This document is a checklist for filling and compaction activities. It lists checks to perform before and during execution, including verifying the latest construction drawings and soil report are on site, safety measures are in place, dewatering requirements are met, proper tools are available, compaction is done by the appropriate method, and backfilling material meets specifications. The checklist is to be checked and approved by site personnel to ensure filling and compaction work is done correctly according to plans.
This document is a checklist for filling and compaction activities. It lists checks to perform before and during execution, including verifying the latest construction drawings and soil report are on site, safety measures are in place, dewatering requirements are met, proper tools are available, compaction is done by the appropriate method, and backfilling material meets specifications. The checklist is to be checked and approved by site personnel to ensure filling and compaction work is done correctly according to plans.
This document is a checklist for filling and compaction activities. It lists checks to perform before and during execution, including verifying the latest construction drawings and soil report are on site, safety measures are in place, dewatering requirements are met, proper tools are available, compaction is done by the appropriate method, and backfilling material meets specifications. The checklist is to be checked and approved by site personnel to ensure filling and compaction work is done correctly according to plans.
PRE-EXECUTION CHECKS Are the latest "Good for 2 Construction" drawings Is the soil investigation report 3 kept on- site? Are safety measures required 4 for the neighboring construction activities? Are all the requirements met for 5 maintaining dewatering? Is it possible to employ water 6 pumps? Does the depth of compaction 7 account for soling ? Are the required tools available 8 ? CHECKS DURING EXECUTION Is the compacting of the 9 backfilled earth done by the appropriate method ? Does the backfilling material 10 meet the acceptable soil characteristics?