ACTIVITY: REINFORCEMENT
Location: Date: _ _
Is the reinforcement free from oil, mud, grease and other forms of
9
contamination?
10 Is the overlapping ensured and the laps are staggered?
11 Has the anchoring been checked ?
Are the dowels for columns, beams and slabs in place and checked for
12
proper length ?
Are the required hooks fixed and is the chair height for the upper layer of
13
reinforcement correct ?
14 Is the reinforcement done as per specification and drawing ?
Are cover blocks provided and fixed in a systematically correct manner and
15
as per specifications?
16 Have beam and column joints checked for sufficient cover blocks?
Is the lock set properly mixed and the reinforcement turned into the fresh
17
lock set ?
Has the consultant inspected the reinforcement before the concreting has
18
started?
19 Has adequate lap lengths been provided for all the column bars ?
Is the steel scrap and the rings used for bundling collected in a safe place
20
to avoid any accidents ?