You are on page 1of 2

Checklist No Issue No: 01

BCL04 Date: 29-06-2010 CHECK LIST FOR CONCRETING


Project Re-checked date Checking Event No:
Section/area Checked after rectification
Date of Check
Result of Rectification of
SL Item Inspection Defects Identified Defects
No
OK Not OK Not
1 Materials-conformity to specs
1.1 Coarse aggregate
1.2 Fine aggregates
1.3 Water for mixing
1.4 Portland cement
2 Formwork-conformity to specs
2.1 Sizing/jointing
2.2 Bracing/props
2.3 Alignment/plumb
2.4 Clean/leaks
3 Reinforcing
3.1 Quality/kind
3.2 Bar size/shape
3.3 Spacing
3.4 Cover blocks
3.5 Laping/starters
4 Equipment
4.1 Mixing plants
4.2 Vibrators/Compactors

Page 1 of 2
4.3 Crane/Hoist
4.5 Transporters
5 General
5.1 Estimated concrete quantity ………………….m3
5.2 Estimated period of concreting………………hrs
5.3 Mix proportion/Grade…………………………………………
5.4 Openings in beams/slabs
5.5 Anchor bolts/Fan hooks
5.6 Special features (drops in slabs)
5.7 Conduits, surface blocks etc
5.8 No of test cubes…………………..
5.9 Slum……….mm and test
6 Curing
6.1 Curing Start……………………… up to……………………..
6.2 7 days cube strength
6.3 28 cube strength
6.4 Honeycombs etc…………
Comments:

TO/WS SE