Project : Date :
YES NO NA
2 Check the column footing size is marked with correct coordinates and
alignment as per drawing?
4 Check the excavated as requred depth with work free & alignment as per the
drawing / specificaiton?
7 Check if any rock is found in excavation area, the measurement should taken
and leftout the rock qty in excavation area?
8 Check the necessary safety measures taken as per IS code when hard rock
blasting ?
11 Is taken the all necessary safety measure @ site for the work like safety signs
boards, barricading, PPE,etc.,??
Remarks :
Contractor
MIPCL/Consultant
Checklist- Earthwork