Technical Operation and Engineering Department

First Bay DAILY ACTIVITIES


POWER CORPORATION
Date: August 12, 2022
Technical Operations
I. Meter Readers (7:00am -5:00pm)
Work Description Location Remarks
La Paz St., San Daniel and Boomtown Subd., BPM-A_JY / Road To
Unichem, San Francisco and Villa Nieves, BPMA-Buendia St, Buendia St.,
Meter Reading J.P. Rizal St., Villa Zenaida and Nuestra Señora 1201, Kalumala Ville, San completed
Diego St / La Correa St., J.Y. Orosa Ext.,BPM-B and
BPM-C
Statement of Account
   
(SOA Deliveries)
 
II. Line Crew (8:00am - 5:00pm)
Crew A B & C
(7 manpower and 2 Work Description Work Order No. Location Remarks
casual)
Work Order: Replacement of
substandard and deteriorated primary Sitio Binukbok, San
    on-going
poles and primary line from #4 PAAC wire Pablo
to #1/0 PACSR wire
1. Erection of wood pole and hole
       
digging for guy anchor.
2. Installation of six (6) set of 8-ways
       
expanding anchor.
Crew D (2 manpower) Dispatch Customers Name Location Remarks
D' Midland Pacific Hotel Villa Florentina,
    1. New Connection Batangas Corp. No. 5 Manghinao Proper
completed
D' Midland Pacific Hotel Villa Florentina,
    2 .New Connection Batangas Corp. No.6 Manghinao Proper
completed
Sitio Alulod, Manghinao
    3. New Connection Maramot, Orlando Aguillon
Proper
completed
    4. New Connection Banta, Eleanor Panganiban San Pedro completed
Blk 4A Lot 30 Lumina
    5. New Connection Joan Manalo
Homes, As-is
completed
Blk 22 Lot 6 Lynville
    6. New Connection Sitti Sireman Parantes
Residence, As-is
completed
    7. Reconnection De Roxas, Larry Durungao completed
    8. Reconnection Dionisio Medrano San Andres Proper completed
    Routinary Activity:        
Inspection of substation and recording of Substation (Taño Rd,
       
operational data . Manghinao Proper)
             
Regular OT - 3 manpower
Routinary Activity:        
(5pm - 10pm)
Inspection of substation and recording of Substation (Taño Rd,
       
operational data . Manghinao Proper)
Crew D (2 manpower)
Routinary Activity:        
10:00pm - 8:00am
Inspection of substation and recording of Substation (Taño Rd,
       
operational data . Manghinao Proper)

TOTAL NO. OF REPLACED KWH METER:


Today To Date
0 17,725
TOTAL CUSTOMER TO DATE:
New Connection
A. Residential   B. Commercial   Total
Today To Date Today To Date
3 8,899 0 1,289 9,872
Total Consumer 23,921 Total Consumer 2,263 25,872