You are on page 1of 1

Checklist No Issue No: 01

BCL13 Date: 29-06-2010 CHECK LIST FOR PAINTING


Project Re-checked date Checking Event No:
Section/area Checked after rectification
Date of Check
Result of Rectification of
SL Item Inspection Defects Identified Defects
No
OK Not OK Not

1 Plaster Finish

2 First coat of wall putty(Base coat)

3 Second Coat of wall putty (Finish coat)

4 Surface preparation

5 Type of undercoat/Primer

6 Primer/Filler coat

7 Type of paint

8 Colour

9 Patches and defects repaired

10 Quality of surface satisfactory ?

11 No of Coats
Comments:

TO/WS SE

You might also like