ACTIVITY: WATERPROOFING
Location : Date : _

DESCRIPTION YES N.A. REMARKS


Sr.No.
PRE-EXECUTION CHECKS
TOILET AND SHOWER AREA:
Is the cement plastering plumb and at right angles to the facing walls, ceiling
1
and floor levels?
Does the plaster have an even surface and slightly rough finished in its
2
structure?
Is the flooring in its finishing stage with the required screed level set towards
3
the water-outlets?
Is the plastered surface free from all dirt, dust particles, fats and other foreign
4
particles
Has the waterproofing area, marked out to a height of 2 meters, width 1
5 meter in shower area and in the rest of toilet area to a height of 0.30 meters
6 Is the marking done using a pencil, measuring tape and spirit levels?
7 Has the waterproofing area bordered using a masking
8 Are the necessary tools available?

CHECKS DURING EXECUTION

9 Has the base coat been applied uniformly on the entire waterproofing area?
Has the drying process been natural for about 20 minutes and not subjected
10
to any wind-draft ?
Has the sealing medium been applied uniformly, firstly, vertically at all the
11
corners and in the spray areas of the showering area?
Has the sealing strip (caulking strip) been placed subsequently along the
12 corners and fixed uniformly and pressed firmly ensuring that there is no
Has the sealing compound applied subsequently with
13
a uniform thickness of 1mm?
Has the area of pipe connections jetting out from the plastered surface
14
overlapped with the strips and the compound is applied uniformly?
Has the second layer of sealing compound of 1 mm thick applied after a drying
15
period of 24 hours of first layer?
POST-EXECUTION CHECKS
16 Has the masking tape been removed?
17 Are the walls tiled after a drying period of 24 hours?
Checked By; Approved By;