan Lantai
1 Lantai Rabat Campuran minimal 1:5, T= 5 cm 2.70 M3

-Semen @ 50 kg 1.00 Zak 53,000 53,000 53,000 -


-Pasir pasang 0.10 M³ 240,000 24,000 24,000 -
-Batu pecah 0.20 M³ 280,000 56,000 56,000 -
2 Lantai Papan M²

-Papan, Ukuran……….. - Lbr - - - -


-Kayu, Ukuran……….. - Btg - - - -
XI MCK
-Septic Tank - Unit - - - -
-Closet Jongkok - Unit 155,000 - - -
-Pipa Air Bersih, Ukuran…… - Btg 27,500 - - -
-Pipa Air Kotor, Ukuran…… - Btg 85,000 - - -
-Kran - Bh 25,000 - - -
-Pintu Kamar Mandi - Set 210,000 - - -
XII Lain-lain/ Instalasi Listrik
Gamping - Zak 8,000 - - -
Paku 3.20 Kg 15,000 48,000 48,000 -
Bendrat 3.00 Kg 20,000 60,000 60,000 -
Loster 10.00 Bh 5,000 50,000 50,000 -
Papan Bekisting - Lbr - - - -
XIII Upah Kerja
Tukang 60.00 Oh 70,000 4,200,000 2,500,000 1,700,000
Pembantu Tukang 60.00 Oh 60,000 3,600,000 3,600,000

JUMLAH 26,279,000 17,500,000 8,779,000

........................................ ....
Difasilitasi, Ketua KPB Diajukan Oleh,
Tenaga Fasilitator Lapangan Penerima Bantuan

(.........................................) ( ....................................) ( ....................................)

Disahkan oleh, Diverifikasi Oleh,


Tim Teknis Kabupaten Magelang Koordinator Fasilitator

( ...............................................) ( ....................................)
NIP..........................................
FORMAT III-17

PANJANG LEBAR KELL VOL M2


SUMBER DANA dimensi 9 6 30 54 genteng
SWADAYA pekerjaan
Memakai Bahan
Bangunan Lama atap kuda-kuda
penutup atap 64.8 1,620.00
SWADAYA pondasi Galian Tanah 6.75
Urugan Pasir 2.43
SWADAYA Pas. Batu belah 4.3875
12 beton sloof 0.9
17 10 kolom 0.675
12 balk 15x15 0.675
17 dinding bata 90
58 batako
SWADAYA Plesteran dinding 180
lantai 5cm 2.7
SWADAYA kayu gording 4 m 30
usuk 2 m 30
reng 2m 135
kusen pintu 80*200 cm 1
jendela 1
daun pintu 80*200 cm 1
jendela 1
pintu kmr 1
SWADAYA JUMLAH 1620

dimensi 9 6 30 54 genteng
pekerjaan
atap kuda-kuda 0 -
penutup atap 64.8 1,600.00
pondasi Galian Tanah 6.75 -
Urugan Pasir 2.43 -
Pas. Batu belah 4.3875 -
beton sloof 0.9 -
10 kolom 0.675 -
balk 15x15 0.675 -
dinding bata 90 -
batako -
Plesteran dinding 180 -
lantai 5cm 2.7 -
kayu gording 4 m 30 -
usuk 2 m 30 -
reng 2m 135 -
kusen pintu 80*200 cm 1 -
jendela 1 -
daun pintu 80*200 cm 1 -
jendela 1 -
pintu kmr 1 -
JUMLAH 1600

SWADAYA
HARGA
MATERIAL VOL SATUAN
SATUAN
Urugan Pasir 240,000 2.00 M³
-Semen @ 50 kg 53,000 57.00 Zak
-Pasir pasang 240,000 13.30 M³
-Batu Kali 215,000 5.00 M³
-Besi beton Φ 10 mm SNI 68,000 30.00 Btg
-Besi beton Φ 8 mm SNI 37,500 30.00 Btg
-Batu pecah 280,000 2.10 M³
-Batu Bata 750 4,000.00 Bh
-Batako 3,500 - Bh
-Kusen Pintu, Ukuran 0,80 X 2,00 M 200,000 2.00 Unit
-Kusen Jendela 150,000 2.00 Unit
-Kusen Ventilasi, Ukuran…… - - Unit
-Daun Pintu Kayu, Ukuran 350,000 2.00 Unit
-Daun Jendela Kayu, Ukuran 200,000 2.00 Unit
-Handle Pintu dan Kunci Pintu - - Set
-Handle Jendela dan Kunci Jendela - - Set
-Engsel Pintu 35,000 - Set
-Engsel Jendela 21,000 - Set
-Kayu rangka kuda-kuda, Ukuran 8/12 x 4m 150,000 - Btg
-Kayu gapit, Ukuran ……. - - Btg
-Kayu usuk, Ukuran 4/6 x 2m 22,000 - Btg
-Kayu Usuk, Ukuran 5/7 x 2m 27,000 - Btg
-Kayu Reng , Ukuran 2/3 x 2m 1,500 - Btg
-Seng gelombang (0,2 cm x 80 cm x 300 cm 78,000 - Lbr
-Genteng 1,250 1,600.00 Bh
-Seng - - Lbr
-Genteng bubungan 5,000 - Bh
-Closet Jongkok 155,000 - Unit
-Pipa Air Bersih, Ukuran…… 27,500 - Btg
-Pipa Air Kotor, Ukuran…… 85,000 - Btg
-Kran 25,000 - Bh
-Pintu Kamar Mandi 210,000 - Set
Gamping 8,000 - Zak
Paku 15,000 3.20 Kg
Bendrat 20,000 3.00 Kg
Loster 5,000 10.00 Bh
Papan Bekisting - - Lbr

15,000,000

- 0
0
........................................ .....2019
Diajukan Oleh,
Penerima Bantuan

( ....................................)

Diverifikasi Oleh,
Koordinator Fasilitator

18,479,000 15,000,000
15,000,000
( ....................................)

-
4
20.25 1.0888888889 4.549 0.45
24.25 0.0108888889

batu semen pasir spit bes 10 besi 8 bata batako

2.00
5.00 7.00 2.60
4.00 0.60 0.70 10.00 11.00
3.00 0.40 0.60 10.00 10.00
3.00 0.40 0.60 10.00 10.00
14.00 4.50 6,300.00
- - -
18.00 4.70
1.00 0.10 0.20

5 50 15.3 2.1 30 31 6300 0

batu semen pasir spit bes 10 besi 8 bata batako

- - - - - - - -
- - - - - - - -
- - - - - - - -
- 2.00 - - - - -
5.00 7.00 2.60 - - - - -
- 4.00 0.60 0.70 10.00 11.00 - -
- 3.00 0.40 0.60 10.00 10.00 - -
- 3.00 0.40 0.60 10.00 10.00 - -
- 14.00 4.50 - - - 4,000.00 -
- - - - - - - -
- 25.00 4.70 - - - - -
- 1.00 0.10 0.20 - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
5 57 15.3 2.1 30 31 4000 0

REKAP VOL
BIAYA BSPS DANA BSPS
- -
2,120,000.00 40.00
2,544,000.00 10.60
- -
2,040,000.00 30.00
750,000.00 20.00
588,000.00 2.10
3,000,000.00 4,000.00
- -
400,000.00 2.00
300,000.00 2.00
- #DIV/0!
700,000.00 2.00
400,000.00 2.00
- #DIV/0!
- #DIV/0!
- -
- -
- -
- #DIV/0!
- -
- -
- -
- -
2,000,000.00 1,600.00
- #DIV/0!
- -
- -
- -
- -
- -
- -
- -
48,000.00 3.20
60,000.00 3.00
50,000.00 10.00
- #DIV/0!
15,000,000.00
DA

Nomor BNBA
Nama Penerima Bantuan
Nomor KTP
Alamat
Desa/Kelurahan
kayu kusen daun Kecamatan
Gording usuk reng pintu jendela pintu jendela pintu KM Kabupaten/Kota
Nomor Rekening Penerim

A. Jumlah Dana yang ditr


No.
1
2
3
4
5
6
7
8
8.00 9
34.00 10
140.00 11
1.00 12
1.00 13
1.00 14
1.00 15
1.00 16
8 34 140 1 1 1 1 1

kayu kusen daun TOTAL HARGA PEMBELIAN


Gording usuk reng pintu jendela pintu jendela pintu KM Terbilang : Enam Juta Dua Ra

- - - - - - - - Disanggupi oleh :
- - - - - - - - Nama Toko/Penyedia Baha
- - - - - - - - Alamat Toko/Penyedia Bah
- - - - - - - - Nomor Rekening Bank Tok
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - - B. Jumlah dana yang dita
- - - - - - - - No
- - - - - - - 1
- - - - - - - TOTAL TARIK TUNAI (B)
- - - 2.00 - - - - Terbilang : Tujuh Juta Lima R
- - - - 2.00 - - -
- - - - - 2.00 - - C. Total dana yang ditarik (
- - - - - - 2.00 - Dana Yang Ditarik (Rp.)
- - - - - - - - Terbilang : Tujuh Juta Lima R
0 0 0 2 2 2 2 0

disahkan oleh:
Tim Teknis Kabupaten Ma

( .....................................
NIP.................................

*) coret yang tidak perlu

DA

Nomor BNBA
Nama Penerima Bantuan
Nomor KTP
Alamat
Desa/Kelurahan
Kecamatan
Kabupaten/Kota
Nomor Rekening Penerim

A. Jumlah Dana yang ditr


No.
1
2
3
4
5
6
7
8
9
10
11
12
13
14

TOTAL HARGA PEMBELIAN


Terbilang : Enam Juta Dua Ra

Disanggupi oleh :
Nama Toko/Penyedia Baha
Alamat Toko/Penyedia Bah
Nomor Rekening Bank Tok

B. Jumlah dana yang dita


No
1
TOTAL TARIK TUNAI (B)
Terbilang : Tujuh Juta Lima R

C. Total dana yang ditarik (


Dana Yang Ditarik (Rp.)
Terbilang : Tujuh Juta Lima R
disahkan oleh:
Tim Teknis Kabupaten Ma

( .....................................
NIP.................................

*) coret yang tidak perlu


DAFTAR RENCANA PEMANFAATAN BANTUAN (DRPB) TAHAP 1

Nomor BNBA : 0
Nama Penerima Bantuan : MUH SHOLEH
Nomor KTP : 0
Alamat : 0
Desa/Kelurahan : 0
Kecamatan : 0
Kabupaten/Kota : 0
Nomor Rekening Penerima Bantuan :

A. Jumlah Dana yang ditransfer ke Toko/Penyedia Bahan Bangunan (Tahap I/II *)


Jumlah Harga per Unit
Jenis Bahan Bangunan
(unit) (Rp)
Batu belah 5.00 m3 215,000
Semen 57.00 zak 53,000
Pasir 15.30 m3 240,000
Batu Pecah 2.10 m3 280,000
Besi Ø 10 30.00 btg 68,000
Besi Ø 8 31.00 btg 37,500
Kusen Pintu Ukuran 0,80 x 2,00 m - Bh 200,000
Kusen Jendela - Bh 150,000
Batu Bata 4,000.00 bh 750
Gamping - zak 8,000
Paku 3.20 Kg 15,000
Bendrat - Kg 22,000
Loster - Bh 7,000
Papan Bekisting - Lbr 20,000
Genteng 1,600.00 Bh 1,250
Genteng bubungan - Bh 5,000

TOTAL HARGA PEMBELIAN


Terbilang : Enam Juta Dua Ratus Lima Puluh Ribu Rupiah

Disanggupi oleh :
Nama Toko/Penyedia Bahan Bangunan :
Alamat Toko/Penyedia Bahan Bangunan :
Nomor Rekening Bank Toko/ Penyedi BB :

Toko/Penyedia Bahan Bangunan


(..................................................)

B. Jumlah dana yang ditarik tunai untuk upah kerja (Tahap I / II *)


Uraian Jumlah harga (Rp)
Upah Kerja PKRS 1,250,000
TOTAL TARIK TUNAI (B) 1,250,000
Terbilang : Tujuh Juta Lima Ratus Ribu Rupiah

C. Total dana yang ditarik ( A + B )


Dana Yang Ditarik (Rp.)
Terbilang : Tujuh Juta Lima Ratus Ribu Rupiah

........................................ .....2019
Diajukan Oleh :
Penerima Bantuan

MUH SHOLEH

disahkan oleh: Diverifikasi oleh: Difasilitasi Oleh :


Tim Teknis Kabupaten Magelang Koordinator Fasilitator Tenaga Fasilitator Lapangan

( ...............................................) ( ....................................) (.........................................)


NIP..........................................

*) coret yang tidak perlu

DAFTAR RENCANA PEMANFAATAN BANTUAN (DRPB) TAHAP 2

Nomor BNBA : 0
Nama Penerima Bantuan : MUH SHOLEH
Nomor KTP : 0
Alamat : 0
Desa/Kelurahan : 0
Kecamatan : 0
Kabupaten/Kota : 0
Nomor Rekening Penerima Bantuan : 0

A. Jumlah Dana yang ditransfer ke Toko/Penyedia Bahan Bangunan (Tahap I/II *)


Jumlah Harga per Unit
Jenis Bahan Bangunan
(unit) (Rp)
Batu belah 0 m3 215,000
Semen 41.00 zak 53,000
Pasir 6 m3 240,000
Batu Pecah 0 m3 280,000
Besi Ø 10 25 btg 68,000
Besi Ø 8 0 btg 37,500
Kusen Pintu Ukuran 0,80 x 2,00 m 0 Bh 200,000
Kusen Jendela 0 Bh 150,000
Batu Bata 700 bh 750
Gamping 0 zak 8,000
Paku 0.0 Kg 15,000
Bendrat 0 Kg 22,000
Loster 0 Bh 7,000
Kayu usuk 10 Btg 19,000

TOTAL HARGA PEMBELIAN


Terbilang : Enam Juta Dua Ratus Lima Puluh Ribu Rupiah

Disanggupi oleh :
Nama Toko/Penyedia Bahan Bangunan : 0
Alamat Toko/Penyedia Bahan Bangunan : 0
Nomor Rekening Bank Toko/ Penyedi BB : 0

Toko/Penyedia Bahan Bangunan

(..................................................)

B. Jumlah dana yang ditarik tunai untuk upah kerja (Tahap I / II *)


Uraian Jumlah harga (Rp)
Upah Kerja PKRS/PBRS *) 1,250,000
TOTAL TARIK TUNAI (B) 1,250,000
Terbilang : Tujuh Juta Lima Ratus Ribu Rupiah

C. Total dana yang ditarik ( A + B )


Dana Yang Ditarik (Rp.)
Terbilang : Tujuh Juta Lima Ratus Ribu Rupiah

........................................ .....2019
Diajukan Oleh :
Penerima Bantuan

MUH SHOLEH
disahkan oleh: Diverifikasi oleh: Difasilitasi Oleh :
Tim Teknis Kabupaten Magelang Koordinator Fasilitator Tenaga Fasilitator Lapangan

( ...............................................) ( ....................................) (.........................................)


NIP..........................................

*) coret yang tidak perlu


Format IV - 2

HAP 1

Jumlah Harga
(Rp)
1,075,000
3,021,000
3,672,000
588,000
2,040,000
1,162,500
-
-
3,000,000
-
48,000
-
-
-
2,000,000
-

16,606,500 15,000,000
(1,606,500)

edia Bahan Bangunan


.................................)

Jumlah harga (Rp)


1,250,000
1,250,000

17,856,500

........................... .....2019
Diajukan Oleh :
Penerima Bantuan

MUH SHOLEH

Difasilitasi Oleh :
enaga Fasilitator Lapangan

.......................................)

Format IV - 2

HAP 2
Jumlah Harga
(Rp)
-
2,173,000
1,440,000
-
1,700,000
-
-
-
525,000
-
129,000
-
-
190,000

6,157,000

edia Bahan Bangunan

.................................)

Jumlah harga (Rp)


1,250,000
1,250,000

7,407,000

..................................... .....2019
Diajukan Oleh :
Penerima Bantuan

MUH SHOLEH
Difasilitasi Oleh :
enaga Fasilitator Lapangan

.......................................)
RENCANA ANGGARAN BIAYA (RAB) BSPS

Nomor BNBA :
Nomor KTP :
Nama Penerima Bantuan : MUH SHOLEH
Alamat :
Desa/Kelurahan :
Kecamatan :
Kabupaten/Kota :
Jenis Kegiatan :

SUMBER DANA
HARGA TOTAL HARGA SWADAYA
NO URAIAN PEKERJAAN VOLUME SATUAN (Rp) (Rp) BSPS
Dana Tunai

I Pekerjaan Persiapan
Bongkar Rumah Lama 1.00 ls - - - -
II Pekerjaan Pondasi

1 Galian Tanah Pondasi 6.30 M³ - - - -


2 Urugan Pasir 2.00 M³ 240,000 480,000 - 480,000

3 Pasangan Pondasi 4.10 M³ - -

-Semen @ 50 kg 7.00 Zak 53,000 371,000 - 371,000


-Pasir pasang 2.40 M³ 240,000 576,000 - 576,000
-Batu Kali 5.00 M³ 215,000 1,075,000 - 1,075,000
4 Urugan kembali 2.21 M³ - - - -
III Pekerjaan Sloof
1 Pekerjaan bekisting M² - - - -
2 Cor Beton Sloof, Ukuran 20 x 15 cm - - -
-Besi beton Φ 10 mm SNI 10.00 Btg 68,000 680,000 680,000 -
-Besi beton Φ 8 mm SNI 10.00 Btg 37,500 375,000 375,000 -
-Semen @ 50 kg 4.00 Zak 53,000 212,000 212,000 -
-Pasir pasang 0.50 M³ 240,000 120,000 120,000 -
-Batu Pecah 0.70 M³ 280,000 196,000 196,000 -
IV Pekerjaan Kolom
1 Pekerjaan bekisting M² 20,000 - - -
2 Cor Beton Kolom, Ukuran 15 x 15 cm min. T=3m 10.00 Bh

-Besi beton Φ 10 mm SNI 10.00 Btg 68,000 680,000 680,000 -


-Besi beton Φ 8 mm SNI 10.00 Btg 37,500 375,000 375,000 -
-Pasir pasang 0.40 M³ 240,000 96,000 96,000 -
-Semen @ 50 kg 3.00 Zak 53,000 159,000 159,000 -
-Batu pecah 0.60 M³ 280,000 168,000 168,000 -
V Dinding Permanen
1 Tembok 84.00 M²

-Pasir Pasang 6.10 M³ 240,000 1,464,000 1,464,000 -


-Semen @ 50 kg 19.00 Zak 53,000 1,007,000 1,007,000 -
-Batu Bata - Bh 750 - - -
-Batako 1,050.00 Bh 3,500 3,675,000 3,675,000 -
2 Pekerjaan Plester
-Pasir Pasang 4.40 M³ 240,000 1,056,000 1,056,000 -
-Semen @ 50 kg 17.00 Zak 53,000 901,000 265,000 636,000
3 Papan
-Papan, Ukuran……… - Lbr - - - -
-Kayu, Ukuran………. - Btg - - - -
VI Pekerjaan Pintu dan Jendela
-Kusen Pintu, Ukuran 0,80 X 2,00 M - Unit 200,000 - - -
-Kusen Jendela - Unit 150,000 - - -
-Kusen Ventilasi, Ukuran…… - Unit - - - -
-Daun Pintu Kayu, Ukuran - Unit 350,000 - - -
-Daun Jendela Kayu, Ukuran - Unit 200,000 - - -
-Handle Pintu dan Kunci Pintu - Set - - - -
-Handle Jendela dan Kunci Jendela - Set - - - -
-Engsel Pintu - Set 35,000 - - -
-Engsel Jendela - Set 21,000 - - -
VII Ring Balok
1 Pekerjaan bekisting - M² - - - -
2 Pekerjaan Cor Beton
-Besi beton Φ 10 mm SNI 10.00 Btg 68,000 680,000 680,000
-Besi beton Φ 8 mm SNI 10.00 Btg 37,500 375,000 375,000 -
-Semen @ 50 kg 3.00 Zak 53,000 159,000 159,000 -
-Pasir pasang 0.40 M³ 240,000 96,000 96,000 -
-Batu pecah 0.50 M³ 280,000 140,000 140,000 -
VIII Pekerjaan Struktur Atap
-Kayu rangka kuda-kuda, Ukuran 6/12 x 4m 16.00 Btg 100,000 1,600,000 1,600,000 -
-Kayu gapit, Ukuran ……. - Btg - - - -
-Kayu usuk, Ukuran 4/6 x 3 m - Btg 27,000 - - -
-Usuk bambu 140.00 m 5,500 770,000 770,000 -
-Reng bambu 240.00 m 1,500 360,000 360,000 -
IX Pekerjaan Penutup Atap
1 Penutup Atap 57.60
-Seng gelombang (0,2 cm x 80 cm x 300 cm), atau - Lbr 78,000 - - -
-Genteng - Bh 1,250 - - -
-Bahan penutup atap lainnya yang diijinkan - Lbr - - - -
2 Bubungan Atap Bh

-Seng Lbr - - -
-Genteng bubungan - Bh 5,000 - - -
-Bahan penutup atap lainnya yang diijinkan Lbr - - -
3 Listplang papan, Ukuran……. M³ - - -
X Pekerjaan Lantai
1 Lantai Rabat Campuran minimal 1:5, T= 5 cm 2.40 M3

-Semen @ 50 kg 1.00 Zak 53,000 53,000 53,000 -


-Pasir pasang 0.10 M³ 240,000 24,000 24,000 -
-Batu pecah 0.20 M³ 280,000 56,000 56,000 -
2 Lantai Papan M²

-Papan, Ukuran……….. - Lbr - - - -


-Kayu, Ukuran……….. - Btg - - - -
XI MCK
-Septic Tank - Unit - - - -
-Closet Jongkok - Unit 155,000 - - -
-Pipa Air Bersih, Ukuran…… - Btg 27,500 - - -
-Pipa Air Kotor, Ukuran…… - Btg 85,000 - - -
-Kran - Bh 25,000 - - -
-Pintu Kamar Mandi - Set 210,000 - - -
XII Lain-lain/ Instalasi Listrik
Gamping - Zak 8,000 - - -
Paku 3.27 Kg 15,000 49,000 49,000 -
Bendrat 3.00 Kg 20,000 60,000 60,000 -
Loster 10.00 Bh 5,000 50,000 50,000 -
Papan Bekisting - Lbr - - - -
XIII Upah Kerja
Tukang 60.00 Oh 70,000 4,200,000 2,500,000 1,700,000
Pembantu Tukang 60.00 Oh 60,000 3,600,000 3,600,000

JUMLAH 25,938,000 17,500,000 8,438,000

........................................ .....20
Difasilitasi, Ketua KPB Diajukan Oleh,
Tenaga Fasilitator Lapangan Penerima Bantuan

(.........................................) ( ....................................) ( ....................................)

Disahkan oleh, Diverifikasi Oleh,


Tim Teknis Kabupaten Magelang Koordinator Fasilitator

( ...............................................) ( ....................................)
NIP..........................................
FORMAT III-17

PANJANG LEBAR KELL VOL M2


SUMBER DANA dimensi 6 8 28 48 genteng
SWADAYA pekerjaan
Memakai Bahan
Bangunan Lama atap kuda-kuda
penutup atap 57.6 1,440.00
SWADAYA pondasi Galian Tanah 6.3
Urugan Pasir 2.16
SWADAYA Pas. Batu belah 4.095
12 beton sloof 0.84
17 10 kolom 0.675
12 balk 15x15 0.63
17 dinding bata
58 batako 84
SWADAYA Plesteran dinding 168
lantai 5cm 2.4
SWADAYA kayu gording 4 m 40
usuk 3 m 28
reng 3 m 120
kusen pintu 80*200 cm 1
jendela 1
daun pintu 80*200 cm 1
jendela 1
pintu kmr 1
SWADAYA JUMLAH 1440

dimensi 6 8 28 48 genteng
pekerjaan
atap kuda-kuda 0 -
penutup atap 57.6 -
pondasi Galian Tanah 6.3 -
Urugan Pasir 2.16 -
Pas. Batu belah 4.095 -
beton sloof 0.84 -
10 kolom 0.675 -
balk 15x15 0.63 -
dinding bata 0 -
batako 84 -
Plesteran dinding 168 -
lantai 5cm 2.4 -
kayu gording 4 m 40 -
usuk 3 m 28 -
reng 3 m 120 -
kusen pintu 80*200 cm 1 -
jendela 1 -
daun pintu 80*200 cm 1 -
jendela 1 -
pintu kmr 1 -
JUMLAH 0

SWADAYA
HARGA
MATERIAL VOL SATUAN
SATUAN
Urugan Pasir 240,000 2.00 M³
-Semen @ 50 kg 53,000 54.00 Zak
-Pasir pasang 240,000 14.30 M³
-Batu Kali 215,000 5.00 M³
-Besi beton Φ 10 mm SNI 68,000 30.00 Btg
-Besi beton Φ 8 mm SNI 37,500 30.00 Btg
-Batu pecah 280,000 2.00 M³
-Batu Bata 750 - Bh
-Batako 3,500 1,050.00 Bh
-Kusen Pintu, Ukuran 0,80 X 2,00 M 200,000 - Unit
-Kusen Jendela 150,000 - Unit
-Kusen Ventilasi, Ukuran…… - - Unit
-Daun Pintu Kayu, Ukuran 350,000 - Unit
-Daun Jendela Kayu, Ukuran 200,000 - Unit
-Handle Pintu dan Kunci Pintu - - Set
-Handle Jendela dan Kunci Jendela - - Set
-Engsel Pintu 35,000 - Set
-Engsel Jendela 21,000 - Set
-Kayu rangka kuda-kuda, Ukuran 6/12 x 4m 100,000 16.00 Btg
-Kayu gapit, Ukuran ……. - - Btg
-Kayu usuk, Ukuran 4/6 x 3 m 27,000 - Btg
-Usuk bambu 4m 5,500 140.00 m
-Reng bambu 4m 1,500 240.00 m
-Seng gelombang (0,2 cm x 80 cm x 300 cm 78,000 - Lbr
-Genteng 1,250 - Bh
-Seng - - Lbr
-Genteng bubungan 5,000 - Bh
-Closet Jongkok 155,000 - Unit
-Pipa Air Bersih, Ukuran…… 27,500 - Btg
-Pipa Air Kotor, Ukuran…… 85,000 - Btg
-Kran 25,000 - Bh
-Pintu Kamar Mandi 210,000 - Set
Gamping 8,000 - Zak
Paku 15,000 3.27 Kg
Bendrat 20,000 3.00 Kg
Loster 5,000 10.00 Bh
Papan Bekisting - - Lbr

15,000,000

- 0
0
........................................ .....2019 0
Diajukan Oleh,
Penerima Bantuan

( ....................................)

Diverifikasi Oleh,
Koordinator Fasilitator

18,138,000 15,000,000
15,000,000
( ....................................)

-
4
20.25 1.0888888889 4.549 0.45
24.25 0.0108888889

batu semen pasir spit bes 10 besi 8 bata batako

2.00
5.00 7.00 2.40
4.00 0.50 0.70 10.00 10.00
3.00 0.40 0.60 10.00 10.00
3.00 0.40 0.50 10.00 10.00
- - -
19.00 6.10 1,050.00
17.00 4.40
1.00 0.10 0.20

5 54 16.3 2 30 30 0 1050

batu semen pasir spit bes 10 besi 8 bata batako

- - - - - - - -
- - - - - - - -
- - - - - - - -
- 2.00 - - - - -
5.00 7.00 2.40 - - - - -
- 4.00 0.50 0.70 10.00 10.00 - -
- 3.00 0.40 0.60 10.00 10.00 - -
- 3.00 0.40 0.50 10.00 10.00 - -
- - - - - - - -
- 19.00 6.10 - - - - 1,050.00
- 17.00 4.40 - - - - -
- 1.00 0.10 0.20 - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
5 54 16.3 2 30 30 0 1050

REKAP VOL
BIAYA BSPS DANA BSPS
- -
1,855,000.00 35.00
2,856,000.00 11.90
- -
2,040,000.00 30.00
1,125,000.00 30.00
560,000.00 2.00
- -
3,675,000.00 1,050.00
- -
- -
- #DIV/0!
- -
- -
- #DIV/0!
- #DIV/0!
- -
- -
1,600,000.00 16.00
- #DIV/0!
- -
770,000.00 140.00
360,000.00 240.00
- -
- -
- #DIV/0!
- -
- -
- -
- -
- -
- -
- -
49,000.00 3.27
60,000.00 3.00
50,000.00 10.00
- #DIV/0!
15,000,000.00
DA

Nomor BNBA
Nama Penerima Bantuan
Nomor KTP
Alamat
Desa/Kelurahan
kayu kusen daun Kecamatan
Gording usuk reng pintu jendela pintu jendela pintu KM Kabupaten/Kota
Nomor Rekening Penerim

A. Jumlah Dana yang ditr


No.
1
2
3
4
5
6
7
8
10.00 9
32.00 10
124.00 11
1.00 12
1.00 13
1.00 14
1.00 15
1.00 16
10 32 124 1 1 1 1 1

kayu kusen daun TOTAL HARGA PEMBELIAN


Gording usuk reng pintu jendela pintu jendela pintu KM Terbilang : Enam Juta Dua Ra

- - - - - - - - Disanggupi oleh :
- - - - - - - - Nama Toko/Penyedia Baha
- - - - - - - - Alamat Toko/Penyedia Bah
- - - - - - - - Nomor Rekening Bank Tok
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - - B. Jumlah dana yang dita
16.00 - - - - - - - No
- 140.00 - - - - - - 1
- - 240.00 - - - - - TOTAL TARIK TUNAI (B)
- - - - - - - - Terbilang : Tujuh Juta Lima R
- - - - - - - -
- - - - - - - - C. Total dana yang ditarik (
- - - - - - - - Dana Yang Ditarik (Rp.)
- - - - - - - Terbilang : Tujuh Juta Lima R
16 140 240 0 0 0 0 0

disahkan oleh:
Tim Teknis Kabupaten Ma

( .....................................
NIP.................................

*) coret yang tidak perlu

DA

Nomor BNBA
Nama Penerima Bantuan
Nomor KTP
Alamat
Desa/Kelurahan
Kecamatan
Kabupaten/Kota
Nomor Rekening Penerim

A. Jumlah Dana yang ditr


No.
1
2
3
4
5
6
7
8
9
10
11
12
13
14

TOTAL HARGA PEMBELIAN


Terbilang : Enam Juta Dua Ra

Disanggupi oleh :
Nama Toko/Penyedia Baha
Alamat Toko/Penyedia Bah
Nomor Rekening Bank Tok

B. Jumlah dana yang dita


No
1
TOTAL TARIK TUNAI (B)
Terbilang : Tujuh Juta Lima R

C. Total dana yang ditarik (


Dana Yang Ditarik (Rp.)
Terbilang : Tujuh Juta Lima R
disahkan oleh:
Tim Teknis Kabupaten Ma

( .....................................
NIP.................................

*) coret yang tidak perlu


DAFTAR RENCANA PEMANFAATAN BANTUAN (DRPB) TAHAP 1

Nomor BNBA : 0
Nama Penerima Bantuan : MUH SHOLEH
Nomor KTP : 0
Alamat : 0
Desa/Kelurahan : 0
Kecamatan : 0
Kabupaten/Kota : 0
Nomor Rekening Penerima Bantuan :

A. Jumlah Dana yang ditransfer ke Toko/Penyedia Bahan Bangunan (Tahap I/II *)


Jumlah Harga per Unit
Jenis Bahan Bangunan
(unit) (Rp)
Batu belah 5.00 m3 215,000
Semen 54.00 zak 53,000
Pasir 16.30 m3 240,000
Batu Pecah 2.00 m3 280,000
Besi Ø 10 30.00 btg 68,000
Besi Ø 8 30.00 btg 37,500
Kusen Pintu Ukuran 0,80 x 2,00 m - Bh 200,000
Kusen Jendela - Bh 150,000
Batu Bata - bh 750
Gamping - zak 8,000
Paku 3.27 Kg 15,000
Bendrat - Kg 22,000
Loster - Bh 7,000
Papan Bekisting - Lbr 20,000
Genteng - Bh 1,250
Genteng bubungan - Bh 5,000

TOTAL HARGA PEMBELIAN


Terbilang : Enam Juta Dua Ratus Lima Puluh Ribu Rupiah

Disanggupi oleh :
Nama Toko/Penyedia Bahan Bangunan :
Alamat Toko/Penyedia Bahan Bangunan :
Nomor Rekening Bank Toko/ Penyedi BB :

Toko/Penyedia Bahan Bangunan


(..................................................)

B. Jumlah dana yang ditarik tunai untuk upah kerja (Tahap I / II *)


Uraian Jumlah harga (Rp)
Upah Kerja PKRS 1,250,000
TOTAL TARIK TUNAI (B) 1,250,000
Terbilang : Tujuh Juta Lima Ratus Ribu Rupiah

C. Total dana yang ditarik ( A + B )


Dana Yang Ditarik (Rp.)
Terbilang : Tujuh Juta Lima Ratus Ribu Rupiah

........................................ .....2019
Diajukan Oleh :
Penerima Bantuan

MUH SHOLEH

disahkan oleh: Diverifikasi oleh: Difasilitasi Oleh :


Tim Teknis Kabupaten Magelang Koordinator Fasilitator Tenaga Fasilitator Lapangan

( ...............................................) ( ....................................) (.........................................)


NIP..........................................

*) coret yang tidak perlu

DAFTAR RENCANA PEMANFAATAN BANTUAN (DRPB) TAHAP 2

Nomor BNBA : 0
Nama Penerima Bantuan : MUH SHOLEH
Nomor KTP : 0
Alamat : 0
Desa/Kelurahan : 0
Kecamatan : 0
Kabupaten/Kota : 0
Nomor Rekening Penerima Bantuan : 0

A. Jumlah Dana yang ditransfer ke Toko/Penyedia Bahan Bangunan (Tahap I/II *)


Jumlah Harga per Unit
Jenis Bahan Bangunan
(unit) (Rp)
Batu belah 0 m3 215,000
Semen 38.00 zak 53,000
Pasir 6 m3 240,000
Batu Pecah 0 m3 280,000
Besi Ø 10 25 btg 68,000
Besi Ø 8 0 btg 37,500
Kusen Pintu Ukuran 0,80 x 2,00 m 0 Bh 200,000
Kusen Jendela 0 Bh 150,000
Batu Bata 700 bh 750
Gamping 0 zak 8,000
Paku 0.0 Kg 15,000
Bendrat 0 Kg 22,000
Loster 0 Bh 7,000
Kayu usuk 10 Btg 19,000

TOTAL HARGA PEMBELIAN


Terbilang : Enam Juta Dua Ratus Lima Puluh Ribu Rupiah

Disanggupi oleh :
Nama Toko/Penyedia Bahan Bangunan : 0
Alamat Toko/Penyedia Bahan Bangunan : 0
Nomor Rekening Bank Toko/ Penyedi BB : 0

Toko/Penyedia Bahan Bangunan

(..................................................)

B. Jumlah dana yang ditarik tunai untuk upah kerja (Tahap I / II *)


Uraian Jumlah harga (Rp)
Upah Kerja PKRS/PBRS *) 1,250,000
TOTAL TARIK TUNAI (B) 1,250,000
Terbilang : Tujuh Juta Lima Ratus Ribu Rupiah

C. Total dana yang ditarik ( A + B )


Dana Yang Ditarik (Rp.)
Terbilang : Tujuh Juta Lima Ratus Ribu Rupiah

........................................ .....2019
Diajukan Oleh :
Penerima Bantuan

MUH SHOLEH
disahkan oleh: Diverifikasi oleh: Difasilitasi Oleh :
Tim Teknis Kabupaten Magelang Koordinator Fasilitator Tenaga Fasilitator Lapangan

( ...............................................) ( ....................................) (.........................................)


NIP..........................................

*) coret yang tidak perlu


Format IV - 2

HAP 1

Jumlah Harga
(Rp)
1,075,000
2,862,000
3,912,000
560,000
2,040,000
1,125,000
-
-
-
-
49,000
-
-
-
-
-

11,623,000 15,000,000
3,377,000

edia Bahan Bangunan


.................................)

Jumlah harga (Rp)


1,250,000
1,250,000

12,873,000

........................... .....2019
Diajukan Oleh :
Penerima Bantuan

MUH SHOLEH

Difasilitasi Oleh :
enaga Fasilitator Lapangan

.......................................)

Format IV - 2

HAP 2
Jumlah Harga
(Rp)
-
2,014,000
1,440,000
-
1,700,000
-
-
-
525,000
-
129,000
-
-
190,000

5,998,000

edia Bahan Bangunan

.................................)

Jumlah harga (Rp)


1,250,000
1,250,000

7,248,000

..................................... .....2019
Diajukan Oleh :
Penerima Bantuan

MUH SHOLEH
Difasilitasi Oleh :
enaga Fasilitator Lapangan

.......................................)
RENCANA ANGGARAN BIAYA (RAB) BSPS

Nomor BNBA :
Nomor KTP :
Nama Penerima Bantuan : MUH SHOLEH
Alamat :
Desa/Kelurahan :
Kecamatan :
Kabupaten/Kota :
Jenis Kegiatan :

SUMBER DANA
HARGA TOTAL HARGA SWADAYA
NO URAIAN PEKERJAAN VOLUME SATUAN (Rp) (Rp) BSPS
Dana Tunai

I Pekerjaan Persiapan
Bongkar Rumah Lama 1.00 ls - - - -
II Pekerjaan Pondasi

1 Galian Tanah Pondasi 7.20 M³ - - - -


2 Urugan Pasir 3.00 M³ 240,000 720,000 - 720,000

3 Pasangan Pondasi 4.68 M³ - -

-Semen @ 50 kg 8.00 Zak 53,000 424,000 - 424,000


-Pasir pasang 2.80 M³ 240,000 672,000 - 672,000
-Batu Kali 6.00 M³ 215,000 1,290,000 - 1,290,000
4 Urugan kembali 2.52 M³ - - - -
III Pekerjaan Sloof
1 Pekerjaan bekisting M² - - - -
2 Cor Beton Sloof, Ukuran 20 x 15 cm - - -
-Besi beton Φ 10 mm SNI 11.00 Btg 68,000 748,000 748,000 -
-Besi beton Φ 8 mm SNI 10.00 Btg 37,500 375,000 375,000 -
-Semen @ 50 kg 5.00 Zak 53,000 265,000 265,000 -
-Pasir pasang 0.60 M³ 240,000 144,000 144,000 -
-Batu Pecah 0.80 M³ 280,000 224,000 224,000 -
IV Pekerjaan Kolom
1 Pekerjaan bekisting M² 20,000 - - -
2 Cor Beton Kolom, Ukuran 15 x 15 cm min. T=3m 10.00 Bh

-Besi beton Φ 10 mm SNI 10.00 Btg 68,000 680,000 680,000 -


-Besi beton Φ 8 mm SNI 10.00 Btg 37,500 375,000 375,000 -
-Pasir pasang 0.40 M³ 240,000 96,000 96,000 -
-Semen @ 50 kg 3.00 Zak 53,000 159,000 159,000 -
-Batu pecah 0.60 M³ 280,000 168,000 168,000 -
V Dinding Permanen
1 Tembok 96.00 M²

-Pasir Pasang 7.00 M³ 240,000 1,680,000 1,680,000 -


-Semen @ 50 kg 22.00 Zak 53,000 1,166,000 1,166,000 -
-Batu Bata - Bh 750 - - -
-Batako 1,300.00 Bh 3,500 4,550,000 4,550,000 -
2 Pekerjaan Plester
-Pasir Pasang 5.00 M³ 240,000 1,200,000 1,200,000 -
-Semen @ 50 kg 19.00 Zak 53,000 1,007,000 1,007,000 -
3 Papan
-Papan, Ukuran……… - Lbr - - - -
-Kayu, Ukuran………. - Btg - - - -
VI Pekerjaan Pintu dan Jendela
-Kusen Pintu, Ukuran 0,80 X 2,00 M - Unit 200,000 - - -
-Kusen Jendela - Unit 150,000 - - -
-Kusen Ventilasi, Ukuran…… - Unit - - - -
-Daun Pintu Kayu, Ukuran - Unit 350,000 - - -
-Daun Jendela Kayu, Ukuran - Unit 200,000 - - -
-Handle Pintu dan Kunci Pintu - Set - - - -
-Handle Jendela dan Kunci Jendela - Set - - - -
-Engsel Pintu - Set 35,000 - - -
-Engsel Jendela - Set 21,000 - - -
VII Ring Balok
1 Pekerjaan bekisting - M² - - - -
2 Pekerjaan Cor Beton
-Besi beton Φ 10 mm SNI 11.00 Btg 68,000 748,000 748,000
-Besi beton Φ 8 mm SNI 11.00 Btg 37,500 412,500 412,500 -
-Semen @ 50 kg 3.00 Zak 53,000 159,000 159,000 -
-Pasir pasang 0.50 M³ 240,000 120,000 120,000 -
-Batu pecah 0.60 M³ 280,000 168,000 168,000 -
VIII Pekerjaan Struktur Atap
-Kayu rangka kuda-kuda, Ukuran 6/12 x 4m - Btg 100,000 - - -
-Kayu gapit, Ukuran ……. - Btg - - - -
-Kayu usuk, Ukuran 4/6 x 3 m - Btg 27,000 - - -
-Usuk bambu - m 5,500 - - -
-Reng bambu - m 1,500 - - -
IX Pekerjaan Penutup Atap
1 Penutup Atap 76.80
-Seng gelombang (0,2 cm x 80 cm x 300 cm), atau - Lbr 78,000 - - -
-Genteng - Bh 1,250 - - -
-Bahan penutup atap lainnya yang diijinkan - Lbr - - - -
2 Bubungan Atap Bh

-Seng Lbr - - -
-Genteng bubungan - Bh 5,000 - - -
-Bahan penutup atap lainnya yang diijinkan Lbr - - -
3 Listplang papan, Ukuran……. M³ - - -
X Pekerjaan Lantai
1 Lantai Rabat Campuran minimal 1:5, T= 5 cm 3.20 M3

-Semen @ 50 kg 1.00 Zak 53,000 53,000 53,000 -


-Pasir pasang 0.10 M³ 240,000 24,000 24,000 -
-Batu pecah 0.20 M³ 280,000 56,000 56,000 -
2 Lantai Papan M²

-Papan, Ukuran……….. - Lbr - - - -


-Kayu, Ukuran……….. - Btg - - - -
XI MCK
-Septic Tank - Unit - - - -
-Closet Jongkok - Unit 155,000 - - -
-Pipa Air Bersih, Ukuran…… - Btg 27,500 - - -
-Pipa Air Kotor, Ukuran…… - Btg 85,000 - - -
-Kran - Bh 25,000 - - -
-Pintu Kamar Mandi - Set 210,000 - - -
XII Lain-lain/ Instalasi Listrik
Gamping - Zak 8,000 - - -
Paku 3.27 Kg 15,000 49,000 49,000 -
Bendrat 3.00 Kg 20,000 60,000 60,000 -
Loster 10.00 Bh 5,000 50,000 50,000 -
Papan Bekisting - Lbr - - - -
XIII Upah Kerja
Tukang 60.00 Oh 70,000 4,200,000 2,500,000 1,700,000
Pembantu Tukang 60.00 Oh 60,000 3,600,000 3,600,000

JUMLAH 25,642,500 17,236,500 8,406,000

........................................ .....20
Difasilitasi, Ketua KPB Diajukan Oleh,
Tenaga Fasilitator Lapangan Penerima Bantuan

(.........................................) ( ....................................) ( ....................................)

Disahkan oleh, Diverifikasi Oleh,


Tim Teknis Kabupaten Magelang Koordinator Fasilitator

( ...............................................) ( ....................................)
NIP..........................................
FORMAT III-17

PANJANG LEBAR KELL VOL M2


SUMBER DANA dimensi 8 8 32 64 genteng
SWADAYA pekerjaan
Memakai Bahan
Bangunan Lama atap kuda-kuda
penutup atap 76.8 1,920.00
SWADAYA pondasi Galian Tanah 7.2
Urugan Pasir 2.88
SWADAYA Pas. Batu belah 4.68
12 beton sloof 0.96
17 10 kolom 0.675
12 balk 15x15 0.72
17 dinding bata
58 batako 96
SWADAYA Plesteran dinding 192
lantai 5cm 3.2
SWADAYA kayu gording 4 m 40
usuk 3 m 32
reng 3 m 160
kusen pintu 80*200 cm 1
jendela 1
daun pintu 80*200 cm 1
jendela 1
pintu kmr 1
SWADAYA JUMLAH 1920

dimensi 8 8 32 64 genteng
pekerjaan
atap kuda-kuda 0 -
penutup atap 76.8 -
pondasi Galian Tanah 7.2 -
Urugan Pasir 2.88 -
Pas. Batu belah 4.68 -
beton sloof 0.96 -
10 kolom 0.675 -
balk 15x15 0.72 -
dinding bata 0 -
batako 96 -
Plesteran dinding 192 -
lantai 5cm 3.2 -
kayu gording 4 m 40 -
usuk 3 m 32 -
reng 3 m 160 -
kusen pintu 80*200 cm 1 -
jendela 1 -
daun pintu 80*200 cm 1 -
jendela 1 -
pintu kmr 1 -
JUMLAH 0

SWADAYA
HARGA
MATERIAL VOL SATUAN
SATUAN
Urugan Pasir 240,000 3.00 M³
-Semen @ 50 kg 53,000 61.00 Zak
-Pasir pasang 240,000 16.40 M³
-Batu Kali 215,000 6.00 M³
-Besi beton Φ 10 mm SNI 68,000 32.00 Btg
-Besi beton Φ 8 mm SNI 37,500 31.00 Btg
-Batu pecah 280,000 2.20 M³
-Batu Bata 750 - Bh
-Batako 3,500 1,300.00 Bh
-Kusen Pintu, Ukuran 0,80 X 2,00 M 200,000 - Unit
-Kusen Jendela 150,000 - Unit
-Kusen Ventilasi, Ukuran…… - - Unit
-Daun Pintu Kayu, Ukuran 350,000 - Unit
-Daun Jendela Kayu, Ukuran 200,000 - Unit
-Handle Pintu dan Kunci Pintu - - Set
-Handle Jendela dan Kunci Jendela - - Set
-Engsel Pintu 35,000 - Set
-Engsel Jendela 21,000 - Set
-Kayu rangka kuda-kuda, Ukuran 6/12 x 4m 100,000 - Btg
-Kayu gapit, Ukuran ……. - - Btg
-Kayu usuk, Ukuran 4/6 x 3 m 27,000 - Btg
-Usuk bambu 4m 5,500 - m
-Reng bambu 4m 1,500 - m
-Seng gelombang (0,2 cm x 80 cm x 300 cm 78,000 - Lbr
-Genteng 1,250 - Bh
-Seng - - Lbr
-Genteng bubungan 5,000 - Bh
-Closet Jongkok 155,000 - Unit
-Pipa Air Bersih, Ukuran…… 27,500 - Btg
-Pipa Air Kotor, Ukuran…… 85,000 - Btg
-Kran 25,000 - Bh
-Pintu Kamar Mandi 210,000 - Set
Gamping 8,000 - Zak
Paku 15,000 3.27 Kg
Bendrat 20,000 3.00 Kg
Loster 5,000 10.00 Bh
Papan Bekisting - - Lbr

14,736,500

263,500 351.3333333333
17.5666666667
........................................ .....2019 13.175
Diajukan Oleh,
Penerima Bantuan

( ....................................)

Diverifikasi Oleh,
Koordinator Fasilitator

17,842,500 14,736,500
14,736,500
( ....................................)

263,500
4
20.25 1.0888888889 4.549 0.45
24.25 0.0108888889

batu semen pasir spit bes 10 besi 8 bata batako

3.00
6.00 8.00 2.80
5.00 0.60 0.80 11.00 12.00
3.00 0.40 0.60 10.00 10.00
3.00 0.50 0.60 11.00 11.00
- - -
22.00 7.00 1,200.00
19.00 5.00
1.00 0.10 0.20

6 61 19.4 2.2 32 33 0 1200

batu semen pasir spit bes 10 besi 8 bata batako

- - - - - - - -
- - - - - - - -
- - - - - - - -
- 3.00 - - - - -
6.00 8.00 2.80 - - - - -
- 5.00 0.60 0.80 11.00 12.00 - -
- 3.00 0.40 0.60 10.00 10.00 - -
- 3.00 0.50 0.60 11.00 11.00 - -
- - - - - - - -
- 22.00 7.00 - - - - 1,300.00
- 19.00 5.00 - - - - -
- 1.00 0.10 0.20 - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
6 61 19.4 2.2 32 33 0 1300

REKAP VOL
BIAYA BSPS DANA BSPS
- -
2,809,000.00 53.00
3,264,000.00 13.60
- -
2,176,000.00 32.00
1,162,500.00 31.00
616,000.00 2.20
- -
4,550,000.00 1,300.00
- -
- -
- #DIV/0!
- -
- -
- #DIV/0!
- #DIV/0!
- -
- -
- -
- #DIV/0!
- -
- -
- -
- -
- -
- #DIV/0!
- -
- -
- -
- -
- -
- -
- -
49,000.00 3.27
60,000.00 3.00
50,000.00 10.00
- #DIV/0!
14,736,500.00
DA

Nomor BNBA
Nama Penerima Bantuan
Nomor KTP
Alamat
Desa/Kelurahan
kayu kusen daun Kecamatan
Gording usuk reng pintu jendela pintu jendela pintu KM Kabupaten/Kota
Nomor Rekening Penerim

A. Jumlah Dana yang ditr


No.
1
2
3
4
5
6
7
8
10.00 9
36.00 10
164.00 11
1.00 12
1.00 13
1.00 14
1.00 15
1.00 16
10 36 164 1 1 1 1 1

kayu kusen daun TOTAL HARGA PEMBELIAN


Gording usuk reng pintu jendela pintu jendela pintu KM Terbilang : Enam Juta Dua Ra

- - - - - - - - Disanggupi oleh :
- - - - - - - - Nama Toko/Penyedia Baha
- - - - - - - - Alamat Toko/Penyedia Bah
- - - - - - - - Nomor Rekening Bank Tok
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - - B. Jumlah dana yang dita
- - - - - - - - No
- - - - - - - - 1
- - - - - - - - TOTAL TARIK TUNAI (B)
- - - - - - - - Terbilang : Tujuh Juta Lima R
- - - - - - - -
- - - - - - - - C. Total dana yang ditarik (
- - - - - - - - Dana Yang Ditarik (Rp.)
- - - - - - - Terbilang : Tujuh Juta Lima R
0 0 0 0 0 0 0 0

disahkan oleh:
Tim Teknis Kabupaten Ma

( .....................................
NIP.................................

*) coret yang tidak perlu

DA

Nomor BNBA
Nama Penerima Bantuan
Nomor KTP
Alamat
Desa/Kelurahan
Kecamatan
Kabupaten/Kota
Nomor Rekening Penerim

A. Jumlah Dana yang ditr


No.
1
2
3
4
5
6
7
8
9
10
11
12
13
14

TOTAL HARGA PEMBELIAN


Terbilang : Enam Juta Dua Ra

Disanggupi oleh :
Nama Toko/Penyedia Baha
Alamat Toko/Penyedia Bah
Nomor Rekening Bank Tok

B. Jumlah dana yang dita


No
1
TOTAL TARIK TUNAI (B)
Terbilang : Tujuh Juta Lima R

C. Total dana yang ditarik (


Dana Yang Ditarik (Rp.)
Terbilang : Tujuh Juta Lima R
disahkan oleh:
Tim Teknis Kabupaten Ma

( .....................................
NIP.................................

*) coret yang tidak perlu


DAFTAR RENCANA PEMANFAATAN BANTUAN (DRPB) TAHAP 1

Nomor BNBA : 0
Nama Penerima Bantuan : MUH SHOLEH
Nomor KTP : 0
Alamat : 0
Desa/Kelurahan : 0
Kecamatan : 0
Kabupaten/Kota : 0
Nomor Rekening Penerima Bantuan :

A. Jumlah Dana yang ditransfer ke Toko/Penyedia Bahan Bangunan (Tahap I/II *)


Jumlah Harga per Unit
Jenis Bahan Bangunan
(unit) (Rp)
Batu belah 6.00 m3 215,000
Semen 61.00 zak 53,000
Pasir 19.40 m3 240,000
Batu Pecah 2.20 m3 280,000
Besi Ø 10 32.00 btg 68,000
Besi Ø 8 33.00 btg 37,500
Kusen Pintu Ukuran 0,80 x 2,00 m - Bh 200,000
Kusen Jendela - Bh 150,000
Batu Bata - bh 750
Gamping - zak 8,000
Paku 3.27 Kg 15,000
Bendrat - Kg 22,000
Loster - Bh 7,000
Papan Bekisting - Lbr 20,000
Genteng - Bh 1,250
Genteng bubungan - Bh 5,000

TOTAL HARGA PEMBELIAN


Terbilang : Enam Juta Dua Ratus Lima Puluh Ribu Rupiah

Disanggupi oleh :
Nama Toko/Penyedia Bahan Bangunan :
Alamat Toko/Penyedia Bahan Bangunan :
Nomor Rekening Bank Toko/ Penyedi BB :

Toko/Penyedia Bahan Bangunan


(..................................................)

B. Jumlah dana yang ditarik tunai untuk upah kerja (Tahap I / II *)


Uraian Jumlah harga (Rp)
Upah Kerja PKRS 1,250,000
TOTAL TARIK TUNAI (B) 1,250,000
Terbilang : Tujuh Juta Lima Ratus Ribu Rupiah

C. Total dana yang ditarik ( A + B )


Dana Yang Ditarik (Rp.)
Terbilang : Tujuh Juta Lima Ratus Ribu Rupiah

........................................ .....2019
Diajukan Oleh :
Penerima Bantuan

MUH SHOLEH

disahkan oleh: Diverifikasi oleh: Difasilitasi Oleh :


Tim Teknis Kabupaten Magelang Koordinator Fasilitator Tenaga Fasilitator Lapangan

( ...............................................) ( ....................................) (.........................................)


NIP..........................................

*) coret yang tidak perlu

DAFTAR RENCANA PEMANFAATAN BANTUAN (DRPB) TAHAP 2

Nomor BNBA : 0
Nama Penerima Bantuan : MUH SHOLEH
Nomor KTP : 0
Alamat : 0
Desa/Kelurahan : 0
Kecamatan : 0
Kabupaten/Kota : 0
Nomor Rekening Penerima Bantuan : 0

A. Jumlah Dana yang ditransfer ke Toko/Penyedia Bahan Bangunan (Tahap I/II *)


Jumlah Harga per Unit
Jenis Bahan Bangunan
(unit) (Rp)
Batu belah 0 m3 215,000
Semen 45.00 zak 53,000
Pasir 6 m3 240,000
Batu Pecah 0 m3 280,000
Besi Ø 10 25 btg 68,000
Besi Ø 8 0 btg 37,500
Kusen Pintu Ukuran 0,80 x 2,00 m 0 Bh 200,000
Kusen Jendela 0 Bh 150,000
Batu Bata 700 bh 750
Gamping 0 zak 8,000
Paku 0.0 Kg 15,000
Bendrat 0 Kg 22,000
Loster 0 Bh 7,000
Kayu usuk 10 Btg 19,000

TOTAL HARGA PEMBELIAN


Terbilang : Enam Juta Dua Ratus Lima Puluh Ribu Rupiah

Disanggupi oleh :
Nama Toko/Penyedia Bahan Bangunan : 0
Alamat Toko/Penyedia Bahan Bangunan : 0
Nomor Rekening Bank Toko/ Penyedi BB : 0

Toko/Penyedia Bahan Bangunan

(..................................................)

B. Jumlah dana yang ditarik tunai untuk upah kerja (Tahap I / II *)


Uraian Jumlah harga (Rp)
Upah Kerja PKRS/PBRS *) 1,250,000
TOTAL TARIK TUNAI (B) 1,250,000
Terbilang : Tujuh Juta Lima Ratus Ribu Rupiah

C. Total dana yang ditarik ( A + B )


Dana Yang Ditarik (Rp.)
Terbilang : Tujuh Juta Lima Ratus Ribu Rupiah

........................................ .....2019
Diajukan Oleh :
Penerima Bantuan

MUH SHOLEH
disahkan oleh: Diverifikasi oleh: Difasilitasi Oleh :
Tim Teknis Kabupaten Magelang Koordinator Fasilitator Tenaga Fasilitator Lapangan

( ...............................................) ( ....................................) (.........................................)


NIP..........................................

*) coret yang tidak perlu


Format IV - 2

HAP 1

Jumlah Harga
(Rp)
1,290,000
3,233,000
4,656,000
616,000
2,176,000
1,237,500
-
-
-
-
49,000
-
-
-
-
-

13,257,500 14,736,500
1,479,000

edia Bahan Bangunan


.................................)

Jumlah harga (Rp)


1,250,000
1,250,000

14,507,500

........................... .....2019
Diajukan Oleh :
Penerima Bantuan

MUH SHOLEH

Difasilitasi Oleh :
enaga Fasilitator Lapangan

.......................................)

Format IV - 2

HAP 2
Jumlah Harga
(Rp)
-
2,385,000
1,440,000
-
1,700,000
-
-
-
525,000
-
129,000
-
-
190,000

6,369,000

edia Bahan Bangunan

.................................)

Jumlah harga (Rp)


1,250,000
1,250,000

7,619,000

..................................... .....2019
Diajukan Oleh :
Penerima Bantuan

MUH SHOLEH
Difasilitasi Oleh :
enaga Fasilitator Lapangan

.......................................)
RENCANA ANGGARAN BIAYA (RAB) BSPS

Nomor BNBA :
Nomor KTP :
Nama Penerima Bantuan : MUH SHOLEH
Alamat :
Desa/Kelurahan :
Kecamatan :
Kabupaten/Kota :
Jenis Kegiatan :

SUMBER DANA
HARGA TOTAL HARGA SWADAYA
NO URAIAN PEKERJAAN VOLUME SATUAN (Rp) (Rp) BSPS
Dana Tunai

I Pekerjaan Persiapan
Bongkar Rumah Lama 1.00 ls - - - -
II Pekerjaan Pondasi

1 Galian Tanah Pondasi 6.30 M³ - - - -


2 Urugan Pasir 1.00 M³ 240,000 240,000 - 240,000

3 Pasangan Pondasi 4.10 M³ - -

-Semen @ 50 kg 7.00 Zak 53,000 371,000 - 371,000


-Pasir pasang 2.40 M³ 240,000 576,000 - 576,000
-Batu Kali 5.00 M³ 215,000 1,075,000 - 1,075,000
4 Urugan kembali 2.21 M³ - - - -
III Pekerjaan Sloof
1 Pekerjaan bekisting M² - - - -
2 Cor Beton Sloof, Ukuran 20 x 15 cm - - -
-Besi beton Φ 10 mm SNI 10.00 Btg 68,000 680,000 680,000 -
-Besi beton Φ 8 mm SNI 8.00 Btg 37,500 300,000 300,000
-Semen @ 50 kg 4.00 Zak 53,000 212,000 212,000 -
-Pasir pasang 0.50 M³ 240,000 120,000 120,000 -
-Batu Pecah 0.70 M³ 280,000 196,000 196,000 -
IV Pekerjaan Kolom
1 Pekerjaan bekisting M² 20,000 - - -
2 Cor Beton Kolom, Ukuran 15 x 15 cm min. T=3m 8.00 Bh

-Besi beton Φ 10 mm SNI 8.00 Btg 68,000 544,000 544,000 -


-Besi beton Φ 8 mm SNI 8.00 Btg 37,500 300,000 300,000 -
-Pasir pasang 0.40 M³ 240,000 96,000 96,000 -
-Semen @ 50 kg 2.00 Zak 53,000 106,000 106,000 -
-Batu pecah 0.50 M³ 280,000 140,000 140,000 -
V Dinding Permanen
1 Tembok - M²

-Pasir Pasang 4.20 M³ 240,000 1,008,000 1,008,000 -


-Semen @ 50 kg 13.00 Zak 53,000 689,000 689,000
-Batu Bata 6,000.00 Bh 750 4,500,000 4,500,000 -
-Batako - Bh 3,500 - - -
2 Pekerjaan Plester
-Pasir Pasang 4.40 M³ 240,000 1,056,000 1,056,000 -
-Semen @ 50 kg 24.00 Zak 53,000 1,272,000 371,000 901,000
3 Papan
-Papan, Ukuran……… - Lbr - - - -
-Kayu, Ukuran………. - Btg - - - -
VI Pekerjaan Pintu dan Jendela
-Kusen Pintu, Ukuran 0,80 X 2,00 M 1.00 Unit 200,000 200,000 200,000 -
-Kusen Jendela 2.00 Unit 150,000 300,000 300,000 -
-Kusen Ventilasi, Ukuran…… - Unit - - - -
-Daun Pintu Kayu, Ukuran 1.00 Unit 350,000 350,000 350,000 -
-Daun Jendela Kayu, Ukuran 2.00 Unit 200,000 400,000 400,000 -
-Handle Pintu dan Kunci Pintu - Set - - - -
-Handle Jendela dan Kunci Jendela - Set - - - -
-Engsel Pintu - Set 35,000 - - -
-Engsel Jendela - Set 21,000 - - -
VII Ring Balok
1 Pekerjaan bekisting - M² - - - -
2 Pekerjaan Cor Beton
-Besi beton Φ 10 mm SNI 10.00 Btg 68,000 680,000 680,000
-Besi beton Φ 8 mm SNI 10.00 Btg 37,500 375,000 375,000 -
-Semen @ 50 kg 3.00 Zak 53,000 159,000 159,000 -
-Pasir pasang 0.40 M³ 240,000 96,000 96,000 -
-Batu pecah 0.50 M³ 280,000 140,000 140,000 -
VIII Pekerjaan Struktur Atap
-Kayu rangka kuda-kuda, Ukuran 6/12 x 4m - Btg 150,000 - - -
-Kayu gapit, Ukuran ……. - Btg - - - -
-Kayu usuk, Ukuran 4/6 x 3m - Btg 27,000 - - -
-Usuk bambu 240.00 Btg 5,500 1,320,000 1,320,000 -
-reng bambu - Btg 1,500 - -
IX Pekerjaan Penutup Atap
1 Penutup Atap 48.00
-Seng gelombang (0,2 cm x 80 cm x 300 cm), atau - Lbr 78,000 - - -
-Genteng 500.00 Bh 1,250 625,000 625,000 -
-Bahan penutup atap lainnya yang diijinkan - Lbr - - - -
2 Bubungan Atap Bh

-Seng Lbr - - -
-Genteng bubungan - Bh 5,000 - - -
-Bahan penutup atap lainnya yang diijinkan Lbr - - -
3 Listplang papan, Ukuran……. M³ - - -
X Pekerjaan Lantai
1 Lantai Rabat Campuran minimal 1:5, T= 5 cm 2.00 M3

-Semen @ 50 kg 1.00 Zak 53,000 53,000 53,000 -


-Pasir pasang 0.10 M³ 240,000 24,000 24,000 -
-Batu pecah 0.10 M³ 280,000 28,000 28,000 -
2 Lantai Papan M²

-Papan, Ukuran……….. - Lbr - - - -


-Kayu, Ukuran……….. - Btg - - - -
XI MCK
-Septic Tank - Unit - - - -
-Closet Jongkok - Unit 155,000 - - -
-Pipa Air Bersih, Ukuran…… - Btg 27,500 - - -
-Pipa Air Kotor, Ukuran…… - Btg 85,000 - - -
-Kran - Bh 25,000 - - -
-Pintu Kamar Mandi - Set 210,000 - - -
XII Lain-lain/ Instalasi Listrik
Gamping - Zak 8,000 - - -
Paku 5.47 Kg 15,000 82,000 82,000 -
Bendrat 5.00 Kg 20,000 100,000 100,000 -
Loster 10.00 Bh 5,000 50,000 50,000 -
Papan Bekisting - Lbr - - - -
XIII Upah Kerja
Tukang 60.00 Oh 70,000 4,200,000 2,500,000 1,700,000
Pembantu Tukang 60.00 Oh 60,000 3,600,000 3,600,000

JUMLAH 26,263,000 17,500,000 8,763,000

........................................ ....
Difasilitasi, Ketua KPB Diajukan Oleh,
Tenaga Fasilitator Lapangan Penerima Bantuan

(.........................................) ( ....................................) ( ....................................)

Disahkan oleh, Diverifikasi Oleh,


Tim Teknis Kabupaten Magelang Koordinator Fasilitator

( ...............................................) ( ....................................)
NIP..........................................
FORMAT III-17

PANJANG LEBAR KELL VOL M2


SUMBER DANA dimensi 4 10 28 40 genteng
SWADAYA pekerjaan
Memakai Bahan
Bangunan Lama atap kuda-kuda
penutup atap 48 1,200.00
SWADAYA pondasi Galian Tanah 6.3
Urugan Pasir 1.8
SWADAYA Pas. Batu belah 4.095
12 beton sloof 0.84
17 8 kolom 0.54
12 balk 15x15 0.63
17 dinding bata 84
58 batako
SWADAYA Plesteran dinding 168
lantai 5cm 2
SWADAYA kayu gording 4 m 50
usuk 2 m 28
reng 2m 100
kusen pintu 80*200 cm 1
jendela 1
daun pintu 80*200 cm 1
jendela 1
pintu kmr 1
SWADAYA JUMLAH 1200

dimensi 4 10 28 40 genteng
pekerjaan
atap kuda-kuda 0 -
penutup atap 48 500.00
pondasi Galian Tanah 6.3 -
Urugan Pasir 1.8 -
Pas. Batu belah 4.095 -
beton sloof 0.84 -
8 kolom 0.54 -
balk 15x15 0.63 -
dinding bata 84 -
batako -
Plesteran dinding 168 -
lantai 5cm 2 -
kayu gording 4 m 50 -
usuk 2 m 28 -
reng 2m 100 -
kusen pintu 80*200 cm 1 -
jendela 1 -
daun pintu 80*200 cm 1 -
jendela 1 -
pintu kmr 1 -
JUMLAH 500

SWADAYA
HARGA
MATERIAL VOL SATUAN
SATUAN
Urugan Pasir 240,000 1.00 M³
-Semen @ 50 kg 53,000 54.00 Zak
-Pasir pasang 240,000 12.40 M³
-Batu Kali 215,000 5.00 M³
-Besi beton Φ 10 mm SNI 68,000 28.00 Btg
-Besi beton Φ 8 mm SNI 37,500 26.00 Btg
-Batu pecah 280,000 1.80 M³
-Batu Bata 750 6,000.00 Bh
-Batako 3,500 - Bh
-Kusen Pintu, Ukuran 0,80 X 2,00 M 200,000 1.00 Unit
-Kusen Jendela 150,000 2.00 Unit
-Kusen Ventilasi, Ukuran…… - - Unit
-Daun Pintu Kayu, Ukuran 350,000 1.00 Unit
-Daun Jendela Kayu, Ukuran 200,000 2.00 Unit
-Handle Pintu dan Kunci Pintu - - Set
-Handle Jendela dan Kunci Jendela - - Set
-Engsel Pintu 35,000 - Set
-Engsel Jendela 21,000 - Set
-Kayu rangka kuda-kuda, Ukuran 6/12 x 4m 150,000 - Btg
-Kayu gapit, Ukuran ……. - - Btg
-Kayu usuk, Ukuran 4/6 x 3m 27,000 - Btg
-Usuk bambu 5,500 240.00 Btg
-reng bambu 1,500 - Btg
-Seng gelombang (0,2 cm x 80 cm x 300 cm 78,000 - Lbr
-Genteng 1,250 500.00 Bh
-Seng - - Lbr
-Genteng bubungan 5,000 - Bh
-Closet Jongkok 155,000 - Unit
-Pipa Air Bersih, Ukuran…… 27,500 - Btg
-Pipa Air Kotor, Ukuran…… 85,000 - Btg
-Kran 25,000 - Bh
-Pintu Kamar Mandi 210,000 - Set
Gamping 8,000 - Zak
Paku 15,000 5.47 Kg
Bendrat 20,000 5.00 Kg
Loster 5,000 10.00 Bh
Papan Bekisting - - Lbr

15,000,000

- 0
0
........................................ .....2019
Diajukan Oleh,
Penerima Bantuan

( ....................................)

Diverifikasi Oleh,
Koordinator Fasilitator

18,463,000 15,000,000
15,000,000
( ....................................)

-
4
20.25 1.0888888889 4.549 0.45
24.25 0.0108888889

batu semen pasir spit bes 10 besi 8 bata batako

1.00
5.00 7.00 2.40
4.00 0.50 0.70 10.00 10.00
2.00 0.40 0.50 8.00 8.00
3.00 0.40 0.50 10.00 10.00
13.00 4.20 5,880.00
- - -
17.00 4.40
1.00 0.10 0.10

5 47 13.4 1.8 28 28 5880 0

batu semen pasir spit bes 10 besi 8 bata batako

- - - - - - - -
- - - - - - - -
- - - - - - - -
- 1.00 - - - - -
5.00 7.00 2.40 - - - - -
- 4.00 0.50 0.70 10.00 10.00 - -
- 2.00 0.40 0.50 8.00 8.00 - -
- 3.00 0.40 0.50 10.00 10.00 - -
- 13.00 4.20 - - - 6,000.00 -
- - - - - - - -
- 24.00 4.40 - - - - -
- 1.00 0.10 0.10 - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
5 54 13.4 1.8 28 28 6000 0

REKAP VOL
BIAYA BSPS DANA BSPS
- -
1,590,000.00 30.00
2,400,000.00 10.00
- -
1,904,000.00 28.00
675,000.00 18.00
504,000.00 1.80
4,500,000.00 6,000.00
- -
200,000.00 1.00
300,000.00 2.00
- #DIV/0!
350,000.00 1.00
400,000.00 2.00
- #DIV/0!
- #DIV/0!
- -
- -
- -
- #DIV/0!
- -
1,320,000.00 240.00
- -
- -
625,000.00 500.00
- #DIV/0!
- -
- -
- -
- -
- -
- -
- -
82,000.00 5.47
100,000.00 5.00
50,000.00 10.00
- #DIV/0!
15,000,000.00
DA

Nomor BNBA
Nama Penerima Bantuan
Nomor KTP
Alamat
Desa/Kelurahan
kayu kusen daun Kecamatan
Gording usuk reng pintu jendela pintu jendela pintu KM Kabupaten/Kota
Nomor Rekening Penerim

A. Jumlah Dana yang ditr


No.
1
2
3
4
5
6
7
8
13.00 9
32.00 10
104.00 11
1.00 12
1.00 13
1.00 14
1.00 15
1.00 16
13 32 104 1 1 1 1 1

kayu kusen daun TOTAL HARGA PEMBELIAN


Gording usuk reng pintu jendela pintu jendela pintu KM Terbilang : Enam Juta Dua Ra

- - - - - - - - Disanggupi oleh :
- - - - - - - - Nama Toko/Penyedia Baha
- - - - - - - - Alamat Toko/Penyedia Bah
- - - - - - - - Nomor Rekening Bank Tok
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - - B. Jumlah dana yang dita
- - - - - - - - No
- 240.00 - - - - - - 1
- - - - - - - TOTAL TARIK TUNAI (B)
- - - 1.00 - - - - Terbilang : Tujuh Juta Lima R
- - - - 2.00 - - -
- - - - - 1.00 - - C. Total dana yang ditarik (
- - - - - - 2.00 - Dana Yang Ditarik (Rp.)
- - - - - - - - Terbilang : Tujuh Juta Lima R
0 240 0 1 2 1 2 0

disahkan oleh:
Tim Teknis Kabupaten Ma

( .....................................
NIP.................................

*) coret yang tidak perlu

DA

Nomor BNBA
Nama Penerima Bantuan
Nomor KTP
Alamat
Desa/Kelurahan
Kecamatan
Kabupaten/Kota
Nomor Rekening Penerim

A. Jumlah Dana yang ditr


No.
1
2
3
4
5
6
7
8
9
10
11
12
13
14

TOTAL HARGA PEMBELIAN


Terbilang : Enam Juta Dua Ra

Disanggupi oleh :
Nama Toko/Penyedia Baha
Alamat Toko/Penyedia Bah
Nomor Rekening Bank Tok

B. Jumlah dana yang dita


No
1
TOTAL TARIK TUNAI (B)
Terbilang : Tujuh Juta Lima R

C. Total dana yang ditarik (


Dana Yang Ditarik (Rp.)
Terbilang : Tujuh Juta Lima R
disahkan oleh:
Tim Teknis Kabupaten Ma

( .....................................
NIP.................................

*) coret yang tidak perlu


DAFTAR RENCANA PEMANFAATAN BANTUAN (DRPB) TAHAP 1

Nomor BNBA : 0
Nama Penerima Bantuan : MUH SHOLEH
Nomor KTP : 0
Alamat : 0
Desa/Kelurahan : 0
Kecamatan : 0
Kabupaten/Kota : 0
Nomor Rekening Penerima Bantuan :

A. Jumlah Dana yang ditransfer ke Toko/Penyedia Bahan Bangunan (Tahap I/II *)


Jumlah Harga per Unit
Jenis Bahan Bangunan
(unit) (Rp)
Batu belah 5.00 m3 215,000
Semen 54.00 zak 53,000
Pasir 13.40 m3 240,000
Batu Pecah 1.80 m3 280,000
Besi Ø 10 28.00 btg 68,000
Besi Ø 8 28.00 btg 37,500
Kusen Pintu Ukuran 0,80 x 2,00 m - Bh 200,000
Kusen Jendela - Bh 150,000
Batu Bata 6,000.00 bh 750
Gamping - zak 8,000
Paku 5.47 Kg 15,000
Bendrat - Kg 22,000
Loster - Bh 7,000
Papan Bekisting - Lbr 20,000
Genteng 500.00 Bh 1,250
Genteng bubungan - Bh 5,000

TOTAL HARGA PEMBELIAN


Terbilang : Enam Juta Dua Ratus Lima Puluh Ribu Rupiah

Disanggupi oleh :
Nama Toko/Penyedia Bahan Bangunan :
Alamat Toko/Penyedia Bahan Bangunan :
Nomor Rekening Bank Toko/ Penyedi BB :

Toko/Penyedia Bahan Bangunan


(..................................................)

B. Jumlah dana yang ditarik tunai untuk upah kerja (Tahap I / II *)


Uraian Jumlah harga (Rp)
Upah Kerja PKRS 1,250,000
TOTAL TARIK TUNAI (B) 1,250,000
Terbilang : Tujuh Juta Lima Ratus Ribu Rupiah

C. Total dana yang ditarik ( A + B )


Dana Yang Ditarik (Rp.)
Terbilang : Tujuh Juta Lima Ratus Ribu Rupiah

........................................ .....2019
Diajukan Oleh :
Penerima Bantuan

MUH SHOLEH

disahkan oleh: Diverifikasi oleh: Difasilitasi Oleh :


Tim Teknis Kabupaten Magelang Koordinator Fasilitator Tenaga Fasilitator Lapangan

( ...............................................) ( ....................................) (.........................................)


NIP..........................................

*) coret yang tidak perlu

DAFTAR RENCANA PEMANFAATAN BANTUAN (DRPB) TAHAP 2

Nomor BNBA : 0
Nama Penerima Bantuan : MUH SHOLEH
Nomor KTP : 0
Alamat : 0
Desa/Kelurahan : 0
Kecamatan : 0
Kabupaten/Kota : 0
Nomor Rekening Penerima Bantuan : 0

A. Jumlah Dana yang ditransfer ke Toko/Penyedia Bahan Bangunan (Tahap I/II *)


Jumlah Harga per Unit
Jenis Bahan Bangunan
(unit) (Rp)
Batu belah 0 m3 215,000
Semen 38.00 zak 53,000
Pasir 6 m3 240,000
Batu Pecah 0 m3 280,000
Besi Ø 10 25 btg 68,000
Besi Ø 8 0 btg 37,500
Kusen Pintu Ukuran 0,80 x 2,00 m 0 Bh 200,000
Kusen Jendela 0 Bh 150,000
Batu Bata 700 bh 750
Gamping 0 zak 8,000
Paku 0.0 Kg 15,000
Bendrat 0 Kg 22,000
Loster 0 Bh 7,000
Kayu usuk 10 Btg 19,000

TOTAL HARGA PEMBELIAN


Terbilang : Enam Juta Dua Ratus Lima Puluh Ribu Rupiah

Disanggupi oleh :
Nama Toko/Penyedia Bahan Bangunan : 0
Alamat Toko/Penyedia Bahan Bangunan : 0
Nomor Rekening Bank Toko/ Penyedi BB : 0

Toko/Penyedia Bahan Bangunan

(..................................................)

B. Jumlah dana yang ditarik tunai untuk upah kerja (Tahap I / II *)


Uraian Jumlah harga (Rp)
Upah Kerja PKRS/PBRS *) 1,250,000
TOTAL TARIK TUNAI (B) 1,250,000
Terbilang : Tujuh Juta Lima Ratus Ribu Rupiah

C. Total dana yang ditarik ( A + B )


Dana Yang Ditarik (Rp.)
Terbilang : Tujuh Juta Lima Ratus Ribu Rupiah

........................................ .....2019
Diajukan Oleh :
Penerima Bantuan

MUH SHOLEH
disahkan oleh: Diverifikasi oleh: Difasilitasi Oleh :
Tim Teknis Kabupaten Magelang Koordinator Fasilitator Tenaga Fasilitator Lapangan

( ...............................................) ( ....................................) (.........................................)


NIP..........................................

*) coret yang tidak perlu


Format IV - 2

HAP 1

Jumlah Harga
(Rp)
1,075,000
2,862,000
3,216,000
504,000
1,904,000
1,050,000
-
-
4,500,000
-
82,000
-
-
-
625,000
-

15,818,000 15,000,000
(818,000)

edia Bahan Bangunan


.................................)

Jumlah harga (Rp)


1,250,000
1,250,000

17,068,000

........................... .....2019
Diajukan Oleh :
Penerima Bantuan

MUH SHOLEH

Difasilitasi Oleh :
enaga Fasilitator Lapangan

.......................................)

Format IV - 2

HAP 2
Jumlah Harga
(Rp)
-
2,014,000
1,440,000
-
1,700,000
-
-
-
525,000
-
129,000
-
-
190,000

5,998,000

edia Bahan Bangunan

.................................)

Jumlah harga (Rp)


1,250,000
1,250,000

7,248,000

..................................... .....2019
Diajukan Oleh :
Penerima Bantuan

MUH SHOLEH
Difasilitasi Oleh :
enaga Fasilitator Lapangan

.......................................)

You might also like