BCL10 Date: 29-06-2010 CHECK LIST FOR ELECTRICAL WORKS
Project Re-checked date Checking Event No: Section/area Checked after rectification Date of Check Result of Rectification of SL Item Inspection Defects Identified Defects No OK Not OK Not 1 Setting Out
2 Installed Junction Boxes
3 Installed Lighting and Ceiling Fan Support Boxes