0 Has the contractor submitted a
method of demolition & disposal?
1 Have the clearances pertaining to
the EI of demolition & disposal
been obtained?
2 Do the staff handling heavy
equipment have PPE?
3 Has the contractor taken adequate
measures to mitigate the
dust/noise?
4 Has the contractor maintained due
diligence to ensure the neighboring
properties are not impacted by
demolition or clearance?

DATE: _________

Contractor’s representative Engineer’s representative


Name: Name:

Designation: Designation:

MIXED DEVELOPMENT PROJECT AT H. ATHIREEGE, MALE, MALDIVES


INSPECTION CHECKLIST
SETTING OUT
REF NO: CIVENG/CONS/PXXX/CHK2/
STATUS
DESCRIPTION YES NO REMARKS
0 Has the contractor submitted the
setting out plan for below and
above DPC?
1 Have the boundaries violated
government guidelines?
2 Have the required front/rear/side
spaces been provided as per the
architectural drawings?
3 Have TBM’s been established?
4 Has the contractor established
adequate offsets?
5 Are the peg points established with
adequate protection?
6 Are the primary gridlines
perpendicular to each other?
7 Are the spacings between grid lines
in accordance with architectural
drawings?
8 Are the inner openings provided for
lift wells or other pivotal
openings within
architectural/structural/EMP
requirements?

DATE: _________

Contractor’s representative Engineer’s representative


Name: Name:

Designation: Designation:

MIXED DEVELOPMENT PROJECT AT H. ATHIREEGE, MALE, MALDIVES


INSPECTION CHECKLIST
DEEP EXCAVATION
REF NO: CIVENG/CONS/PXXX/CHK3/
DEPTH OF EXCAVATION FROM EGL:
STATUS
DESCRIPTION YES NO REMARKS
0 Has the contractor submitted the
method deployed to commence
excavation and the method of
protecting boundaries?
1 Are the laborers involved protected
with PPE?
2 Are all temporary structures,
personnel and machinery kept clear
from unprotected vertical cuts?
3 Has the contractor provided
adequate sign boards and safety
barricading?
4 Has the contractor deployed an
appropriate shoring methodology to
ensure the excavation doesn’t
disturb the stability of adjacent
structures?
5 Has the contractor planned to
deploy temporary support structures
within site premises to assist
shoring?
6 If in the affirmative for 5., then,
have those temporary structures
been located in critical junctures
such as columns, walls or beams?
7 Are the materials used for shore
protection in acceptable condition?
8 Can the process of driving the
shore protection system towards the
subsoil, impact adjacent
buildings/walkways/roads?

MIXED DEVELOPMENT PROJECT AT H. ATHIREEGE, MALE, MALDIVES


INSPECTION CHECKLIST
9 If in the affirmative for 8., then
has the contractor taken adequate
measures to mitigate or dampen the
impact?
10 Is groundwater prevalent within the
excavation depth?
11 If in the affirmative for 10., then
has the method of shoring addressed
the impact of groundwater ingress?
12 If in the affirmative for 10., does
the contractor have a proposal to
dispose water out of site premises?
13 If in the affirmative for 12., has
the contractor ensured not to get
the waterlogged or trickled in to
public areas?
14 Have approvals been obtained to
dispose excavated material?
15 Has the contractor deployed
appropriate machinery for deep
excavation (e.g. long-arm
excavator)
16 Have the excavated materials been
stacked/piled in safe areas?

DATE: _________

Contractor’s representative Engineer’s representative


Name: Name:

Designation: Designation:

MIXED DEVELOPMENT PROJECT AT H. ATHIREEGE, MALE, MALDIVES


INSPECTION CHECKLIST
SCREED CONCRETE
REF NO: CIVENG/CONS/PXXX/CHK4/
STATUS
DESCRIPTION YES NO REMARKS
1 Has the contractor levelled the
ground adequately?
2 Is the height from the top to the
screed to the top of DPC as per
architectural requirements?
3 Have the required front/rear/side
spaces been provided as per the
architectural drawings?
4 Have TBM’s been established?
5 Has the contractor established
adequate offsets?
6 Are the peg points established with
adequate protection?
7 Are the primary gridlines
perpendicular to each other?
8 Are the spacings between grid lines
in accordance with architectural
drawings?
9 Are the inner openings provided for
lift wells or other pivotal
openings within
architectural/structural/EMP
requirements?

DATE: _________

Contractor’s representative Engineer’s representative


Name: Name:

Designation: Designation:

MIXED DEVELOPMENT PROJECT AT H. ATHIREEGE, MALE, MALDIVES