Checklist No Issue No: 01

BCL08b Date: 29-06-2010 CHECK LIST FOR BRICK WORK


Project Re-checked date Checking Event No:
Section/area Checked after rectification
Date of Check
Result of Rectification of
SL Inspection Defects
No Item Defects Identified
OK Not OK Not
1 Setting Out

2 Mortar( mix propotion-1:5)

3 Water Cement Ratio

4 Bond Type

5 Expansion Joints (if any)

6 Wetting of Bricks

7 Verticality

8 Mortar Thickness

9 Construction Height (<1.2m)

10 Construction Joint (45 deg)

11 Curing
Comments:

TO/WS SE