Large-area formwork Top 50

for all shapes and sizes

- only three system components


- optimum adaptation to any set of
requirements
- preassembly by the Doka Ready-
to-use service

1
Doka large-area formwork Top 50
is highly variable:
... in terms of it‘s loadability • Doka H 20 formwork
beams

• Doka WS 10, WU 12
steel walings

• Doka 3SO sheathing

... in terms of the element sizes (shapes of element)

2
Doka large-area formwork Top 50
is most highly variable ...

... with regard to the direction ... with regard to the form
3
In practice

4
Free formwork sheeting choice

3SO Dokaplex

3SO Eco 3SO Plus


Xlife

5
Formwork sheeting choice

6
Formwork sheeting choice

7
Doka H20 Formwork Beams

8
• Sturdy steel walings for sustaining the form-tie forces
• Hold the H20 formwork beams in place and give the element rigidity
• Make the elements easy to join, using plates and connecting pins

Universal connectability
(e.g. bracing couplers)

Continuous hole-grid
(e.g. for bolting on struts)

9
•diagonally opposite
•for fewer uses •strongest connection
•inclined fastening •drilled holes in the H20
• inclined connection
• diagonally opposite

Flange clamp Beam screw


Waling clamp H20 (1x) (2x)
H 20 (2x)
•stronger connection
•for more uses
•only rectangular

10
Normal installation function
A B C

D E F
Sealing pulling by half the pulling stroke

A) Doka formwork beam H20


B) Doka formwork sheet
C) Nailed-on thick plank for the
support
of the formwork sheet
Sealing pulling by the whole pulling D) Adjustable waling extension
stroke FF20/50
E) Beam clamp Top50
F) Connecting pin 10 cm

11
Element connection functions
Corners – Stop-end formwork

Anchoring plate

12
13
In practice

14
In practice

15
Mounting Lifting Bracket

16
Stacking plate H20

17
Universal bracket 90

18
Panel struts

Panel strut 340


Panel strut 540

19
In practice

20
In practice

21
22
Doka express anchor 16x125mm
… tighten quickly using the hammer

•The hammer suffices as


screwdriver and spanner

•Can be re-used several


times

•Optimum carrying force


for Doka systems

e.g. for fastening panel struts at wall formwork


23
Filler neck GF SCC

24
25
Filler neck GF SCC

26
Assembly platform:

27
Element assembly

Assembly Assembly angle


platform
Lifting bracket

Pressure bracing
(timber 5x20)

H20 beams

Steel waling WS10

Plywood

28
„Ready-to-Use“ pre-assembly service
Formworks for exceptional requirements

Doka can assemble and deliver


complete formworks within a
very short space of time

Quality is assured by pre-


assembly with an accuracy
right down to the last millimetre

29
Doka “Ready-to-Use" service

30
31
Bridge superstructure

32
33
34
35
36
Special splice plate Stacking plate H20

37
38
Shaft formwork

39
Outside corner

40
41
Shaft formwork with stripping corner

Form-tie zones

42
Shaft formwork with stripping corner
Fitting the Transition plate Lifting by crane

See technical newsletter - 709


43
Anchoring with special anchor plate

Consider the
deflection of the
rebars !!
44
45
46
47
Circular formwork
with large-area formwork Top 50

 each curve possible


 Many re-uses
 Optional concrete
surfaces feasible
 Can be dimensioned to
each concrete pressure

48
Execution variants

Standard panel with H20-Binding pieces


moulded wood

49
Column FormworkTop 50

50
Steel walings
and corner connecting plates

Steel waling Steel waling


WS 10 Top 50 WU 12
Up to 70 x 70 cm Up to 120 x 120 cm

51
Columns of each geometry
of standard parts

Geometry timbers for special Column connecting


geometries plates 6/8
52
53