RENCANA ANGGARAN BIAYA (RAB) BSPS
Nomor BNBA :
Nomor KTP :
Nama Penerima Bantuan : MUH SHOLEH
Alamat :
Desa/Kelurahan :
Kecamatan :
Kabupaten/Kota :
Jenis Kegiatan :
SUMBER DANA
HARGA TOTAL HARGA SWADAYA
NO URAIAN PEKERJAAN VOLUME SATUAN (Rp) (Rp) BSPS
Dana Tunai
I Pekerjaan Persiapan
Bongkar Rumah Lama 1.00 ls - - - -
II Pekerjaan Pondasi
-Seng Lbr - - -
-Genteng bubungan - Bh 5,000 - - -
-Bahan penutup atap lainnya yang diijinkan Lbr - - -
3 Listplang papan, Ukuran……. M³ - - -
X Pekerjaan Lantai
1 Lantai Rabat Campuran minimal 1:5, T= 5 cm 3.15 M3
........................................ ....
Difasilitasi, Ketua KPB Diajukan Oleh,
Tenaga Fasilitator Lapangan Penerima Bantuan
( ...............................................) ( ....................................)
NIP..........................................
FORMAT III-17
dimensi 9 7 32 63 genteng
pekerjaan
atap kuda-kuda 0 -
penutup atap 75.6 3,000.00
pondasi Galian Tanah 7.2 -
Urugan Pasir 2.835 -
Pas. Batu belah 4.68 -
beton sloof 0.96 -
10 kolom 0.675 -
balk 15x15 0.72 -
dinding bata 96 -
batako -
Plesteran dinding 192 -
lantai 5cm 3.15 -
kayu gording 4 m 35 -
usuk 2 m 32 -
reng 2m 157.5 -
kusen pintu 80*200 cm 1 -
jendela 1 -
daun pintu 80*200 cm 1 -
jendela 1 -
pintu kmr 1 -
JUMLAH 3000
SWADAYA
HARGA
MATERIAL VOL SATUAN
SATUAN
Urugan Pasir 240,000 3.00 M³
-Semen @ 50 kg 53,000 61.00 Zak
-Pasir pasang 240,000 14.20 M³
-Batu Kali 215,000 6.00 M³
-Besi beton Φ 10 mm SNI 68,000 32.00 Btg
-Besi beton Φ 8 mm SNI 37,500 31.00 Btg
-Batu pecah 280,000 2.20 M³
-Batu Bata 750 6,720.00 Bh
-Batako 3,500 - Bh
-Kusen Pintu, Ukuran 0,80 X 2,00 M 200,000 2.00 Unit
-Kusen Jendela 150,000 - Unit
-Kusen Ventilasi, Ukuran…… - - Unit
-Daun Pintu Kayu, Ukuran 350,000 2.00 Unit
-Daun Jendela Kayu, Ukuran 200,000 - Unit
-Handle Pintu dan Kunci Pintu - - Set
-Handle Jendela dan Kunci Jendela - - Set
-Engsel Pintu 35,000 - Set
-Engsel Jendela 21,000 - Set
-Kayu rangka kuda-kuda, Ukuran 8/12 x 4m 150,000 2.00 Btg
-Kayu gapit, Ukuran ……. - - Btg
-Kayu usuk, Ukuran 4/6 x 2m 22,000 - Btg
-Kayu Usuk, Ukuran 5/7 x 2m 27,000 - Btg
-Kayu Reng , Ukuran 2/3 x 2m 1,500 - Btg
-Seng gelombang (0,2 cm x 80 cm x 300 cm 78,000 - Lbr
-Genteng 1,250 3,000.00 Bh
-Seng - - Lbr
-Genteng bubungan 5,000 - Bh
-Closet Jongkok 155,000 - Unit
-Pipa Air Bersih, Ukuran…… 27,500 - Btg
-Pipa Air Kotor, Ukuran…… 85,000 - Btg
-Kran 25,000 - Bh
-Pintu Kamar Mandi 210,000 1.00 Set
Gamping 8,000 30.00 Zak
Paku 15,000 13.87 Kg
Bendrat 20,000 10.00 Kg
Loster 5,000 30.00 Bh
Papan Bekisting - - Lbr
15,630,600
(630,600) -840.8
-42.04
........................................ .....2019
Diajukan Oleh,
Penerima Bantuan
( ....................................)
Diverifikasi Oleh,
Koordinator Fasilitator
23,803,600 15,630,600
15,630,600
( ....................................)
(630,600)
4
20.25 1.0888888889 4.549 0.45
24.25 0.0108888889
3.00
6.00 8.00 2.80
5.00 0.60 0.80 11.00 12.00
3.00 0.40 0.60 10.00 10.00
3.00 0.50 0.60 11.00 11.00
15.00 4.80 6,720.00
- - -
19.00 5.00
1.00 0.10 0.20
- - - - - - - -
- - - - - - - -
- - - - - - - -
- 3.00 - - - - -
6.00 8.00 2.80 - - - - -
- 5.00 0.60 0.80 11.00 12.00 - -
- 3.00 0.40 0.60 10.00 10.00 - -
- 3.00 0.50 0.60 11.00 11.00 - -
- 15.00 4.80 - - - 6,720.00 -
- - - - - - - -
- 26.00 5.00 - - - - -
- 1.00 0.10 0.20 - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
6 61 17.2 2.2 32 33 6720 0
REKAP VOL
BIAYA BSPS DANA BSPS
- -
3,233,000.00 61.00
3,408,000.00 14.20
- -
1,428,000.00 21.00
787,500.00 21.00
616,000.00 2.20
- -
- -
400,000.00 2.00
- -
- #DIV/0!
700,000.00 2.00
- -
- #DIV/0!
- #DIV/0!
- -
- -
300,000.00 2.00
- #DIV/0!
- -
- -
- -
- -
3,750,000.00 3,000.00
- #DIV/0!
- -
- -
- -
- -
- -
210,000.00 1.00
240,000.00 30.00
208,100.00 13.87
200,000.00 10.00
150,000.00 30.00
- #DIV/0!
15,630,600.00
DA
Nomor BNBA
Nama Penerima Bantuan
Nomor KTP
Alamat
Desa/Kelurahan
kayu kusen daun Kecamatan
Gording usuk reng pintu jendela pintu jendela pintu KM Kabupaten/Kota
Nomor Rekening Penerim
- - - - - - - - Disanggupi oleh :
- - - - - - - - Nama Toko/Penyedia Baha
- - - - - - - - Alamat Toko/Penyedia Bah
- - - - - - - - Nomor Rekening Bank Tok
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - - B. Jumlah dana yang dita
2.00 - - - - - - - No
- - - - - - - 1
- - - - - - - TOTAL TARIK TUNAI (B)
- - - 2.00 - - - - Terbilang : Tujuh Juta Lima R
- - - - - - - -
- - - - - 2.00 - - C. Total dana yang ditarik (
- - - - - - - - Dana Yang Ditarik (Rp.)
- - - - - - - 1.00 Terbilang : Tujuh Juta Lima R
2 0 0 2 0 2 0 1
disahkan oleh:
Tim Teknis Kabupaten Ma
( .....................................
NIP.................................
DA
Nomor BNBA
Nama Penerima Bantuan
Nomor KTP
Alamat
Desa/Kelurahan
Kecamatan
Kabupaten/Kota
Nomor Rekening Penerim
Disanggupi oleh :
Nama Toko/Penyedia Baha
Alamat Toko/Penyedia Bah
Nomor Rekening Bank Tok
( .....................................
NIP.................................
Nomor BNBA : 0
Nama Penerima Bantuan : MUH SHOLEH
Nomor KTP : 0
Alamat : 0
Desa/Kelurahan : 0
Kecamatan : 0
Kabupaten/Kota : 0
Nomor Rekening Penerima Bantuan :
Disanggupi oleh :
Nama Toko/Penyedia Bahan Bangunan :
Alamat Toko/Penyedia Bahan Bangunan :
Nomor Rekening Bank Toko/ Penyedi BB :
........................................ .....2019
Diajukan Oleh :
Penerima Bantuan
MUH SHOLEH
Nomor BNBA : 0
Nama Penerima Bantuan : MUH SHOLEH
Nomor KTP : 0
Alamat : 0
Desa/Kelurahan : 0
Kecamatan : 0
Kabupaten/Kota : 0
Nomor Rekening Penerima Bantuan : 0
Disanggupi oleh :
Nama Toko/Penyedia Bahan Bangunan : 0
Alamat Toko/Penyedia Bahan Bangunan : 0
Nomor Rekening Bank Toko/ Penyedi BB : 0
(..................................................)
........................................ .....2019
Diajukan Oleh :
Penerima Bantuan
MUH SHOLEH
disahkan oleh: Diverifikasi oleh: Difasilitasi Oleh :
Tim Teknis Kabupaten Magelang Koordinator Fasilitator Tenaga Fasilitator Lapangan
HAP 1
Jumlah Harga
(Rp)
1,290,000
3,233,000
4,128,000
616,000
2,176,000
1,237,500
-
-
5,040,000
240,000
208,100
-
-
-
3,750,000
-
21,918,600 15,630,600
(6,288,000)
23,168,600
........................... .....2019
Diajukan Oleh :
Penerima Bantuan
MUH SHOLEH
Difasilitasi Oleh :
enaga Fasilitator Lapangan
.......................................)
Format IV - 2
HAP 2
Jumlah Harga
(Rp)
-
2,385,000
1,440,000
-
1,700,000
-
-
-
525,000
-
129,000
-
-
190,000
6,369,000
.................................)
7,619,000
..................................... .....2019
Diajukan Oleh :
Penerima Bantuan
MUH SHOLEH
Difasilitasi Oleh :
enaga Fasilitator Lapangan
.......................................)
RENCANA ANGGARAN BIAYA (RAB) BSPS
Nomor BNBA :
Nomor KTP :
Nama Penerima Bantuan : MUH SHOLEH
Alamat :
Desa/Kelurahan :
Kecamatan :
Kabupaten/Kota :
Jenis Kegiatan :
SUMBER DANA
HARGA TOTAL HARGA SWADAYA
NO URAIAN PEKERJAAN VOLUME SATUAN (Rp) (Rp) BSPS
Dana Tunai
I Pekerjaan Persiapan
Bongkar Rumah Lama 1.00 ls - - - -
II Pekerjaan Pondasi
-Seng Lbr - - -
-Genteng bubungan - Bh 5,000 - - -
-Bahan penutup atap lainnya yang diijinkan Lbr - - -
3 Listplang papan, Ukuran……. M³ - - -
X Pekerjaan Lantai
1 Lantai Rabat Campuran minimal 1:5, T= 5 cm 2.40 M3
........................................ .....20
Difasilitasi, Ketua KPB Diajukan Oleh,
Tenaga Fasilitator Lapangan Penerima Bantuan
( ...............................................) ( ....................................)
NIP..........................................
FORMAT III-17
dimensi 6 8 28 48 genteng
pekerjaan
atap kuda-kuda 0 -
penutup atap 57.6 -
pondasi Galian Tanah 6.3 -
Urugan Pasir 2.16 -
Pas. Batu belah 4.095 -
beton sloof 0.84 -
8 kolom 0.54 -
balk 15x15 0.63 -
dinding bata 0 -
batako 84 -
Plesteran dinding 168 -
lantai 5cm 2.4 -
kayu gording 4 m 40 -
usuk 3 m 28 -
reng 3 m 120 -
kusen pintu 80*200 cm 1 -
jendela 1 -
daun pintu 80*200 cm 1 -
jendela 1 -
pintu kmr 1 -
JUMLAH 0
SWADAYA
HARGA
MATERIAL VOL SATUAN
SATUAN
Urugan Pasir 240,000 2.00 M³
-Semen @ 50 kg 53,000 53.00 Zak
-Pasir pasang 240,000 14.30 M³
-Batu Kali 215,000 5.00 M³
-Besi beton Φ 10 mm SNI 68,000 28.00 Btg
-Besi beton Φ 8 mm SNI 37,500 26.00 Btg
-Batu pecah 280,000 1.90 M³
-Batu Bata 750 - Bh
-Batako 3,500 1,100.00 Bh
-Kusen Pintu, Ukuran 0,80 X 2,00 M 200,000 1.00 Unit
-Kusen Jendela 150,000 2.00 Unit
-Kusen Ventilasi, Ukuran…… - - Unit
-Daun Pintu Kayu, Ukuran 350,000 1.00 Unit
-Daun Jendela Kayu, Ukuran 200,000 2.00 Unit
-Handle Pintu dan Kunci Pintu - - Set
-Handle Jendela dan Kunci Jendela - - Set
-Engsel Pintu 35,000 - Set
-Engsel Jendela 21,000 - Set
-Kayu rangka kuda-kuda, Ukuran 6/12 x 4m 100,000 4.00 Btg
-Kayu gapit, Ukuran ……. - - Btg
-Kayu usuk, Ukuran 4/6 x 3 m 27,000 - Btg
-Usuk bambu 4m 5,500 200.00 m
-Reng bambu 4m 1,500 320.00 m
-Seng gelombang (0,2 cm x 80 cm x 300 cm 78,000 - Lbr
-Genteng 1,250 - Bh
-Seng - - Lbr
-Genteng bubungan 5,000 - Bh
-Closet Jongkok 155,000 - Unit
-Pipa Air Bersih, Ukuran…… 27,500 - Btg
-Pipa Air Kotor, Ukuran…… 85,000 - Btg
-Kran 25,000 - Bh
-Pintu Kamar Mandi 210,000 - Set
Gamping 8,000 - Zak
Paku 15,000 8.53 Kg
Bendrat 20,000 5.00 Kg
Loster 5,000 10.00 Bh
Papan Bekisting - - Lbr
15,000,000
- 0
0
........................................ .....2019
Diajukan Oleh,
Penerima Bantuan
( ....................................)
Diverifikasi Oleh,
Koordinator Fasilitator
18,565,000 15,000,000
15,000,000
( ....................................)
-
4
20.25 1.0888888889 4.549 0.45
24.25 0.0108888889
2.00
5.00 7.00 2.40
4.00 0.50 0.70 10.00 10.00
2.00 0.40 0.50 8.00 8.00
3.00 0.40 0.50 10.00 10.00
- - -
19.00 6.10 1,050.00
17.00 4.40
1.00 0.10 0.20
- - - - - - - -
- - - - - - - -
- - - - - - - -
- 2.00 - - - - -
5.00 7.00 2.40 - - - - -
- 4.00 0.50 0.70 10.00 10.00 - -
- 2.00 0.40 0.50 8.00 8.00 - -
- 3.00 0.40 0.50 10.00 10.00 - -
- - - - - - - -
- 19.00 6.10 - - - - 1,100.00
- 17.00 4.40 - - - - -
- 1.00 0.10 0.20 - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
5 53 16.3 1.9 28 28 0 1100
REKAP VOL
BIAYA BSPS DANA BSPS
- -
1,855,000.00 35.00
2,376,000.00 9.90
- -
1,904,000.00 28.00
975,000.00 26.00
532,000.00 1.90
- -
3,850,000.00 1,100.00
200,000.00 1.00
300,000.00 2.00
- #DIV/0!
350,000.00 1.00
400,000.00 2.00
- #DIV/0!
- #DIV/0!
- -
- -
400,000.00 4.00
- #DIV/0!
- -
1,100,000.00 200.00
480,000.00 320.00
- -
- -
- #DIV/0!
- -
- -
- -
- -
- -
- -
- -
128,000.00 8.53
100,000.00 5.00
50,000.00 10.00
- #DIV/0!
15,000,000.00
DA
Nomor BNBA
Nama Penerima Bantuan
Nomor KTP
Alamat
Desa/Kelurahan
kayu kusen daun Kecamatan
Gording usuk reng pintu jendela pintu jendela pintu KM Kabupaten/Kota
Nomor Rekening Penerim
- - - - - - - - Disanggupi oleh :
- - - - - - - - Nama Toko/Penyedia Baha
- - - - - - - - Alamat Toko/Penyedia Bah
- - - - - - - - Nomor Rekening Bank Tok
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - - B. Jumlah dana yang dita
4.00 - - - - - - - No
- 200.00 - - - - - - 1
- - 320.00 - - - - - TOTAL TARIK TUNAI (B)
- - - 1.00 - - - - Terbilang : Tujuh Juta Lima R
- - - - 2.00 - - -
- - - - - 1.00 - - C. Total dana yang ditarik (
- - - - - - 2.00 - Dana Yang Ditarik (Rp.)
- - - - - - - Terbilang : Tujuh Juta Lima R
4 200 320 1 2 1 2 0
disahkan oleh:
Tim Teknis Kabupaten Ma
( .....................................
NIP.................................
DA
Nomor BNBA
Nama Penerima Bantuan
Nomor KTP
Alamat
Desa/Kelurahan
Kecamatan
Kabupaten/Kota
Nomor Rekening Penerim
Disanggupi oleh :
Nama Toko/Penyedia Baha
Alamat Toko/Penyedia Bah
Nomor Rekening Bank Tok
( .....................................
NIP.................................
Nomor BNBA : 0
Nama Penerima Bantuan : MUH SHOLEH
Nomor KTP : 0
Alamat : 0
Desa/Kelurahan : 0
Kecamatan : 0
Kabupaten/Kota : 0
Nomor Rekening Penerima Bantuan :
Disanggupi oleh :
Nama Toko/Penyedia Bahan Bangunan :
Alamat Toko/Penyedia Bahan Bangunan :
Nomor Rekening Bank Toko/ Penyedi BB :
........................................ .....2019
Diajukan Oleh :
Penerima Bantuan
MUH SHOLEH
Nomor BNBA : 0
Nama Penerima Bantuan : MUH SHOLEH
Nomor KTP : 0
Alamat : 0
Desa/Kelurahan : 0
Kecamatan : 0
Kabupaten/Kota : 0
Nomor Rekening Penerima Bantuan : 0
Disanggupi oleh :
Nama Toko/Penyedia Bahan Bangunan : 0
Alamat Toko/Penyedia Bahan Bangunan : 0
Nomor Rekening Bank Toko/ Penyedi BB : 0
(..................................................)
........................................ .....2019
Diajukan Oleh :
Penerima Bantuan
MUH SHOLEH
disahkan oleh: Diverifikasi oleh: Difasilitasi Oleh :
Tim Teknis Kabupaten Magelang Koordinator Fasilitator Tenaga Fasilitator Lapangan
HAP 1
Jumlah Harga
(Rp)
1,075,000
2,809,000
3,912,000
532,000
1,904,000
1,050,000
-
-
-
-
128,000
-
-
-
-
-
11,410,000 15,000,000
3,590,000
12,660,000
........................... .....2019
Diajukan Oleh :
Penerima Bantuan
MUH SHOLEH
Difasilitasi Oleh :
enaga Fasilitator Lapangan
.......................................)
Format IV - 2
HAP 2
Jumlah Harga
(Rp)
-
1,961,000
1,440,000
-
1,700,000
-
-
-
525,000
-
129,000
-
-
190,000
5,945,000
.................................)
7,195,000
..................................... .....2019
Diajukan Oleh :
Penerima Bantuan
MUH SHOLEH
Difasilitasi Oleh :
enaga Fasilitator Lapangan
.......................................)
RENCANA ANGGARAN BIAYA (RAB) BSPS
Nomor BNBA :
Nomor KTP :
Nama Penerima Bantuan : MUH SHOLEH
Alamat :
Desa/Kelurahan :
Kecamatan :
Kabupaten/Kota :
Jenis Kegiatan :
SUMBER DANA
HARGA TOTAL HARGA SWADAYA
NO URAIAN PEKERJAAN VOLUME SATUAN (Rp) (Rp) BSPS
Dana Tunai
I Pekerjaan Persiapan
Bongkar Rumah Lama 1.00 ls - - - -
II Pekerjaan Pondasi
-Seng Lbr - - -
-Genteng bubungan - Bh 5,000 - - -
-Bahan penutup atap lainnya yang diijinkan Lbr - - -
3 Listplang papan, Ukuran……. M³ - - -
X Pekerjaan Lantai
1 Lantai Rabat Campuran minimal 1:5, T= 5 cm 2.40 M3
........................................ .....20
Difasilitasi, Ketua KPB Diajukan Oleh,
Tenaga Fasilitator Lapangan Penerima Bantuan
( ...............................................) ( ....................................)
NIP..........................................
FORMAT III-17
dimensi 6 8 28 48 genteng
pekerjaan
atap kuda-kuda 0 -
penutup atap 57.6 -
pondasi Galian Tanah 6.3 -
Urugan Pasir 2.16 -
Pas. Batu belah 4.095 -
beton sloof 0.84 -
8 kolom 0.54 -
balk 15x15 0.63 -
dinding bata 0 -
batako 84 -
Plesteran dinding 168 -
lantai 5cm 2.4 -
kayu gording 4 m 40 -
usuk 3 m 28 -
reng 3 m 120 -
kusen pintu 80*200 cm 1 -
jendela 1 -
daun pintu 80*200 cm 1 -
jendela 1 -
pintu kmr 1 -
JUMLAH 0
SWADAYA
HARGA
MATERIAL VOL SATUAN
SATUAN
Urugan Pasir 240,000 2.00 M³
-Semen @ 50 kg 53,000 53.00 Zak
-Pasir pasang 240,000 14.30 M³
-Batu Kali 215,000 5.00 M³
-Besi beton Φ 10 mm SNI 68,000 28.00 Btg
-Besi beton Φ 8 mm SNI 37,500 26.00 Btg
-Batu pecah 280,000 1.90 M³
-Batu Bata 750 - Bh
-Batako 3,500 1,100.00 Bh
-Kusen Pintu, Ukuran 0,80 X 2,00 M 200,000 1.00 Unit
-Kusen Jendela 150,000 2.00 Unit
-Kusen Ventilasi, Ukuran…… - - Unit
-Daun Pintu Kayu, Ukuran 350,000 1.00 Unit
-Daun Jendela Kayu, Ukuran 200,000 2.00 Unit
-Handle Pintu dan Kunci Pintu - - Set
-Handle Jendela dan Kunci Jendela - - Set
-Engsel Pintu 35,000 - Set
-Engsel Jendela 21,000 - Set
-Kayu rangka kuda-kuda, Ukuran 8/12 x 4m 150,000 - Btg
-Kayu gapit, Ukuran ……. - - Btg
-Kayu usuk, Ukuran 4/6 x 3 m 27,000 - Btg
-Kayu Usuk, Ukuran 5/7 x 3 m 27,000 - Btg
-Kayu Reng , Ukuran 2/3 x 2m 1,500 - Btg
-Seng gelombang (0,2 cm x 80 cm x 300 cm 78,000 - Lbr
-Genteng 1,250 - Bh
-Seng - - Lbr
-Genteng bubungan 5,000 - Bh
-Closet Jongkok 155,000 - Unit
-Pipa Air Bersih, Ukuran…… 27,500 - Btg
-Pipa Air Kotor, Ukuran…… 85,000 - Btg
-Kran 25,000 - Bh
-Pintu Kamar Mandi 210,000 - Set
Gamping 8,000 - Zak
Paku 15,000 11.67 Kg
Bendrat 20,000 5.00 Kg
Loster 5,000 10.00 Bh
Papan Bekisting - - Lbr
15,000,000
- 0
0
........................................ .....2019
Diajukan Oleh,
Penerima Bantuan
( ....................................)
Diverifikasi Oleh,
Koordinator Fasilitator
16,632,000 15,000,000
15,000,000
( ....................................)
-
4
20.25 1.0888888889 4.549 0.45
24.25 0.0108888889
2.00
5.00 7.00 2.40
4.00 0.50 0.70 10.00 10.00
2.00 0.40 0.50 8.00 8.00
3.00 0.40 0.50 10.00 10.00
- - -
19.00 6.10 1,050.00
17.00 4.40
1.00 0.10 0.20
- - - - - - - -
- - - - - - - -
- - - - - - - -
- 2.00 - - - - -
5.00 7.00 2.40 - - - - -
- 4.00 0.50 0.70 10.00 10.00 - -
- 2.00 0.40 0.50 8.00 8.00 - -
- 3.00 0.40 0.50 10.00 10.00 - -
- - - - - - - -
- 19.00 6.10 - - - - 1,100.00
- 17.00 4.40 - - - - -
- 1.00 0.10 0.20 - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
5 53 16.3 1.9 28 28 0 1100
REKAP VOL
BIAYA BSPS DANA BSPS
- -
2,756,000.00 52.00
3,408,000.00 14.20
- -
1,904,000.00 28.00
975,000.00 26.00
532,000.00 1.90
- -
3,850,000.00 1,100.00
200,000.00 1.00
300,000.00 2.00
- #DIV/0!
350,000.00 1.00
400,000.00 2.00
- #DIV/0!
- #DIV/0!
- -
- -
- -
- #DIV/0!
- -
- -
- -
- -
- -
- #DIV/0!
- -
- -
- -
- -
- -
- -
- -
175,000.00 11.67
100,000.00 5.00
50,000.00 10.00
- #DIV/0!
15,000,000.00
DA
Nomor BNBA
Nama Penerima Bantuan
Nomor KTP
Alamat
Desa/Kelurahan
kayu kusen daun Kecamatan
Gording usuk reng pintu jendela pintu jendela pintu KM Kabupaten/Kota
Nomor Rekening Penerim
- - - - - - - - Disanggupi oleh :
- - - - - - - - Nama Toko/Penyedia Baha
- - - - - - - - Alamat Toko/Penyedia Bah
- - - - - - - - Nomor Rekening Bank Tok
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - - B. Jumlah dana yang dita
- - - - - - - - No
- - - - - - - - 1
- - - - - - - TOTAL TARIK TUNAI (B)
- - - 1.00 - - - - Terbilang : Tujuh Juta Lima R
- - - - 2.00 - - -
- - - - - 1.00 - - C. Total dana yang ditarik (
- - - - - - 2.00 - Dana Yang Ditarik (Rp.)
- - - - - - - Terbilang : Tujuh Juta Lima R
0 0 0 1 2 1 2 0
disahkan oleh:
Tim Teknis Kabupaten Ma
( .....................................
NIP.................................
DA
Nomor BNBA
Nama Penerima Bantuan
Nomor KTP
Alamat
Desa/Kelurahan
Kecamatan
Kabupaten/Kota
Nomor Rekening Penerim
Disanggupi oleh :
Nama Toko/Penyedia Baha
Alamat Toko/Penyedia Bah
Nomor Rekening Bank Tok
( .....................................
NIP.................................
Nomor BNBA : 0
Nama Penerima Bantuan : MUH SHOLEH
Nomor KTP : 0
Alamat : 0
Desa/Kelurahan : 0
Kecamatan : 0
Kabupaten/Kota : 0
Nomor Rekening Penerima Bantuan :
Disanggupi oleh :
Nama Toko/Penyedia Bahan Bangunan :
Alamat Toko/Penyedia Bahan Bangunan :
Nomor Rekening Bank Toko/ Penyedi BB :
........................................ .....2019
Diajukan Oleh :
Penerima Bantuan
MUH SHOLEH
Nomor BNBA : 0
Nama Penerima Bantuan : MUH SHOLEH
Nomor KTP : 0
Alamat : 0
Desa/Kelurahan : 0
Kecamatan : 0
Kabupaten/Kota : 0
Nomor Rekening Penerima Bantuan : 0
Disanggupi oleh :
Nama Toko/Penyedia Bahan Bangunan : 0
Alamat Toko/Penyedia Bahan Bangunan : 0
Nomor Rekening Bank Toko/ Penyedi BB : 0
(..................................................)
........................................ .....2019
Diajukan Oleh :
Penerima Bantuan
MUH SHOLEH
disahkan oleh: Diverifikasi oleh: Difasilitasi Oleh :
Tim Teknis Kabupaten Magelang Koordinator Fasilitator Tenaga Fasilitator Lapangan
HAP 1
Jumlah Harga
(Rp)
1,075,000
2,809,000
3,912,000
532,000
1,904,000
1,050,000
-
-
-
-
175,000
-
-
-
-
-
11,457,000 15,000,000
3,543,000
12,707,000
........................... .....2019
Diajukan Oleh :
Penerima Bantuan
MUH SHOLEH
Difasilitasi Oleh :
enaga Fasilitator Lapangan
.......................................)
Format IV - 2
HAP 2
Jumlah Harga
(Rp)
-
1,961,000
1,440,000
-
1,700,000
-
-
-
525,000
-
129,000
-
-
190,000
5,945,000
.................................)
7,195,000
..................................... .....2019
Diajukan Oleh :
Penerima Bantuan
MUH SHOLEH
Difasilitasi Oleh :
enaga Fasilitator Lapangan
.......................................)
RENCANA ANGGARAN BIAYA (RAB) BSPS
Nomor BNBA :
Nomor KTP :
Nama Penerima Bantuan : MUH SHOLEH
Alamat :
Desa/Kelurahan :
Kecamatan :
Kabupaten/Kota :
Jenis Kegiatan :
SUMBER DANA
HARGA TOTAL HARGA SWADAYA
NO URAIAN PEKERJAAN VOLUME SATUAN (Rp) (Rp) BSPS
Dana Tunai
I Pekerjaan Persiapan
Bongkar Rumah Lama 1.00 ls - - - -
II Pekerjaan Pondasi
-Seng Lbr - - -
-Genteng bubungan - Bh 5,000 - - -
-Bahan penutup atap lainnya yang diijinkan Lbr - - -
3 Listplang papan, Ukuran……. M³ - - -
X Pekerjaan Lantai
1 Lantai Rabat Campuran minimal 1:5, T= 5 cm 1.60 M3
........................................ .....20
Difasilitasi, Ketua KPB Diajukan Oleh,
Tenaga Fasilitator Lapangan Penerima Bantuan
( ...............................................) ( ....................................)
NIP..........................................
FORMAT III-17
dimensi 4 8 24 32 genteng
pekerjaan
atap kuda-kuda 0 -
penutup atap 38.4 -
pondasi Galian Tanah 5.4 -
Urugan Pasir 1.44 -
Pas. Batu belah 3.51 -
beton sloof 0.72 -
8 kolom 0.54 -
balk 15x15 0.54 -
dinding bata 0 -
batako 72 -
Plesteran dinding 144 -
lantai 5cm 1.6 -
kayu gording 4 m 40 -
usuk 3 m 24 -
reng 3 m 80 -
kusen pintu 80*200 cm 1 -
jendela 1 -
daun pintu 80*200 cm 1 -
jendela 1 -
pintu kmr 1 -
JUMLAH 0
SWADAYA
HARGA
MATERIAL VOL SATUAN
SATUAN
Urugan Pasir 240,000 1.00 M³
-Semen @ 50 kg 53,000 44.00 Zak
-Pasir pasang 240,000 12.50 M³
-Batu Kali 215,000 4.00 M³
-Besi beton Φ 10 mm SNI 68,000 24.00 Btg
-Besi beton Φ 8 mm SNI 37,500 24.00 Btg
-Batu pecah 280,000 1.70 M³
-Batu Bata 750 - Bh
-Batako 3,500 1,150.00 Bh
-Kusen Pintu, Ukuran 0,80 X 2,00 M 200,000 1.00 Unit
-Kusen Jendela 150,000 2.00 Unit
-Kusen Ventilasi, Ukuran…… - - Unit
-Daun Pintu Kayu, Ukuran 350,000 1.00 Unit
-Daun Jendela Kayu, Ukuran 200,000 2.00 Unit
-Handle Pintu dan Kunci Pintu - - Set
-Handle Jendela dan Kunci Jendela - - Set
-Engsel Pintu 35,000 - Set
-Engsel Jendela 21,000 - Set
-Kayu rangka kuda-kuda, Ukuran 6/12 x 4m 100,000 10.00 Btg
-Kayu gapit, Ukuran ……. - - Btg
-Kayu usuk, Ukuran 4/6 x 3 m 27,000 - Btg
-Usuk bambu 4m 5,500 100.00 Btg
-Reng bambu 4m 1,500 360.00 Btg
-Seng gelombang (0,2 cm x 80 cm x 300 cm 78,000 - Lbr
-Genteng 1,250 - Bh
-Seng - - Lbr
-Genteng bubungan 5,000 - Bh
-Closet Jongkok 155,000 - Unit
-Pipa Air Bersih, Ukuran…… 27,500 - Btg
-Pipa Air Kotor, Ukuran…… 85,000 - Btg
-Kran 25,000 - Bh
-Pintu Kamar Mandi 210,000 - Set
Gamping 8,000 - Zak
Paku 15,000 6.67 Kg
Bendrat 20,000 5.00 Kg
Loster 5,000 20.00 Bh
Papan Bekisting - - Lbr
15,000,000
- 0
0
........................................ .....2019
Diajukan Oleh,
Penerima Bantuan
( ....................................)
Diverifikasi Oleh,
Koordinator Fasilitator
17,105,000 15,000,000
15,000,000
( ....................................)
-
4
20.25 1.0888888889 4.549 0.45
24.25 0.0108888889
1.00
4.00 6.00 2.10
3.00 0.50 0.60 8.00 9.00
2.00 0.40 0.50 8.00 8.00
2.00 0.40 0.50 8.00 8.00
- - -
16.00 5.20 900.00
14.00 3.80
1.00 0.10 0.10
- - - - - - - -
- - - - - - - -
- - - - - - - -
- 1.00 - - - - -
4.00 6.00 2.10 - - - - -
- 3.00 0.50 0.60 8.00 9.00 - -
- 2.00 0.40 0.50 8.00 8.00 - -
- 2.00 0.40 0.50 8.00 8.00 - -
- - - - - - - -
- 16.00 5.20 - - - - 1,150.00
- 14.00 3.80 - - - - -
- 1.00 0.10 0.10 - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
4 44 13.5 1.7 24 25 0 1150
REKAP VOL
BIAYA BSPS DANA BSPS
- -
1,855,000.00 35.00
2,472,000.00 10.30
- -
1,632,000.00 24.00
900,000.00 24.00
476,000.00 1.70
- -
4,025,000.00 1,150.00
200,000.00 1.00
300,000.00 2.00
- #DIV/0!
350,000.00 1.00
400,000.00 2.00
- #DIV/0!
- #DIV/0!
- -
- -
1,000,000.00 10.00
- #DIV/0!
- -
550,000.00 100.00
540,000.00 360.00
- -
- -
- #DIV/0!
- -
- -
- -
- -
- -
- -
- -
100,000.00 6.67
100,000.00 5.00
100,000.00 20.00
- #DIV/0!
15,000,000.00
DA
Nomor BNBA
Nama Penerima Bantuan
Nomor KTP
Alamat
Desa/Kelurahan
kayu kusen daun Kecamatan
Gording usuk reng pintu jendela pintu jendela pintu KM Kabupaten/Kota
Nomor Rekening Penerim
- - - - - - - - Disanggupi oleh :
- - - - - - - - Nama Toko/Penyedia Baha
- - - - - - - - Alamat Toko/Penyedia Bah
- - - - - - - - Nomor Rekening Bank Tok
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - - B. Jumlah dana yang dita
10.00 - - - - - - - No
- 100.00 - - - - - - 1
- - 360.00 - - - - - TOTAL TARIK TUNAI (B)
- - - 1.00 - - - - Terbilang : Tujuh Juta Lima R
- - - - 2.00 - - -
- - - - - 1.00 - - C. Total dana yang ditarik (
- - - - - - 2.00 - Dana Yang Ditarik (Rp.)
- - - - - - - Terbilang : Tujuh Juta Lima R
10 100 360 1 2 1 2 0
disahkan oleh:
Tim Teknis Kabupaten Ma
( .....................................
NIP.................................
DA
Nomor BNBA
Nama Penerima Bantuan
Nomor KTP
Alamat
Desa/Kelurahan
Kecamatan
Kabupaten/Kota
Nomor Rekening Penerim
Disanggupi oleh :
Nama Toko/Penyedia Baha
Alamat Toko/Penyedia Bah
Nomor Rekening Bank Tok
( .....................................
NIP.................................
Nomor BNBA : 0
Nama Penerima Bantuan : MUH SHOLEH
Nomor KTP : 0
Alamat : 0
Desa/Kelurahan : 0
Kecamatan : 0
Kabupaten/Kota : 0
Nomor Rekening Penerima Bantuan :
Disanggupi oleh :
Nama Toko/Penyedia Bahan Bangunan :
Alamat Toko/Penyedia Bahan Bangunan :
Nomor Rekening Bank Toko/ Penyedi BB :
........................................ .....2019
Diajukan Oleh :
Penerima Bantuan
MUH SHOLEH
Nomor BNBA : 0
Nama Penerima Bantuan : MUH SHOLEH
Nomor KTP : 0
Alamat : 0
Desa/Kelurahan : 0
Kecamatan : 0
Kabupaten/Kota : 0
Nomor Rekening Penerima Bantuan : 0
Disanggupi oleh :
Nama Toko/Penyedia Bahan Bangunan : 0
Alamat Toko/Penyedia Bahan Bangunan : 0
Nomor Rekening Bank Toko/ Penyedi BB : 0
(..................................................)
........................................ .....2019
Diajukan Oleh :
Penerima Bantuan
MUH SHOLEH
disahkan oleh: Diverifikasi oleh: Difasilitasi Oleh :
Tim Teknis Kabupaten Magelang Koordinator Fasilitator Tenaga Fasilitator Lapangan
HAP 1
Jumlah Harga
(Rp)
860,000
2,332,000
3,240,000
476,000
1,632,000
937,500
-
-
-
-
100,000
-
-
-
-
-
9,577,500 15,000,000
5,422,500
10,827,500
........................... .....2019
Diajukan Oleh :
Penerima Bantuan
MUH SHOLEH
Difasilitasi Oleh :
enaga Fasilitator Lapangan
.......................................)
Format IV - 2
HAP 2
Jumlah Harga
(Rp)
-
1,484,000
1,440,000
-
1,700,000
-
-
-
525,000
-
129,000
-
-
190,000
5,468,000
.................................)
6,718,000
..................................... .....2019
Diajukan Oleh :
Penerima Bantuan
MUH SHOLEH
Difasilitasi Oleh :
enaga Fasilitator Lapangan
.......................................)
RENCANA ANGGARAN BIAYA (RAB) BSPS
Nomor BNBA :
Nomor KTP :
Nama Penerima Bantuan : MUH SHOLEH
Alamat :
Desa/Kelurahan :
Kecamatan :
Kabupaten/Kota :
Jenis Kegiatan :
SUMBER DANA
HARGA TOTAL HARGA SWADAYA
NO URAIAN PEKERJAAN VOLUME SATUAN (Rp) (Rp) BSPS
Dana Tunai
I Pekerjaan Persiapan
Bongkar Rumah Lama 1.00 ls - - - -
II Pekerjaan Pondasi
-Seng Lbr - - -
-Genteng bubungan - Bh 5,000 - - -
-Bahan penutup atap lainnya yang diijinkan Lbr - - -
3 Listplang papan, Ukuran……. M³ - - -
X Pekerjaan Lantai
1 Lantai Rabat Campuran minimal 1:5, T= 5 cm 3.60 M3
........................................ .....20
Difasilitasi, Ketua KPB Diajukan Oleh,
Tenaga Fasilitator Lapangan Penerima Bantuan
( ...............................................) ( ....................................)
NIP..........................................
FORMAT III-17
dimensi 8 9 34 72 genteng
pekerjaan
atap kuda-kuda 0 -
penutup atap 86.4 -
pondasi Galian Tanah 7.65 -
Urugan Pasir 3.24 -
Pas. Batu belah 4.9725 -
beton sloof 1.02 -
10 kolom 0.54 -
balk 15x15 0.765 -
dinding bata 0 -
batako 102 -
Plesteran dinding 204 -
lantai 5cm 3.6 -
kayu gording 4 m 45 -
usuk 3 m 34 -
reng 3 m 180 -
kusen pintu 80*200 cm 1 -
jendela 1 -
daun pintu 80*200 cm 1 -
jendela 1 -
pintu kmr 1 -
JUMLAH 0
SWADAYA
HARGA
MATERIAL VOL SATUAN
SATUAN
Urugan Pasir 240,000 3.00 M³
-Semen @ 50 kg 53,000 65.00 Zak
-Pasir pasang 240,000 17.50 M³
-Batu Kali 215,000 6.00 M³
-Besi beton Φ 10 mm SNI 68,000 32.00 Btg
-Besi beton Φ 8 mm SNI 37,500 27.00 Btg
-Batu pecah 280,000 2.10 M³
-Batu Bata 750 - Bh
-Batako 3,500 1,100.00 Bh
-Kusen Pintu, Ukuran 0,80 X 2,00 M 200,000 1.00 Unit
-Kusen Jendela 150,000 2.00 Unit
-Kusen Ventilasi, Ukuran…… - - Unit
-Daun Pintu Kayu, Ukuran 350,000 1.00 Unit
-Daun Jendela Kayu, Ukuran 200,000 2.00 Unit
-Handle Pintu dan Kunci Pintu - - Set
-Handle Jendela dan Kunci Jendela - - Set
-Engsel Pintu 35,000 - Set
-Engsel Jendela 21,000 - Set
-Kayu rangka kuda-kuda, Ukuran 6/12 x 4m 100,000 - Btg
-Kayu gapit, Ukuran ……. - - Btg
-Kayu usuk, Ukuran 4/6 x 3 m 27,000 - Btg
-Usuk Bambu 4m 5,500 240.00 m
-Reng Bambu 4m 1,500 360.00 m
-Seng gelombang (0,2 cm x 80 cm x 300 cm 78,000 - Lbr
-Genteng 1,250 - Bh
-Seng - - Lbr
-Genteng bubungan 5,000 - Bh
-Closet Jongkok 155,000 - Unit
-Pipa Air Bersih, Ukuran…… 27,500 - Btg
-Pipa Air Kotor, Ukuran…… 85,000 - Btg
-Kran 25,000 - Bh
-Pintu Kamar Mandi 210,000 - Set
Gamping 8,000 - Zak
Paku 15,000 4.97 Kg
Bendrat 20,000 5.00 Kg
Loster 5,000 10.00 Bh
Papan Bekisting - - Lbr
15,000,000
- 0
0
........................................ .....2019
Diajukan Oleh,
Penerima Bantuan
( ....................................)
Diverifikasi Oleh,
Koordinator Fasilitator
20,616,000 15,000,000
15,000,000
( ....................................)
-
4
20.25 1.0888888889 4.549 0.45
24.25 0.0108888889
3.00
6.00 9.00 3.00
5.00 0.70 0.80 12.00 12.00
2.00 0.40 0.50 8.00 8.00
4.00 0.50 0.60 12.00 11.00
- - -
23.00 7.40 1,275.00
21.00 5.40
1.00 0.10 0.20
- - - - - - - -
- - - - - - - -
- - - - - - - -
- 3.00 - - - - -
6.00 9.00 3.00 - - - - -
- 5.00 0.70 0.80 12.00 12.00 - -
- 2.00 0.40 0.50 8.00 8.00 - -
- 4.00 0.50 0.60 12.00 11.00 - -
- - - - - - - -
- 23.00 7.40 - - - - 1,100.00
- 21.00 5.40 - - - - -
- 1.00 0.10 0.20 - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
6 65 20.5 2.1 32 31 0 1100
REKAP VOL
BIAYA BSPS DANA BSPS
- -
1,855,000.00 35.00
2,184,000.00 9.10
- -
2,176,000.00 32.00
1,012,500.00 27.00
588,000.00 2.10
- -
3,850,000.00 1,100.00
200,000.00 1.00
300,000.00 2.00
- #DIV/0!
350,000.00 1.00
400,000.00 2.00
- #DIV/0!
- #DIV/0!
- -
- -
- -
- #DIV/0!
- -
1,320,000.00 240.00
540,000.00 360.00
- -
- -
- #DIV/0!
- -
- -
- -
- -
- -
- -
- -
74,500.00 4.97
100,000.00 5.00
50,000.00 10.00
- #DIV/0!
15,000,000.00
DA
Nomor BNBA
Nama Penerima Bantuan
Nomor KTP
Alamat
Desa/Kelurahan
kayu kusen daun Kecamatan
Gording usuk reng pintu jendela pintu jendela pintu KM Kabupaten/Kota
Nomor Rekening Penerim
- - - - - - - - Disanggupi oleh :
- - - - - - - - Nama Toko/Penyedia Baha
- - - - - - - - Alamat Toko/Penyedia Bah
- - - - - - - - Nomor Rekening Bank Tok
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - - B. Jumlah dana yang dita
- - - - - - - - No
- 240.00 - - - - - - 1
- - 360.00 - - - - - TOTAL TARIK TUNAI (B)
- - - 1.00 - - - - Terbilang : Tujuh Juta Lima R
- - - - 2.00 - - -
- - - - - 1.00 - - C. Total dana yang ditarik (
- - - - - - 2.00 - Dana Yang Ditarik (Rp.)
- - - - - - - Terbilang : Tujuh Juta Lima R
0 240 360 1 2 1 2 0
disahkan oleh:
Tim Teknis Kabupaten Ma
( .....................................
NIP.................................
DA
Nomor BNBA
Nama Penerima Bantuan
Nomor KTP
Alamat
Desa/Kelurahan
Kecamatan
Kabupaten/Kota
Nomor Rekening Penerim
Disanggupi oleh :
Nama Toko/Penyedia Baha
Alamat Toko/Penyedia Bah
Nomor Rekening Bank Tok
( .....................................
NIP.................................
Nomor BNBA : 0
Nama Penerima Bantuan : MUH SHOLEH
Nomor KTP : 0
Alamat : 0
Desa/Kelurahan : 0
Kecamatan : 0
Kabupaten/Kota : 0
Nomor Rekening Penerima Bantuan :
Disanggupi oleh :
Nama Toko/Penyedia Bahan Bangunan :
Alamat Toko/Penyedia Bahan Bangunan :
Nomor Rekening Bank Toko/ Penyedi BB :
........................................ .....2019
Diajukan Oleh :
Penerima Bantuan
MUH SHOLEH
Nomor BNBA : 0
Nama Penerima Bantuan : MUH SHOLEH
Nomor KTP : 0
Alamat : 0
Desa/Kelurahan : 0
Kecamatan : 0
Kabupaten/Kota : 0
Nomor Rekening Penerima Bantuan : 0
Disanggupi oleh :
Nama Toko/Penyedia Bahan Bangunan : 0
Alamat Toko/Penyedia Bahan Bangunan : 0
Nomor Rekening Bank Toko/ Penyedi BB : 0
(..................................................)
........................................ .....2019
Diajukan Oleh :
Penerima Bantuan
MUH SHOLEH
disahkan oleh: Diverifikasi oleh: Difasilitasi Oleh :
Tim Teknis Kabupaten Magelang Koordinator Fasilitator Tenaga Fasilitator Lapangan
HAP 1
Jumlah Harga
(Rp)
1,290,000
3,445,000
4,920,000
588,000
2,176,000
1,162,500
-
-
-
-
74,500
-
-
-
-
-
13,656,000 15,000,000
1,344,000
14,906,000
........................... .....2019
Diajukan Oleh :
Penerima Bantuan
MUH SHOLEH
Difasilitasi Oleh :
enaga Fasilitator Lapangan
.......................................)
Format IV - 2
HAP 2
Jumlah Harga
(Rp)
-
2,597,000
1,440,000
-
1,700,000
-
-
-
525,000
-
129,000
-
-
190,000
6,581,000
.................................)
7,831,000
..................................... .....2019
Diajukan Oleh :
Penerima Bantuan
MUH SHOLEH
Difasilitasi Oleh :
enaga Fasilitator Lapangan
.......................................)
RENCANA ANGGARAN BIAYA (RAB) BSPS
Nomor BNBA :
Nomor KTP :
Nama Penerima Bantuan : MUH SHOLEH
Alamat :
Desa/Kelurahan :
Kecamatan :
Kabupaten/Kota :
Jenis Kegiatan :
SUMBER DANA
HARGA TOTAL HARGA SWADAYA
NO URAIAN PEKERJAAN VOLUME SATUAN (Rp) (Rp) BSPS
Dana Tunai
I Pekerjaan Persiapan
Bongkar Rumah Lama 1.00 ls - - - -
II Pekerjaan Pondasi
-Seng Lbr - - -
-Genteng bubungan 30.00 Bh 5,000 150,000 150,000 -
-Bahan penutup atap lainnya yang diijinkan Lbr - - -
3 Listplang papan, Ukuran……. M³ - - -
X Pekerjaan Lantai
1 Lantai Rabat Campuran minimal 1:5, T= 5 cm 2.40 M3
........................................ .....20
Difasilitasi, Ketua KPB Diajukan Oleh,
Tenaga Fasilitator Lapangan Penerima Bantuan
( ...............................................) ( ....................................)
NIP..........................................
FORMAT III-17
dimensi 12 4 32 48 genteng
pekerjaan
atap kuda-kuda 0 -
penutup atap 57.6 1,500.00
pondasi Galian Tanah 7.2 -
Urugan Pasir 2.16 -
Pas. Batu belah 4.68 -
beton sloof 0.96 -
5 kolom 0.3375 -
balk 15x15 0.72 -
dinding bata 0 -
batako 96 -
Plesteran dinding 192 -
lantai 5cm 2.4 -
kayu gording 4 m 20 -
usuk 2 m 32 -
reng 2m 120 -
kusen pintu 80*200 cm 1 -
jendela 1 -
daun pintu 80*200 cm 1 -
jendela 1 -
pintu kmr 1 -
JUMLAH 1500
SWADAYA
HARGA
MATERIAL VOL SATUAN
SATUAN
Urugan Pasir 240,000 2.00 M³
-Semen @ 50 kg 53,000 49.00 Zak
-Pasir pasang 240,000 16.20 M³
-Batu Kali 215,000 6.00 M³
-Besi beton Φ 10 mm SNI 68,000 21.00 Btg
-Besi beton Φ 8 mm SNI 37,500 21.00 Btg
-Batu pecah 280,000 1.90 M³
-Batu Bata 750 - Bh
-Batako 3,500 750.00 Bh
-Kusen Pintu, Ukuran 0,80 X 2,00 M 200,000 2.00 Unit
-Kusen Jendela 150,000 2.00 Unit
-Kusen Ventilasi, Ukuran…… - - Unit
-Daun Pintu Kayu, Ukuran 350,000 2.00 Unit
-Daun Jendela Kayu, Ukuran 200,000 2.00 Unit
-Handle Pintu dan Kunci Pintu - - Set
-Handle Jendela dan Kunci Jendela - - Set
-Engsel Pintu 35,000 - Set
-Engsel Jendela 21,000 - Set
-Kayu rangka kuda-kuda, Ukuran 6/12 x 4m 100,000 5.00 Btg
-Kayu gapit, Ukuran ……. - - Btg
-Kayu usuk, Ukuran 4/6 x 2m 27,000 - Btg
-Usuk bambu 4m 5,500 120.00 Btg
-Reng Bambu 4m 1,500 280.00 Btg
-Seng gelombang (0,2 cm x 80 cm x 300 cm 78,000 - Lbr
-Genteng 1,250 1,500.00 Bh
-Seng - - Lbr
-Genteng bubungan 5,000 30.00 Bh
-Closet Jongkok 155,000 1.00 Unit
-Pipa Air Bersih, Ukuran…… 27,500 - Btg
-Pipa Air Kotor, Ukuran…… 85,000 - Btg
-Kran 25,000 - Bh
-Pintu Kamar Mandi 210,000 1.00 Set
Gamping 8,000 - Zak
Paku 15,000 8.10 Kg
Bendrat 20,000 5.00 Kg
Loster 5,000 6.00 Bh
Papan Bekisting - - Lbr
15,000,000
- 0
0
........................................ .....2019
Diajukan Oleh,
Penerima Bantuan
( ....................................)
Diverifikasi Oleh,
Koordinator Fasilitator
19,649,000 15,000,000
15,000,000
( ....................................)
-
4
20.25 1.0888888889 4.549 0.45
24.25 0.0108888889
2.00
6.00 8.00 2.80
5.00 0.60 0.80 11.00 12.00
1.00 0.20 0.30 5.00 5.00
3.00 0.50 0.60 11.00 11.00
- - -
22.00 7.00 1,200.00
19.00 5.00
1.00 0.10 0.20
- - - - - - - -
- - - - - - - -
- - - - - - - -
- 2.00 - - - - -
6.00 8.00 2.80 - - - - -
- 5.00 0.60 0.80 5.00 4.00 - -
- 1.00 0.20 0.30 5.00 5.00 - -
- 3.00 0.50 0.60 11.00 11.00 - -
- - - - - - - -
- 12.00 7.00 - - - - 750.00
- 19.00 5.00 - - - - -
- 1.00 0.10 0.20 - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
6 49 18.2 1.9 21 20 0 750
REKAP VOL
BIAYA BSPS DANA BSPS
- -
1,590,000.00 30.00
2,016,000.00 8.40
- -
1,428,000.00 21.00
787,500.00 21.00
532,000.00 1.90
- -
2,625,000.00 750.00
400,000.00 2.00
300,000.00 2.00
- #DIV/0!
700,000.00 2.00
400,000.00 2.00
- #DIV/0!
- #DIV/0!
- -
- -
500,000.00 5.00
- #DIV/0!
- -
660,000.00 120.00
420,000.00 280.00
- -
1,875,000.00 1,500.00
- #DIV/0!
150,000.00 30.00
155,000.00 1.00
- -
- -
- -
210,000.00 1.00
- -
121,500.00 8.10
100,000.00 5.00
30,000.00 6.00
- #DIV/0!
15,000,000.00
DA
Nomor BNBA
Nama Penerima Bantuan
Nomor KTP
Alamat
Desa/Kelurahan
kayu kusen daun Kecamatan
Gording usuk reng pintu jendela pintu jendela pintu KM Kabupaten/Kota
Nomor Rekening Penerim
- - - - - - - - Disanggupi oleh :
- - - - - - - - Nama Toko/Penyedia Baha
- - - - - - - - Alamat Toko/Penyedia Bah
- - - - - - - - Nomor Rekening Bank Tok
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - - B. Jumlah dana yang dita
5.00 - - - - - - - No
- 120.00 - - - - - - 1
- - 280.00 - - - - - TOTAL TARIK TUNAI (B)
- - - 2.00 - - - - Terbilang : Tujuh Juta Lima R
- - - - 2.00 - - -
- - - - - 2.00 - - C. Total dana yang ditarik (
- - - - - - 2.00 - Dana Yang Ditarik (Rp.)
- - - - - - - 1.00 Terbilang : Tujuh Juta Lima R
5 120 280 2 2 2 2 1
disahkan oleh:
Tim Teknis Kabupaten Ma
( .....................................
NIP.................................
DA
Nomor BNBA
Nama Penerima Bantuan
Nomor KTP
Alamat
Desa/Kelurahan
Kecamatan
Kabupaten/Kota
Nomor Rekening Penerim
Disanggupi oleh :
Nama Toko/Penyedia Baha
Alamat Toko/Penyedia Bah
Nomor Rekening Bank Tok
( .....................................
NIP.................................
Nomor BNBA : 0
Nama Penerima Bantuan : MUH SHOLEH
Nomor KTP : 0
Alamat : 0
Desa/Kelurahan : 0
Kecamatan : 0
Kabupaten/Kota : 0
Nomor Rekening Penerima Bantuan :
Disanggupi oleh :
Nama Toko/Penyedia Bahan Bangunan :
Alamat Toko/Penyedia Bahan Bangunan :
Nomor Rekening Bank Toko/ Penyedi BB :
........................................ .....2019
Diajukan Oleh :
Penerima Bantuan
MUH SHOLEH
Nomor BNBA : 0
Nama Penerima Bantuan : MUH SHOLEH
Nomor KTP : 0
Alamat : 0
Desa/Kelurahan : 0
Kecamatan : 0
Kabupaten/Kota : 0
Nomor Rekening Penerima Bantuan : 0
Disanggupi oleh :
Nama Toko/Penyedia Bahan Bangunan : 0
Alamat Toko/Penyedia Bahan Bangunan : 0
Nomor Rekening Bank Toko/ Penyedi BB : 0
(..................................................)
........................................ .....2019
Diajukan Oleh :
Penerima Bantuan
MUH SHOLEH
disahkan oleh: Diverifikasi oleh: Difasilitasi Oleh :
Tim Teknis Kabupaten Magelang Koordinator Fasilitator Tenaga Fasilitator Lapangan
HAP 1
Jumlah Harga
(Rp)
1,290,000
2,597,000
4,368,000
532,000
1,428,000
750,000
-
-
-
-
121,500
-
-
-
1,875,000
150,000
13,111,500 15,000,000
1,888,500
14,361,500
........................... .....2019
Diajukan Oleh :
Penerima Bantuan
MUH SHOLEH
Difasilitasi Oleh :
enaga Fasilitator Lapangan
.......................................)
Format IV - 2
HAP 2
Jumlah Harga
(Rp)
-
1,749,000
1,440,000
-
1,700,000
-
-
-
525,000
-
129,000
-
-
190,000
5,733,000
.................................)
6,983,000
..................................... .....2019
Diajukan Oleh :
Penerima Bantuan
MUH SHOLEH
Difasilitasi Oleh :
enaga Fasilitator Lapangan
.......................................)
RENCANA ANGGARAN BIAYA (RAB) BSPS
Nomor BNBA :
Nomor KTP :
Nama Penerima Bantuan : MUH SHOLEH
Alamat :
Desa/Kelurahan :
Kecamatan :
Kabupaten/Kota :
Jenis Kegiatan :
SUMBER DANA
HARGA TOTAL HARGA SWADAYA
NO URAIAN PEKERJAAN VOLUME SATUAN (Rp) (Rp) BSPS
Dana Tunai
I Pekerjaan Persiapan
Bongkar Rumah Lama 1.00 ls - - - -
II Pekerjaan Pondasi
-Seng Lbr - - -
-Genteng bubungan - Bh 5,000 - - -
-Bahan penutup atap lainnya yang diijinkan Lbr - - -
3 Listplang papan, Ukuran……. M³ - - -
X Pekerjaan Lantai
1 Lantai Rabat Campuran minimal 1:5, T= 5 cm 3.15 M3
........................................ .....20
Difasilitasi, Ketua KPB Diajukan Oleh,
Tenaga Fasilitator Lapangan Penerima Bantuan
( ...............................................) ( ....................................)
NIP..........................................
FORMAT III-17
dimensi 7 9 32 63 genteng
pekerjaan
atap kuda-kuda 0 -
penutup atap 75.6 -
pondasi Galian Tanah 7.2 -
Urugan Pasir 2.835 -
Pas. Batu belah 4.68 -
beton sloof 0.96 -
6 kolom 0.675 -
balk 15x15 0.72 -
dinding bata 96 -
batako 0 -
Plesteran dinding 192 -
lantai 5cm 3.15 -
kayu gording 4 m 45 -
usuk 2 m 32 -
reng 2m 157.5 -
kusen pintu 80*200 cm 1 -
jendela 1 -
daun pintu 80*200 cm 1 -
jendela 1 -
pintu kmr 1 -
JUMLAH 0
SWADAYA
HARGA
MATERIAL VOL SATUAN
SATUAN
Urugan Pasir 240,000 3.00 M³
-Semen @ 50 kg 53,000 54.00 Zak
-Pasir pasang 240,000 14.20 M³
-Batu Kali 215,000 6.00 M³
-Besi beton Φ 10 mm SNI 68,000 21.00 Btg
-Besi beton Φ 8 mm SNI 37,500 21.00 Btg
-Batu pecah 280,000 2.20 M³
-Batu Bata 750 2,000.00 Bh
-Batako 3,500 - Bh
-Kusen Pintu, Ukuran 0,80 X 2,00 M 200,000 1.00 Unit
-Kusen Jendela 150,000 2.00 Unit
-Kusen Ventilasi, Ukuran…… - - Unit
-Daun Pintu Kayu, Ukuran 350,000 1.00 Unit
-Daun Jendela Kayu, Ukuran 200,000 2.00 Unit
-Handle Pintu dan Kunci Pintu - - Set
-Handle Jendela dan Kunci Jendela - - Set
-Engsel Pintu 35,000 - Set
-Engsel Jendela 21,000 - Set
-Kayu rangka kuda-kuda, Ukuran 6/12 x 4m 100,000 10.00 Btg
-Kayu gapit, Ukuran ……. - - Btg
-Kayu usuk, Ukuran 4/6 x 3m 27,000 - Btg
-Usuk Bambu - - m
-Reng bambu 1,500 - m
-Seng gelombang (0,2 cm x 80 cm x 300 cm 78,000 - Lbr
-Genteng 1,250 - Bh
-Seng - - Lbr
-Genteng bubungan 5,000 - Bh
-Closet Jongkok 155,000 - Unit
-Pipa Air Bersih, Ukuran…… 27,500 - Btg
-Pipa Air Kotor, Ukuran…… 85,000 - Btg
-Kran 25,000 - Bh
-Pintu Kamar Mandi 210,000 - Set
Gamping 8,000 20.00 Zak
Paku 15,000 - Kg
Bendrat 20,000 4.00 Kg
Loster 5,000 10.00 Bh
Papan Bekisting - - Lbr
9,838,500
5,161,500 6882
344.1
........................................ .....2019
Diajukan Oleh,
Penerima Bantuan
( ....................................)
Diverifikasi Oleh,
Koordinator Fasilitator
15,151,500 9,838,500
9,838,500
( ....................................)
5,161,500
4
20.25 1.0888888889 4.549 0.45
24.25 0.0108888889
3.00
6.00 8.00 2.80
5.00 0.60 0.80 11.00 12.00
3.00 0.40 0.60 10.00 10.00
3.00 0.50 0.60 11.00 11.00
15.00 4.80 6,720.00
- - -
19.00 5.00
1.00 0.10 0.20
- - - - - - - -
- - - - - - - -
- - - - - - - -
- 3.00 - - - - -
6.00 8.00 2.80 - - - - -
- 5.00 0.60 0.80 5.00 6.00 - -
- 3.00 0.40 0.60 5.00 5.00 - -
- 3.00 0.50 0.60 11.00 11.00 - -
- 15.00 4.80 - - - 2,000.00 -
- - - - - - -
- 19.00 5.00 - - - - -
- 1.00 0.10 0.20 - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
6 54 17.2 2.2 21 22 2000 0
REKAP VOL
BIAYA BSPS DANA BSPS
- -
1,431,000.00 27.00
1,536,000.00 6.40
- -
1,428,000.00 21.00
787,500.00 21.00
616,000.00 2.20
1,500,000.00 2,000.00
- -
200,000.00 1.00
300,000.00 2.00
- #DIV/0!
350,000.00 1.00
400,000.00 2.00
- #DIV/0!
- #DIV/0!
- -
- -
1,000,000.00 10.00
- #DIV/0!
- -
- #DIV/0!
- -
- -
- -
- #DIV/0!
- -
- -
- -
- -
- -
- -
160,000.00 20.00
- -
80,000.00 4.00
50,000.00 10.00
- #DIV/0!
9,838,500.00
DA
Nomor BNBA
Nama Penerima Bantuan
Nomor KTP
Alamat
Desa/Kelurahan
kayu kusen daun Kecamatan
Gording usuk reng pintu jendela pintu jendela pintu KM Kabupaten/Kota
Nomor Rekening Penerim
- - - - - - - - Disanggupi oleh :
- - - - - - - - Nama Toko/Penyedia Baha
- - - - - - - - Alamat Toko/Penyedia Bah
- - - - - - - - Nomor Rekening Bank Tok
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - - B. Jumlah dana yang dita
10.00 - - - - - - - No
- - - - - - - 1
- - - - - - - TOTAL TARIK TUNAI (B)
- - - 1.00 - - - - Terbilang : Tujuh Juta Lima R
- - - - 2.00 - - -
- - - - - 1.00 - - C. Total dana yang ditarik (
- - - - - - 2.00 - Dana Yang Ditarik (Rp.)
- - - - - - - Terbilang : Tujuh Juta Lima R
10 0 0 1 2 1 2 0
disahkan oleh:
Tim Teknis Kabupaten Ma
( .....................................
NIP.................................
DA
Nomor BNBA
Nama Penerima Bantuan
Nomor KTP
Alamat
Desa/Kelurahan
Kecamatan
Kabupaten/Kota
Nomor Rekening Penerim
Disanggupi oleh :
Nama Toko/Penyedia Baha
Alamat Toko/Penyedia Bah
Nomor Rekening Bank Tok
( .....................................
NIP.................................
Nomor BNBA : 0
Nama Penerima Bantuan : MUH SHOLEH
Nomor KTP : 0
Alamat : 0
Desa/Kelurahan : 0
Kecamatan : 0
Kabupaten/Kota : 0
Nomor Rekening Penerima Bantuan :
Disanggupi oleh :
Nama Toko/Penyedia Bahan Bangunan :
Alamat Toko/Penyedia Bahan Bangunan :
Nomor Rekening Bank Toko/ Penyedi BB :
........................................ .....2019
Diajukan Oleh :
Penerima Bantuan
MUH SHOLEH
Nomor BNBA : 0
Nama Penerima Bantuan : MUH SHOLEH
Nomor KTP : 0
Alamat : 0
Desa/Kelurahan : 0
Kecamatan : 0
Kabupaten/Kota : 0
Nomor Rekening Penerima Bantuan : 0
Disanggupi oleh :
Nama Toko/Penyedia Bahan Bangunan : 0
Alamat Toko/Penyedia Bahan Bangunan : 0
Nomor Rekening Bank Toko/ Penyedi BB : 0
(..................................................)
........................................ .....2019
Diajukan Oleh :
Penerima Bantuan
MUH SHOLEH
disahkan oleh: Diverifikasi oleh: Difasilitasi Oleh :
Tim Teknis Kabupaten Magelang Koordinator Fasilitator Tenaga Fasilitator Lapangan
HAP 1
Jumlah Harga
(Rp)
1,290,000
2,862,000
4,128,000
616,000
1,428,000
825,000
-
-
1,500,000
160,000
-
-
-
-
-
-
12,809,000 9,838,500
(2,970,500)
14,059,000
........................... .....2019
Diajukan Oleh :
Penerima Bantuan
MUH SHOLEH
Difasilitasi Oleh :
enaga Fasilitator Lapangan
.......................................)
Format IV - 2
HAP 2
Jumlah Harga
(Rp)
-
2,014,000
1,440,000
-
1,700,000
-
-
-
525,000
-
129,000
-
-
190,000
5,998,000
.................................)
7,248,000
..................................... .....2019
Diajukan Oleh :
Penerima Bantuan
MUH SHOLEH
Difasilitasi Oleh :
enaga Fasilitator Lapangan
.......................................)
RENCANA ANGGARAN BIAYA (RAB) BSPS
Nomor BNBA :
Nomor KTP :
Nama Penerima Bantuan : MUH SHOLEH
Alamat :
Desa/Kelurahan :
Kecamatan :
Kabupaten/Kota :
Jenis Kegiatan :
SUMBER DANA
HARGA TOTAL HARGA SWADAYA
NO URAIAN PEKERJAAN VOLUME SATUAN (Rp) (Rp) BSPS
Dana Tunai
I Pekerjaan Persiapan
Bongkar Rumah Lama 1.00 ls - - - -
II Pekerjaan Pondasi
-Seng Lbr - - -
-Genteng bubungan - Bh 5,000 - - -
-Bahan penutup atap lainnya yang diijinkan Lbr - - -
3 Listplang papan, Ukuran……. M³ - - -
X Pekerjaan Lantai
1 Lantai Rabat Campuran minimal 1:5, T= 5 cm 3.00 M3
........................................ .....20
Difasilitasi, Ketua KPB Diajukan Oleh,
Tenaga Fasilitator Lapangan Penerima Bantuan
( ...............................................) ( ....................................)
NIP..........................................
FORMAT III-17
dimensi 6 10 32 60 genteng
pekerjaan
atap kuda-kuda 0 -
penutup atap 72 1,800.00
pondasi Galian Tanah 7.2 -
Urugan Pasir 2.7 -
Pas. Batu belah 4.68 -
beton sloof 0.96 -
10 kolom 0.675 -
balk 15x15 0.72 -
dinding bata 0 -
batako 96 -
Plesteran dinding 192 -
lantai 5cm 3 -
kayu gording 4 m 50 -
usuk 2 m 32 -
reng 2m 150 -
kusen pintu 80*200 cm 1 -
jendela 1 -
daun pintu 80*200 cm 1 -
jendela 1 -
pintu kmr 1 -
JUMLAH 1800
SWADAYA
HARGA
MATERIAL VOL SATUAN
SATUAN
Urugan Pasir 240,000 2.00 M³
-Semen @ 50 kg 53,000 61.00 Zak
-Pasir pasang 240,000 16.40 M³
-Batu Kali 215,000 6.00 M³
-Besi beton Φ 10 mm SNI 68,000 31.00 Btg
-Besi beton Φ 8 mm SNI 37,500 31.00 Btg
-Batu pecah 280,000 2.20 M³
-Batu Bata 750 - Bh
-Batako 3,500 1,350.00 Bh
-Kusen Pintu, Ukuran 0,80 X 2,00 M 200,000 1.00 Unit
-Kusen Jendela 150,000 2.00 Unit
-Kusen Ventilasi, Ukuran…… - - Unit
-Daun Pintu Kayu, Ukuran 350,000 1.00 Unit
-Daun Jendela Kayu, Ukuran 200,000 2.00 Unit
-Handle Pintu dan Kunci Pintu - - Set
-Handle Jendela dan Kunci Jendela - - Set
-Engsel Pintu 35,000 - Set
-Engsel Jendela 21,000 - Set
-Kayu rangka kuda-kuda, Ukuran 6/12 x 4m 100,000 - Btg
-Kayu gapit, Ukuran ……. - - Btg
-Kayu usuk, Ukuran 4/6 x 3m 27,000 - Btg
-Usuk bambu - - Btg
Reng bambu 1,500 - Btg
-Seng gelombang (0,2 cm x 80 cm x 300 cm 78,000 - Lbr
-Genteng 1,250 1,800.00 Bh
-Seng - - Lbr
-Genteng bubungan 5,000 - Bh
-Closet Jongkok 155,000 - Unit
-Pipa Air Bersih, Ukuran…… 27,500 - Btg
-Pipa Air Kotor, Ukuran…… 85,000 - Btg
-Kran 25,000 - Bh
-Pintu Kamar Mandi 210,000 - Set
Gamping 8,000 - Zak
Paku 15,000 2.80 Kg
Bendrat 20,000 2.00 Kg
Loster 5,000 10.00 Bh
Papan Bekisting - - Lbr
15,000,000
- 0
0
........................................ .....2019
Diajukan Oleh,
Penerima Bantuan
( ....................................)
Diverifikasi Oleh,
Koordinator Fasilitator
21,182,500 15,000,000
15,000,000
( ....................................)
-
4
20.25 1.0888888889 4.549 0.45
24.25 0.0108888889
2.00
6.00 8.00 2.80
5.00 0.60 0.80 10.00 12.00
3.00 0.40 0.60 10.00 10.00
3.00 0.50 0.60 11.00 11.00
- - -
22.00 7.00 1,200.00
19.00 5.00
1.00 0.10 0.20
- - - - - - - -
- - - - - - - -
- - - - - - - -
- 2.00 - - - - -
6.00 8.00 2.80 - - - - -
- 5.00 0.60 0.80 10.00 12.00 - -
- 3.00 0.40 0.60 10.00 10.00 - -
- 3.00 0.50 0.60 11.00 11.00 - -
- - - - - - - -
- 22.00 7.00 - - - - 1,350.00
- 19.00 5.00 - - - - -
- 1.00 0.10 0.20 - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
6 61 18.4 2.2 31 33 0 1350
REKAP VOL
BIAYA BSPS DANA BSPS
- -
1,855,000.00 35.00
2,064,000.00 8.60
- -
2,108,000.00 31.00
- -
616,000.00 2.20
- -
4,725,000.00 1,350.00
200,000.00 1.00
300,000.00 2.00
- #DIV/0!
350,000.00 1.00
400,000.00 2.00
- #DIV/0!
- #DIV/0!
- -
- -
- -
- #DIV/0!
- -
- #DIV/0!
- -
- -
2,250,000.00 1,800.00
- #DIV/0!
- -
- -
- -
- -
- -
- -
- -
42,000.00 2.80
40,000.00 2.00
50,000.00 10.00
- #DIV/0!
15,000,000.00
DA
Nomor BNBA
Nama Penerima Bantuan
Nomor KTP
Alamat
Desa/Kelurahan
kayu kusen daun Kecamatan
Gording usuk reng pintu jendela pintu jendela pintu KM Kabupaten/Kota
Nomor Rekening Penerim
- - - - - - - - Disanggupi oleh :
- - - - - - - - Nama Toko/Penyedia Baha
- - - - - - - - Alamat Toko/Penyedia Bah
- - - - - - - - Nomor Rekening Bank Tok
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - - B. Jumlah dana yang dita
- - - - - - - - No
- - - - - - - 1
- - - - - - - TOTAL TARIK TUNAI (B)
- - - 1.00 - - - - Terbilang : Tujuh Juta Lima R
- - - - 2.00 - - -
- - - - - 1.00 - - C. Total dana yang ditarik (
- - - - - - 2.00 - Dana Yang Ditarik (Rp.)
- - - - - - - Terbilang : Tujuh Juta Lima R
0 0 0 1 2 1 2 0
disahkan oleh:
Tim Teknis Kabupaten Ma
( .....................................
NIP.................................
DA
Nomor BNBA
Nama Penerima Bantuan
Nomor KTP
Alamat
Desa/Kelurahan
Kecamatan
Kabupaten/Kota
Nomor Rekening Penerim
Disanggupi oleh :
Nama Toko/Penyedia Baha
Alamat Toko/Penyedia Bah
Nomor Rekening Bank Tok
( .....................................
NIP.................................
Nomor BNBA : 0
Nama Penerima Bantuan : MUH SHOLEH
Nomor KTP : 0
Alamat : 0
Desa/Kelurahan : 0
Kecamatan : 0
Kabupaten/Kota : 0
Nomor Rekening Penerima Bantuan :
Disanggupi oleh :
Nama Toko/Penyedia Bahan Bangunan :
Alamat Toko/Penyedia Bahan Bangunan :
Nomor Rekening Bank Toko/ Penyedi BB :
........................................ .....2019
Diajukan Oleh :
Penerima Bantuan
MUH SHOLEH
Nomor BNBA : 0
Nama Penerima Bantuan : MUH SHOLEH
Nomor KTP : 0
Alamat : 0
Desa/Kelurahan : 0
Kecamatan : 0
Kabupaten/Kota : 0
Nomor Rekening Penerima Bantuan : 0
Disanggupi oleh :
Nama Toko/Penyedia Bahan Bangunan : 0
Alamat Toko/Penyedia Bahan Bangunan : 0
Nomor Rekening Bank Toko/ Penyedi BB : 0
(..................................................)
........................................ .....2019
Diajukan Oleh :
Penerima Bantuan
MUH SHOLEH
disahkan oleh: Diverifikasi oleh: Difasilitasi Oleh :
Tim Teknis Kabupaten Magelang Koordinator Fasilitator Tenaga Fasilitator Lapangan
HAP 1
Jumlah Harga
(Rp)
1,290,000
3,233,000
4,416,000
616,000
2,108,000
1,237,500
-
-
-
-
42,000
-
-
-
2,250,000
-
15,192,500 15,000,000
(192,500)
16,442,500
........................... .....2019
Diajukan Oleh :
Penerima Bantuan
MUH SHOLEH
Difasilitasi Oleh :
enaga Fasilitator Lapangan
.......................................)
Format IV - 2
HAP 2
Jumlah Harga
(Rp)
-
2,385,000
1,440,000
-
1,700,000
-
-
-
525,000
-
129,000
-
-
190,000
6,369,000
.................................)
7,619,000
..................................... .....2019
Diajukan Oleh :
Penerima Bantuan
MUH SHOLEH
Difasilitasi Oleh :
enaga Fasilitator Lapangan
.......................................)
RENCANA ANGGARAN BIAYA (RAB) BSPS
Nomor BNBA :
Nomor KTP :
Nama Penerima Bantuan : MUH SHOLEH
Alamat :
Desa/Kelurahan :
Kecamatan :
Kabupaten/Kota :
Jenis Kegiatan :
SUMBER DANA
HARGA TOTAL HARGA SWADAYA
NO URAIAN PEKERJAAN VOLUME SATUAN (Rp) (Rp) BSPS
Dana Tunai
I Pekerjaan Persiapan
Bongkar Rumah Lama 1.00 ls - - - -
II Pekerjaan Pondasi
-Seng Lbr - - -
-Genteng bubungan - Bh 5,000 - - -
-Bahan penutup atap lainnya yang diijinkan Lbr - - -
3 Listplang papan, Ukuran……. M³ - - -
X Pekerjaan Lantai
1 Lantai Rabat Campuran minimal 1:5, T= 5 cm 3.60 M3
........................................ .....20
Difasilitasi, Ketua KPB Diajukan Oleh,
Tenaga Fasilitator Lapangan Penerima Bantuan
( ...............................................) ( ....................................)
NIP..........................................
FORMAT III-17
dimensi 8 9 34 72 genteng
pekerjaan
atap kuda-kuda 0 -
penutup atap 86.4 -
pondasi Galian Tanah 7.65 -
Urugan Pasir 3.24 -
Pas. Batu belah 4.9725 -
beton sloof 1.02 -
12 kolom 0.81 -
balk 15x15 0.765 -
dinding bata 0 -
batako 102 -
Plesteran dinding 204 -
lantai 5cm 3.6 -
kayu gording 4 m 45 -
usuk 2 m 34 -
reng 2m 180 -
kusen pintu 80*200 cm 1 -
jendela 1 -
daun pintu 80*200 cm 1 -
jendela 1 -
pintu kmr 1 -
JUMLAH 0
SWADAYA
HARGA
MATERIAL VOL SATUAN
SATUAN
Urugan Pasir 240,000 3.00 M³
-Semen @ 50 kg 53,000 67.00 Zak
-Pasir pasang 240,000 17.60 M³
-Batu Kali 215,000 6.00 M³
-Besi beton Φ 10 mm SNI 68,000 36.00 Btg
-Besi beton Φ 8 mm SNI 37,500 35.00 Btg
-Batu pecah 280,000 2.30 M³
-Batu Bata 750 - Bh
-Batako 3,500 1,450.00 Bh
-Kusen Pintu, Ukuran 0,80 X 2,00 M 200,000 - Unit
-Kusen Jendela 150,000 - Unit
-Kusen Ventilasi, Ukuran…… - - Unit
-Daun Pintu Kayu, Ukuran 350,000 - Unit
-Daun Jendela Kayu, Ukuran 200,000 - Unit
-Handle Pintu dan Kunci Pintu - - Set
-Handle Jendela dan Kunci Jendela - - Set
-Engsel Pintu 35,000 - Set
-Engsel Jendela 21,000 - Set
-Kayu rangka kuda-kuda, Ukuran 6/12 x 4m 100,000 4.00 Btg
-Kayu gapit, Ukuran ……. - - Btg
-Kayu usuk, Ukuran 4/6 x 3m 27,000 - Btg
-Kayu Usuk, Ukuran 5/7 x 3m - - Btg
-Kayu Reng , Ukuran 2/3 x 3m 1,500 - Btg
-Seng gelombang (0,2 cm x 80 cm x 300 cm 78,000 - Lbr
-Genteng 1,250 - Bh
-Seng - - Lbr
-Genteng bubungan 5,000 - Bh
-Closet Jongkok 155,000 - Unit
-Pipa Air Bersih, Ukuran…… 27,500 - Btg
-Pipa Air Kotor, Ukuran…… 85,000 - Btg
-Kran 25,000 - Bh
-Pintu Kamar Mandi 210,000 - Set
Gamping 8,000 - Zak
Paku 15,000 4.83 Kg
Bendrat 20,000 7.00 Kg
Loster 5,000 10.00 Bh
Papan Bekisting - - Lbr
15,000,000
- 0
0
........................................ .....2019
Diajukan Oleh,
Penerima Bantuan
( ....................................)
Diverifikasi Oleh,
Koordinator Fasilitator
19,927,000 15,000,000
15,000,000
( ....................................)
-
4
20.25 1.0888888889 4.549 0.45
24.25 0.0108888889
3.00
6.00 9.00 3.00
5.00 0.70 0.80 12.00 12.00
4.00 0.50 0.70 12.00 12.00
4.00 0.50 0.60 12.00 11.00
- - -
23.00 7.40 1,275.00
21.00 5.40
1.00 0.10 0.20
- - - - - - - -
- - - - - - - -
- - - - - - - -
- 3.00 - - - - -
6.00 9.00 3.00 - - - - -
- 5.00 0.70 0.80 12.00 12.00 - -
- 4.00 0.50 0.70 12.00 12.00 - -
- 4.00 0.50 0.60 12.00 11.00 - -
- - - - - - - -
- 23.00 7.40 - - - - 1,450.00
- 21.00 5.40 - - - - -
- 1.00 0.10 0.20 - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
6 67 20.6 2.3 36 35 0 1450
REKAP VOL
BIAYA BSPS DANA BSPS
- -
2,650,000.00 50.00
2,208,000.00 9.20
- -
2,448,000.00 36.00
1,312,500.00 35.00
644,000.00 2.30
- -
5,075,000.00 1,450.00
- -
- -
- #DIV/0!
- -
- -
- #DIV/0!
- #DIV/0!
- -
- -
400,000.00 4.00
- #DIV/0!
- -
- #DIV/0!
- -
- -
- -
- #DIV/0!
- -
- -
- -
- -
- -
- -
- -
72,500.00 4.83
140,000.00 7.00
50,000.00 10.00
- #DIV/0!
15,000,000.00
DA
Nomor BNBA
Nama Penerima Bantuan
Nomor KTP
Alamat
Desa/Kelurahan
kayu kusen daun Kecamatan
Gording usuk reng pintu jendela pintu jendela pintu KM Kabupaten/Kota
Nomor Rekening Penerim
- - - - - - - - Disanggupi oleh :
- - - - - - - - Nama Toko/Penyedia Baha
- - - - - - - - Alamat Toko/Penyedia Bah
- - - - - - - - Nomor Rekening Bank Tok
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - - B. Jumlah dana yang dita
4.00 - - - - - - - No
- - - - - - - 1
- - - - - - - TOTAL TARIK TUNAI (B)
- - - - - - - - Terbilang : Tujuh Juta Lima R
- - - - - - - -
- - - - - - - - C. Total dana yang ditarik (
- - - - - - - - Dana Yang Ditarik (Rp.)
- - - - - - - Terbilang : Tujuh Juta Lima R
4 0 0 0 0 0 0 0
disahkan oleh:
Tim Teknis Kabupaten Ma
( .....................................
NIP.................................
DA
Nomor BNBA
Nama Penerima Bantuan
Nomor KTP
Alamat
Desa/Kelurahan
Kecamatan
Kabupaten/Kota
Nomor Rekening Penerim
Disanggupi oleh :
Nama Toko/Penyedia Baha
Alamat Toko/Penyedia Bah
Nomor Rekening Bank Tok
( .....................................
NIP.................................
Nomor BNBA : 0
Nama Penerima Bantuan : MUH SHOLEH
Nomor KTP : 0
Alamat : 0
Desa/Kelurahan : 0
Kecamatan : 0
Kabupaten/Kota : 0
Nomor Rekening Penerima Bantuan :
Disanggupi oleh :
Nama Toko/Penyedia Bahan Bangunan :
Alamat Toko/Penyedia Bahan Bangunan :
Nomor Rekening Bank Toko/ Penyedi BB :
........................................ .....2019
Diajukan Oleh :
Penerima Bantuan
MUH SHOLEH
Nomor BNBA : 0
Nama Penerima Bantuan : MUH SHOLEH
Nomor KTP : 0
Alamat : 0
Desa/Kelurahan : 0
Kecamatan : 0
Kabupaten/Kota : 0
Nomor Rekening Penerima Bantuan : 0
Disanggupi oleh :
Nama Toko/Penyedia Bahan Bangunan : 0
Alamat Toko/Penyedia Bahan Bangunan : 0
Nomor Rekening Bank Toko/ Penyedi BB : 0
(..................................................)
........................................ .....2019
Diajukan Oleh :
Penerima Bantuan
MUH SHOLEH
disahkan oleh: Diverifikasi oleh: Difasilitasi Oleh :
Tim Teknis Kabupaten Magelang Koordinator Fasilitator Tenaga Fasilitator Lapangan
HAP 1
Jumlah Harga
(Rp)
1,290,000
3,551,000
4,944,000
644,000
2,448,000
1,312,500
-
-
-
-
72,500
-
-
-
-
-
14,262,000 15,000,000
738,000
15,512,000
........................... .....2019
Diajukan Oleh :
Penerima Bantuan
MUH SHOLEH
Difasilitasi Oleh :
enaga Fasilitator Lapangan
.......................................)
Format IV - 2
HAP 2
Jumlah Harga
(Rp)
-
2,703,000
1,440,000
-
1,700,000
-
-
-
525,000
-
129,000
-
-
190,000
6,687,000
.................................)
7,937,000
..................................... .....2019
Diajukan Oleh :
Penerima Bantuan
MUH SHOLEH
Difasilitasi Oleh :
enaga Fasilitator Lapangan
.......................................)
RENCANA ANGGARAN BIAYA (RAB) BSPS
Nomor BNBA :
Nomor KTP :
Nama Penerima Bantuan : MUH SHOLEH
Alamat :
Desa/Kelurahan :
Kecamatan :
Kabupaten/Kota :
Jenis Kegiatan :
SUMBER DANA
HARGA TOTAL HARGA SWADAYA
NO URAIAN PEKERJAAN VOLUME SATUAN (Rp) (Rp) BSPS
Dana Tunai
I Pekerjaan Persiapan
Bongkar Rumah Lama 1.00 ls - - - -
II Pekerjaan Pondasi
-Seng Lbr - - -
-Genteng bubungan - Bh 5,000 - - -
-Bahan penutup atap lainnya yang diijinkan Lbr - - -
3 Listplang papan, Ukuran……. M³ - - -
X Pekerjaan Lantai
1 Lantai Rabat Campuran minimal 1:5, T= 5 cm 2.00 M3
........................................ .....20
Difasilitasi, Ketua KPB Diajukan Oleh,
Tenaga Fasilitator Lapangan Penerima Bantuan
( ...............................................) ( ....................................)
NIP..........................................
FORMAT III-17
dimensi 5 8 26 40 genteng
pekerjaan
atap kuda-kuda 0 -
penutup atap 48 1,400.00
pondasi Galian Tanah 5.85 -
Urugan Pasir 1.8 -
Pas. Batu belah 3.8025 -
beton sloof 0.78 -
8 kolom 0.54 -
balk 15x15 0.585 -
dinding bata 0 -
batako 78 -
Plesteran dinding 156 -
lantai 5cm 2 -
kayu gording 4 m 40 -
usuk 2 m 26 -
reng 2m 100 -
kusen pintu 80*200 cm 1 -
jendela 1 -
daun pintu 80*200 cm 1 -
jendela 1 -
pintu kmr 1 -
JUMLAH 1400
SWADAYA
HARGA
MATERIAL VOL SATUAN
SATUAN
Urugan Pasir 240,000 1.00 M³
-Semen @ 50 kg 53,000 49.00 Zak
-Pasir pasang 240,000 13.50 M³
-Batu Kali 215,000 5.00 M³
-Besi beton Φ 10 mm SNI 68,000 26.00 Btg
-Besi beton Φ 8 mm SNI 37,500 25.00 Btg
-Batu pecah 280,000 1.70 M³
-Batu Bata 750 - Bh
-Batako 3,500 500.00 Bh
-Kusen Pintu, Ukuran 0,80 X 2,00 M 200,000 2.00 Unit
-Kusen Jendela 150,000 2.00 Unit
-Kusen Ventilasi, Ukuran…… - - Unit
-Daun Pintu Kayu, Ukuran 350,000 2.00 Unit
-Daun Jendela Kayu, Ukuran 200,000 2.00 Unit
-Handle Pintu dan Kunci Pintu - - Set
-Handle Jendela dan Kunci Jendela - - Set
-Engsel Pintu 35,000 - Set
-Engsel Jendela 21,000 - Set
-Kayu rangka kuda-kuda, Ukuran 6/12 x 4m 100,000 10.00 Btg
-Kayu gapit, Ukuran ……. - - Btg
-Kayu usuk, Ukuran 4/6 x 3m 27,000 - Btg
-Kayu Usuk, Ukuran 5/7 x 3m - - Btg
-Kayu Reng , Ukuran 2/3 x 3m 1,500 - Btg
-Seng gelombang (0,2 cm x 80 cm x 300 cm 78,000 - Lbr
-Genteng 1,250 1,400.00 Bh
-Seng - - Lbr
-Genteng bubungan 5,000 - Bh
-Closet Jongkok 155,000 - Unit
-Pipa Air Bersih, Ukuran…… 27,500 - Btg
-Pipa Air Kotor, Ukuran…… 85,000 - Btg
-Kran 25,000 - Bh
-Pintu Kamar Mandi 210,000 - Set
Gamping 8,000 35.00 Zak
Paku 15,000 8.10 Kg
Bendrat 20,000 5.00 Kg
Loster 5,000 10.00 Bh
Papan Bekisting - - Lbr
15,000,000
- 0
0
........................................ .....2019
Diajukan Oleh,
Penerima Bantuan
( ....................................)
Diverifikasi Oleh,
Koordinator Fasilitator
17,185,000 15,000,000
15,000,000
( ....................................)
-
4
20.25 1.0888888889 4.549 0.45
24.25 0.0108888889
1.00
5.00 6.00 2.30
4.00 0.50 0.60 9.00 10.00
2.00 0.40 0.50 8.00 8.00
3.00 0.40 0.50 9.00 9.00
- - -
17.00 5.70 975.00
16.00 4.10
1.00 0.10 0.10
- - - - - - - -
- - - - - - - -
- - - - - - - -
- 1.00 - - - - -
5.00 6.00 2.30 - - - - -
- 4.00 0.50 0.60 9.00 10.00 - -
- 2.00 0.40 0.50 8.00 8.00 - -
- 3.00 0.40 0.50 9.00 9.00 - -
- - - - - - - -
- 17.00 5.70 - - - - 500.00
- 16.00 4.10 - - - - -
- 1.00 0.10 0.10 - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
5 49 14.5 1.7 26 27 0 500
REKAP VOL
BIAYA BSPS DANA BSPS
- -
2,279,000.00 43.00
2,688,000.00 11.20
- -
1,768,000.00 26.00
937,500.00 25.00
476,000.00 1.70
- -
1,750,000.00 500.00
400,000.00 2.00
300,000.00 2.00
- #DIV/0!
700,000.00 2.00
400,000.00 2.00
- #DIV/0!
- #DIV/0!
- -
- -
1,000,000.00 10.00
- #DIV/0!
- -
- #DIV/0!
- -
- -
1,750,000.00 1,400.00
- #DIV/0!
- -
- -
- -
- -
- -
- -
280,000.00 35.00
121,500.00 8.10
100,000.00 5.00
50,000.00 10.00
- #DIV/0!
15,000,000.00
DA
Nomor BNBA
Nama Penerima Bantuan
Nomor KTP
Alamat
Desa/Kelurahan
kayu kusen daun Kecamatan
Gording usuk reng pintu jendela pintu jendela pintu KM Kabupaten/Kota
Nomor Rekening Penerim
- - - - - - - - Disanggupi oleh :
- - - - - - - - Nama Toko/Penyedia Baha
- - - - - - - - Alamat Toko/Penyedia Bah
- - - - - - - - Nomor Rekening Bank Tok
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - - B. Jumlah dana yang dita
10.00 - - - - - - - No
- - - - - - - 1
- - - - - - - TOTAL TARIK TUNAI (B)
- - - 2.00 - - - - Terbilang : Tujuh Juta Lima R
- - - - 2.00 - - -
- - - - - 2.00 - - C. Total dana yang ditarik (
- - - - - - 2.00 - Dana Yang Ditarik (Rp.)
- - - - - - - Terbilang : Tujuh Juta Lima R
10 0 0 2 2 2 2 0
disahkan oleh:
Tim Teknis Kabupaten Ma
( .....................................
NIP.................................
DA
Nomor BNBA
Nama Penerima Bantuan
Nomor KTP
Alamat
Desa/Kelurahan
Kecamatan
Kabupaten/Kota
Nomor Rekening Penerim
Disanggupi oleh :
Nama Toko/Penyedia Baha
Alamat Toko/Penyedia Bah
Nomor Rekening Bank Tok
( .....................................
NIP.................................
Nomor BNBA : 0
Nama Penerima Bantuan : MUH SHOLEH
Nomor KTP : 0
Alamat : 0
Desa/Kelurahan : 0
Kecamatan : 0
Kabupaten/Kota : 0
Nomor Rekening Penerima Bantuan :
Disanggupi oleh :
Nama Toko/Penyedia Bahan Bangunan :
Alamat Toko/Penyedia Bahan Bangunan :
Nomor Rekening Bank Toko/ Penyedi BB :
........................................ .....2019
Diajukan Oleh :
Penerima Bantuan
MUH SHOLEH
Nomor BNBA : 0
Nama Penerima Bantuan : MUH SHOLEH
Nomor KTP : 0
Alamat : 0
Desa/Kelurahan : 0
Kecamatan : 0
Kabupaten/Kota : 0
Nomor Rekening Penerima Bantuan : 0
Disanggupi oleh :
Nama Toko/Penyedia Bahan Bangunan : 0
Alamat Toko/Penyedia Bahan Bangunan : 0
Nomor Rekening Bank Toko/ Penyedi BB : 0
(..................................................)
........................................ .....2019
Diajukan Oleh :
Penerima Bantuan
MUH SHOLEH
disahkan oleh: Diverifikasi oleh: Difasilitasi Oleh :
Tim Teknis Kabupaten Magelang Koordinator Fasilitator Tenaga Fasilitator Lapangan
HAP 1
Jumlah Harga
(Rp)
1,075,000
2,597,000
3,480,000
476,000
1,768,000
1,012,500
-
-
-
280,000
121,500
-
-
-
1,750,000
-
12,560,000 15,000,000
2,440,000
13,810,000
........................... .....2019
Diajukan Oleh :
Penerima Bantuan
MUH SHOLEH
Difasilitasi Oleh :
enaga Fasilitator Lapangan
.......................................)
Format IV - 2
HAP 2
Jumlah Harga
(Rp)
-
1,749,000
1,440,000
-
1,700,000
-
-
-
525,000
-
129,000
-
-
190,000
5,733,000
.................................)
6,983,000
..................................... .....2019
Diajukan Oleh :
Penerima Bantuan
MUH SHOLEH
Difasilitasi Oleh :
enaga Fasilitator Lapangan
.......................................)
RENCANA ANGGARAN BIAYA (RAB) BSPS
Nomor BNBA :
Nomor KTP :
Nama Penerima Bantuan : MUH SHOLEH
Alamat :
Desa/Kelurahan :
Kecamatan :
Kabupaten/Kota :
Jenis Kegiatan :
SUMBER DANA
HARGA TOTAL HARGA SWADAYA
NO URAIAN PEKERJAAN VOLUME SATUAN (Rp) (Rp) BSPS
Dana Tunai
I Pekerjaan Persiapan
Bongkar Rumah Lama 1.00 ls - - - -
II Pekerjaan Pondasi
-Seng Lbr - - -
-Genteng bubungan - Bh 5,000 - - -
-Bahan penutup atap lainnya yang diijinkan Lbr - - -
3 Listplang papan, Ukuran……. M³ - - -
X Pekerjaan Lantai
1 Lantai Rabat Campuran minimal 1:5, T= 5 cm 2.70 M3
........................................ ....
Difasilitasi, Ketua KPB Diajukan Oleh,
Tenaga Fasilitator Lapangan Penerima Bantuan
( ...............................................) ( ....................................)
NIP..........................................
FORMAT III-17
dimensi 6 9 30 54 genteng
pekerjaan
atap kuda-kuda 0 -
penutup atap 64.8 1,000.00
pondasi Galian Tanah 6.75 -
Urugan Pasir 2.43 -
Pas. Batu belah 4.3875 -
beton sloof 0.9 -
10 kolom 0.675 -
balk 15x15 0.675 -
dinding bata 90 -
batako -
Plesteran dinding 180 -
lantai 5cm 2.7 -
kayu gording 4 m 45 -
usuk 2 m 30 -
reng 2m 135 -
kusen pintu 80*200 cm 1 -
jendela 1 -
daun pintu 80*200 cm 1 -
jendela 1 -
pintu kmr 1 -
JUMLAH 1000
SWADAYA
HARGA
MATERIAL VOL SATUAN
SATUAN
Urugan Pasir 240,000 2.00 M³
-Semen @ 50 kg 53,000 57.00 Zak
-Pasir pasang 240,000 13.30 M³
-Batu Kali 215,000 5.00 M³
-Besi beton Φ 10 mm SNI 68,000 30.00 Btg
-Besi beton Φ 8 mm SNI 37,500 30.00 Btg
-Batu pecah 280,000 2.10 M³
-Batu Bata 750 5,000.00 Bh
-Batako 3,500 - Bh
-Kusen Pintu, Ukuran 0,80 X 2,00 M 200,000 1.00 Unit
-Kusen Jendela 150,000 - Unit
-Kusen Ventilasi, Ukuran…… - - Unit
-Daun Pintu Kayu, Ukuran 350,000 1.00 Unit
-Daun Jendela Kayu, Ukuran 200,000 10.00 Unit
-Handle Pintu dan Kunci Pintu - - Set
-Handle Jendela dan Kunci Jendela - - Set
-Engsel Pintu 35,000 - Set
-Engsel Jendela 21,000 - Set
-Kayu rangka kuda-kuda, Ukuran 8/12 x 4m 150,000 2.00 Btg
-Kayu gapit, Ukuran ……. - - Btg
-Kayu usuk, Ukuran 4/6 x 2m 22,000 - Btg
-Kayu Usuk, Ukuran 5/7 x 2m 27,000 - Btg
-Kayu Reng , Ukuran 2/3 x 2m 1,500 - Btg
-Seng gelombang (0,2 cm x 80 cm x 300 cm 78,000 - Lbr
-Genteng 1,250 1,000.00 Bh
-Seng - - Lbr
-Genteng bubungan 5,000 - Bh
-Closet Jongkok 155,000 - Unit
-Pipa Air Bersih, Ukuran…… 27,500 - Btg
-Pipa Air Kotor, Ukuran…… 85,000 - Btg
-Kran 25,000 - Bh
-Pintu Kamar Mandi 210,000 - Set
Gamping 8,000 - Zak
Paku 15,000 5.80 Kg
Bendrat 20,000 5.00 Kg
Loster 5,000 10.00 Bh
Papan Bekisting - - Lbr
15,000,000
- 0
0
........................................ .....2019
Diajukan Oleh,
Penerima Bantuan
( ....................................)
Diverifikasi Oleh,
Koordinator Fasilitator
19,608,000 15,000,000
15,000,000
( ....................................)
-
4
20.25 1.0888888889 4.549 0.45
24.25 0.0108888889
2.00
5.00 7.00 2.60
4.00 0.60 0.70 10.00 11.00
3.00 0.40 0.60 10.00 10.00
3.00 0.40 0.60 10.00 10.00
14.00 4.50 6,300.00
- - -
18.00 4.70
1.00 0.10 0.20
- - - - - - - -
- - - - - - - -
- - - - - - - -
- 2.00 - - - - -
5.00 7.00 2.60 - - - - -
- 4.00 0.60 0.70 10.00 11.00 - -
- 3.00 0.40 0.60 10.00 10.00 - -
- 3.00 0.40 0.60 10.00 10.00 - -
- 14.00 4.50 - - - 5,000.00 -
- - - - - - - -
- 25.00 4.70 - - - - -
- 1.00 0.10 0.20 - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
5 57 15.3 2.1 30 31 5000 0
REKAP VOL
BIAYA BSPS DANA BSPS
- -
1,855,000.00 35.00
1,680,000.00 7.00
- -
2,040,000.00 30.00
750,000.00 20.00
588,000.00 2.10
3,750,000.00 5,000.00
- -
200,000.00 1.00
- -
- #DIV/0!
350,000.00 1.00
2,000,000.00 10.00
- #DIV/0!
- #DIV/0!
- -
- -
300,000.00 2.00
- #DIV/0!
- -
- -
- -
- -
1,250,000.00 1,000.00
- #DIV/0!
- -
- -
- -
- -
- -
- -
- -
87,000.00 5.80
100,000.00 5.00
50,000.00 10.00
- #DIV/0!
15,000,000.00
DA
Nomor BNBA
Nama Penerima Bantuan
Nomor KTP
Alamat
Desa/Kelurahan
kayu kusen daun Kecamatan
Gording usuk reng pintu jendela pintu jendela pintu KM Kabupaten/Kota
Nomor Rekening Penerim
- - - - - - - - Disanggupi oleh :
- - - - - - - - Nama Toko/Penyedia Baha
- - - - - - - - Alamat Toko/Penyedia Bah
- - - - - - - - Nomor Rekening Bank Tok
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - - B. Jumlah dana yang dita
2.00 - - - - - - - No
- - - - - - - 1
- - - - - - - TOTAL TARIK TUNAI (B)
- - - 1.00 - - - - Terbilang : Tujuh Juta Lima R
- - - - - - - -
- - - - - 1.00 - - C. Total dana yang ditarik (
- - - - - - 10.00 - Dana Yang Ditarik (Rp.)
- - - - - - - - Terbilang : Tujuh Juta Lima R
2 0 0 1 0 1 10 0
disahkan oleh:
Tim Teknis Kabupaten Ma
( .....................................
NIP.................................
DA
Nomor BNBA
Nama Penerima Bantuan
Nomor KTP
Alamat
Desa/Kelurahan
Kecamatan
Kabupaten/Kota
Nomor Rekening Penerim
Disanggupi oleh :
Nama Toko/Penyedia Baha
Alamat Toko/Penyedia Bah
Nomor Rekening Bank Tok
( .....................................
NIP.................................
Nomor BNBA : 0
Nama Penerima Bantuan : MUH SHOLEH
Nomor KTP : 0
Alamat : 0
Desa/Kelurahan : 0
Kecamatan : 0
Kabupaten/Kota : 0
Nomor Rekening Penerima Bantuan :
Disanggupi oleh :
Nama Toko/Penyedia Bahan Bangunan :
Alamat Toko/Penyedia Bahan Bangunan :
Nomor Rekening Bank Toko/ Penyedi BB :
........................................ .....2019
Diajukan Oleh :
Penerima Bantuan
MUH SHOLEH
Nomor BNBA : 0
Nama Penerima Bantuan : MUH SHOLEH
Nomor KTP : 0
Alamat : 0
Desa/Kelurahan : 0
Kecamatan : 0
Kabupaten/Kota : 0
Nomor Rekening Penerima Bantuan : 0
Disanggupi oleh :
Nama Toko/Penyedia Bahan Bangunan : 0
Alamat Toko/Penyedia Bahan Bangunan : 0
Nomor Rekening Bank Toko/ Penyedi BB : 0
(..................................................)
........................................ .....2019
Diajukan Oleh :
Penerima Bantuan
MUH SHOLEH
disahkan oleh: Diverifikasi oleh: Difasilitasi Oleh :
Tim Teknis Kabupaten Magelang Koordinator Fasilitator Tenaga Fasilitator Lapangan
HAP 1
Jumlah Harga
(Rp)
1,075,000
3,021,000
3,672,000
588,000
2,040,000
1,162,500
-
-
3,750,000
-
87,000
-
-
-
1,250,000
-
16,645,500 15,000,000
(1,645,500)
17,895,500
........................... .....2019
Diajukan Oleh :
Penerima Bantuan
MUH SHOLEH
Difasilitasi Oleh :
enaga Fasilitator Lapangan
.......................................)
Format IV - 2
HAP 2
Jumlah Harga
(Rp)
-
2,173,000
1,440,000
-
1,700,000
-
-
-
525,000
-
129,000
-
-
190,000
6,157,000
.................................)
7,407,000
..................................... .....2019
Diajukan Oleh :
Penerima Bantuan
MUH SHOLEH
Difasilitasi Oleh :
enaga Fasilitator Lapangan
.......................................)
RENCANA ANGGARAN BIAYA (RAB) BSPS
Nomor BNBA :
Nomor KTP :
Nama Penerima Bantuan : MUH SHOLEH
Alamat :
Desa/Kelurahan :
Kecamatan :
Kabupaten/Kota :
Jenis Kegiatan :
SUMBER DANA
HARGA TOTAL HARGA SWADAYA
NO URAIAN PEKERJAAN VOLUME SATUAN (Rp) (Rp) BSPS
Dana Tunai
I Pekerjaan Persiapan
Bongkar Rumah Lama 1.00 ls - - - -
II Pekerjaan Pondasi
-Seng Lbr - - -
-Genteng bubungan - Bh 5,000 - - -
-Bahan penutup atap lainnya yang diijinkan Lbr - - -
3 Listplang papan, Ukuran……. M³ - - -
X Pekerjaan Lantai
1 Lantai Rabat Campuran minimal 1:5, T= 5 cm 2.70 M3
........................................ ....
Difasilitasi, Ketua KPB Diajukan Oleh,
Tenaga Fasilitator Lapangan Penerima Bantuan
( ...............................................) ( ....................................)
NIP..........................................
FORMAT III-17
dimensi 6 9 30 54 genteng
pekerjaan
atap kuda-kuda 0 -
penutup atap 64.8 -
pondasi Galian Tanah 6.75 -
Urugan Pasir 2.43 -
Pas. Batu belah 4.3875 -
beton sloof 0.9 -
10 kolom 0.675 -
balk 15x15 0.675 -
dinding bata 90 -
batako -
Plesteran dinding 180 -
lantai 5cm 2.7 -
kayu gording 4 m 45 -
usuk 2 m 30 -
reng 2m 135 -
kusen pintu 80*200 cm 1 -
jendela 1 -
daun pintu 80*200 cm 1 -
jendela 1 -
pintu kmr 1 -
JUMLAH 0
SWADAYA
HARGA
MATERIAL VOL SATUAN
SATUAN
Urugan Pasir 240,000 2.00 M³
-Semen @ 50 kg 53,000 57.00 Zak
-Pasir pasang 240,000 13.30 M³
-Batu Kali 215,000 5.00 M³
-Besi beton Φ 10 mm SNI 68,000 30.00 Btg
-Besi beton Φ 8 mm SNI 37,500 30.00 Btg
-Batu pecah 280,000 2.10 M³
-Batu Bata 750 5,000.00 Bh
-Batako 3,500 - Bh
-Kusen Pintu, Ukuran 0,80 X 2,00 M 200,000 2.00 Unit
-Kusen Jendela 150,000 3.00 Unit
-Kusen Ventilasi, Ukuran…… - - Unit
-Daun Pintu Kayu, Ukuran 350,000 2.00 Unit
-Daun Jendela Kayu, Ukuran 200,000 3.00 Unit
-Handle Pintu dan Kunci Pintu - - Set
-Handle Jendela dan Kunci Jendela - - Set
-Engsel Pintu 35,000 - Set
-Engsel Jendela 21,000 - Set
-Kayu rangka kuda-kuda, Ukuran 8/12 x 4m 150,000 - Btg
-Kayu gapit, Ukuran ……. - - Btg
-Kayu usuk, Ukuran 4/6 x 2m 22,000 - Btg
-Kayu Usuk, Ukuran 5/7 x 2m 27,000 - Btg
-Kayu Reng , Ukuran 2/3 x 2m 1,500 - Btg
-Seng gelombang (0,2 cm x 80 cm x 300 cm 78,000 - Lbr
-Genteng 1,250 - Bh
-Seng - - Lbr
-Genteng bubungan 5,000 - Bh
-Closet Jongkok 155,000 - Unit
-Pipa Air Bersih, Ukuran…… 27,500 - Btg
-Pipa Air Kotor, Ukuran…… 85,000 - Btg
-Kran 25,000 - Bh
-Pintu Kamar Mandi 210,000 - Set
Gamping 8,000 30.00 Zak
Paku 15,000 5.93 Kg
Bendrat 20,000 4.00 Kg
Loster 5,000 10.00 Bh
Papan Bekisting - - Lbr
15,000,000
- 0
0
........................................ .....2019
Diajukan Oleh,
Penerima Bantuan
( ....................................)
Diverifikasi Oleh,
Koordinator Fasilitator
17,880,000 15,000,000
15,000,000
( ....................................)
-
4
20.25 1.0888888889 4.549 0.45
24.25 0.0108888889
2.00
5.00 7.00 2.60
4.00 0.60 0.70 10.00 11.00
3.00 0.40 0.60 10.00 10.00
3.00 0.40 0.60 10.00 10.00
14.00 4.50 6,300.00
- - -
18.00 4.70
1.00 0.10 0.20
- - - - - - - -
- - - - - - - -
- - - - - - - -
- 2.00 - - - - -
5.00 7.00 2.60 - - - - -
- 4.00 0.60 0.70 10.00 11.00 - -
- 3.00 0.40 0.60 10.00 10.00 - -
- 3.00 0.40 0.60 10.00 10.00 - -
- 14.00 4.50 - - - 5,000.00 -
- - - - - - - -
- 25.00 4.70 - - - - -
- 1.00 0.10 0.20 - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
5 57 15.3 2.1 30 31 5000 0
REKAP VOL
BIAYA BSPS DANA BSPS
- -
1,696,000.00 32.00
3,192,000.00 13.30
- -
2,040,000.00 30.00
1,125,000.00 30.00
588,000.00 2.10
3,750,000.00 5,000.00
- -
400,000.00 2.00
450,000.00 3.00
- #DIV/0!
700,000.00 2.00
600,000.00 3.00
- #DIV/0!
- #DIV/0!
- -
- -
- -
- #DIV/0!
- -
- -
- -
- -
- -
- #DIV/0!
- -
- -
- -
- -
- -
- -
240,000.00 30.00
89,000.00 5.93
80,000.00 4.00
50,000.00 10.00
- #DIV/0!
15,000,000.00
DA
Nomor BNBA
Nama Penerima Bantuan
Nomor KTP
Alamat
Desa/Kelurahan
kayu kusen daun Kecamatan
Gording usuk reng pintu jendela pintu jendela pintu KM Kabupaten/Kota
Nomor Rekening Penerim
- - - - - - - - Disanggupi oleh :
- - - - - - - - Nama Toko/Penyedia Baha
- - - - - - - - Alamat Toko/Penyedia Bah
- - - - - - - - Nomor Rekening Bank Tok
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - - B. Jumlah dana yang dita
- - - - - - - - No
- - - - - - - 1
- - - - - - - TOTAL TARIK TUNAI (B)
- - - 2.00 - - - - Terbilang : Tujuh Juta Lima R
- - - - 3.00 - - -
- - - - - 2.00 - - C. Total dana yang ditarik (
- - - - - - 3.00 - Dana Yang Ditarik (Rp.)
- - - - - - - - Terbilang : Tujuh Juta Lima R
0 0 0 2 3 2 3 0
disahkan oleh:
Tim Teknis Kabupaten Ma
( .....................................
NIP.................................
DA
Nomor BNBA
Nama Penerima Bantuan
Nomor KTP
Alamat
Desa/Kelurahan
Kecamatan
Kabupaten/Kota
Nomor Rekening Penerim
Disanggupi oleh :
Nama Toko/Penyedia Baha
Alamat Toko/Penyedia Bah
Nomor Rekening Bank Tok
( .....................................
NIP.................................
Nomor BNBA : 0
Nama Penerima Bantuan : MUH SHOLEH
Nomor KTP : 0
Alamat : 0
Desa/Kelurahan : 0
Kecamatan : 0
Kabupaten/Kota : 0
Nomor Rekening Penerima Bantuan :
Disanggupi oleh :
Nama Toko/Penyedia Bahan Bangunan :
Alamat Toko/Penyedia Bahan Bangunan :
Nomor Rekening Bank Toko/ Penyedi BB :
........................................ .....2019
Diajukan Oleh :
Penerima Bantuan
MUH SHOLEH
Nomor BNBA : 0
Nama Penerima Bantuan : MUH SHOLEH
Nomor KTP : 0
Alamat : 0
Desa/Kelurahan : 0
Kecamatan : 0
Kabupaten/Kota : 0
Nomor Rekening Penerima Bantuan : 0
Disanggupi oleh :
Nama Toko/Penyedia Bahan Bangunan : 0
Alamat Toko/Penyedia Bahan Bangunan : 0
Nomor Rekening Bank Toko/ Penyedi BB : 0
(..................................................)
........................................ .....2019
Diajukan Oleh :
Penerima Bantuan
MUH SHOLEH
disahkan oleh: Diverifikasi oleh: Difasilitasi Oleh :
Tim Teknis Kabupaten Magelang Koordinator Fasilitator Tenaga Fasilitator Lapangan
HAP 1
Jumlah Harga
(Rp)
1,075,000
3,021,000
3,672,000
588,000
2,040,000
1,162,500
-
-
3,750,000
240,000
89,000
-
-
-
-
-
15,637,500 15,000,000
(637,500)
16,887,500
........................... .....2019
Diajukan Oleh :
Penerima Bantuan
MUH SHOLEH
Difasilitasi Oleh :
enaga Fasilitator Lapangan
.......................................)
Format IV - 2
HAP 2
Jumlah Harga
(Rp)
-
2,173,000
1,440,000
-
1,700,000
-
-
-
525,000
-
129,000
-
-
190,000
6,157,000
.................................)
7,407,000
..................................... .....2019
Diajukan Oleh :
Penerima Bantuan
MUH SHOLEH
Difasilitasi Oleh :
enaga Fasilitator Lapangan
.......................................)
RENCANA ANGGARAN BIAYA (RAB) BSPS
Nomor BNBA :
Nomor KTP :
Nama Penerima Bantuan : MUH SHOLEH
Alamat :
Desa/Kelurahan :
Kecamatan :
Kabupaten/Kota :
Jenis Kegiatan :
SUMBER DANA
HARGA TOTAL HARGA SWADAYA
NO URAIAN PEKERJAAN VOLUME SATUAN (Rp) (Rp) BSPS
Dana Tunai
I Pekerjaan Persiapan
Bongkar Rumah Lama 1.00 ls - - - -
II Pekerjaan Pondasi
-Seng Lbr - - -
-Genteng bubungan - Bh 5,000 - - -
-Bahan penutup atap lainnya yang diijinkan Lbr - - -
3 Listplang papan, Ukuran……. M³ - - -
X Pekerjaan Lantai
1 Lantai Rabat Campuran minimal 1:5, T= 5 cm 2.10 M3
........................................ .....20
Difasilitasi, Ketua KPB Diajukan Oleh,
Tenaga Fasilitator Lapangan Penerima Bantuan
( ...............................................) ( ....................................)
NIP..........................................
FORMAT III-17
dimensi 6 7 26 42 genteng
pekerjaan
atap kuda-kuda 0 -
penutup atap 50.4 -
pondasi Galian Tanah 5.85 -
Urugan Pasir 1.89 -
Pas. Batu belah 3.8025 -
beton sloof 0.78 -
8 kolom 0.54 -
balk 15x15 0.585 -
dinding bata 0 -
batako 78 -
Plesteran dinding 156 -
lantai 5cm 2.1 -
kayu gording 4 m 35 -
usuk 3 m 26 -
reng 3 m 105 -
kusen pintu 80*200 cm 1 -
jendela 1 -
daun pintu 80*200 cm 1 -
jendela 1 -
pintu kmr 1 -
JUMLAH 0
SWADAYA
HARGA
MATERIAL VOL SATUAN
SATUAN
Urugan Pasir 240,000 2.00 M³
-Semen @ 50 kg 53,000 49.00 Zak
-Pasir pasang 240,000 13.50 M³
-Batu Kali 215,000 5.00 M³
-Besi beton Φ 10 mm SNI 68,000 26.00 Btg
-Besi beton Φ 8 mm SNI 37,500 25.00 Btg
-Batu pecah 280,000 1.70 M³
-Batu Bata 750 - Bh
-Batako 3,500 1,400.00 Bh
-Kusen Pintu, Ukuran 0,80 X 2,00 M 200,000 2.00 Unit
-Kusen Jendela 150,000 2.00 Unit
-Kusen Ventilasi, Ukuran…… - - Unit
-Daun Pintu Kayu, Ukuran 350,000 2.00 Unit
-Daun Jendela Kayu, Ukuran 200,000 2.00 Unit
-Handle Pintu dan Kunci Pintu - - Set
-Handle Jendela dan Kunci Jendela - - Set
-Engsel Pintu 35,000 - Set
-Engsel Jendela 21,000 - Set
-Kayu rangka kuda-kuda, Ukuran 6/12 x 4m 100,000 - Btg
-Kayu gapit, Ukuran ……. - - Btg
-Kayu usuk, Ukuran 4/6 x 3 m 27,000 - Btg
-Usuk bambu 5,500 - Btg
-Reng bambu 1,500 - Btg
-Seng gelombang (0,2 cm x 80 cm x 300 cm 78,000 - Lbr
-Genteng 1,250 - Bh
-Seng - - Lbr
-Genteng bubungan 5,000 - Bh
-Closet Jongkok 155,000 - Unit
-Pipa Air Bersih, Ukuran…… 27,500 - Btg
-Pipa Air Kotor, Ukuran…… 85,000 - Btg
-Kran 25,000 - Bh
-Pintu Kamar Mandi 210,000 - Set
Gamping 8,000 - Zak
Paku 15,000 9.23 Kg
Bendrat 20,000 5.00 Kg
Loster 5,000 10.00 Bh
Papan Bekisting - - Lbr
15,000,000
- 0
0
........................................ .....2019
Diajukan Oleh,
Penerima Bantuan
( ....................................)
Diverifikasi Oleh,
Koordinator Fasilitator
17,562,000 15,000,000
15,000,000
( ....................................)
-
4
20.25 1.0888888889 4.549 0.45
24.25 0.0108888889
2.00
5.00 6.00 2.30
4.00 0.50 0.60 9.00 10.00
2.00 0.40 0.50 8.00 8.00
3.00 0.40 0.50 9.00 9.00
- - -
17.00 5.70 975.00
16.00 4.10
1.00 0.10 0.10
- - - - - - - -
- - - - - - - -
- - - - - - - -
- 2.00 - - - - -
5.00 6.00 2.30 - - - - -
- 4.00 0.50 0.60 9.00 10.00 - -
- 2.00 0.40 0.50 8.00 8.00 - -
- 3.00 0.40 0.50 9.00 9.00 - -
- - - - - - - -
- 17.00 5.70 - - - - 1,400.00
- 16.00 4.10 - - - - -
- 1.00 0.10 0.10 - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
5 49 15.5 1.7 26 27 0 1400
REKAP VOL
BIAYA BSPS DANA BSPS
- -
1,590,000.00 30.00
3,240,000.00 13.50
- -
1,768,000.00 26.00
937,500.00 25.00
476,000.00 1.70
- -
4,900,000.00 1,400.00
400,000.00 2.00
300,000.00 2.00
- #DIV/0!
700,000.00 2.00
400,000.00 2.00
- #DIV/0!
- #DIV/0!
- -
- -
- -
- #DIV/0!
- -
- -
- -
- -
- -
- #DIV/0!
- -
- -
- -
- -
- -
- -
- -
138,500.00 9.23
100,000.00 5.00
50,000.00 10.00
- #DIV/0!
15,000,000.00
DA
Nomor BNBA
Nama Penerima Bantuan
Nomor KTP
Alamat
Desa/Kelurahan
kayu kusen daun Kecamatan
Gording usuk reng pintu jendela pintu jendela pintu KM Kabupaten/Kota
Nomor Rekening Penerim
- - - - - - - - Disanggupi oleh :
- - - - - - - - Nama Toko/Penyedia Baha
- - - - - - - - Alamat Toko/Penyedia Bah
- - - - - - - - Nomor Rekening Bank Tok
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - - B. Jumlah dana yang dita
- - - - - - - - No
- - - - - - - - 1
- - - - - - - TOTAL TARIK TUNAI (B)
- - - 2.00 - - - - Terbilang : Tujuh Juta Lima R
- - - - 2.00 - - -
- - - - - 2.00 - - C. Total dana yang ditarik (
- - - - - - 2.00 - Dana Yang Ditarik (Rp.)
- - - - - - - Terbilang : Tujuh Juta Lima R
0 0 0 2 2 2 2 0
disahkan oleh:
Tim Teknis Kabupaten Ma
( .....................................
NIP.................................
DA
Nomor BNBA
Nama Penerima Bantuan
Nomor KTP
Alamat
Desa/Kelurahan
Kecamatan
Kabupaten/Kota
Nomor Rekening Penerim
Disanggupi oleh :
Nama Toko/Penyedia Baha
Alamat Toko/Penyedia Bah
Nomor Rekening Bank Tok
( .....................................
NIP.................................
Nomor BNBA : 0
Nama Penerima Bantuan : MUH SHOLEH
Nomor KTP : 0
Alamat : 0
Desa/Kelurahan : 0
Kecamatan : 0
Kabupaten/Kota : 0
Nomor Rekening Penerima Bantuan :
Disanggupi oleh :
Nama Toko/Penyedia Bahan Bangunan :
Alamat Toko/Penyedia Bahan Bangunan :
Nomor Rekening Bank Toko/ Penyedi BB :
........................................ .....2019
Diajukan Oleh :
Penerima Bantuan
MUH SHOLEH
Nomor BNBA : 0
Nama Penerima Bantuan : MUH SHOLEH
Nomor KTP : 0
Alamat : 0
Desa/Kelurahan : 0
Kecamatan : 0
Kabupaten/Kota : 0
Nomor Rekening Penerima Bantuan : 0
Disanggupi oleh :
Nama Toko/Penyedia Bahan Bangunan : 0
Alamat Toko/Penyedia Bahan Bangunan : 0
Nomor Rekening Bank Toko/ Penyedi BB : 0
(..................................................)
........................................ .....2019
Diajukan Oleh :
Penerima Bantuan
MUH SHOLEH
disahkan oleh: Diverifikasi oleh: Difasilitasi Oleh :
Tim Teknis Kabupaten Magelang Koordinator Fasilitator Tenaga Fasilitator Lapangan
HAP 1
Jumlah Harga
(Rp)
1,075,000
2,597,000
3,720,000
476,000
1,768,000
1,012,500
-
-
-
-
138,500
-
-
-
-
-
10,787,000 15,000,000
4,213,000
12,037,000
........................... .....2019
Diajukan Oleh :
Penerima Bantuan
MUH SHOLEH
Difasilitasi Oleh :
enaga Fasilitator Lapangan
.......................................)
Format IV - 2
HAP 2
Jumlah Harga
(Rp)
-
1,749,000
1,440,000
-
1,700,000
-
-
-
525,000
-
129,000
-
-
190,000
5,733,000
.................................)
6,983,000
..................................... .....2019
Diajukan Oleh :
Penerima Bantuan
MUH SHOLEH
Difasilitasi Oleh :
enaga Fasilitator Lapangan
.......................................)
RENCANA ANGGARAN BIAYA (RAB) BSPS
Nomor BNBA :
Nomor KTP :
Nama Penerima Bantuan : MUH SHOLEH
Alamat :
Desa/Kelurahan :
Kecamatan :
Kabupaten/Kota :
Jenis Kegiatan :
SUMBER DANA
HARGA TOTAL HARGA SWADAYA
NO URAIAN PEKERJAAN VOLUME SATUAN (Rp) (Rp) BSPS
Dana Tunai
I Pekerjaan Persiapan
Bongkar Rumah Lama 1.00 ls - - - -
II Pekerjaan Pondasi
-Seng Lbr - - -
-Genteng bubungan - Bh 5,000 - - -
-Bahan penutup atap lainnya yang diijinkan Lbr - - -
3 Listplang papan, Ukuran……. M³ - - -
X Pekerjaan Lantai
1 Lantai Rabat Campuran minimal 1:5, T= 5 cm 2.70 M3
........................................ .....20
Difasilitasi, Ketua KPB Diajukan Oleh,
Tenaga Fasilitator Lapangan Penerima Bantuan
( ...............................................) ( ....................................)
NIP..........................................
FORMAT III-17
dimensi 9 6 30 54 genteng
pekerjaan
atap kuda-kuda 0 -
penutup atap 64.8 -
pondasi Galian Tanah 6.75 -
Urugan Pasir 2.43 -
Pas. Batu belah 4.3875 -
beton sloof 0.9 -
10 kolom 0.675 -
balk 15x15 0.675 -
dinding bata 0 -
batako 90 -
Plesteran dinding 180 -
lantai 5cm 2.7 -
kayu gording 4 m 30 -
usuk 3 m 30 -
reng 3 m 135 -
kusen pintu 80*200 cm 1 -
jendela 1 -
daun pintu 80*200 cm 1 -
jendela 1 -
pintu kmr 1 -
JUMLAH 0
SWADAYA
HARGA
MATERIAL VOL SATUAN
SATUAN
Urugan Pasir 240,000 2.00 M³
-Semen @ 50 kg 53,000 56.00 Zak
-Pasir pasang 240,000 15.30 M³
-Batu Kali 215,000 5.00 M³
-Besi beton Φ 10 mm SNI 68,000 30.00 Btg
-Besi beton Φ 8 mm SNI 37,500 30.00 Btg
-Batu pecah 280,000 2.10 M³
-Batu Bata 750 - Bh
-Batako 3,500 1,250.00 Bh
-Kusen Pintu, Ukuran 0,80 X 2,00 M 200,000 2.00 Unit
-Kusen Jendela 150,000 - Unit
-Kusen Ventilasi, Ukuran…… - - Unit
-Daun Pintu Kayu, Ukuran 350,000 2.00 Unit
-Daun Jendela Kayu, Ukuran 200,000 - Unit
-Handle Pintu dan Kunci Pintu - - Set
-Handle Jendela dan Kunci Jendela - - Set
-Engsel Pintu 35,000 - Set
-Engsel Jendela 21,000 - Set
-Kayu rangka kuda-kuda, Ukuran 6/12 x 4m 100,000 - Btg
-Kayu gapit, Ukuran ……. - - Btg
-Kayu usuk, Ukuran 4/6 x 3 m 27,000 - Btg
-Usuk bambu 4m 5,500 - m
-Reng bambu 4m 1,500 - m
-Seng gelombang (0,2 cm x 80 cm x 300 cm 78,000 - Lbr
-Genteng 1,250 - Bh
-Seng - - Lbr
-Genteng bubungan 5,000 - Bh
-Closet Jongkok 155,000 - Unit
-Pipa Air Bersih, Ukuran…… 27,500 - Btg
-Pipa Air Kotor, Ukuran…… 85,000 - Btg
-Kran 25,000 - Bh
-Pintu Kamar Mandi 210,000 - Set
Gamping 8,000 - Zak
Paku 15,000 5.00 Kg
Bendrat 20,000 8.05 Kg
Loster 5,000 10.00 Bh
Papan Bekisting - - Lbr
15,000,000
- 0
0
........................................ .....2019 0
Diajukan Oleh,
Penerima Bantuan
( ....................................)
Diverifikasi Oleh,
Koordinator Fasilitator
17,709,000 15,000,000
15,000,000
( ....................................)
-
4
20.25 1.0888888889 4.549 0.45
24.25 0.0108888889
2.00
5.00 7.00 2.60
4.00 0.60 0.70 10.00 11.00
3.00 0.40 0.60 10.00 10.00
3.00 0.40 0.60 10.00 10.00
- - -
20.00 6.50 1,125.00
18.00 4.70
1.00 0.10 0.20
- - - - - - - -
- - - - - - - -
- - - - - - - -
- 2.00 - - - - -
5.00 7.00 2.60 - - - - -
- 4.00 0.60 0.70 10.00 11.00 - -
- 3.00 0.40 0.60 10.00 10.00 - -
- 3.00 0.40 0.60 10.00 10.00 - -
- - - - - - - -
- 20.00 6.50 - - - - 1,250.00
- 18.00 4.70 - - - - -
- 1.00 0.10 0.20 - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
5 56 17.3 2.1 30 31 0 1250
REKAP VOL
BIAYA BSPS DANA BSPS
- -
2,438,000.00 46.00
3,048,000.00 12.70
- -
2,040,000.00 30.00
1,125,000.00 30.00
588,000.00 2.10
- -
4,375,000.00 1,250.00
400,000.00 2.00
- -
- #DIV/0!
700,000.00 2.00
- -
- #DIV/0!
- #DIV/0!
- -
- -
- -
- #DIV/0!
- -
- -
- -
- -
- -
- #DIV/0!
- -
- -
- -
- -
- -
- -
- -
75,000.00 5.00
161,000.00 8.05
50,000.00 10.00
- #DIV/0!
15,000,000.00
DA
Nomor BNBA
Nama Penerima Bantuan
Nomor KTP
Alamat
Desa/Kelurahan
kayu kusen daun Kecamatan
Gording usuk reng pintu jendela pintu jendela pintu KM Kabupaten/Kota
Nomor Rekening Penerim
- - - - - - - - Disanggupi oleh :
- - - - - - - - Nama Toko/Penyedia Baha
- - - - - - - - Alamat Toko/Penyedia Bah
- - - - - - - - Nomor Rekening Bank Tok
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - - B. Jumlah dana yang dita
- - - - - - - - No
- - - - - - - - 1
- - - - - - - - TOTAL TARIK TUNAI (B)
- - - 2.00 - - - - Terbilang : Tujuh Juta Lima R
- - - - - - - -
- - - - - 2.00 - - C. Total dana yang ditarik (
- - - - - - - - Dana Yang Ditarik (Rp.)
- - - - - - - Terbilang : Tujuh Juta Lima R
0 0 0 2 0 2 0 0
disahkan oleh:
Tim Teknis Kabupaten Ma
( .....................................
NIP.................................
DA
Nomor BNBA
Nama Penerima Bantuan
Nomor KTP
Alamat
Desa/Kelurahan
Kecamatan
Kabupaten/Kota
Nomor Rekening Penerim
Disanggupi oleh :
Nama Toko/Penyedia Baha
Alamat Toko/Penyedia Bah
Nomor Rekening Bank Tok
( .....................................
NIP.................................
Nomor BNBA : 0
Nama Penerima Bantuan : MUH SHOLEH
Nomor KTP : 0
Alamat : 0
Desa/Kelurahan : 0
Kecamatan : 0
Kabupaten/Kota : 0
Nomor Rekening Penerima Bantuan :
Disanggupi oleh :
Nama Toko/Penyedia Bahan Bangunan :
Alamat Toko/Penyedia Bahan Bangunan :
Nomor Rekening Bank Toko/ Penyedi BB :
........................................ .....2019
Diajukan Oleh :
Penerima Bantuan
MUH SHOLEH
Nomor BNBA : 0
Nama Penerima Bantuan : MUH SHOLEH
Nomor KTP : 0
Alamat : 0
Desa/Kelurahan : 0
Kecamatan : 0
Kabupaten/Kota : 0
Nomor Rekening Penerima Bantuan : 0
Disanggupi oleh :
Nama Toko/Penyedia Bahan Bangunan : 0
Alamat Toko/Penyedia Bahan Bangunan : 0
Nomor Rekening Bank Toko/ Penyedi BB : 0
(..................................................)
........................................ .....2019
Diajukan Oleh :
Penerima Bantuan
MUH SHOLEH
disahkan oleh: Diverifikasi oleh: Difasilitasi Oleh :
Tim Teknis Kabupaten Magelang Koordinator Fasilitator Tenaga Fasilitator Lapangan
HAP 1
Jumlah Harga
(Rp)
1,075,000
2,968,000
4,152,000
588,000
2,040,000
1,162,500
-
-
-
-
75,000
-
-
-
-
-
12,060,500 15,000,000
2,939,500
13,310,500
........................... .....2019
Diajukan Oleh :
Penerima Bantuan
MUH SHOLEH
Difasilitasi Oleh :
enaga Fasilitator Lapangan
.......................................)
Format IV - 2
HAP 2
Jumlah Harga
(Rp)
-
2,120,000
1,440,000
-
1,700,000
-
-
-
525,000
-
129,000
-
-
190,000
6,104,000
.................................)
7,354,000
..................................... .....2019
Diajukan Oleh :
Penerima Bantuan
MUH SHOLEH
Difasilitasi Oleh :
enaga Fasilitator Lapangan
.......................................)
RENCANA ANGGARAN BIAYA (RAB) BSPS
Nomor BNBA :
Nomor KTP :
Nama Penerima Bantuan : MUH SHOLEH
Alamat :
Desa/Kelurahan :
Kecamatan :
Kabupaten/Kota :
Jenis Kegiatan :
SUMBER DANA
HARGA TOTAL HARGA SWADAYA
NO URAIAN PEKERJAAN VOLUME SATUAN (Rp) (Rp) BSPS
Dana Tunai
I Pekerjaan Persiapan
Bongkar Rumah Lama 1.00 ls - - - -
II Pekerjaan Pondasi
-Seng Lbr - - -
-Genteng bubungan - Bh 5,000 - - -
-Bahan penutup atap lainnya yang diijinkan Lbr - - -
3 Listplang papan, Ukuran……. M³ - - -
X Pekerjaan Lantai
1 Lantai Rabat Campuran minimal 1:5, T= 5 cm 2.70 M3
........................................ .....20
Difasilitasi, Ketua KPB Diajukan Oleh,
Tenaga Fasilitator Lapangan Penerima Bantuan
( ...............................................) ( ....................................)
NIP..........................................
FORMAT III-17
dimensi 6 9 30 54 genteng
pekerjaan
atap kuda-kuda 0 -
penutup atap 64.8 1,500.00
pondasi Galian Tanah 6.75 -
Urugan Pasir 2.43 -
Pas. Batu belah 4.3875 -
beton sloof 0.9 -
10 kolom 0.675 -
balk 15x15 0.675 -
dinding bata 0 -
batako 90 -
Plesteran dinding 180 -
lantai 5cm 2.7 -
kayu gording 4 m 45 -
usuk 3 m 30 -
reng 3 m 135 -
kusen pintu 80*200 cm 1 -
jendela 1 -
daun pintu 80*200 cm 1 -
jendela 1 -
pintu kmr 1 -
JUMLAH 1500
SWADAYA
HARGA
MATERIAL VOL SATUAN
SATUAN
Urugan Pasir 240,000 2.00 M³
-Semen @ 50 kg 53,000 56.00 Zak
-Pasir pasang 240,000 15.30 M³
-Batu Kali 215,000 5.00 M³
-Besi beton Φ 10 mm SNI 68,000 30.00 Btg
-Besi beton Φ 8 mm SNI 37,500 30.00 Btg
-Batu pecah 280,000 2.10 M³
-Batu Bata 750 - Bh
-Batako 3,500 1,000.00 Bh
-Kusen Pintu, Ukuran 0,80 X 2,00 M 200,000 2.00 Unit
-Kusen Jendela 150,000 2.00 Unit
-Kusen Ventilasi, Ukuran…… - - Unit
-Daun Pintu Kayu, Ukuran 350,000 2.00 Unit
-Daun Jendela Kayu, Ukuran 200,000 2.00 Unit
-Handle Pintu dan Kunci Pintu - - Set
-Handle Jendela dan Kunci Jendela - - Set
-Engsel Pintu 35,000 - Set
-Engsel Jendela 21,000 - Set
-Kayu rangka kuda-kuda, Ukuran 6/12 x 4m 100,000 6.00 Btg
-Kayu gapit, Ukuran ……. - - Btg
-Kayu usuk, Ukuran 4/6 x 3 m 27,000 10.00 Btg
-Usuk bambu 4m 5,500 - m
-Reng bambu 4m 1,500 - m
-Seng gelombang (0,2 cm x 80 cm x 300 cm 78,000 - Lbr
-Genteng 1,250 1,500.00 Bh
-Seng - - Lbr
-Genteng bubungan 5,000 - Bh
-Closet Jongkok 155,000 - Unit
-Pipa Air Bersih, Ukuran…… 27,500 - Btg
-Pipa Air Kotor, Ukuran…… 85,000 - Btg
-Kran 25,000 - Bh
-Pintu Kamar Mandi 210,000 - Set
Gamping 8,000 - Zak
Paku 15,000 6.13 Kg
Bendrat 20,000 5.00 Kg
Loster 5,000 6.00 Bh
Papan Bekisting - - Lbr
15,000,000
- 0
0
........................................ .....2019 0
Diajukan Oleh,
Penerima Bantuan
( ....................................)
Diverifikasi Oleh,
Koordinator Fasilitator
20,215,000 15,000,000
15,000,000
( ....................................)
-
4
20.25 1.0888888889 4.549 0.45
24.25 0.0108888889
2.00
5.00 7.00 2.60
4.00 0.60 0.70 10.00 11.00
3.00 0.40 0.60 10.00 10.00
3.00 0.40 0.60 10.00 10.00
- - -
20.00 6.50 1,125.00
18.00 4.70
1.00 0.10 0.20
- - - - - - - -
- - - - - - - -
- - - - - - - -
- 2.00 - - - - -
5.00 7.00 2.60 - - - - -
- 4.00 0.60 0.70 10.00 11.00 - -
- 3.00 0.40 0.60 10.00 10.00 - -
- 3.00 0.40 0.60 10.00 10.00 - -
- - - - - - - -
- 20.00 6.50 - - - - 1,000.00
- 18.00 4.70 - - - - -
- 1.00 0.10 0.20 - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
5 56 17.3 2.1 30 31 0 1000
REKAP VOL
BIAYA BSPS DANA BSPS
- -
1,060,000.00 20.00
1,920,000.00 8.00
- -
2,040,000.00 30.00
1,125,000.00 30.00
588,000.00 2.10
- -
3,500,000.00 1,000.00
400,000.00 2.00
300,000.00 2.00
- #DIV/0!
700,000.00 2.00
400,000.00 2.00
- #DIV/0!
- #DIV/0!
- -
- -
600,000.00 6.00
- #DIV/0!
270,000.00 10.00
- -
- -
- -
1,875,000.00 1,500.00
- #DIV/0!
- -
- -
- -
- -
- -
- -
- -
92,000.00 6.13
100,000.00 5.00
30,000.00 6.00
- #DIV/0!
15,000,000.00
DA
Nomor BNBA
Nama Penerima Bantuan
Nomor KTP
Alamat
Desa/Kelurahan
kayu kusen daun Kecamatan
Gording usuk reng pintu jendela pintu jendela pintu KM Kabupaten/Kota
Nomor Rekening Penerim
- - - - - - - - Disanggupi oleh :
- - - - - - - - Nama Toko/Penyedia Baha
- - - - - - - - Alamat Toko/Penyedia Bah
- - - - - - - - Nomor Rekening Bank Tok
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - - B. Jumlah dana yang dita
6.00 - - - - - - - No
- - - - - - - - 1
- - - - - - - - TOTAL TARIK TUNAI (B)
- - - 2.00 - - - - Terbilang : Tujuh Juta Lima R
- - - - 2.00 - - -
- - - - - 2.00 - - C. Total dana yang ditarik (
- - - - - - 2.00 - Dana Yang Ditarik (Rp.)
- - - - - - - Terbilang : Tujuh Juta Lima R
6 0 0 2 2 2 2 0
disahkan oleh:
Tim Teknis Kabupaten Ma
( .....................................
NIP.................................
DA
Nomor BNBA
Nama Penerima Bantuan
Nomor KTP
Alamat
Desa/Kelurahan
Kecamatan
Kabupaten/Kota
Nomor Rekening Penerim
Disanggupi oleh :
Nama Toko/Penyedia Baha
Alamat Toko/Penyedia Bah
Nomor Rekening Bank Tok
( .....................................
NIP.................................
Nomor BNBA : 0
Nama Penerima Bantuan : MUH SHOLEH
Nomor KTP : 0
Alamat : 0
Desa/Kelurahan : 0
Kecamatan : 0
Kabupaten/Kota : 0
Nomor Rekening Penerima Bantuan :
Disanggupi oleh :
Nama Toko/Penyedia Bahan Bangunan :
Alamat Toko/Penyedia Bahan Bangunan :
Nomor Rekening Bank Toko/ Penyedi BB :
........................................ .....2019
Diajukan Oleh :
Penerima Bantuan
MUH SHOLEH
Nomor BNBA : 0
Nama Penerima Bantuan : MUH SHOLEH
Nomor KTP : 0
Alamat : 0
Desa/Kelurahan : 0
Kecamatan : 0
Kabupaten/Kota : 0
Nomor Rekening Penerima Bantuan : 0
Disanggupi oleh :
Nama Toko/Penyedia Bahan Bangunan : 0
Alamat Toko/Penyedia Bahan Bangunan : 0
Nomor Rekening Bank Toko/ Penyedi BB : 0
(..................................................)
........................................ .....2019
Diajukan Oleh :
Penerima Bantuan
MUH SHOLEH
disahkan oleh: Diverifikasi oleh: Difasilitasi Oleh :
Tim Teknis Kabupaten Magelang Koordinator Fasilitator Tenaga Fasilitator Lapangan
HAP 1
Jumlah Harga
(Rp)
1,075,000
2,968,000
4,152,000
588,000
2,040,000
1,162,500
-
-
-
-
92,000
-
-
-
1,875,000
-
13,952,500 15,000,000
1,047,500
15,202,500
........................... .....2019
Diajukan Oleh :
Penerima Bantuan
MUH SHOLEH
Difasilitasi Oleh :
enaga Fasilitator Lapangan
.......................................)
Format IV - 2
HAP 2
Jumlah Harga
(Rp)
-
2,120,000
1,440,000
-
1,700,000
-
-
-
525,000
-
129,000
-
-
190,000
6,104,000
.................................)
7,354,000
..................................... .....2019
Diajukan Oleh :
Penerima Bantuan
MUH SHOLEH
Difasilitasi Oleh :
enaga Fasilitator Lapangan
.......................................)
RENCANA ANGGARAN BIAYA (RAB) BSPS
Nomor BNBA :
Nomor KTP :
Nama Penerima Bantuan : MUH SHOLEH
Alamat :
Desa/Kelurahan :
Kecamatan :
Kabupaten/Kota :
Jenis Kegiatan :
SUMBER DANA
HARGA TOTAL HARGA SWADAYA
NO URAIAN PEKERJAAN VOLUME SATUAN (Rp) (Rp) BSPS
Dana Tunai
I Pekerjaan Persiapan
Bongkar Rumah Lama 1.00 ls - - - -
II Pekerjaan Pondasi
-Seng Lbr - - -
-Genteng bubungan - Bh 5,000 - - -
-Bahan penutup atap lainnya yang diijinkan Lbr - - -
3 Listplang papan, Ukuran……. M³ - - -
X Pekerjaan Lantai
1 Lantai Rabat Campuran minimal 1:5, T= 5 cm 2.70 M3
........................................ .....20
Difasilitasi, Ketua KPB Diajukan Oleh,
Tenaga Fasilitator Lapangan Penerima Bantuan
( ...............................................) ( ....................................)
NIP..........................................
FORMAT III-17
dimensi 6 9 30 54 genteng
pekerjaan
atap kuda-kuda 0 -
penutup atap 64.8 -
pondasi Galian Tanah 6.75 -
Urugan Pasir 2.43 -
Pas. Batu belah 4.3875 -
beton sloof 0.9 -
10 kolom 0.675 -
balk 15x15 0.675 -
dinding bata 0 -
batako 90 -
Plesteran dinding 180 -
lantai 5cm 2.7 -
kayu gording 4 m 45 -
usuk 3 m 30 -
reng 3 m 135 -
kusen pintu 80*200 cm 1 -
jendela 1 -
daun pintu 80*200 cm 1 -
jendela 1 -
pintu kmr 1 -
JUMLAH 0
SWADAYA
HARGA
MATERIAL VOL SATUAN
SATUAN
Urugan Pasir 240,000 2.00 M³
-Semen @ 50 kg 53,000 56.00 Zak
-Pasir pasang 240,000 15.30 M³
-Batu Kali 215,000 5.00 M³
-Besi beton Φ 10 mm SNI 68,000 30.00 Btg
-Besi beton Φ 8 mm SNI 37,500 30.00 Btg
-Batu pecah 280,000 2.10 M³
-Batu Bata 750 - Bh
-Batako 3,500 1,600.00 Bh
-Kusen Pintu, Ukuran 0,80 X 2,00 M 200,000 - Unit
-Kusen Jendela 150,000 - Unit
-Kusen Ventilasi, Ukuran…… - - Unit
-Daun Pintu Kayu, Ukuran 350,000 - Unit
-Daun Jendela Kayu, Ukuran 200,000 - Unit
-Handle Pintu dan Kunci Pintu - - Set
-Handle Jendela dan Kunci Jendela - - Set
-Engsel Pintu 35,000 - Set
-Engsel Jendela 21,000 - Set
-Kayu rangka kuda-kuda, Ukuran 6/12 x 4m 100,000 - Btg
-Kayu gapit, Ukuran ……. - - Btg
-Kayu usuk, Ukuran 4/6 x 3 m 27,000 - Btg
-Usuk bambu 4m 5,500 - m
-Reng bambu 4m 1,500 - m
-Seng gelombang (0,2 cm x 80 cm x 300 cm 78,000 - Lbr
-Genteng 1,250 - Bh
-Seng - - Lbr
-Genteng bubungan 5,000 - Bh
-Closet Jongkok 155,000 - Unit
-Pipa Air Bersih, Ukuran…… 27,500 - Btg
-Pipa Air Kotor, Ukuran…… 85,000 - Btg
-Kran 25,000 - Bh
-Pintu Kamar Mandi 210,000 - Set
Gamping 8,000 - Zak
Paku 15,000 8.20 Kg
Bendrat 20,000 10.00 Kg
Loster 5,000 10.00 Bh
Papan Bekisting - - Lbr
15,000,000
- 0
0
........................................ .....2019 0
Diajukan Oleh,
Penerima Bantuan
( ....................................)
Diverifikasi Oleh,
Koordinator Fasilitator
17,921,000 15,000,000
15,000,000
( ....................................)
-
4
20.25 1.0888888889 4.549 0.45
24.25 0.0108888889
2.00
5.00 7.00 2.60
4.00 0.60 0.70 10.00 11.00
3.00 0.40 0.60 10.00 10.00
3.00 0.40 0.60 10.00 10.00
- - -
20.00 6.50 1,125.00
18.00 4.70
1.00 0.10 0.20
- - - - - - - -
- - - - - - - -
- - - - - - - -
- 2.00 - - - - -
5.00 7.00 2.60 - - - - -
- 4.00 0.60 0.70 10.00 11.00 - -
- 3.00 0.40 0.60 10.00 10.00 - -
- 3.00 0.40 0.60 10.00 10.00 - -
- - - - - - - -
- 20.00 6.50 - - - - 1,600.00
- 18.00 4.70 - - - - -
- 1.00 0.10 0.20 - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
5 56 17.3 2.1 30 31 0 1600
REKAP VOL
BIAYA BSPS DANA BSPS
- -
2,226,000.00 42.00
3,048,000.00 12.70
- -
2,040,000.00 30.00
1,125,000.00 30.00
588,000.00 2.10
- -
5,600,000.00 1,600.00
- -
- -
- #DIV/0!
- -
- -
- #DIV/0!
- #DIV/0!
- -
- -
- -
- #DIV/0!
- -
- -
- -
- -
- -
- #DIV/0!
- -
- -
- -
- -
- -
- -
- -
123,000.00 8.20
200,000.00 10.00
50,000.00 10.00
- #DIV/0!
15,000,000.00
DA
Nomor BNBA
Nama Penerima Bantuan
Nomor KTP
Alamat
Desa/Kelurahan
kayu kusen daun Kecamatan
Gording usuk reng pintu jendela pintu jendela pintu KM Kabupaten/Kota
Nomor Rekening Penerim
- - - - - - - - Disanggupi oleh :
- - - - - - - - Nama Toko/Penyedia Baha
- - - - - - - - Alamat Toko/Penyedia Bah
- - - - - - - - Nomor Rekening Bank Tok
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - - B. Jumlah dana yang dita
- - - - - - - - No
- - - - - - - - 1
- - - - - - - - TOTAL TARIK TUNAI (B)
- - - - - - - - Terbilang : Tujuh Juta Lima R
- - - - - - - -
- - - - - - - - C. Total dana yang ditarik (
- - - - - - - - Dana Yang Ditarik (Rp.)
- - - - - - - Terbilang : Tujuh Juta Lima R
0 0 0 0 0 0 0 0
disahkan oleh:
Tim Teknis Kabupaten Ma
( .....................................
NIP.................................
DA
Nomor BNBA
Nama Penerima Bantuan
Nomor KTP
Alamat
Desa/Kelurahan
Kecamatan
Kabupaten/Kota
Nomor Rekening Penerim
Disanggupi oleh :
Nama Toko/Penyedia Baha
Alamat Toko/Penyedia Bah
Nomor Rekening Bank Tok
( .....................................
NIP.................................
Nomor BNBA : 0
Nama Penerima Bantuan : MUH SHOLEH
Nomor KTP : 0
Alamat : 0
Desa/Kelurahan : 0
Kecamatan : 0
Kabupaten/Kota : 0
Nomor Rekening Penerima Bantuan :
Disanggupi oleh :
Nama Toko/Penyedia Bahan Bangunan :
Alamat Toko/Penyedia Bahan Bangunan :
Nomor Rekening Bank Toko/ Penyedi BB :
........................................ .....2019
Diajukan Oleh :
Penerima Bantuan
MUH SHOLEH
Nomor BNBA : 0
Nama Penerima Bantuan : MUH SHOLEH
Nomor KTP : 0
Alamat : 0
Desa/Kelurahan : 0
Kecamatan : 0
Kabupaten/Kota : 0
Nomor Rekening Penerima Bantuan : 0
Disanggupi oleh :
Nama Toko/Penyedia Bahan Bangunan : 0
Alamat Toko/Penyedia Bahan Bangunan : 0
Nomor Rekening Bank Toko/ Penyedi BB : 0
(..................................................)
........................................ .....2019
Diajukan Oleh :
Penerima Bantuan
MUH SHOLEH
disahkan oleh: Diverifikasi oleh: Difasilitasi Oleh :
Tim Teknis Kabupaten Magelang Koordinator Fasilitator Tenaga Fasilitator Lapangan
HAP 1
Jumlah Harga
(Rp)
1,075,000
2,968,000
4,152,000
588,000
2,040,000
1,162,500
-
-
-
-
123,000
-
-
-
-
-
12,108,500 15,000,000
2,891,500
13,358,500
........................... .....2019
Diajukan Oleh :
Penerima Bantuan
MUH SHOLEH
Difasilitasi Oleh :
enaga Fasilitator Lapangan
.......................................)
Format IV - 2
HAP 2
Jumlah Harga
(Rp)
-
2,120,000
1,440,000
-
1,700,000
-
-
-
525,000
-
129,000
-
-
190,000
6,104,000
.................................)
7,354,000
..................................... .....2019
Diajukan Oleh :
Penerima Bantuan
MUH SHOLEH
Difasilitasi Oleh :
enaga Fasilitator Lapangan
.......................................)
RENCANA ANGGARAN BIAYA (RAB) BSPS
Nomor BNBA :
Nomor KTP :
Nama Penerima Bantuan : MUH SHOLEH
Alamat :
Desa/Kelurahan :
Kecamatan :
Kabupaten/Kota :
Jenis Kegiatan :
SUMBER DANA
HARGA TOTAL HARGA SWADAYA
NO URAIAN PEKERJAAN VOLUME SATUAN (Rp) (Rp) BSPS
Dana Tunai
I Pekerjaan Persiapan
Bongkar Rumah Lama 1.00 ls - - - -
II Pekerjaan Pondasi
-Seng Lbr - - -
-Genteng bubungan - Bh 5,000 - - -
-Bahan penutup atap lainnya yang diijinkan Lbr - - -
3 Listplang papan, Ukuran……. M³ - - -
X Pekerjaan Lantai
1 Lantai Rabat Campuran minimal 1:5, T= 5 cm 2.70 M3
........................................ .....20
Difasilitasi, Ketua KPB Diajukan Oleh,
Tenaga Fasilitator Lapangan Penerima Bantuan
( ...............................................) ( ....................................)
NIP..........................................
FORMAT III-17
dimensi 6 9 30 54 genteng
pekerjaan
atap kuda-kuda 0 -
penutup atap 64.8 -
pondasi Galian Tanah 6.75 -
Urugan Pasir 2.43 -
Pas. Batu belah 4.3875 -
beton sloof 0.9 -
10 kolom 0.675 -
balk 15x15 0.675 -
dinding bata 0 -
batako 90 -
Plesteran dinding 180 -
lantai 5cm 2.7 -
kayu gording 4 m 45 -
usuk 3 m 30 -
reng 3 m 135 -
kusen pintu 80*200 cm 1 -
jendela 1 -
daun pintu 80*200 cm 1 -
jendela 1 -
pintu kmr 1 -
JUMLAH 0
SWADAYA
HARGA
MATERIAL VOL SATUAN
SATUAN
Urugan Pasir 240,000 2.00 M³
-Semen @ 50 kg 53,000 56.00 Zak
-Pasir pasang 240,000 15.30 M³
-Batu Kali 215,000 5.00 M³
-Besi beton Φ 10 mm SNI 68,000 30.00 Btg
-Besi beton Φ 8 mm SNI 37,500 30.00 Btg
-Batu pecah 280,000 2.10 M³
-Batu Bata 750 - Bh
-Batako 3,500 1,250.00 Bh
-Kusen Pintu, Ukuran 0,80 X 2,00 M 200,000 2.00 Unit
-Kusen Jendela 150,000 2.00 Unit
-Kusen Ventilasi, Ukuran…… - - Unit
-Daun Pintu Kayu, Ukuran 350,000 2.00 Unit
-Daun Jendela Kayu, Ukuran 200,000 2.00 Unit
-Handle Pintu dan Kunci Pintu - - Set
-Handle Jendela dan Kunci Jendela - - Set
-Engsel Pintu 35,000 - Set
-Engsel Jendela 21,000 - Set
-Kayu rangka kuda-kuda, Ukuran 6/12 x 4m 100,000 5.00 Btg
-Kayu gapit, Ukuran ……. - - Btg
-Kayu usuk, Ukuran 4/6 x 3 m 27,000 10.00 Btg
-Usuk bambu 4m 5,500 - m
-Reng bambu 4m 1,500 - m
-Seng gelombang (0,2 cm x 80 cm x 300 cm 78,000 - Lbr
-Genteng 1,250 - Bh
-Seng - - Lbr
-Genteng bubungan 5,000 - Bh
-Closet Jongkok 155,000 - Unit
-Pipa Air Bersih, Ukuran…… 27,500 - Btg
-Pipa Air Kotor, Ukuran…… 85,000 - Btg
-Kran 25,000 - Bh
-Pintu Kamar Mandi 210,000 - Set
Gamping 8,000 - Zak
Paku 15,000 5.07 Kg
Bendrat 20,000 5.00 Kg
Loster 5,000 6.00 Bh
Papan Bekisting - - Lbr
15,000,000
- 0
0
........................................ .....2019 0
Diajukan Oleh,
Penerima Bantuan
( ....................................)
Diverifikasi Oleh,
Koordinator Fasilitator
19,099,000 15,000,000
15,000,000
( ....................................)
-
4
20.25 1.0888888889 4.549 0.45
24.25 0.0108888889
2.00
5.00 7.00 2.60
4.00 0.60 0.70 10.00 11.00
3.00 0.40 0.60 10.00 10.00
3.00 0.40 0.60 10.00 10.00
- - -
20.00 6.50 1,125.00
18.00 4.70
1.00 0.10 0.20
- - - - - - - -
- - - - - - - -
- - - - - - - -
- 2.00 - - - - -
5.00 7.00 2.60 - - - - -
- 4.00 0.60 0.70 10.00 11.00 - -
- 3.00 0.40 0.60 10.00 10.00 - -
- 3.00 0.40 0.60 10.00 10.00 - -
- - - - - - - -
- 20.00 6.50 - - - - 1,250.00
- 18.00 4.70 - - - - -
- 1.00 0.10 0.20 - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
5 56 17.3 2.1 30 31 0 1250
REKAP VOL
BIAYA BSPS DANA BSPS
- -
1,696,000.00 32.00
2,400,000.00 10.00
- -
2,040,000.00 30.00
1,125,000.00 30.00
588,000.00 2.10
- -
4,375,000.00 1,250.00
400,000.00 2.00
300,000.00 2.00
- #DIV/0!
700,000.00 2.00
400,000.00 2.00
- #DIV/0!
- #DIV/0!
- -
- -
500,000.00 5.00
- #DIV/0!
270,000.00 10.00
- -
- -
- -
- -
- #DIV/0!
- -
- -
- -
- -
- -
- -
- -
76,000.00 5.07
100,000.00 5.00
30,000.00 6.00
- #DIV/0!
15,000,000.00
DA
Nomor BNBA
Nama Penerima Bantuan
Nomor KTP
Alamat
Desa/Kelurahan
kayu kusen daun Kecamatan
Gording usuk reng pintu jendela pintu jendela pintu KM Kabupaten/Kota
Nomor Rekening Penerim
- - - - - - - - Disanggupi oleh :
- - - - - - - - Nama Toko/Penyedia Baha
- - - - - - - - Alamat Toko/Penyedia Bah
- - - - - - - - Nomor Rekening Bank Tok
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - - B. Jumlah dana yang dita
5.00 - - - - - - - No
- - - - - - - - 1
- - - - - - - - TOTAL TARIK TUNAI (B)
- - - 2.00 - - - - Terbilang : Tujuh Juta Lima R
- - - - 2.00 - - -
- - - - - 2.00 - - C. Total dana yang ditarik (
- - - - - - 2.00 - Dana Yang Ditarik (Rp.)
- - - - - - - Terbilang : Tujuh Juta Lima R
5 0 0 2 2 2 2 0
disahkan oleh:
Tim Teknis Kabupaten Ma
( .....................................
NIP.................................
DA
Nomor BNBA
Nama Penerima Bantuan
Nomor KTP
Alamat
Desa/Kelurahan
Kecamatan
Kabupaten/Kota
Nomor Rekening Penerim
Disanggupi oleh :
Nama Toko/Penyedia Baha
Alamat Toko/Penyedia Bah
Nomor Rekening Bank Tok
( .....................................
NIP.................................
Nomor BNBA : 0
Nama Penerima Bantuan : MUH SHOLEH
Nomor KTP : 0
Alamat : 0
Desa/Kelurahan : 0
Kecamatan : 0
Kabupaten/Kota : 0
Nomor Rekening Penerima Bantuan :
Disanggupi oleh :
Nama Toko/Penyedia Bahan Bangunan :
Alamat Toko/Penyedia Bahan Bangunan :
Nomor Rekening Bank Toko/ Penyedi BB :
........................................ .....2019
Diajukan Oleh :
Penerima Bantuan
MUH SHOLEH
Nomor BNBA : 0
Nama Penerima Bantuan : MUH SHOLEH
Nomor KTP : 0
Alamat : 0
Desa/Kelurahan : 0
Kecamatan : 0
Kabupaten/Kota : 0
Nomor Rekening Penerima Bantuan : 0
Disanggupi oleh :
Nama Toko/Penyedia Bahan Bangunan : 0
Alamat Toko/Penyedia Bahan Bangunan : 0
Nomor Rekening Bank Toko/ Penyedi BB : 0
(..................................................)
........................................ .....2019
Diajukan Oleh :
Penerima Bantuan
MUH SHOLEH
disahkan oleh: Diverifikasi oleh: Difasilitasi Oleh :
Tim Teknis Kabupaten Magelang Koordinator Fasilitator Tenaga Fasilitator Lapangan
HAP 1
Jumlah Harga
(Rp)
1,075,000
2,968,000
4,152,000
588,000
2,040,000
1,162,500
-
-
-
-
76,000
-
-
-
-
-
12,061,500 15,000,000
2,938,500
13,311,500
........................... .....2019
Diajukan Oleh :
Penerima Bantuan
MUH SHOLEH
Difasilitasi Oleh :
enaga Fasilitator Lapangan
.......................................)
Format IV - 2
HAP 2
Jumlah Harga
(Rp)
-
2,120,000
1,440,000
-
1,700,000
-
-
-
525,000
-
129,000
-
-
190,000
6,104,000
.................................)
7,354,000
..................................... .....2019
Diajukan Oleh :
Penerima Bantuan
MUH SHOLEH
Difasilitasi Oleh :
enaga Fasilitator Lapangan
.......................................)
RENCANA ANGGARAN BIAYA (RAB) BSPS
Nomor BNBA :
Nomor KTP :
Nama Penerima Bantuan : MUH SHOLEH
Alamat :
Desa/Kelurahan :
Kecamatan :
Kabupaten/Kota :
Jenis Kegiatan :
SUMBER DANA
HARGA TOTAL HARGA SWADAYA
NO URAIAN PEKERJAAN VOLUME SATUAN (Rp) (Rp) BSPS
Dana Tunai
I Pekerjaan Persiapan
Bongkar Rumah Lama 1.00 ls - - - -
II Pekerjaan Pondasi
-Seng Lbr - - -
-Genteng bubungan - Bh 5,000 - - -
-Bahan penutup atap lainnya yang diijinkan Lbr - - -
3 Listplang papan, Ukuran……. M³ - - -
X Pekerjaan Lantai
1 Lantai Rabat Campuran minimal 1:5, T= 5 cm 2.70 M3
........................................ ....
Difasilitasi, Ketua KPB Diajukan Oleh,
Tenaga Fasilitator Lapangan Penerima Bantuan
( ...............................................) ( ....................................)
NIP..........................................
FORMAT III-17
dimensi 9 6 30 54 genteng
pekerjaan
atap kuda-kuda 0 -
penutup atap 64.8 1,600.00
pondasi Galian Tanah 6.75 -
Urugan Pasir 2.43 -
Pas. Batu belah 4.3875 -
beton sloof 0.9 -
10 kolom 0.675 -
balk 15x15 0.675 -
dinding bata 90 -
batako -
Plesteran dinding 180 -
lantai 5cm 2.7 -
kayu gording 4 m 30 -
usuk 2 m 30 -
reng 2m 135 -
kusen pintu 80*200 cm 1 -
jendela 1 -
daun pintu 80*200 cm 1 -
jendela 1 -
pintu kmr 1 -
JUMLAH 1600
SWADAYA
HARGA
MATERIAL VOL SATUAN
SATUAN
Urugan Pasir 240,000 2.00 M³
-Semen @ 50 kg 53,000 57.00 Zak
-Pasir pasang 240,000 13.30 M³
-Batu Kali 215,000 5.00 M³
-Besi beton Φ 10 mm SNI 68,000 30.00 Btg
-Besi beton Φ 8 mm SNI 37,500 30.00 Btg
-Batu pecah 280,000 2.10 M³
-Batu Bata 750 4,000.00 Bh
-Batako 3,500 - Bh
-Kusen Pintu, Ukuran 0,80 X 2,00 M 200,000 2.00 Unit
-Kusen Jendela 150,000 2.00 Unit
-Kusen Ventilasi, Ukuran…… - - Unit
-Daun Pintu Kayu, Ukuran 350,000 2.00 Unit
-Daun Jendela Kayu, Ukuran 200,000 2.00 Unit
-Handle Pintu dan Kunci Pintu - - Set
-Handle Jendela dan Kunci Jendela - - Set
-Engsel Pintu 35,000 - Set
-Engsel Jendela 21,000 - Set
-Kayu rangka kuda-kuda, Ukuran 8/12 x 4m 150,000 - Btg
-Kayu gapit, Ukuran ……. - - Btg
-Kayu usuk, Ukuran 4/6 x 2m 22,000 - Btg
-Kayu Usuk, Ukuran 5/7 x 2m 27,000 - Btg
-Kayu Reng , Ukuran 2/3 x 2m 1,500 - Btg
-Seng gelombang (0,2 cm x 80 cm x 300 cm 78,000 - Lbr
-Genteng 1,250 1,600.00 Bh
-Seng - - Lbr
-Genteng bubungan 5,000 - Bh
-Closet Jongkok 155,000 - Unit
-Pipa Air Bersih, Ukuran…… 27,500 - Btg
-Pipa Air Kotor, Ukuran…… 85,000 - Btg
-Kran 25,000 - Bh
-Pintu Kamar Mandi 210,000 - Set
Gamping 8,000 - Zak
Paku 15,000 3.20 Kg
Bendrat 20,000 3.00 Kg
Loster 5,000 10.00 Bh
Papan Bekisting - - Lbr
15,000,000
- 0
0
........................................ .....2019
Diajukan Oleh,
Penerima Bantuan
( ....................................)
Diverifikasi Oleh,
Koordinator Fasilitator
18,479,000 15,000,000
15,000,000
( ....................................)
-
4
20.25 1.0888888889 4.549 0.45
24.25 0.0108888889
2.00
5.00 7.00 2.60
4.00 0.60 0.70 10.00 11.00
3.00 0.40 0.60 10.00 10.00
3.00 0.40 0.60 10.00 10.00
14.00 4.50 6,300.00
- - -
18.00 4.70
1.00 0.10 0.20
- - - - - - - -
- - - - - - - -
- - - - - - - -
- 2.00 - - - - -
5.00 7.00 2.60 - - - - -
- 4.00 0.60 0.70 10.00 11.00 - -
- 3.00 0.40 0.60 10.00 10.00 - -
- 3.00 0.40 0.60 10.00 10.00 - -
- 14.00 4.50 - - - 4,000.00 -
- - - - - - - -
- 25.00 4.70 - - - - -
- 1.00 0.10 0.20 - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
5 57 15.3 2.1 30 31 4000 0
REKAP VOL
BIAYA BSPS DANA BSPS
- -
2,120,000.00 40.00
2,544,000.00 10.60
- -
2,040,000.00 30.00
750,000.00 20.00
588,000.00 2.10
3,000,000.00 4,000.00
- -
400,000.00 2.00
300,000.00 2.00
- #DIV/0!
700,000.00 2.00
400,000.00 2.00
- #DIV/0!
- #DIV/0!
- -
- -
- -
- #DIV/0!
- -
- -
- -
- -
2,000,000.00 1,600.00
- #DIV/0!
- -
- -
- -
- -
- -
- -
- -
48,000.00 3.20
60,000.00 3.00
50,000.00 10.00
- #DIV/0!
15,000,000.00
DA
Nomor BNBA
Nama Penerima Bantuan
Nomor KTP
Alamat
Desa/Kelurahan
kayu kusen daun Kecamatan
Gording usuk reng pintu jendela pintu jendela pintu KM Kabupaten/Kota
Nomor Rekening Penerim
- - - - - - - - Disanggupi oleh :
- - - - - - - - Nama Toko/Penyedia Baha
- - - - - - - - Alamat Toko/Penyedia Bah
- - - - - - - - Nomor Rekening Bank Tok
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - - B. Jumlah dana yang dita
- - - - - - - - No
- - - - - - - 1
- - - - - - - TOTAL TARIK TUNAI (B)
- - - 2.00 - - - - Terbilang : Tujuh Juta Lima R
- - - - 2.00 - - -
- - - - - 2.00 - - C. Total dana yang ditarik (
- - - - - - 2.00 - Dana Yang Ditarik (Rp.)
- - - - - - - - Terbilang : Tujuh Juta Lima R
0 0 0 2 2 2 2 0
disahkan oleh:
Tim Teknis Kabupaten Ma
( .....................................
NIP.................................
DA
Nomor BNBA
Nama Penerima Bantuan
Nomor KTP
Alamat
Desa/Kelurahan
Kecamatan
Kabupaten/Kota
Nomor Rekening Penerim
Disanggupi oleh :
Nama Toko/Penyedia Baha
Alamat Toko/Penyedia Bah
Nomor Rekening Bank Tok
( .....................................
NIP.................................
Nomor BNBA : 0
Nama Penerima Bantuan : MUH SHOLEH
Nomor KTP : 0
Alamat : 0
Desa/Kelurahan : 0
Kecamatan : 0
Kabupaten/Kota : 0
Nomor Rekening Penerima Bantuan :
Disanggupi oleh :
Nama Toko/Penyedia Bahan Bangunan :
Alamat Toko/Penyedia Bahan Bangunan :
Nomor Rekening Bank Toko/ Penyedi BB :
........................................ .....2019
Diajukan Oleh :
Penerima Bantuan
MUH SHOLEH
Nomor BNBA : 0
Nama Penerima Bantuan : MUH SHOLEH
Nomor KTP : 0
Alamat : 0
Desa/Kelurahan : 0
Kecamatan : 0
Kabupaten/Kota : 0
Nomor Rekening Penerima Bantuan : 0
Disanggupi oleh :
Nama Toko/Penyedia Bahan Bangunan : 0
Alamat Toko/Penyedia Bahan Bangunan : 0
Nomor Rekening Bank Toko/ Penyedi BB : 0
(..................................................)
........................................ .....2019
Diajukan Oleh :
Penerima Bantuan
MUH SHOLEH
disahkan oleh: Diverifikasi oleh: Difasilitasi Oleh :
Tim Teknis Kabupaten Magelang Koordinator Fasilitator Tenaga Fasilitator Lapangan
HAP 1
Jumlah Harga
(Rp)
1,075,000
3,021,000
3,672,000
588,000
2,040,000
1,162,500
-
-
3,000,000
-
48,000
-
-
-
2,000,000
-
16,606,500 15,000,000
(1,606,500)
17,856,500
........................... .....2019
Diajukan Oleh :
Penerima Bantuan
MUH SHOLEH
Difasilitasi Oleh :
enaga Fasilitator Lapangan
.......................................)
Format IV - 2
HAP 2
Jumlah Harga
(Rp)
-
2,173,000
1,440,000
-
1,700,000
-
-
-
525,000
-
129,000
-
-
190,000
6,157,000
.................................)
7,407,000
..................................... .....2019
Diajukan Oleh :
Penerima Bantuan
MUH SHOLEH
Difasilitasi Oleh :
enaga Fasilitator Lapangan
.......................................)
RENCANA ANGGARAN BIAYA (RAB) BSPS
Nomor BNBA :
Nomor KTP :
Nama Penerima Bantuan : MUH SHOLEH
Alamat :
Desa/Kelurahan :
Kecamatan :
Kabupaten/Kota :
Jenis Kegiatan :
SUMBER DANA
HARGA TOTAL HARGA SWADAYA
NO URAIAN PEKERJAAN VOLUME SATUAN (Rp) (Rp) BSPS
Dana Tunai
I Pekerjaan Persiapan
Bongkar Rumah Lama 1.00 ls - - - -
II Pekerjaan Pondasi
-Seng Lbr - - -
-Genteng bubungan - Bh 5,000 - - -
-Bahan penutup atap lainnya yang diijinkan Lbr - - -
3 Listplang papan, Ukuran……. M³ - - -
X Pekerjaan Lantai
1 Lantai Rabat Campuran minimal 1:5, T= 5 cm 2.40 M3
........................................ .....20
Difasilitasi, Ketua KPB Diajukan Oleh,
Tenaga Fasilitator Lapangan Penerima Bantuan
( ...............................................) ( ....................................)
NIP..........................................
FORMAT III-17
dimensi 6 8 28 48 genteng
pekerjaan
atap kuda-kuda 0 -
penutup atap 57.6 -
pondasi Galian Tanah 6.3 -
Urugan Pasir 2.16 -
Pas. Batu belah 4.095 -
beton sloof 0.84 -
10 kolom 0.675 -
balk 15x15 0.63 -
dinding bata 0 -
batako 84 -
Plesteran dinding 168 -
lantai 5cm 2.4 -
kayu gording 4 m 40 -
usuk 3 m 28 -
reng 3 m 120 -
kusen pintu 80*200 cm 1 -
jendela 1 -
daun pintu 80*200 cm 1 -
jendela 1 -
pintu kmr 1 -
JUMLAH 0
SWADAYA
HARGA
MATERIAL VOL SATUAN
SATUAN
Urugan Pasir 240,000 2.00 M³
-Semen @ 50 kg 53,000 54.00 Zak
-Pasir pasang 240,000 14.30 M³
-Batu Kali 215,000 5.00 M³
-Besi beton Φ 10 mm SNI 68,000 30.00 Btg
-Besi beton Φ 8 mm SNI 37,500 30.00 Btg
-Batu pecah 280,000 2.00 M³
-Batu Bata 750 - Bh
-Batako 3,500 1,050.00 Bh
-Kusen Pintu, Ukuran 0,80 X 2,00 M 200,000 - Unit
-Kusen Jendela 150,000 - Unit
-Kusen Ventilasi, Ukuran…… - - Unit
-Daun Pintu Kayu, Ukuran 350,000 - Unit
-Daun Jendela Kayu, Ukuran 200,000 - Unit
-Handle Pintu dan Kunci Pintu - - Set
-Handle Jendela dan Kunci Jendela - - Set
-Engsel Pintu 35,000 - Set
-Engsel Jendela 21,000 - Set
-Kayu rangka kuda-kuda, Ukuran 6/12 x 4m 100,000 16.00 Btg
-Kayu gapit, Ukuran ……. - - Btg
-Kayu usuk, Ukuran 4/6 x 3 m 27,000 - Btg
-Usuk bambu 4m 5,500 140.00 m
-Reng bambu 4m 1,500 240.00 m
-Seng gelombang (0,2 cm x 80 cm x 300 cm 78,000 - Lbr
-Genteng 1,250 - Bh
-Seng - - Lbr
-Genteng bubungan 5,000 - Bh
-Closet Jongkok 155,000 - Unit
-Pipa Air Bersih, Ukuran…… 27,500 - Btg
-Pipa Air Kotor, Ukuran…… 85,000 - Btg
-Kran 25,000 - Bh
-Pintu Kamar Mandi 210,000 - Set
Gamping 8,000 - Zak
Paku 15,000 3.27 Kg
Bendrat 20,000 3.00 Kg
Loster 5,000 10.00 Bh
Papan Bekisting - - Lbr
15,000,000
- 0
0
........................................ .....2019 0
Diajukan Oleh,
Penerima Bantuan
( ....................................)
Diverifikasi Oleh,
Koordinator Fasilitator
18,138,000 15,000,000
15,000,000
( ....................................)
-
4
20.25 1.0888888889 4.549 0.45
24.25 0.0108888889
2.00
5.00 7.00 2.40
4.00 0.50 0.70 10.00 10.00
3.00 0.40 0.60 10.00 10.00
3.00 0.40 0.50 10.00 10.00
- - -
19.00 6.10 1,050.00
17.00 4.40
1.00 0.10 0.20
5 54 16.3 2 30 30 0 1050
- - - - - - - -
- - - - - - - -
- - - - - - - -
- 2.00 - - - - -
5.00 7.00 2.40 - - - - -
- 4.00 0.50 0.70 10.00 10.00 - -
- 3.00 0.40 0.60 10.00 10.00 - -
- 3.00 0.40 0.50 10.00 10.00 - -
- - - - - - - -
- 19.00 6.10 - - - - 1,050.00
- 17.00 4.40 - - - - -
- 1.00 0.10 0.20 - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
5 54 16.3 2 30 30 0 1050
REKAP VOL
BIAYA BSPS DANA BSPS
- -
1,855,000.00 35.00
2,856,000.00 11.90
- -
2,040,000.00 30.00
1,125,000.00 30.00
560,000.00 2.00
- -
3,675,000.00 1,050.00
- -
- -
- #DIV/0!
- -
- -
- #DIV/0!
- #DIV/0!
- -
- -
1,600,000.00 16.00
- #DIV/0!
- -
770,000.00 140.00
360,000.00 240.00
- -
- -
- #DIV/0!
- -
- -
- -
- -
- -
- -
- -
49,000.00 3.27
60,000.00 3.00
50,000.00 10.00
- #DIV/0!
15,000,000.00
DA
Nomor BNBA
Nama Penerima Bantuan
Nomor KTP
Alamat
Desa/Kelurahan
kayu kusen daun Kecamatan
Gording usuk reng pintu jendela pintu jendela pintu KM Kabupaten/Kota
Nomor Rekening Penerim
- - - - - - - - Disanggupi oleh :
- - - - - - - - Nama Toko/Penyedia Baha
- - - - - - - - Alamat Toko/Penyedia Bah
- - - - - - - - Nomor Rekening Bank Tok
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - - B. Jumlah dana yang dita
16.00 - - - - - - - No
- 140.00 - - - - - - 1
- - 240.00 - - - - - TOTAL TARIK TUNAI (B)
- - - - - - - - Terbilang : Tujuh Juta Lima R
- - - - - - - -
- - - - - - - - C. Total dana yang ditarik (
- - - - - - - - Dana Yang Ditarik (Rp.)
- - - - - - - Terbilang : Tujuh Juta Lima R
16 140 240 0 0 0 0 0
disahkan oleh:
Tim Teknis Kabupaten Ma
( .....................................
NIP.................................
DA
Nomor BNBA
Nama Penerima Bantuan
Nomor KTP
Alamat
Desa/Kelurahan
Kecamatan
Kabupaten/Kota
Nomor Rekening Penerim
Disanggupi oleh :
Nama Toko/Penyedia Baha
Alamat Toko/Penyedia Bah
Nomor Rekening Bank Tok
( .....................................
NIP.................................
Nomor BNBA : 0
Nama Penerima Bantuan : MUH SHOLEH
Nomor KTP : 0
Alamat : 0
Desa/Kelurahan : 0
Kecamatan : 0
Kabupaten/Kota : 0
Nomor Rekening Penerima Bantuan :
Disanggupi oleh :
Nama Toko/Penyedia Bahan Bangunan :
Alamat Toko/Penyedia Bahan Bangunan :
Nomor Rekening Bank Toko/ Penyedi BB :
........................................ .....2019
Diajukan Oleh :
Penerima Bantuan
MUH SHOLEH
Nomor BNBA : 0
Nama Penerima Bantuan : MUH SHOLEH
Nomor KTP : 0
Alamat : 0
Desa/Kelurahan : 0
Kecamatan : 0
Kabupaten/Kota : 0
Nomor Rekening Penerima Bantuan : 0
Disanggupi oleh :
Nama Toko/Penyedia Bahan Bangunan : 0
Alamat Toko/Penyedia Bahan Bangunan : 0
Nomor Rekening Bank Toko/ Penyedi BB : 0
(..................................................)
........................................ .....2019
Diajukan Oleh :
Penerima Bantuan
MUH SHOLEH
disahkan oleh: Diverifikasi oleh: Difasilitasi Oleh :
Tim Teknis Kabupaten Magelang Koordinator Fasilitator Tenaga Fasilitator Lapangan
HAP 1
Jumlah Harga
(Rp)
1,075,000
2,862,000
3,912,000
560,000
2,040,000
1,125,000
-
-
-
-
49,000
-
-
-
-
-
11,623,000 15,000,000
3,377,000
12,873,000
........................... .....2019
Diajukan Oleh :
Penerima Bantuan
MUH SHOLEH
Difasilitasi Oleh :
enaga Fasilitator Lapangan
.......................................)
Format IV - 2
HAP 2
Jumlah Harga
(Rp)
-
2,014,000
1,440,000
-
1,700,000
-
-
-
525,000
-
129,000
-
-
190,000
5,998,000
.................................)
7,248,000
..................................... .....2019
Diajukan Oleh :
Penerima Bantuan
MUH SHOLEH
Difasilitasi Oleh :
enaga Fasilitator Lapangan
.......................................)
RENCANA ANGGARAN BIAYA (RAB) BSPS
Nomor BNBA :
Nomor KTP :
Nama Penerima Bantuan : MUH SHOLEH
Alamat :
Desa/Kelurahan :
Kecamatan :
Kabupaten/Kota :
Jenis Kegiatan :
SUMBER DANA
HARGA TOTAL HARGA SWADAYA
NO URAIAN PEKERJAAN VOLUME SATUAN (Rp) (Rp) BSPS
Dana Tunai
I Pekerjaan Persiapan
Bongkar Rumah Lama 1.00 ls - - - -
II Pekerjaan Pondasi
-Seng Lbr - - -
-Genteng bubungan - Bh 5,000 - - -
-Bahan penutup atap lainnya yang diijinkan Lbr - - -
3 Listplang papan, Ukuran……. M³ - - -
X Pekerjaan Lantai
1 Lantai Rabat Campuran minimal 1:5, T= 5 cm 3.20 M3
........................................ .....20
Difasilitasi, Ketua KPB Diajukan Oleh,
Tenaga Fasilitator Lapangan Penerima Bantuan
( ...............................................) ( ....................................)
NIP..........................................
FORMAT III-17
dimensi 8 8 32 64 genteng
pekerjaan
atap kuda-kuda 0 -
penutup atap 76.8 -
pondasi Galian Tanah 7.2 -
Urugan Pasir 2.88 -
Pas. Batu belah 4.68 -
beton sloof 0.96 -
10 kolom 0.675 -
balk 15x15 0.72 -
dinding bata 0 -
batako 96 -
Plesteran dinding 192 -
lantai 5cm 3.2 -
kayu gording 4 m 40 -
usuk 3 m 32 -
reng 3 m 160 -
kusen pintu 80*200 cm 1 -
jendela 1 -
daun pintu 80*200 cm 1 -
jendela 1 -
pintu kmr 1 -
JUMLAH 0
SWADAYA
HARGA
MATERIAL VOL SATUAN
SATUAN
Urugan Pasir 240,000 3.00 M³
-Semen @ 50 kg 53,000 61.00 Zak
-Pasir pasang 240,000 16.40 M³
-Batu Kali 215,000 6.00 M³
-Besi beton Φ 10 mm SNI 68,000 32.00 Btg
-Besi beton Φ 8 mm SNI 37,500 31.00 Btg
-Batu pecah 280,000 2.20 M³
-Batu Bata 750 - Bh
-Batako 3,500 1,300.00 Bh
-Kusen Pintu, Ukuran 0,80 X 2,00 M 200,000 - Unit
-Kusen Jendela 150,000 - Unit
-Kusen Ventilasi, Ukuran…… - - Unit
-Daun Pintu Kayu, Ukuran 350,000 - Unit
-Daun Jendela Kayu, Ukuran 200,000 - Unit
-Handle Pintu dan Kunci Pintu - - Set
-Handle Jendela dan Kunci Jendela - - Set
-Engsel Pintu 35,000 - Set
-Engsel Jendela 21,000 - Set
-Kayu rangka kuda-kuda, Ukuran 6/12 x 4m 100,000 - Btg
-Kayu gapit, Ukuran ……. - - Btg
-Kayu usuk, Ukuran 4/6 x 3 m 27,000 - Btg
-Usuk bambu 4m 5,500 - m
-Reng bambu 4m 1,500 - m
-Seng gelombang (0,2 cm x 80 cm x 300 cm 78,000 - Lbr
-Genteng 1,250 - Bh
-Seng - - Lbr
-Genteng bubungan 5,000 - Bh
-Closet Jongkok 155,000 - Unit
-Pipa Air Bersih, Ukuran…… 27,500 - Btg
-Pipa Air Kotor, Ukuran…… 85,000 - Btg
-Kran 25,000 - Bh
-Pintu Kamar Mandi 210,000 - Set
Gamping 8,000 - Zak
Paku 15,000 3.27 Kg
Bendrat 20,000 3.00 Kg
Loster 5,000 10.00 Bh
Papan Bekisting - - Lbr
14,736,500
263,500 351.3333333333
17.5666666667
........................................ .....2019 13.175
Diajukan Oleh,
Penerima Bantuan
( ....................................)
Diverifikasi Oleh,
Koordinator Fasilitator
17,842,500 14,736,500
14,736,500
( ....................................)
263,500
4
20.25 1.0888888889 4.549 0.45
24.25 0.0108888889
3.00
6.00 8.00 2.80
5.00 0.60 0.80 11.00 12.00
3.00 0.40 0.60 10.00 10.00
3.00 0.50 0.60 11.00 11.00
- - -
22.00 7.00 1,200.00
19.00 5.00
1.00 0.10 0.20
- - - - - - - -
- - - - - - - -
- - - - - - - -
- 3.00 - - - - -
6.00 8.00 2.80 - - - - -
- 5.00 0.60 0.80 11.00 12.00 - -
- 3.00 0.40 0.60 10.00 10.00 - -
- 3.00 0.50 0.60 11.00 11.00 - -
- - - - - - - -
- 22.00 7.00 - - - - 1,300.00
- 19.00 5.00 - - - - -
- 1.00 0.10 0.20 - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
6 61 19.4 2.2 32 33 0 1300
REKAP VOL
BIAYA BSPS DANA BSPS
- -
2,809,000.00 53.00
3,264,000.00 13.60
- -
2,176,000.00 32.00
1,162,500.00 31.00
616,000.00 2.20
- -
4,550,000.00 1,300.00
- -
- -
- #DIV/0!
- -
- -
- #DIV/0!
- #DIV/0!
- -
- -
- -
- #DIV/0!
- -
- -
- -
- -
- -
- #DIV/0!
- -
- -
- -
- -
- -
- -
- -
49,000.00 3.27
60,000.00 3.00
50,000.00 10.00
- #DIV/0!
14,736,500.00
DA
Nomor BNBA
Nama Penerima Bantuan
Nomor KTP
Alamat
Desa/Kelurahan
kayu kusen daun Kecamatan
Gording usuk reng pintu jendela pintu jendela pintu KM Kabupaten/Kota
Nomor Rekening Penerim
- - - - - - - - Disanggupi oleh :
- - - - - - - - Nama Toko/Penyedia Baha
- - - - - - - - Alamat Toko/Penyedia Bah
- - - - - - - - Nomor Rekening Bank Tok
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - - B. Jumlah dana yang dita
- - - - - - - - No
- - - - - - - - 1
- - - - - - - - TOTAL TARIK TUNAI (B)
- - - - - - - - Terbilang : Tujuh Juta Lima R
- - - - - - - -
- - - - - - - - C. Total dana yang ditarik (
- - - - - - - - Dana Yang Ditarik (Rp.)
- - - - - - - Terbilang : Tujuh Juta Lima R
0 0 0 0 0 0 0 0
disahkan oleh:
Tim Teknis Kabupaten Ma
( .....................................
NIP.................................
DA
Nomor BNBA
Nama Penerima Bantuan
Nomor KTP
Alamat
Desa/Kelurahan
Kecamatan
Kabupaten/Kota
Nomor Rekening Penerim
Disanggupi oleh :
Nama Toko/Penyedia Baha
Alamat Toko/Penyedia Bah
Nomor Rekening Bank Tok
( .....................................
NIP.................................
Nomor BNBA : 0
Nama Penerima Bantuan : MUH SHOLEH
Nomor KTP : 0
Alamat : 0
Desa/Kelurahan : 0
Kecamatan : 0
Kabupaten/Kota : 0
Nomor Rekening Penerima Bantuan :
Disanggupi oleh :
Nama Toko/Penyedia Bahan Bangunan :
Alamat Toko/Penyedia Bahan Bangunan :
Nomor Rekening Bank Toko/ Penyedi BB :
........................................ .....2019
Diajukan Oleh :
Penerima Bantuan
MUH SHOLEH
Nomor BNBA : 0
Nama Penerima Bantuan : MUH SHOLEH
Nomor KTP : 0
Alamat : 0
Desa/Kelurahan : 0
Kecamatan : 0
Kabupaten/Kota : 0
Nomor Rekening Penerima Bantuan : 0
Disanggupi oleh :
Nama Toko/Penyedia Bahan Bangunan : 0
Alamat Toko/Penyedia Bahan Bangunan : 0
Nomor Rekening Bank Toko/ Penyedi BB : 0
(..................................................)
........................................ .....2019
Diajukan Oleh :
Penerima Bantuan
MUH SHOLEH
disahkan oleh: Diverifikasi oleh: Difasilitasi Oleh :
Tim Teknis Kabupaten Magelang Koordinator Fasilitator Tenaga Fasilitator Lapangan
HAP 1
Jumlah Harga
(Rp)
1,290,000
3,233,000
4,656,000
616,000
2,176,000
1,237,500
-
-
-
-
49,000
-
-
-
-
-
13,257,500 14,736,500
1,479,000
14,507,500
........................... .....2019
Diajukan Oleh :
Penerima Bantuan
MUH SHOLEH
Difasilitasi Oleh :
enaga Fasilitator Lapangan
.......................................)
Format IV - 2
HAP 2
Jumlah Harga
(Rp)
-
2,385,000
1,440,000
-
1,700,000
-
-
-
525,000
-
129,000
-
-
190,000
6,369,000
.................................)
7,619,000
..................................... .....2019
Diajukan Oleh :
Penerima Bantuan
MUH SHOLEH
Difasilitasi Oleh :
enaga Fasilitator Lapangan
.......................................)
RENCANA ANGGARAN BIAYA (RAB) BSPS
Nomor BNBA :
Nomor KTP :
Nama Penerima Bantuan : MUH SHOLEH
Alamat :
Desa/Kelurahan :
Kecamatan :
Kabupaten/Kota :
Jenis Kegiatan :
SUMBER DANA
HARGA TOTAL HARGA SWADAYA
NO URAIAN PEKERJAAN VOLUME SATUAN (Rp) (Rp) BSPS
Dana Tunai
I Pekerjaan Persiapan
Bongkar Rumah Lama 1.00 ls - - - -
II Pekerjaan Pondasi
-Seng Lbr - - -
-Genteng bubungan - Bh 5,000 - - -
-Bahan penutup atap lainnya yang diijinkan Lbr - - -
3 Listplang papan, Ukuran……. M³ - - -
X Pekerjaan Lantai
1 Lantai Rabat Campuran minimal 1:5, T= 5 cm 2.00 M3
........................................ ....
Difasilitasi, Ketua KPB Diajukan Oleh,
Tenaga Fasilitator Lapangan Penerima Bantuan
( ...............................................) ( ....................................)
NIP..........................................
FORMAT III-17
dimensi 4 10 28 40 genteng
pekerjaan
atap kuda-kuda 0 -
penutup atap 48 500.00
pondasi Galian Tanah 6.3 -
Urugan Pasir 1.8 -
Pas. Batu belah 4.095 -
beton sloof 0.84 -
8 kolom 0.54 -
balk 15x15 0.63 -
dinding bata 84 -
batako -
Plesteran dinding 168 -
lantai 5cm 2 -
kayu gording 4 m 50 -
usuk 2 m 28 -
reng 2m 100 -
kusen pintu 80*200 cm 1 -
jendela 1 -
daun pintu 80*200 cm 1 -
jendela 1 -
pintu kmr 1 -
JUMLAH 500
SWADAYA
HARGA
MATERIAL VOL SATUAN
SATUAN
Urugan Pasir 240,000 1.00 M³
-Semen @ 50 kg 53,000 54.00 Zak
-Pasir pasang 240,000 12.40 M³
-Batu Kali 215,000 5.00 M³
-Besi beton Φ 10 mm SNI 68,000 28.00 Btg
-Besi beton Φ 8 mm SNI 37,500 26.00 Btg
-Batu pecah 280,000 1.80 M³
-Batu Bata 750 6,000.00 Bh
-Batako 3,500 - Bh
-Kusen Pintu, Ukuran 0,80 X 2,00 M 200,000 1.00 Unit
-Kusen Jendela 150,000 2.00 Unit
-Kusen Ventilasi, Ukuran…… - - Unit
-Daun Pintu Kayu, Ukuran 350,000 1.00 Unit
-Daun Jendela Kayu, Ukuran 200,000 2.00 Unit
-Handle Pintu dan Kunci Pintu - - Set
-Handle Jendela dan Kunci Jendela - - Set
-Engsel Pintu 35,000 - Set
-Engsel Jendela 21,000 - Set
-Kayu rangka kuda-kuda, Ukuran 6/12 x 4m 150,000 - Btg
-Kayu gapit, Ukuran ……. - - Btg
-Kayu usuk, Ukuran 4/6 x 3m 27,000 - Btg
-Usuk bambu 5,500 240.00 Btg
-reng bambu 1,500 - Btg
-Seng gelombang (0,2 cm x 80 cm x 300 cm 78,000 - Lbr
-Genteng 1,250 500.00 Bh
-Seng - - Lbr
-Genteng bubungan 5,000 - Bh
-Closet Jongkok 155,000 - Unit
-Pipa Air Bersih, Ukuran…… 27,500 - Btg
-Pipa Air Kotor, Ukuran…… 85,000 - Btg
-Kran 25,000 - Bh
-Pintu Kamar Mandi 210,000 - Set
Gamping 8,000 - Zak
Paku 15,000 5.47 Kg
Bendrat 20,000 5.00 Kg
Loster 5,000 10.00 Bh
Papan Bekisting - - Lbr
15,000,000
- 0
0
........................................ .....2019
Diajukan Oleh,
Penerima Bantuan
( ....................................)
Diverifikasi Oleh,
Koordinator Fasilitator
18,463,000 15,000,000
15,000,000
( ....................................)
-
4
20.25 1.0888888889 4.549 0.45
24.25 0.0108888889
1.00
5.00 7.00 2.40
4.00 0.50 0.70 10.00 10.00
2.00 0.40 0.50 8.00 8.00
3.00 0.40 0.50 10.00 10.00
13.00 4.20 5,880.00
- - -
17.00 4.40
1.00 0.10 0.10
- - - - - - - -
- - - - - - - -
- - - - - - - -
- 1.00 - - - - -
5.00 7.00 2.40 - - - - -
- 4.00 0.50 0.70 10.00 10.00 - -
- 2.00 0.40 0.50 8.00 8.00 - -
- 3.00 0.40 0.50 10.00 10.00 - -
- 13.00 4.20 - - - 6,000.00 -
- - - - - - - -
- 24.00 4.40 - - - - -
- 1.00 0.10 0.10 - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
5 54 13.4 1.8 28 28 6000 0
REKAP VOL
BIAYA BSPS DANA BSPS
- -
1,590,000.00 30.00
2,400,000.00 10.00
- -
1,904,000.00 28.00
675,000.00 18.00
504,000.00 1.80
4,500,000.00 6,000.00
- -
200,000.00 1.00
300,000.00 2.00
- #DIV/0!
350,000.00 1.00
400,000.00 2.00
- #DIV/0!
- #DIV/0!
- -
- -
- -
- #DIV/0!
- -
1,320,000.00 240.00
- -
- -
625,000.00 500.00
- #DIV/0!
- -
- -
- -
- -
- -
- -
- -
82,000.00 5.47
100,000.00 5.00
50,000.00 10.00
- #DIV/0!
15,000,000.00
DA
Nomor BNBA
Nama Penerima Bantuan
Nomor KTP
Alamat
Desa/Kelurahan
kayu kusen daun Kecamatan
Gording usuk reng pintu jendela pintu jendela pintu KM Kabupaten/Kota
Nomor Rekening Penerim
- - - - - - - - Disanggupi oleh :
- - - - - - - - Nama Toko/Penyedia Baha
- - - - - - - - Alamat Toko/Penyedia Bah
- - - - - - - - Nomor Rekening Bank Tok
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - - B. Jumlah dana yang dita
- - - - - - - - No
- 240.00 - - - - - - 1
- - - - - - - TOTAL TARIK TUNAI (B)
- - - 1.00 - - - - Terbilang : Tujuh Juta Lima R
- - - - 2.00 - - -
- - - - - 1.00 - - C. Total dana yang ditarik (
- - - - - - 2.00 - Dana Yang Ditarik (Rp.)
- - - - - - - - Terbilang : Tujuh Juta Lima R
0 240 0 1 2 1 2 0
disahkan oleh:
Tim Teknis Kabupaten Ma
( .....................................
NIP.................................
DA
Nomor BNBA
Nama Penerima Bantuan
Nomor KTP
Alamat
Desa/Kelurahan
Kecamatan
Kabupaten/Kota
Nomor Rekening Penerim
Disanggupi oleh :
Nama Toko/Penyedia Baha
Alamat Toko/Penyedia Bah
Nomor Rekening Bank Tok
( .....................................
NIP.................................
Nomor BNBA : 0
Nama Penerima Bantuan : MUH SHOLEH
Nomor KTP : 0
Alamat : 0
Desa/Kelurahan : 0
Kecamatan : 0
Kabupaten/Kota : 0
Nomor Rekening Penerima Bantuan :
Disanggupi oleh :
Nama Toko/Penyedia Bahan Bangunan :
Alamat Toko/Penyedia Bahan Bangunan :
Nomor Rekening Bank Toko/ Penyedi BB :
........................................ .....2019
Diajukan Oleh :
Penerima Bantuan
MUH SHOLEH
Nomor BNBA : 0
Nama Penerima Bantuan : MUH SHOLEH
Nomor KTP : 0
Alamat : 0
Desa/Kelurahan : 0
Kecamatan : 0
Kabupaten/Kota : 0
Nomor Rekening Penerima Bantuan : 0
Disanggupi oleh :
Nama Toko/Penyedia Bahan Bangunan : 0
Alamat Toko/Penyedia Bahan Bangunan : 0
Nomor Rekening Bank Toko/ Penyedi BB : 0
(..................................................)
........................................ .....2019
Diajukan Oleh :
Penerima Bantuan
MUH SHOLEH
disahkan oleh: Diverifikasi oleh: Difasilitasi Oleh :
Tim Teknis Kabupaten Magelang Koordinator Fasilitator Tenaga Fasilitator Lapangan
HAP 1
Jumlah Harga
(Rp)
1,075,000
2,862,000
3,216,000
504,000
1,904,000
1,050,000
-
-
4,500,000
-
82,000
-
-
-
625,000
-
15,818,000 15,000,000
(818,000)
17,068,000
........................... .....2019
Diajukan Oleh :
Penerima Bantuan
MUH SHOLEH
Difasilitasi Oleh :
enaga Fasilitator Lapangan
.......................................)
Format IV - 2
HAP 2
Jumlah Harga
(Rp)
-
2,014,000
1,440,000
-
1,700,000
-
-
-
525,000
-
129,000
-
-
190,000
5,998,000
.................................)
7,248,000
..................................... .....2019
Diajukan Oleh :
Penerima Bantuan
MUH SHOLEH
Difasilitasi Oleh :
enaga Fasilitator Lapangan
.......................................)